Loading...
HomeMy WebLinkAboutCorrespondence November 17, 2021 Mr. Daren Mindham Principal Urban Forester City of Carmel One Civic Square Carmel, Indiana 46032 RE: PZ19060019 DP ADLS Franciscan Orthopedic Center of Excellence Daren: Due to availability, certain species originally specified for the project noted above are not available through nurseries and substitution are required. Those substitutions are as follows: ORIGINALLY SPECIFIED SPECIES PROPOSED SUBSTITUTIONS TREES (1) Que-r Quercus rubra Red Oak (1) Nys-s Nyssa sylvatica Sour Gum (16) Pic-g Picea glauca ‘Globosa’ Dwarf Globe Spruce (16) Pic-g Picea glauca White Spruce SHRUBS (73) Die-l Diervilla loniceri ‘Kodiac Orange’ (73) Fot-g Fothergilla gardenia Dwarf Fothergilla Please let me know if there are any concerns with these substitutions. We consider these substitutions to be equal in both plant quality and quantity. Nyssa sylvatica was already approved during the original plan submittal process and adding one more does not take the plant quantity beyond the 20% threshold. There are other oaks provided on the project, as well. Thank you for your time concerning this matter. Alyssa P. Prazeau Managing Principal Context, LLC (5) Tax-x(3) Ulm-x(5) Zel-s(3) Gin-p(1) Gin-p(1) Gle-t(1) Que-b(3) Pic-p(1) Gle-t(1) Zel-s(1) Que-b(4) Pic-g(9) Fot-g(3) Ame-x(1) Gle-t(1) Zel-s(7) Phy-o(4) Pic-p(2) Pic-g(2) Pic-p(12) Ite-s(1) Lir-t(3) Pic-g(15) Hyd-w(6) Myr-p(10) Ile-v(5) Myr-p(3) Phy-o(14) Fot-g(1) Ulm-x(22) Ile-v(1) Bet-n(3) Cer-c(3) Phy-o(23) Fot-g(1) Lir-t(2) Ame-c(14) Fot-g(10) Aro-m(28) Hyd-w(3) Pic-a(31) Thu-p(12) Tax-x(5) Ile-v(3) Pic-p(13) Cal-x(10) Spo-h(14) Cal-x(9) Spo-h(15) Pan-v(11) Cal-x(36) Spo-h394'-5"67'-10"(14) Pan-v(7) Myr-p(22) Ite-s(3) Zel-s(8) Vib-x(11) Pan-v(3) Pic-a(13) Fot-g(2) Nys-sLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION 0Scale 1" = 20'-0"40'20'10'NorthPlanting PlanL123Matchline - Refer to Sheet L124Matchline - Refer to Sheet L124Matchline - Refer to Sheet L122 Matchline - Refer to Sheet L122 1.Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer toPlant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Owner at anytime. Landscape Architect to inspect all plant locations and plant bed conditions prior toinstallation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'American Standards forNursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates within five (5)days after planting. Replace immediately with approved, specified material.5.Plant counts indicated on drawings are for Landscape Architect's use only. Contractorshall make own plant quantity takeoffs using drawings, specifications, and plant schedulerequirements (i.e., spacing), unless otherwise directed by Landscape Architect.Contractor to verify bed measurements and install appropriate quantities as governed byplant spacing per schedule. Plant material quantities shown on plan are minimumquantities. Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise noted to receivepavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas to meetSpecifications. Contractor shall coordinate quantity and placement of topsoil.Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specificationsfor topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for review andapproval by the Landscape Architect. Any plant material installed in an incorrectlocation, by the judgment of the Landscape Architect, shall be reinstalled at theContractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unlessotherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damaged utilitiesto Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project is fullyaccepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for a period of onecalendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances. Coordinatewith the Owner to obtain any required permits necessary to complete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protected areashall include the full drip line of the canopy. NO construction activities, material storage,etc. may occur within that area. The Contractor shall ensure that no soil compaction ortree damage occurs in any Protected areas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.TURFGENERAL LANDSCAPE ANDPLANTING NOTESNOTE: ALL PLANTINGS SHALL BE INSTALLED PER CARMEL STANDARDDETAILS. REFER TO SHEET L510 FOR CARMEL STANDARD DETAILS ANDPLANT CHARTParking GarageFFE = 838.79Architecture | Engineering | Interior Design1715 Magnavox WayFort Wayne, IN 46804260.432.9337930 North MeridianIndianapolis, IN 46204317.917.1190www.msktd.comSHEET TITLESHEET NUMBERSET DESCRIPTIONBP#5PROJECT NO.DATEMSKTD& AssociatesCarmel, Indiana Franciscan Orthopedic Center of Excellence738212-06-19A Project for:REV.DATEM:\18-1228 Franciscan Carmel Ortho Hospital\Dwg\Sheets\L120 - Planting Plans 1228.dwg, November 8, 2021 11:19 AM, ALYSSA PRAZEAU, © Paul I. Cripe, Inc.112-20-2019ADDENDUM 1201-06-2020ADDENDUM 2303-10-2020ISSUED FOR CONSTRUCTION411-09-2020ASI #55501/25/2021PR#12602/24/2021ASI#81809/21/2021ASI#101707/01/2021PR#26Franciscan shall install, maintain for three months, andwarrantee for one year shrubs planted in the Right of way.After that time, the City of Carmel shall take ownership ofthese trees, including maintenance.888 TREESQTYBOTANICAL NAMECOMMON NAMECONT CALREMARKSBet-n9Betula nigraRiver BirchB & Bmin. 8` ht.clump form, 3-5 stemsCel-o5Celtis occidentalisCommon HackberryB & Bmin. 2.5" cal.full, strong central leader, matchedCor-k5Cornus kousaKousa DogwoodB & Bmin. 1.5" cal.full, strong central leader, matchedGin-p8Ginkgo biloba `Princeton Sentry`Princeton Sentry GinkgoB & Bmin. 2.5" cal.full, strong central leader, matchedGle-t6Gleditsia triacanthos inermis `Skycole`Skyline Thornless HoneylocustB & Bmin. 2.5" cal.full, strong central leader, matchedLir-t4Liriodendron tulipiferaTulip TreeB & Bmin. 2.5" cal.full, strong central leader, matchedNys-s3Nyssa sylvaticaSour GumB & Bmin. 2.5" cal.full, strong central leader, matchedPla-a11Platanus x acerifolia `Bloodgood`London Plane TreeB & Bmin. 2.5" cal.full, strong central leader, matchedQue-b6Quercus bicolorSwamp White OakB & Bmin. 2.5" cal.spring dug, full, strong central leader,matchedTax-d10Taxodium distichumBald CypressB & Bmin. 2.5" cal.full, strong central leader, matchedUlm-x11Ulmus x americana `Libertas`Liberty ElmB & Bmin. 2.5" cal.full, strong central leader, matchedZel-s10Zelkova serrata `Green Vase`Green Vase Sawleaf ZelkovaB & Bmin. 2.5" cal.full, strong central leader, matchedEVERGREEN TREESQTYBOTANICAL NAMECOMMON NAMECONT CALREMARKSAbi-c4Abies concolorWhite FirB & Bmin. 6` ht.full, strong central leader, matched,symmetricalPic-a20Picea abiesNorway SpruceB & Bmin. 6` ht.full, strong central leader, matched,symmetricalPic-g16Picea glaucaWhite SpruceB & Bmin. 6` ht.space @ 15`-0" o.c.Pic-p26Picea pungensColorado SpruceB & Bmin. 6` ht.full, strong central leader, matched,symmetricalORNAMENTAL TREESQTYBOTANICAL NAMECOMMON NAMECONT CALREMARKSAme-c4Amelanchier laevis `Cumulus`Cumulus Allegheny ServiceberryB & Bmin. 6` ht.clump form, 3-10 stemsAme-x8Amelanchier x grandiflora `Autumn Brilliance`Autumn Brilliance ServiceberryB & Bmin. 6` ht.clump form, 5-13 stemsCer-c3Cercis canadensisEastern RedbudB & Bmin. 6` ht.clump form, 3-7 stemsSHRUBSQTYBOTANICAL NAMECOMMON NAMESIZEHEIGHTREMARKSAro-m116Aronia melanocarpa `Autumn Magic`Autumn Magic Black Chokeberrycontainer24"space @ 5`-0" o.c.Cal-x93Calamagrostis x acutiflora `Karl Foerster`Karl Foerster Feather Reed Grasspot#2space @ 3`-0" o.c.Fot-g73Fothergilla gardeniiDwarf Fothergillacontainer24"space @ 3`-0" o.c.Hyd-w67Hydrangea quercifolia `Pee Wee`Pee Wee Oakleaf Hydrangeacontainer18" ht. min.space @ 3`-0" o.c.Ile-v125Ilex verticillata `Red Sprite`Red Sprite Winterberrycontainer24"space @ 4`-0" o.c., allow to mass; provide 1Jim Dandy per 5 Red SpritesIte-s67Itea virginica `Sprich`Little Henry Virginia Sweetspirecontainer24"space @ 3`-0" o.c.Myr-p46Myrica pensylvanicaNorthern Bayberrycontainer24"space @ 8`-0" o.c., allow to massPan-v51Panicum virgatum `Cloud Nine`Cloud Nine Switch Grasspot#2space @ 3`-0" o.c.Phy-o44Physocarpus opulifolius `Summer Wine`Summer Wine Ninebarkcontainer24"space @ 5`-0" o.c.Rhu-g17Rhus aromatica `Gro-Low`Gro-Low Fragrant Sumaccontainerspace @ 4`-0" o.c.Spo-h241Sporobolus heterolepisPrairie Dropseedpot#1space @ 2`-0" o.c.Tax-x17Taxus x media `Densiformis`Dense Yewcontainer24"space @ 3`-0" o.c., allow to massThu-p37Thuja occidentalis `Pyramidalis`Pyramidalis Cedarcontainer4` ht.space @ 4`-0" o.c.Vib-x60Viburnum x juddiiJudd Viburnumcontainer24"space @ 5`-0" o.c.PLANT SCHEDULESHRUBSQTYBOTANICAL NAMECOMMON NAMESIZEHEIGHTREMARKSCal-x13Calamagrostis x acutiflora `Karl Foerster`Karl Foerster Feather Reed Grasspot#2space @ 3`-0" o.c.PERENNIALSQTYBOTANICAL NAMECOMMON NAMESIZEHEIGHTREMARKSLav-x59Lavandula x intermedia 'Grosso'Grosso Lavendinpot#1space @ 15" o.c.Nep-x11Nepeta x faassenii `Junior Walker'Junior Walker Catmintpot#1space @ 2'-6" o.c.PLANT SCHEDULETREESQTYBOTANICAL NAMECOMMON NAMECONT CALREMARKSGle-t1Gleditsia triacanthos inermis `Skycole`Skyline Thornless HoneylocustB & Bmin. 2.5" cal.full, strong central leader, matchedQue-b2Quercus bicolorSwamp White OakB & Bmin. 2.5" cal.spring dug, full, strong central leader,matchedZel-s4Zelkova serrata `Green Vase`Green Vase Sawleaf ZelkovaB & Bmin. 2.5" cal.full, strong central leader, matchedSHRUBSQTYBOTANICAL NAMECOMMON NAMESIZEHEIGHTREMARKSIte-s35Itea virginica `Sprich`Little Henry Virginia Sweetspirecontainer24"space @ 3`-0" o.c.PLANT SCHEDULEPlanting DetailsL510Hold down finish grade in lawns 1/2" below topof metal edge.Face of BuildingCompacted Subgrade#6 to #10 Washed river rockSteel Edge Refer to Detail this sheet6"12" min.,varies1/2" maxSTONE MAINTENANCE EDGE WITH STEEL EDGENot to Scalenon woven geotextile fabric. Refer toSpecification 32 05 16PERENNIAL PLANTINGNot to ScaleNote: All perennial beds shall be plantedusing triangular planting