HomeMy WebLinkAboutP101 WATER & GAS PIPING & UNDERFLOOR PLUMBING`4"0 SAN. STUB
r--- >JL
-----
I
I L--------J
r r-_2.0 V.
f/ I
-0 GV/ T
/ 1ST rc2
RELEASED FOR CONSTROCTID"
Subject to compliance with all regulations
of State and meal Codes
City of Cam�e�l
�VT�1Jt�D*141WML
DATE: \ 06/19/19
PUMP
SCHEDULE
MARK
(CP-1)
MFR
BIG
MODEL
LR-15
FLOW
3GPM 11' OF HEAD
ELEC
115V/1.1FLA2950RPM/125W
7:) WATER AND GAS PIPING PLAN
P101 SCALE: 1/4"=III
-1--r-
TOV---2"0V-TJ
_�
-----_2.0V_
-
O
GVV
1
PLUMBING NOTE:
WS
1 7
• HANDSINKSTOHAVE
S.S. DRAIN PIPES
• BAR SINKS TO HAVE
CHROME DRAIN PIPES. FD 1
I
3"0 GW
Fs 1
7 �
I I
III
'z 7' 'Z 7' 17U-
UNDERFLOOR1}"v z 1TO GW TO GWFD 1 FD 1 1}" V 1}^V OSAN 2 "05AN
1
SO� PLUMBING PLAN
P1(11 I SCALE: 1/4" = 111
Pipe Legend
COLD WATER LINE
SANITARY SEWER (UNDERGROUND U.N.0)
VENT
HOT WATER RETURN LINE
HOT WATER LINE
Plumbina Notes
ROOF STRUCTURE.
2. PLUMBING CONTRACTOR SHALL COORDINATE HIS
CONTRACTED WORK WITH THE GENERAL, MECHANICAL,
PLUMBING FIXTURE SCHEDULE
ADA. 1.286PF. FLOORMOUNTED. FLUSHOMETERTANK. ELONGATED AMERICAN STANDARD
WC -1 WATERCLOSET BOWL PROVIDE WITHAMERICAN STANDARD 5901.10155 ELONGATED 1/2" 4" 2" CADET215DA.104
HEAVY-DUIYOPEN FRONTSEAT WITH SELF-SUSTAINING HINGES.
ADA. WALL MOUNT. PROVIDE WITHAMERICAN STANDARD RELIANT 3 AMERICAN STANDARD
L-1 LAVATORY BEII DAGPM RESTRICTORAND GRID DRAIN. PROVIDE WITH
................. .-...................,... ..-..- ..-.......... 11... .,- 1/2" 1/2" 2" 1-1/2" WHEELCHAIR9141.DII
GT-1
GREASETRAP
IN FLOORM GPM, 150LBCAPACITY GREASETRAP
4"
I
SCHIER-GB-7S
Gr-2
GREASETRAP
LANDLORD PROVIDED VERIFY W/ LANDLORD FOR SIZE&LOCATION
4"
1Z'X12'XA' Wool! NICKEL BRASS GRATERS REQUIRED. PROVIDETRAP
FS-1
FLOORSINK
1/2"
2"
1-1/2"
ZURN Z1751
PRIMERCONNECTION.
ADJUSTABLE COUAR. VAN DAL PROOF SCREWS. PROVIDE TRAP PRIMER
F61
FLOORDRAIN
1/2"
2"
1-1/2"
ZURN Z415-VP
CONNECTION. COORDINATE FINISH AND STYLE WITH ARCHITECTURAL
AUTOMATIC PRESSURE DROP ACIVATED VALVE. ACTIVATES AT 10 PSI.
TP-1
TRAP PRIMER
PROVIDE WITH ACCESS PANEL. COORDINATE LOCATIONS WITH
1/2"
PPP PRIME RITE
ARCHTIECTURAL.
Mi
MOPSINK
24'k2Pk13"w/ BACKFLOW PREVENTER
1/2"
1/2"
3"
11/2"
GSWSE242AFM
ET
EXPANSIONTANK
VOLUME 2.0 GALLONS.MAX ACCEPTANCE VOLUME 0.9. PROVIDE WITH
3/1
9-5
-1
EMERGENCY SHUT-OFF VALVE. PROVIDED BY GAS FIRE SUPPRESSION
GV-1
GASVALVE
CONTRACTOR, INSTALLED BY PLUMBER.
