Loading...
HomeMy WebLinkAboutBackflow Test1 Mishler, Nicholas F From:bell@bellplumbingservice.com Sent:Tuesday, June 11, 2019 11:10 AM To:Rhonda Bates Subject:FW: We have received your response for City of Carmel Backflow Test Form Importance:High Rhonda,  This is what I received from Carmel.    Let me know if you are needing something else.    Thanks,  Katie    From: Carmel Backflow <Backflow@carmel.in.gov>   Sent: Tuesday, June 11, 2019 8:47 AM  To: bell@bellplumbingservice.com  Subject: We have received your response for City of Carmel Backflow Test Form       Right-click here tpictures. To helpprivacy, Outlookautomatic downlopicture from the              Testers Email dbensheimer@gmail.com  Testing Company's Email bell@bellplumbingservice.com  Customers Email tclark@capitalconstruct.com  Select Tester From List BENSHEIMER, DAVID M. _BF00‐1786  Indiana State Certification  Number BF00_17860  Gauge Information 04133272  Phone Number (317) 474 4990  Calibration Date 07‐19‐2018  Select Company or Self Company  Company Name Testing  For CAPITAL CONSTRUCTION SERVICES INC.    2 Phone Number (317) 574‐5488  Address Street Address: 11051 VILLAGE SQUARE LANE  City: FISHERS  State / Province: IN  Postal / Zip Code: 46038  Select Service Use Commercial   MANAGER NAME or  COMMERCIAL CUSTOMER  NAME  MCCALL HOLDINGS LLC  Type a question 49532222  DEVICE LOCATION  ADDRESS  Street name: Horseferry Road  House number: 12760  City: Carmel  State: IN  Postal code: 46032  Country: United States  Existing, New or Replacing  Device Existing  Device Serial Number 189227  Manufacturer of device Watts  Device Size .75  Model Number Of Device 009‐M3 QT  Type of protection Containment  Type Of Service Domestic  Type a question MECHANICAL ROOM  Hazard Code RP  Passed or Failed PASS  DC DC   Check Valve #1 Held At What PISD Closed Tight Leaked Check Valve #2 Held At What PISD Closed Tight Leaked Date  Time  DC DC   Check Valve #1 Held At What PISD Closed Tight 3 Leaked Check Valve #2 Held At What PISD Closed Tight Leaked Date  Time  RP RP   Check Valve #1 Held At What PISD Closed Tight Leaked Check Valve #2 Held At What PISD Closed Tight Leaked Pressure Differential Relief Valve Opened At What PISD Did NOT Open Date  Time  RP RP   Check Valve #1 Held At What PSID 7  Closed Tight CLOSED TIGHT  Leaked Check Valve #2 Held At What PSID 8  Closed Tight CLOSED TIGHT  Leaked Pressure Differential Relief Valve Opened At What PSID 2  Did NOT Open Passed or Failed PASS  Tagged YES  Date 06/10/2019 5:00 PM  Time  Notes : PASSED TEST AT 5 PM 06‐10‐2019 OK AT THIS TIME  PVB PVB Opened At What PSID Did NOT Open Did OPEN Check Valve Held At What PSID Date  Time  PVB PVB 4 Opened At What PSID Did NOT Open Did OPEN Check Valve Held At What PSID Date  Time  AIR GAP ONLY Final Test  Results   Measured vertical inches  above overflow rim Supply size diameter  Air Gap Date  Time  Testers Full Name: dbensheimer@gmail.com  Date 06/11/2019 5:00 AM  Time                       ______________________________________________________________________ This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com ______________________________________________________________________ ______________________________________________________________________ This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com ______________________________________________________________________