scheme. Refer toPlanting Schedule for On-Center plantingdimension.3" Shredded Hardwood Bark MulchRemove Container12" Prepared Soil; Refer to SpecificationsCompacted SubgradeExisting GradeSPADE EDGENot to ScaleExisting GradeArea to Receive Hardwood Bark MulchTopsoil (As Specified)5"3"3" 12"Compacted subgrade3"Shredded Hardwood Organic MulchPlace level with adjacent finish grades.Refer to Special Provisions.min.Topsoil, to include a min. of 5% organic matterRemove all stones 1" & larger andother extraneous materials. Refer to Special Provisions.LANDSCAPE BED PREPARATIONNot to ScaleAdjacent sidewalk or curb, typ.Area to receive lawnSTATUE ALTERNATE BIDBASE BID132456CONIFEROUS TREE PLANTING DETAILNot to ScaleDECIDUOUS TREE PLANTING DETAILNot to ScaleSHRUB PLANTING DETAILNot to ScaleArchitecture | Engineering | Interior Design1715 Magnavox WayFort Wayne, IN 46804260.432.9337930 North MeridianIndianapolis, IN 46204317.917.1190www.msktd.comSHEET TITLESHEET NUMBERSET DESCRIPTIONBP#5PROJECT NO.DATEMSKTD& AssociatesCarmel, Indiana Franciscan Orthopedic Center of Excellence738212-06-19A Project for:REV.DATEM:\18-1228 Franciscan Carmel Ortho Hospital\Dwg\Sheets\L510 - Planting Details 1228.dwg, November 8, 2021 11:18 AM, ALYSSA PRAZEAU, © Paul I. Cripe, Inc.112-20-2019ADDENDUM 1201-06-2020ADDENDUM 2303-10-2020ISSUED FOR CONSTRUCTION411-09-2020ASI #55501/25/2021PR#12602/24/2021ASI#81809/21/2021ASI#101707/01/2021PR#267Face of BuildingCompacted Subgrade#6 to #10 Washed river rock6"12" min.,variesSTONE MAINTENANCE EDGE AGAINST CONCRETENot to Scale878- PARKING LOT ALTERNATE BID8888 89'-4"216'-5"90'-7"17'-4"394'-5"67'-10"ROW = 153'-6"LIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTIONExisting Trees to Remain0Scale 1" = 40'-0"20'40'10'NorthPlanting PlanL1201.Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer toPlant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Owner at anytime. Landscape Architect to inspect all plant locations and plant bed conditions prior toinstallation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'American Standards forNursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates within five (5)days after planting. Replace immediately with approved, specified material.5.Plant counts indicated on drawings are for Landscape Architect's use only. Contractorshall make own plant quantity takeoffs using drawings, specifications, and plant schedulerequirements (i.e., spacing), unless otherwise directed by Landscape Architect.Contractor to verify bed measurements and install appropriate quantities as governed byplant spacing per schedule. Plant material quantities shown on plan are minimumquantities. Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise noted to receivepavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas to meetSpecifications. Contractor shall coordinate quantity and placement of topsoil.Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specificationsfor topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for review andapproval by the Landscape Architect. Any plant material installed in an incorrectlocation, by the judgment of the Landscape Architect, shall be reinstalled at theContractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unlessotherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damaged utilitiesto Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project is fullyaccepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for a period of onecalendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances. Coordinatewith the Owner to obtain any required permits necessary to complete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protected areashall include the full drip line of the canopy. NO construction activities, material storage,etc. may occur within that area. The Contractor shall ensure that no soil compaction ortree damage occurs in any Protected areas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.TURFGENERAL LANDSCAPE ANDPLANTING NOTESNOTE: ALL PLANTINGS SHALL BE INSTALLED PER CARMEL STANDARDDETAILS. REFER TO SHEET L510 FOR CARMEL STANDARD DETAILS ANDPLANT CHARTArchitecture | Engineering | Interior Design1715 Magnavox WayFort Wayne, IN 46804260.432.9337930 North MeridianIndianapolis, IN 46204317.917.1190www.msktd.comSHEET TITLESHEET NUMBERSET DESCRIPTIONBP#5PROJECT NO.DATEMSKTD& AssociatesCarmel, Indiana Franciscan Orthopedic Center of Excellence738212-06-19A Project for:REV.DATEM:\18-1228 Franciscan Carmel Ortho Hospital\Dwg\Sheets\L120 - Planting Plans 1228.dwg, January 22, 2021 2:07 PM, ALYSSA PRAZEAU, © Paul I. Cripe, Inc.112-20-2019ADDENDUM 1201-06-2020ADDENDUM 2303-10-2020ISSUED FOR CONSTRUCTION411-09-2020ASI #55501/25/2021PR#12L122L121L123L124ZONING:Site: MC Meridian OverlayNorth: MCEast: Meridian RoadSouth: MC - office useWest: Illinois StreetPARKING LOT INTERIORRequirement: Provide a minimum of 1 shade tree + 5 shrubs for every 10 parking spacesprovide.Required: 69 spaces = 7 shade