DURA-COATED CAST I RON BODY. GAS AND WATERTIGHT. VANDAL
SEE
WOO
WALLCLEANOUT
PROOF SCREWS. COORDINATE FINAL LOCATIONS AND FINISH WITH
ZURN Z1441-VP
PLANS
ARCHMICTURAL.
ADJUSTABLE LEVELING. GAS AND WATERTIGHT. VANDAL PROOF
SEE
FCO
FLOORCLFJWOUT
ZURN Z190DVP
SCREWS. COORDINATE FINISH AND TOP STYLE WITH ARCHITECTURAL
PLANS
Yi
WATERFILTER
PROVIDED BY OWNER INSTALLED BY PLUMBER
311
3M/CFS-22
O Key Notes
KITCHEN GAS LOAD CALCULATIONS
1. DRAIN BAR SINKS TO FS-1.
2. PLUMBING CONTRACTOR SHALL PROVIDE (2) TIMES THE DIAMETER OF THE
DISCHARGE PIPE OR A 2"MINIMUM AIR GAP ON ALL LINES DISCHARGING TO FLOOR
DESCRIPTION
QT'
CFH
I TOTAL CFH
TANKLESS WATER HEATER
1
199
199
DEEP FRYER
2
720
240
FLATGRIDDLE
7
60
60
SINK.
CHARBROILER
1
58
58
3. PLUMBING CONTRACTOR TO RUN NEW COLD WATER SUPPLY, SANITARY SEWER, AND
GREASE (WHERE APPLICABLE) AND CONNECT TO NEAREST EXISTING (V.I.F.).
TOTAL
1 557
PLUMBING CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS, FOUNDATIONS,
INVERT & FLOW DIRECTION OF EXISTING SEWER PRIOR TO EXCAVATING FOR NEW
HOT WATER LOAD CALCULATION
SANITARY.
DESCRIPTION
CITY
GPH
TOTAL GPH
4. 11" INDIRECT WASTE MANIFOLDED BY PLUMBING CONTRACTOR TO FLOOR SINK.
3-COMPARTMENT SINK
5. WHEN EXISTING UTILITIES ARE BEING USED: PLUMBING CONTRACTOR TO SCOUT
EXISTING GAS METER / LINES IN FIELD AND RELOCATE AS NECESSARY FOR NEW
CONSTRUCTION (EX: NEW EMERGENCY EXIT DOORS). WHEN CONNECTING TO
(UNDERBAR)
1
60
0
3-COMPARTMENT SINK (BACK
EXISTING UNDERFLOOR PIPING, PLUMBING CONTRACTOR SHALL SCOPE THE SYSTEM
OF HOUSE)
1
60
0
PRIOR TO CUTTING THE FLOOR TO ENSURE THAT ASSUMED LOCATIONS OF EXISTING
J
SANITARYAND/OR GREASE PIPING ARE AS INDICATED ON THE PLANS. CONTACT
ARCHITECT IF ANY VARIANCE IS FOUND. THE PLUMBING CONTRACTOR ASSUMES THE
1-COMPARTMENT SINK
1
5
5
HAND SINK
2
5
10
RISK OF ANY ADDED EXPENSE IF PROCEEDING WITHOUT SCORING THE EXISTING
PIPING FIRST.
6. CONNECT WATER FILTER SYSTEM TO EXISTING WATER MAIN AHEAD OF ALL PIPING /
MOP SINK
1
15
15
2-COMP SINK
0
30
30
HAND SINK (UNDERBAR)
I 7
1 5
5
FIXTURES TO PROVIDE FILTERED WATER TO ENTIRE SPACE AS SHOWN IN PLAN).
LAVATORY
1 2
1 5
5
PLUMBING CONTRACTOR TO ROUGH -IN AND CONNECT FILTER SYSTEM, PLUMBING
TOTAL POSSIBLE
LOAD
70
CONTRACTOR TO RUN 3/4" HW FROM HW. SEE WATER PIPING PLAN AND ISOMETRIC
FOR REMAINDER OF PIPING.
