Loading...
HomeMy WebLinkAboutBack Flow Test ResultsRhonda Bates ��nnnn�nnama<®r m��mnm�uu:mnm n ou�munnu From: bell@bellplumbingservice.com Sent: Tuesday, June 11, 2019 11:10 AM To: Rhonda Bates Subject: FW: We have received your response for City of Carmel Backflow Test Form Importance: High Rhonda, This is what I received from Carmel. Let me know if you are needing something else. Thanks, Katie From: Carmel Backflow <Backflow@carmel.in.gov> Sent: Tuesday, June 11, 2019 8:47 AM To: bell@bellplumbingservice.com Subject: We have received your response for City of Carmel Backflow Test Form Testers Email dbensheimer @gmail�cq_iLi Testing Company's Email bcilC«)beliplumbiri rservice.com Customers Email tclark capitalconstruct.com Select Tester From List BENSHEIMER, DAVID M. _BF00-1786 Indiana State Certification Number BF00 17860 — Gauge Information 04133272 Phone Number (317) 474 4990 Calibration Date 07-19-2018 Select Company or Self Company Company Name Testing CAPITAL CONSTRUCTION SERVICES INC. For Phone Number (317) 574-5488 Address Street Address: 11051 VILLAGE SQUARE LANE City: FISHERS State / Province: IN Postal / Zip Code: 46038 Select Service Use Commercial MANAGER NAME or COMMERCIAL CUSTOMER MCCALL HOLDINGS LLC NAME Type a question 49532222 DEVICE LOCATION Street name: Horseferry Road ADDRESS House number: 12760 City: Carmel State: IN Postal code: 46032 Country: United States Existing, New or Replacing Existing Device Device Serial Number 189227 Manufacturer of device Watts Device Size .75 Model Number Of Device 009-M3 QT Type of protection Containment Type Of Service Domestic Type a question MECHANICAL ROOM Hazard Code RP Passed or Failed PASS DC DC Check Valve #1 Held At What PISD 2 Closed Tight Leaked Check Valve #2 Held At What PISD Closed Tight Leaked Date Time DC DC Check Valve #1 Held At What PISD Closed Tight Leaked Check Valve #2 Held At What PISD Closed Tight Leaked Date Time RP RP Check Valve #1 Held At What PISD Closed Tight Leaked Check Valve #2 Held At What PISD Closed Tight Leaked Pressure Differential Relief Valve Opened At What PISD Did NOT Open Date Time RP RP Check Valve #1 Held At What PSID 7 Closed Tight CLOSED TIGHT Leaked Check Valve #2 Held At What PSID 8 Closed Tight CLOSED TIGHT Leaked Pressure Differential Relief Valve Opened At What PSID 2 Did NOT Open Passed or Failed PASS Tagged YES Date 06/10/2019 5:00 PM Time 3 Notes PVB Date Time PVB Date Time AIR GAP ONLY Final Test Results Date Time Testers Full Name Date Time PASSED TEST AT 5 PM 06-10-2019 OK AT THIS TIME PVB Opened At What PSID Did NOT Open Did OPEN Check Valve Held At What PSID PVB Opened At What PSID Did NOT Open Did OPEN Check Valve Held At What PSID Measured vertical inches Supply size diameter above overflow rim Air Gap dbensheimer @grnal.coi 06/11/2019 5:00 AM This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com 4