trees + 35 shrubsProvided: 7 shade trees + 35 shrubsFOUNDATION PLANTINGSRequirement: Provide planting beds 5 feet in width, excluding driveways, courtyards,plazas, and pedestrian access to building entrances. Plantings shall cover seventy-fivepercent (75%) of the planting areaRequired:Office Building @ 1,280 l.f. - 775 l.f. hardscape x 5 = 2,525 x 75% = 1,894 s.f.planting areaGarage @ 1002 l.f. - 52 l.f. for drive access - 16 l.f. for pedestrian access x 5 =4,670 s.f. x 75% = 3,503 s.f. planting areaProposed:Office Building: 3,975 s.f. planting areaGarage: 3,506 s.f. planting areaBUFFER YARDSRequirements:Type A: 5' Minimum Yard Width - 4 Shade or Evergreen Trees + 10 shrubs/100 l.f.Type C: 15' Minimum Yard Width - 6 Shade or Evergreen Trees + 1 Ornamental Tree + 15shrubs/100 l.f.Type D: 30' Minimum Yard Width - 8 Shade or Evergreen Trees (at least 3 shall beevergreen) + 2 ornamental trees + 20 shrubs/100 l.f.Note: 1 Evergreen Tree = 3 shrubsRequired:West: (Illinois Street) Type C @ 825 l.f. - 65 l.f. (gas easement) = 46 Shade orEvergreen Trees + 8 Ornamental Tree + 114 shrubsEast: (US 31) Type C @ 669 l.f. - 65 l.f. (gas easement) = 36 Shade or EvergreenTrees + 6 Ornamental Trees + 91 shrubsNorth:Same property for future development @ 234 l.f.- no buffer required(Residential Neighborhood) Type D @ 600 l.f. - 35 l.f. sanitary easement = 45Shade or Evergreen Trees + 11 ornamental trees + 113 shrubsSouth:(Office Use) Type A @ 700 l.f. = 28 Shade or Evergreen Trees + 70 shrubsProposed: West: 46 shade/evergreen trees + 8 ornamental trees + 114 shrubs East: 36 shade/evergreen trees + 7 ornamental trees + 91 shrubs North: 3 existing trees to remain + 26 shade trees + 16 evergeen trees + 11ornamental trees + 113 shrubs South: 23 shade/evergreen trees + 70 shrubsSTREET TREESRequirement: Provide 1 tree for every 25 l.f. (minimum spacing) to 50 feet (maximumspacing) in ROW.Required: Illinois Street @ 823 l.f. = 17-32 canopy treesProposed: 17 treesORDINANCE CHARTL123A834 l.f.55 DECONTAMRECOMMENDED INSTALLATION CLEARANCERECOMMENDED INSTALLATION CLEARANCENEWEX.EX.NEW NEWEX.EX.NEW NEWEX.EX.NEW NEWEX.EX.NEW FEFEFEFEFEFEFEFEFEFEFEFEFEFEFEFE159 SFPVT TREAT(CONCUSSION)380 SFM.O.B. NORMALPOWER622 SFEMERGENCYPOWER913 SFNORMAL POWER195 SFPUBLIC TLT171 SFPUBLIC TLT71 SFFAMILY TLT55 SFHSKP132 SFCHAPLAIN OFFICE 90 SFSACRISTY 133 SFIT OFFICE119 SFIT STORAGE246 SFSHARED CONFROOM474 SFIT WORKROOM650 SFMDF ROOM722 SFCLINICALENGINEERING594 SFBUILDINGMAINTENANCE1896 SFMECH131 SFMED GASMANIFOLD113 SFBODY HOLD314 SFSOILED LINENHOLD 180 SFWASHER180 SFDRYER364 SFCLEAN LINENSTOR153 SFBIO HAZARDHOLD784 SFCENTRAL STOR730 SFSIMS320 SFBREAKDOWN205 SFWORK285 SFEVS STOR307 SFEVS EQUIP STOR114 SFCART WASH /HOLD122 SFCLEAN CART67 SFVENDOR PICKUP100 SFCLEAN VEST63 SFSTAFF TLT57 SFDRY HSKP507 SFSTERIL / CHEMSTOR52 SFDECON HSKP512 SFCOFFEE199 SFFOOD BAKERY /PIZZA 1054 SFFOOD OUTSIDEVENDOR 18 SFTRAY RETURN283 SFCOOLER189 SFFREEZER118 SFRECEIVING 30 SFSTORAGE302 SFDRY STORAGE1803 SFKITCHEN76 SFORDER ENTRY66 SFOFFICE52 SFSTAFF TLT59 SFLOCKER ALCOVE59 SFKITCHENTRASH 380 SFDISHWASH 52 SFHSKP150 SFELEC129 SFDATA221 SFRETAIL149 SFDECON VEST157 SFMALE LOCKER154 SFFEMALE LOCKER57 SFSHOWER49 SFMALE TLT50 SFFEMALE TLT57 SFSHOWER256 SFLOUNGE114 SFEVS OFFICE116 SFREVERSEOSMOSIS 338 SFCONF/ PRIVATEDINING62 SFVESTIBULE127 SFDATA165 SFELEC250 SFSTAIR155 SFRECEPTION 2017 SFLOBBY / WAITING 2494 SFDINING104 SFELEVATOR(PATIENT)96 SFELEVATOR(SERVICE)447 SFCORRIDOR82 SFSTORAGE50 SFICE ROOM335 SFSTAIR1196 SFDECONTAMINATION3112 SFSTERILIZATION 445 SFCORRIDOR285 SFCORRIDOR809 SFCORRIDOR1334 SFCORRIDOR 1089 SFCORRIDOR 60 SFELEVATOR(SOILED)60 SFELEVATOR(CLEAN)337 SFSTAIR621 SFLOADING DOCK /RECEIVING 94 SFLACTATION733 SFCORRIDOR 99 SFVESTIBULE335 SFDME STORAGE117 SFC.S. MNGR OFFICE68 SFELEV. CTRL ROOM89 SFSTAFF TLT/ SHOWER225 SFSTAFF LOCKER89 SFSTAFF TLT/ SHOWER172 SFFIRE PUMP660 SFCHAPEL18 SFCLOSET57 SFWHEELCHAIRALCOVE194 SFM.O.B. POWERDECONTAMRECOMMENDED INSTALLATION CLEARANCERECOMMENDED INSTALLATION CLEARANCENEWEX.EX.NEW NEWEX.EX.NEW NEWEX.EX.NEW NEWEX.EX.NEW FEFEFEFEFEFEFEFEFEFEFEFEFEFEFEFE159 SFPVT TREAT(CONCUSSION)380 SFM.O.B. NORMALPOWER622 SFEMERGENCYPOWER913 SFNORMAL POWER195 SFPUBLIC TLT171 SFPUBLIC TLT71 SFFAMILY TLT55 SFHSKP132 SFCHAPLAIN OFFICE 90 SFSACRISTY 133 SFIT OFFICE119 SFIT STORAGE246 SFSHARED CONFROOM474 SFIT WORKROOM650 SFMDF ROOM722 SFCLINICALENGINEERING594 SFBUILDINGMAINTENANCE1896 SFMECH131 SFMED GASMANIFOLD113 SFBODY HOLD314 SFSOILED LINENHOLD 180 SFWASHER180 SFDRYER364 SFCLEAN LINENSTOR153 SFBIO HAZARDHOLD784 SFCENTRAL STOR730 SFSIMS320 SFBREAKDOWN205 SFWORK285 SFEVS STOR307 SFEVS EQUIP STOR114 SFCART WASH /HOLD122 SFCLEAN CART67 SFVENDOR PICKUP100 SFCLEAN VEST63 SFSTAFF TLT57 SFDRY HSKP507 SFSTERIL / CHEMSTOR52 SFDECON HSKP512 SFCOFFEE199 SFFOOD BAKERY /PIZZA 1054 SFFOOD OUTSIDEVENDOR 18 SFTRAY RETURN283 SFCOOLER189 SFFREEZER118 SFRECEIVING 30 SFSTORAGE302 SFDRY STORAGE1803 SFKITCHEN76 SFORDER ENTRY66 SFOFFICE52 SFSTAFF TLT59 