LOAD FACTOR
(0.81
7. 14" INDIRECT WASTE ON ITEM PS (PREP SINK) EXTEND TO FS AS REQUIRED.
HOT WATER LOAD
35 GALLONS
8. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE NEW GAS PIPING AND METER
INSTALLATION WITH LOCAL UTILITY. PROVIDE GAS LINE TO GAS FIRED EQUIPMENT AS
TOTAL HOT WATER LOAD @ 100•F RISE
175 GPH
General Notes
NECESSARY. CONTRACTOR SHALL INCLUDE ALL FEES ASSOCIATED WITH NEW GAS
PIPING.
1. CONTRACTORS ARE TO REVIEW DRAWINGS, VISIT SITE TO
9. CONNECT NEW 4"0 SAN. TO EXISTING STUB OR CLOSEST POINT AVAILABLE (V.I.F. FOR
EXISTING MAIN LOCATION).
DETERMINE EXTENT OF WORK INVOLVED, ADVISE ARCHITECTI
10.}"HW&CW DOWN TO"PRE-RINSE ASSEMBLY"FOR 3 COMPARTMENT SINK.
ENGINEER OF ANY DISCREPANCY BEFORE BIDDING THIS
11. WATER SERVICE (IF NOT EXISTING CONNECT EXISTING CW SERVICE WITH SHUT-OFF
PROJECT.
VALVE). CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING WATER SERVICE.
CONFIRM METERING REQUIREMENTS WITH BUILDING AND UTILITY AND PROVIDE AND
2. MECHANICAL CONTRACTOR IS RESPONSIBLE TO PROVIDE A
INSTALLAPPROVED SUB -METER IF REQUIRED. COORDINATE BACKFLOW PREVENTION
WORKING SYSTEM. COMPLETE AND DEMONSTRATE TO THE
REQUIREMENTS WITH LOCAL AUTHORITYAND PROVIDE AND INSTALL APPROVED BFP
OWNER THE WORKING SYSTEMS OF THE SYSTEMS.
AS REQUIRED.
COMPLETION OF THE JOB WILL INCLUDE CLEAN UP OF ALL
12. CONNECT TO EXISTING PLUMBING IN WALL.
WORK PERFORMED BY THIS CONTRACTOR BEFORE FINAL
13.AUTOMATIC GAS SHUT-OFF VALVE PROVIDED AND INSTALLED BY P.C. INSTALL BELOW
PAYMENT FOR WORK COMPLETED IS PAID.
CEILING PER LOCAL FIRE MARSHAL REQUIREMENTS.
14. PROVIDE GAS COCK, DIRT LEG ASSEMBLY, UNION AND GAS PRESSURE REGULATOR IF
3. ALL WORK IS TO COMPLY WITH ALL LOCAL AND STATE
REQUIRED.
BUILDING CODES, N.E.C., PRESSURE PIPING, SMACNA, AND
15.PLUMBING CONTRACTOR TO VERIFY METER BANK LOCATION, GAS PIPE SIZE BASED
ASHRAE STANDARDS.
ON THE FUEL GAS CODE LISTED ON THE COVER OF THESE DRAWINGS. USE TABLE
401 SCHEDULE 40 METALLIC PIPE, LESS THAN 2 PSI SYSTEM PRESSURE, 0.5" W.C.
4. DRAWINGS ARE TO SCALE AS INDICATED AND REPRESENTS
PRESSURE DROP.
A DIAGRAMMATIC OUTLINE OF WORK TO BE PERFORMED, BUT
16.1"CW DOWN TO WATER FILTER SYSTEM PROVIDED BY OWNER (CONNECT ALL PIPING/
DO NOT REFLECT ALL INTERFERENCE'S THAT MAY ARISE IN
FIXTURES AFTER WATER FILTER SYSTEM TO PROVIDE FILTERED WATER TO ENTIRE
CONCEALED AREAS THAT COULD NOT BE DETECTED DURING
SPACE AS SHOWN IN PLAN). PLUMBING CONTRACTOR TO ROUGH -IN AND CONNECT
DESIGN OF THESE DOCUMENTS. CONTRACTORS ARE TO
FILTER SYSTEM, PLUMBING CONTRACTOR TO RUN 3/4" HW FROM HW. SEE WATER
INCLUDE THESE CHANGES AS PART OF THEIR BID AND WILL
PIPING PLAN AND ISOMETRIC FOR REMAINDER OF PIPING.
