Loading...
HomeMy WebLinkAboutA000.2\A1;1'-0{\H0.750000x;\S5#8;}" \A1;9'-1{\H0.750000x;\S1#8;}" \A1;1'-0{\H0.750000x;\S5#8;}" \A1;9'-1{\H0.750000x;\S1#8;}" TOP OF PLATEFIRST FLOOR FIRST FLOOR PL.SECOND FLOOR BOTTOM OF HEADER GARAGE PL. SECOND FLOOR PL. BOTTOM OF HEADER 1X6 WINDOW SURROUND PER SPEC. ROOF SHINGLES1X3 ON 1X8 FRIEZE BD.1X6 FASCIA TOP OF CHIMNEY SHALL BE 2'-0" ABOVE THE HIGHEST POINT WITHIN A 10'-0" RADIUS SLOPED CHIMNEY CAP\PPER SPEC. ROOF SHINGLES1X3 ON 1X8 FRIEZE BD.1X6 FASCIA BRICK VENEER PER SPEC. 1X6 WINDOW SURROUND PER SPEC. SCALE 1/4" = 1'-0"REAR ELEVATION \A1;8'-2{\H0.750000x;\S7#8;}" (WINDOW HEAD HT, TYP.) \A1;8'-2{\H0.750000x;\S7#8;}" (WINDOW HEAD HT, TYP.)129 BOARD AND BATTEN SIDING PER SPEC. BRICK HEAD PER SPEC. 12121212 BRICK ROWLOCK 126126 BRICK ROWLOCK 1X6 FASCIA1X3 ON 1X8 FRIEZE BD. BRICK VENEER PER SPEC.BRICK ROWLOCK SILL PER SPEC. \A1;4'-0" BRICK ROWLOCK SILL PER SPEC. BRICK VENEER PER SPEC.\A1;1'-0{\H0.750000x;\S5#8;}" \A1;9'-1{\H0.750000x;\S1#8;}" \A1;1'-0{\H0.750000x;\S5#8;}" \A1;9'-1{\H0.750000x;\S1#8;}" BRICK VENEER PER SPEC. ROOF SHINGLES 1X3 ON 1X8 FRIEZE BD. TOP OF PLATEFIRST FLOOR FIRST FLOOR PL.SECOND FLOOR BOTTOM OF HEADERSECOND FLOOR PL. BOTTOM OF HEADER ROOF SHINGLES WD PANEL W/6" BATTENS1X3 ON 1X8 FRIEZE \PBD. SCALE 1/4" = 1'-0"FRONT ELEVATION \A1;8'-2{\H0.750000x;\S7#8;}" (WINDOW HEAD HT, TYP.) \A1;8'-2{\H0.750000x;\S7#8;}" (WINDOW HEAD HT, TYP.) 1212 1212 1X6 FASCIA BRICK ROWLOCK 18" PLANK SHUTTER WOOD PANEL W/6" BATTENS6:12 6:12 6:12 6" SUB-RAKETRIPLE ROWLOCK ARCHWAY 1212 12121212 \A1;6'-8" \A1;2'-5{\H0.750000x;\S1#8;}" \A1;9'-1{\H0.750000x;\S1#8;}"\A1;13'-11{\H0.750000x;\S3#4;}" ROOF FINIAL BRICK ROWLOCK 126 1264:12 \A1;R5'-4{\H0.750000x;\S1#2;}" 1X3 ON 1X8 FRIEZE BD.\A1;R3'-0{\H0.750000x;\S3#4;}" FINIAL, FYPON #S6X32 OR EQUAL STONE VENEER PER SPEC.STONE SILL PER SPEC. Elevation ATTIC VENT SCHEDULE{\C0;VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE\P** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS\P* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION} ROOF AREA "A"SQ FTG 2896 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 3.86 4.83 4.24 43.88 10 0 AT EAVE 5.79 4.83 5.42 56.12 0 78.00 TOTAL (MIN)9.65 9.65 9.65 100.00 HIGH - RIDGE VENT 3.86 4.83 4.50 45.38 0 0 36.00 AT EAVE 5.79 4.83 5.42 54.62 0 78.00 TOTAL (MIN)9.65 9.65 9.92 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ROOF AREA "B"SQ FTG 410 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 0.55 0.68 0.85 50.41 2 0 AT EAVE 0.82 0.68 0.83 49.59 0 12.00 TOTAL (MIN)1.37 1.37 1.68 100.00 HIGH - RIDGE VENT 0.55 0.68 0.75 47.37 0 0 6.00 AT EAVE 0.82 0.68 0.83 52.63 0 12.00 TOTAL (MIN)1.37 1.37 1.58 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ROOF AREA "C"SQ FTG 463 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 0.62 0.77 0.85 46.56 2 0 AT EAVE 0.93 0.77 0.97 53.44 0 14.00 TOTAL (MIN)1.54 1.54 1.82 100.00 HIGH - RIDGE VENT 0.62 0.77 0.75 43.55 0 0 6.00 AT EAVE 0.93 0.77 0.97 56.45 0 14.00 TOTAL (MIN)1.54 1.54 1.72 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE SCALE 1/8" = 1'-0"ROOF PLAN 6/12 SLOPE CONT. RIDGE VENT TRUSS E 6/12 SLOPE 3/12 SLOPETRUSS F TRUSS C 8/12 SLOPE 8/12 SLOPE TRUSS BTRUSS A 12/12 SLOPE \pxql;12/12 SLOPE 8/12 SLOPE 12/12 SLOPE12/12 SLOPE CONT. RIDGE VENT 12/12 SLOPE 12/12 SLOPE CONT. RIDGE VENT TRUSS HTRUSS G 8/12 SLOPE12:1212:12 8:12TRUSS D 12/12 SLOPE12/12 SLOPE 8/12 SLOPE12:1212:12 MIN. 55 SQ. IN. OF VENTILATION REQUIRED AT EAVE FOR ROOF "D" 12/12 SLOPE 6/12 SLOPE 6/12 SLOPE TRUSS G 8:12 "A"2896ROOF AREA:SQ. FT. "C"463ROOF AREA:SQ. FT. "B"410ROOF AREA:SQ. FT. "E"528ROOF AREA:SQ. FT. PLAN NAME SHEET COMMUNITY NAME PRODUCTION MANAGER LAWSON COMMUNITY ID RELEASE DATE:DATE / DESCRIPTION NPC PLAN NUMBERLAWSON PLAN IDLEGACY PLAN NUMBER / NAME SPECIFICATION LEVEL GARAGE HANDING REV # PROJECT TYPE CURRENT NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS ARCHITECT OF RECORD:ENGINEER OF RECORD: 12/12/2018Joel Hampshire (c) Copyright PulteGroup, Inc. - 2011 Indiana Division11590 N. Meridian St, Suite 530Carmel, Indiana 46032SINGLE FAMILY West ClayLOT 323---- GARAGE LEFT Red Plan 51815.0000 --5271MULHERN & KULPGODUCO DESIGN - ARCHITECTS PLOTTED: May 30, 2019 / Annie Lee / PLAN-5271-IN-WCLY-EL-FE3S.DWG 1--2--3--4-------------------------- PLOTTED: May 30, 2019 / Annie Lee / PLAN-5271-IN-WCLY-EL-FE3S.DWGPLOTTED: May 30, 2019 / Annie Lee / PLAN-5271-IN-WCLY-EL-FE3S.DWG 7.01A FE3SFrench Eclectic 3SFront & Rear Elevations1------------------------------ 06/16/19 William Hohlt