SFLOCKER ALCOVE59 SFKITCHENTRASH 380 SFDISHWASH 52 SFHSKP150 SFELEC129 SFDATA221 SFRETAIL149 SFDECON VEST157 SFMALE LOCKER154 SFFEMALE LOCKER57 SFSHOWER49 SFMALE TLT50 SFFEMALE TLT57 SFSHOWER256 SFLOUNGE114 SFEVS OFFICE116 SFREVERSEOSMOSIS 338 SFCONF/ PRIVATEDINING62 SFVESTIBULE127 SFDATA165 SFELEC250 SFSTAIR155 SFRECEPTION 2017 SFLOBBY / WAITING 2494 SFDINING104 SFELEVATOR(PATIENT)96 SFELEVATOR(SERVICE)447 SFCORRIDOR82 SFSTORAGE50 SFICE ROOM335 SFSTAIR1196 SFDECONTAMINATION3112 SFSTERILIZATION 445 SFCORRIDOR285 SFCORRIDOR809 SFCORRIDOR1334 SFCORRIDOR 1089 SFCORRIDOR 60 SFELEVATOR(SOILED)60 SFELEVATOR(CLEAN)337 SFSTAIR621 SFLOADING DOCK /RECEIVING 94 SFLACTATION733 SFCORRIDOR 99 SFVESTIBULE335 SFDME STORAGE117 SFC.S. MNGR OFFICE68 SFELEV. CTRL ROOM89 SFSTAFF TLT/ SHOWER225 SFSTAFF LOCKER89 SFSTAFF TLT/ SHOWER172 SFFIRE PUMP660 SFCHAPEL18 SFCLOSET57 SFWHEELCHAIRALCOVE194 SFM.O.B. POWER(5) Cor-k(2) Bet-n(2) Ame-c(3) Pic-p(1) Cel-o(11) Myr-p(2) Cel-o(1) Pla-a(1) Tax-d(12) Ile-v(1) Tax-d(3) Pla-a(13) Vib-x(1) Tax-d(3) Pic-a(10) Aro-m(15) Ile-v(2) Pla-a(10) Vib-x(3) Pic-a(1) Pla-a(2) Cel-o(3) Pic-p(2) Pic-a(1) Bet-n(15) Aro-m(2) Que-b(3) Pic-g(2) Pic-g(7) Phy-o(1) Pla-a(1) Pic-a(19) Ile-v(1) Lir-t(3) Pic-p(2) Tax-d(11) Aro-m(5) Aro-m(8) Ite-s(9) Hyd-w(3) Ame-x(1) Pla-a(5) Myr-p(88) Spo-h(9) Hyd-w(17) Rhu-g(2) Pic-p(14) Ite-s(4) Ile-v(20) Ile-vLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONIMITS OF CONSTRUCTION0Scale 1" = 20'-0"40'20'10'NorthPlanting PlanL121Matchline - Refer to Sheet L122Matchline - Refer to Sheet L124 Matchline - Refer to Sheet L122Matchline - Refer to Sheet L124 1.Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer toPlant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Owner at anytime. Landscape Architect to inspect all plant locations and plant bed conditions prior toinstallation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'American Standards forNursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates within five (5)days after planting. Replace immediately with approved, specified material.5.Plant counts indicated on drawings are for Landscape Architect's use only. Contractorshall make own plant quantity takeoffs using drawings, specifications, and plant schedulerequirements (i.e., spacing), unless otherwise directed by Landscape Architect.Contractor to verify bed measurements and install appropriate quantities as governed byplant spacing per schedule. Plant material quantities shown on plan are minimumquantities. Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise noted to receivepavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas to meetSpecifications. Contractor shall coordinate quantity and placement of topsoil.Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specificationsfor topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for review andapproval by the Landscape Architect. Any plant material installed in an incorrectlocation, by the judgment of the Landscape Architect, shall be reinstalled at theContractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unlessotherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damaged utilitiesto Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project is fullyaccepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for a period of onecalendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances. Coordinatewith the Owner to obtain any required permits necessary to complete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protected areashall include the full drip line of the canopy. NO construction activities, material storage,etc. may occur within that area. The Contractor shall ensure that no soil compaction ortree damage occurs in any Protected areas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.TURFGENERAL LANDSCAPE ANDPLANTING NOTESNOTE: ALL PLANTINGS SHALL BE INSTALLED PER CARMEL STANDARDDETAILS. REFER TO SHEET L510 FOR CARMEL STANDARD DETAILS ANDPLANT CHARTArchitecture | Engineering | Interior Design1715 Magnavox WayFort Wayne, IN 46804260.432.9337930 North MeridianIndianapolis, IN 46204317.917.1190www.msktd.comSHEET TITLESHEET NUMBERSET DESCRIPTIONBP#5PROJECT NO.DATEMSKTD& AssociatesCarmel, Indiana Franciscan Orthopedic Center of Excellence738212-06-19A Project for:REV.DATEM:\18-1228 Franciscan Carmel Ortho Hospital\Dwg\Sheets\L120 - Planting Plans 1228.dwg, January 18, 2021 3:29 AM, ALYSSA PRAZEAU, © Paul I. Cripe, Inc.112-20-2019ADDENDUM 1201-06-2020ADDENDUM 2303-10-2020ISSUED FOR CONSTRUCTION411-09-2020ASI #55501/18/2021LANDSCAPE REVISION45 (1) Tax-d(2) Ame-x(3) Tax-d(1) Tax-d(5) Tax-x(1) Pla-a(1) Pic-a(19) Ile-v(12) Tax-x(7) Spo-h(11) Pan-v(13) Cal-x(10) Spo-h(14) Cal-x(9) Spo-h(15) Pan-v(11) Cal-x(14) Pan-v(1) Pla-a(1) Nys-s(11) Pan-v(3) Gle-t(3) Pic-a(13) Die-lLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTIONExisting Trees to Remain0Scale 1" = 20'-0"40'20'10'NorthPlanting PlanL122Matchline - Refer to Sheet L121Matchline - Refer to Sheet L123 Matchline - Refer to Sheet L123 Matchline - Refer to Sheet L1211.Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer toPlant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Owner at anytime. Landscape Architect to inspect all plant locations and plant bed conditions prior toinstallation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'American Standards forNursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates within five (5)days after planting. Replace immediately with approved, specified material.5.Plant counts indicated on drawings are for Landscape Architect's use only. Contractorshall make own plant quantity takeoffs using drawings, specifications, and plant schedulerequirements (i.e., spacing), unless otherwise directed by Landscape Architect.Contractor to verify bed measurements and install appropriate quantities as governed byplant spacing per schedule. Plant material quantities shown on plan are minimumquantities. Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise noted to receivepavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas to meetSpecifications. Contractor shall coordinate quantity and placement of topsoil.Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specificationsfor topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for review andapproval by the Landscape Architect. Any plant material installed in an incorrectlocation, by the judgment of the Landscape Architect, shall be reinstalled at theContractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unlessotherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damaged utilitiesto Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project is fullyaccepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for a period of onecalendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances. Coordinatewith the Owner to obtain any required permits necessary to complete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protected areashall include the full drip line of the canopy. NO construction activities, material storage,etc. may occur within that area. The Contractor shall ensure that no soil compaction ortree damage occurs in any Protected areas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.TURFGENERAL LANDSCAPE ANDPLANTING NOTESNOTE: ALL PLANTINGS SHALL BE INSTALLED PER CARMEL STANDARDDETAILS. REFER TO SHEET L510 FOR CARMEL STANDARD DETAILS ANDPLANT CHARTArchitecture | Engineering | Interior Design1715 Magnavox WayFort Wayne, IN 46804260.432.9337930 North MeridianIndianapolis, IN 46204317.917.1190www.msktd.comSHEET TITLESHEET NUMBERSET DESCRIPTIONBP#5PROJECT NO.DATEMSKTD& AssociatesCarmel, Indiana Franciscan Orthopedic Center of Excellence738212-06-19A Project for:REV.DATEM:\18-1228 Franciscan Carmel Ortho Hospital\Dwg\Sheets\L120 - Planting Plans 1228.dwg, January 22, 2021 2:08 PM, ALYSSA PRAZEAU, © Paul I. Cripe, Inc.112-20-2019ADDENDUM 1201-06-2020ADDENDUM 2303-10-2020ISSUED FOR CONSTRUCTION411-09-2020ASI #55501/25/2021PR#125 FEFE FEFEFEFEFEFE FE FEFE FE FE FE FE179 SFMRI CTRL382 SFMRI (3T )398 SFMRI (1 .5T )285 SFMRI VEST122 SFMRI EQU IP 465 SFCT143 SFCT CTRL285 SFSTAFF LOUNGE129 SFPAT CHANGE58 SFPAT CHANGE66 SFHSKP49 SFELEC147 SFDATA135 SFDATA119 SFELEC57 SFPATIENT TLT145 SFPVT TREAT144 SFPVT TREAT159 SFPVT TREAT (CONCUSS ION )380 SFM.O .B . NORMALPOWER622 SFEMERGENCYPOWER913 SFNORMAL POWER128 SFEXAM 7128 SFEXAM 8131 SFEXAM 9202 SFPHYSIC IANBULLPEN 133 SFEXAM 10115 SFEXAM 11127 SFEXAM 12133 SFEXAM 13124 SFEXAM 1452 SFPAT TLT120 SFEXAM 15112 SFMGR OFF ICE167 SFTREAT / CAST 1124 SFEXAM 2124 SFEXAM 3124 SFEXAM 4124 SFEXAM 5124 SFEXAM 656 SFSECURITY HOLD195 SFPUBLIC TLT171 SFPUBLIC TLT71 SFFAMILY TLT55 SFHSKP132 SFCHAPLAIN OFF ICE 90 SFSACRISTY153 SFBIO HAZARDHOLD512 SFCOFFEE189 SFFREEZER118 SFRECEIV ING 302 SFDRY STORAGE76 SFORDER ENTRY66 SFOFFICE52 SFSTAFF TLT59 SFLOCKER ALCOVE221 SFRETAIL66 SFSTAFF TLT65 SFPATIENT TLT113 SFCLEAN97 SFSOILED 64 SFSTAFF TLT40 SFHSKP153 SFMRI EQU IP 255 SFHYDRO POOLROOM49 SFSHOWER/CHANGE245 SFX-RAY248 SFFUTURE X -RAY460 SFWAIT ING 222 SFCHECK IN / OUT210 SFNURSE STAT ION 197 SFNURSE STAT ION314 SFWAIT ING 258 SFRECEPTION /WORK783 SFACUTE INJURYAREA 1271 SFWAIT ING 127 SFDATA165 SFELEC347 SFVESTIBULE57 SFSTORAGE90 SFSOILED HOLD759 SFCORRIDOR 421 SFCORRIDOR 275 SFCORRIDOR 301 SFCORRIDOR 286 SFCORRIDOR 79 SFELEVATOR(PUBL IC )82 SFELEVATOR(PUBL IC )250 SFSTAIR155 SFRECEPTION 2017 SFLOBBY / WA IT ING1565 SFCORRIDOR 447 SFCORRIDOR 82 SFSTORAGEDECONTAMINAT ION1089 SFCORRIDOR337 SFSTAIR 78 SFELEVATOR(SUPPLY )464 SFSTAFF WORKAREA84 SFPATIENT LOCKERS299 SFSTAIR 85 SFCORRIDOR 9 SFCHECK- IN ALCOVE124 SFHYDRO POOLEQUIPMENT 65 SFPAT TLT11 SFALCOVE89 SFSTAFF TLT / SHOWER60 SFPATIENT TLT231 SFEQUIP STOR179 SFOFFICE / WORK551 SFSTAFF LOUNGE225 SFSTAFF LOCKER487 SFOT AREA / HANDTHERAPY89 SFSTAFF TLT / SHOWER9076 SFREHAB SPACE660 SFCHAPEL18 SFCLOSET159 SFSECURITY OFF ICE 57 SFWHEELCHAIRALCOVE 194 SFM.O .B . POWERFEFE FEFEFEFEFEFE