NOT BE PAID ANY EXTRAS UNLESS TO DETERMINED TO BE A
17.SCOUT EXISTING 4" SANITARY MAIN PLUMBER TO VERIFY EXACT LOCATION AND FLOW
SIGNIFICANT CHANGE TO WARRANTA CHANGE ORDER AS
DIRECTION BEFORE BIDDING.
DETERMINED BY THE ARCHITECT/ ENGINEER.
18.CONTRACTOR SHALL EXTEND WATER HEATER FLUE VENT CONDENSATE TO MOP SINK.
19. FURNISH AND INSTALL NEW TEMPERING VALVE BELOW SINK (IF NOT EXISTING). SEE
5. ALL WORK PERFORMED WILL BE GUARANTEED FOR A
DETAIL ON P102
PERIOD OF ONE YEAR AFTER ACCEPTANCE BY OWNER WITH
20.3" DIRECT WASTE FOR MOP SINK
ANY ADDITIONAL WORK TO BE AT NO COST TO THE OWNER.
21.CO2 TANK& LINE TO BE RUN BY LOCAL SERVICE REPRESENTATIVE PLACEMENT MUST
ALL EQUIPMENT SHALL BE AS SPECIFIED.
BE ACCESSIBLE FOR SERVICE.
-, Plumbing Notes
1. ALL WATER PIPING SHALL BE TYPE 'L' COPPER ASTM B-88 HARD W/ ANSI B16.22 WROUGHT COPPER FITTINGS AND NONLEAD SOLDERED JOINTS.
UNDERGROUND PIPING SHALL BE TYPEWSOFT ASTM B-88W/ NO JOINTS AND ROLLED RADIUS TURNS UNKINKED. REX PIPING WITH ASSOCIATED
FITTINGS IS THE PREFERRED PIPING TO BE USED WHERE ALLOWED BY STATE AND LOCAL CODE. VERIFY BEFORE PURCHASING OR INSTALLING.
q 2. ALL GAS, VACUUM, AND COMPRESSED AIR PIPING SHALL BE SCHEDULE 40 ASTM A-120/53 W/ MALLEABLE IRON 125 I.S. FITTINGS. ALL JOINTS SHALL BE
TEFLON TAPE AND PIPING CAULKED.
3. ALL GAS PIPING TO BE PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR, COORDINATE EXACT LOCATIONS WITH MECHANICAL CONTRACTOR.
4. ALL SANITARY SEWER SHALL BE CAST IRON SCHEDULED 40 HUBLESS CISPI STANDARD 301-78 ANY PIPING LOCATED EXPOSED OR IN A RETURN AIR
PLENUM SPACE SHALL BE CAST IRON. VENT PIPING SHALL BE THE SAME MATERIAL AS SANITARY SEWER. SCHEDULE 40 PVC MAYBE USED WHERE
ALLOWABLE BY STATE AND LOCAL CODE. VERIFY BEFORE PURCHASING OR INSTALLING. ALL INDIRECT WASTE MUST DISCHARGE THROUGH AN AIR
GAP AT LEAST TWICE THE DIAMETER OF THE INDIRECT WASTE PIPE PER THE PLUMBING CODE.
5. VALVES SHALL BE OF THE TYPE AND DESIGN FOR SERVICES BEING USED.
BALL -BRONZE BODY 125 I.S. WOG NIBCO T OR S-580Y.
J GATE- " " S-111.
GLOBE- S-211.
CHECK- S413-B.
GAS COCKS - NORDSTROM 142.