FE FEFE FE FE FE FE179 SFMRI CTRL382 SFMRI (3T )398 SFMRI (1 .5T )285 SFMRI VEST122 SFMRI EQU IP 465 SFCT143 SFCT CTRL285 SFSTAFF LOUNGE129 SFPAT CHANGE58 SFPAT CHANGE66 SFHSKP49 SFELEC147 SFDATA135 SFDATA119 SFELEC57 SFPATIENT TLT145 SFPVT TREAT144 SFPVT TREAT159 SFPVT TREAT (CONCUSS ION )380 SFM.O .B . NORMALPOWER622 SFEMERGENCYPOWER913 SFNORMAL POWER128 SFEXAM 7128 SFEXAM 8131 SFEXAM 9202 SFPHYSIC IANBULLPEN 133 SFEXAM 10115 SFEXAM 11127 SFEXAM 12133 SFEXAM 13124 SFEXAM 1452 SFPAT TLT120 SFEXAM 15112 SFMGR OFF ICE167 SFTREAT / CAST 1124 SFEXAM 2124 SFEXAM 3124 SFEXAM 4124 SFEXAM 5124 SFEXAM 656 SFSECURITY HOLD195 SFPUBLIC TLT171 SFPUBLIC TLT71 SFFAMILY TLT55 SFHSKP132 SFCHAPLAIN OFF ICE 90 SFSACRISTY153 SFBIO HAZARDHOLD512 SFCOFFEE189 SFFREEZER118 SFRECEIV ING 302 SFDRY STORAGE76 SFORDER ENTRY66 SFOFFICE52 SFSTAFF TLT59 SFLOCKER ALCOVE221 SFRETAIL66 SFSTAFF TLT65 SFPATIENT TLT113 SFCLEAN97 SFSOILED 64 SFSTAFF TLT40 SFHSKP153 SFMRI EQU IP 255 SFHYDRO POOLROOM49 SFSHOWER/CHANGE245 SFX-RAY248 SFFUTURE X -RAY460 SFWAIT ING 222 SFCHECK IN / OUT210 SFNURSE STAT ION 197 SFNURSE STAT ION314 SFWAIT ING 258 SFRECEPTION /WORK783 SFACUTE INJURYAREA 1271 SFWAIT ING 127 SFDATA165 SFELEC347 SFVESTIBULE57 SFSTORAGE90 SFSOILED HOLD759 SFCORRIDOR 421 SFCORRIDOR 275 SFCORRIDOR 301 SFCORRIDOR 286 SFCORRIDOR 79 SFELEVATOR(PUBL IC )82 SFELEVATOR(PUBL IC )250 SFSTAIR155 SFRECEPTION 2017 SFLOBBY / WA IT ING1565 SFCORRIDOR 447 SFCORRIDOR 82 SFSTORAGEDECONTAMINAT ION1089 SFCORRIDOR337 SFSTAIR 78 SFELEVATOR(SUPPLY )464 SFSTAFF WORKAREA84 SFPATIENT LOCKERS299 SFSTAIR 85 SFCORRIDOR 9 SFCHECK- IN ALCOVE124 SFHYDRO POOLEQUIPMENT 65 SFPAT TLT11 SFALCOVE89 SFSTAFF TLT / SHOWER60 SFPATIENT TLT231 SFEQUIP STOR179 SFOFFICE / WORK551 SFSTAFF LOUNGE225 SFSTAFF LOCKER487 SFOT AREA / HANDTHERAPY89 SFSTAFF TLT / SHOWER9076 SFREHAB SPACE660 SFCHAPEL18 SFCLOSET159 SFSECURITY OFF ICE 57 SFWHEELCHAIRALCOVE 194 SFM.O .B . POWER(2) Pic-g(1) Que-b(1) Que-b(3) Bet-n(3) Ulm-x(5) Myr-p(1) Lir-t(5) Cal-x(7) Phy-o(5) Cal-x(11) Aro-m(5) Cal-x(7) Phy-o(5) Cal-x(4) Gin-p(2) Pic-p(4) Aro-m(1) Pic-p(11) Phy-o(1) Ulm-x(1) Ulm-x(9) Aro-m(10) Ile-v(39) Spo-h(3) Phy-o(6) Phy-o(5) Aro-m(5) Aro-m(22) Ile-v(2) Bet-n(1) Bet-n(9) Myr-p(14) Aro-m(17) Vib-x(3) Ile-v(3) Phy-o(12) Vib-x(3) Pic-a(2) Abi-c(2) Abi-c(3) Pic-a(2) Pic-a(5) Ile-v(6) Hyd-w(29) Spo-h(3) Pic-p(9) Aro-m(11) Ite-s(2) Pic-g(1) Pla-a(1) Ulm-x(1) Ulm-x(3) Aro-m(36) Spo-h(35) Cal-x(10) Ile-v(23) Spo-h(5) Aro-m89'-4"216'-5"90'-7"17'-4"ROW = 153'-6"LIMITS OF CONSTRUCTIONLIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION0Scale 1" = 20'-0"40'20'10'NorthPlanting PlanL124Matchline - Refer to Sheet L123Matchline - Refer to Sheet L123Matchline - Refer to Sheet L121Matchline - Refer to Sheet L121 1.Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer toPlant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Owner at anytime. Landscape Architect to inspect all plant locations and plant bed conditions prior toinstallation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'American Standards forNursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates within five (5)days after planting. Replace immediately with approved, specified material.5.Plant counts indicated on drawings are for Landscape Architect's use only. Contractorshall make own plant quantity takeoffs using drawings, specifications, and plant schedulerequirements (i.e., spacing), unless otherwise directed by Landscape Architect.Contractor to verify bed measurements and install appropriate quantities as governed byplant spacing per schedule. Plant material quantities shown on plan are minimumquantities. Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise noted to receivepavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas to meetSpecifications. Contractor shall coordinate quantity and placement of topsoil.Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specificationsfor topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for review andapproval by the Landscape Architect. Any plant material installed in an incorrectlocation, by the judgment of the Landscape Architect, shall be reinstalled at theContractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unlessotherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damaged utilitiesto Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project is fullyaccepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for a period of onecalendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances. Coordinatewith the Owner to obtain any required permits necessary to complete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protected areashall include the full drip line of the canopy. NO construction activities, material storage,etc. may occur within that area. The Contractor shall ensure that no soil compaction ortree damage occurs in any Protected areas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.TURFGENERAL LANDSCAPE ANDPLANTING