6. OTHER APPROVED MANUFACTURERS ARE APOLLO, STICKHAM, GRINNELL, HAMMOND, WALWORTH, LUNKENHEIMER, CRANE OR MILWAUKEE. (OR EQUAL)
7. INSULATION FOR PIPING SYSTEMS SHALL BE INSTALLED AS PER MANUFACTURERS INSTRUCTIONS AND RECOMMENDED INSTALLATION PROCEDURES.
8. WATER LINES- 112" CLOSED CELLED FOAM BY HALLSTEAD OR ARMAFLEX FR/UL. OPTIONAL 112" FIBERGLASS ASTM C547 W/ASJ JACKET AND PRE
MOLDED PVC FRI FITTINGS BY KNAUF, OCF OR SCHUELLER. (OR EQUAL.)
9. STORM SEWER -SAME AS ABOVE.
10. CONDENSATE SHALL BE 3/4" FIBERGLASS OR PVC AND TO BY SUPPLIED AND INSTALLED BY PLUMBER - SAME AS ABOVE.
A: INSULATE ALL WATER LINES, COLD AND HOT, AND ALL HORIZONTAL STORM SEWER PIPING. B: ALL INSULATION SHALL HAVE A GALVANIZED
SLEEVE WHEN RESTING ON THE INSULATION.
11.ANY EXPOSED PIPING SHALL HAVE A CHROME ESCUTCHEON PLATE WHERE EXPOSED IN FINISH ROOMS. NO EXPOSED PVC TRAPS OR TAILSAHE
ALLOWED USE STAINLESS STEEL OR COPPER IN THEKITCHENAND CHROMED BRASS ORPVC IN THE TOILETROOM. ALL PIPES THAT PASS THROUGH
FIRE WALL SHALL BE CAULKED AROUND PENETRATION W/A FLAME RETARDENT UL SEALANT TO MAINTAIN RATINGS ON WALL. SILICONE CAULK ALL
FIXTURES AROUND PERIMETER AFTER FINAL PAINTING OF WALLS.
12.ALL PIPING SYSTEMS SHALL BE PRESSURE TESTED FOR 24 HOURS BEFORE FINAL CONNECTION TO EXISTING IN ACCORDANCE W/ CODES.
13.ALL FIXTURES SHALL BE AS SHOWN ON THE DRAWINGS AS TO TYPE AND MATERIALS BY ELJER, KOHLER, CRANE, AMERICAN STANDARD, ZURN, WADE,
JOSAM, DELANY, SLOAN, PRICE, MOEN, POWERS, SPEAKMAN, CHICAGO FAUCET, BEMIS, OLSONITE, FIAT. (ORAPPROVED EQUAL.)
GAS PIPING:
1. ALL GAS PIPING SHALL BE RUN STRAIGHT AND TRUE AND BE INSTALLED IN A QUALITY WORKMANLIKE FASHION PROVIDED AND INSTALLED BY THE
PLUMBER, COORDINATE WITH HVAC CONTRACTOR.
2. GAS PIPING SHALL CONFORM TO ALL STATE AND LOCAL CODES, AS WELL AS NATIONAL FUEL GAS CODE RECOMMENDATIONS.
3. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL SCHEDULE 40 STEEL GAS PIPING AND FITTINGS. HVAC CONTRACTOR SHALL INSTALL ALL
C
Cr
C:
i
C
U
C)
c Cr.
a)
C;
LL
7580 48th Street, S.E.
Grand Rapids, Mi. 49512
P. 616.634.2253
Glenn@rdc-Ilc.com
oCo
M
mCD
Y Cc
E�
iJ0Z
E E
as � CU
U 19 U
DATE ISSUEDFOR
03/15/2019 REVIEW
04/01/2019 Construction
04/23/2019 Per State Rev.
o1p0Tunnlnnunumvi
o GVEr1N .....
.Q��lsregFo -a
i No. AR11000167 j `_
'w ...... `
file
CH'TECt�aoo°"\`�
THIS DRAWING IS THE
SOLE PROPERTY OF
RETAIL DESIGN
CONSULTANTS LLC AND IS
A COPYRIGHTED
DOCUMENT AND IS NOT
TO BE USED OR
REPRODUCED WITHOUT
WRITTEN CONSENT.
P101