NOTESNOTE: ALL PLANTINGS SHALL BE INSTALLED PER CARMEL STANDARDDETAILS. REFER TO SHEET L510 FOR CARMEL STANDARD DETAILS ANDPLANT CHARTArchitecture | Engineering | Interior Design1715 Magnavox WayFort Wayne, IN 46804260.432.9337930 North MeridianIndianapolis, IN 46204317.917.1190www.msktd.comSHEET TITLESHEET NUMBERSET DESCRIPTIONBP#5PROJECT NO.DATEMSKTD& AssociatesCarmel, Indiana Franciscan Orthopedic Center of Excellence738212-06-19A Project for:REV.DATEM:\18-1228 Franciscan Carmel Ortho Hospital\Dwg\Sheets\L120 - Planting Plans 1228.dwg, January 18, 2021 3:30 AM, ALYSSA PRAZEAU, © Paul I. Cripe, Inc.112-20-2019ADDENDUM 1201-06-2020ADDENDUM 2303-10-2020ISSUED FOR CONSTRUCTION411-09-2020ASI #55501/18/2021LANDSCAPE REVISIONFranciscan shall install, maintain for three months, andwarrantee for one year trees planted in the Right of way.After that time, the City of Carmel shall take ownership ofthese trees, including maintenance. 3939 Priority Way South Drive, Suite 200 Indianapolis, IN 46240 Ph: 317.844.6777 Fax: 317.706.6451 www.cripe.biz Page 1 of 1 MEMORANDUM TO: Rachel Keesling, City of Carmel FROM: Jennifer M Lasch, PE, LEED® BD+C DATE: September 21, 2021 RE: Franciscan Orthopedic Center of Excellence (19060019 DP ADLS) General The Franciscan Orthopedic Center of Excellence project went through planning and approval back in August 2019 – March 2020 timeframe. At that time, there were four alternates shown on the plans which included the following: • Alternate Exterior Sports Training including the synthetic turf field, batting cage, tennis and half-basketball court (located west of the Medical Office Building) • Alternate Dining Area north of hospital • Valet Parking north of the parking garage • Alternate Fitness Trail/Path on the east side of the site The project phasing has resulted in the Exterior Sports Training elements to be incorporated into this phase of construction and included with the Medical Office Building, Hospital, and Parking Garage Construction. The Valet Parking will not be constructed at this time. This will be constructed in the future. Additionally, the Fitness Trail/Path will not be constructed at this time. The layout of this trail may be revisited as the land north of this phase of construction is developed so that a more comprehensive trail/path system may be established. The accompanying plans show the revised documents reflecting the current phase of construction. We appreciate your time and consideration. cc: File, Alex Jordan (Carmel Engineering) 3939 Priority Way South Drive,Suite 200 r I pe Indianapolis,IN 46240 AUG� 3 ��%�� . 317 77 K FAX: 317.706 6451 p www.cripe.biz — J Date: 8/12/19 Cripe Job #: 180235-20000 To: City of Carmel RE: Franciscan Orthopedic Center of Plan Commission Excellence 1 Civic Sq., Carmel, IN 46032 Docket# 19060019 DP/ADLS Attention : Joe Shestak- (317) 571-2419 We are sending you the following items via: Courier Shop Drawings Prints Plans Samples Specifications Copy of Letter Change Order Attached Report X Other Copies Date Description 10 8/12/19 Plan Commission Packet 2 8/12/19 Digital Copy Plan Commission Packet 1 8/12/19 Check THESE ARE TRANSMITTED as checked below: For Approval Submit Approved as Submitted Copies for Approval X For Your Use Return Approved as Noted Copies for Distribution x As Requested Not Approved Reviewed for Compliance Signature Requested Resubmit Corrected Prints For Review and Comment Remarks: c: Scanned File Signed: Jennifer Lasch,jlasch@cripe.biz Transmittal Only: Notice: The drawing/computer files listed above are the property of Cripe Architects + Engineers and are transmitted for reproduction use only. Any modification or reuse of the documents without written permission from Cripe Architects+Engineers is prohibited.Any person or entity using these documents for any purpose other than the project for which they were originally intended, with or without permission from Cripe Architects + Engineers, by their use agrees to indemnify and hold harmless Cripe Architects+ Engineers from any loss,including,but not limited to attorney's fees occurring from their use. \\CRIPE\PROJECTS\2018\180235\20000\DOCS\ENGR\PERMITS\PLAN COMMISSION 2019-08-12\TRANSMITTAL_CARMEL PLAN COMMISSION 2019-08- 12.DOCX 5�qtvxSVISYOR'S OF_p I�. .7Centon C. 7R�ard, CF.7vf Surveyor of 9familton County Thone (317) 776-9495 Fax (.317) 776-9629 Cripe Engineering 3939 Priority Way South Drive; Suite 200 Indianapolis, IN 46240 Jlasch ,,.(:ripe.biz RE: Franciscan Orthopedic Center Suite r88 One 9familton County Square Noblesville, Indiana 46o6o-223o We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on 7uly 12, 2019, for this project and have the following comments: 1. The project falls in the incorporated area and MS4 jurisdiction of the City of Carmel. 2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone. 3. The proposed project falls in the Williams Creels Watershed, 4. Please direct all stormwater questions outside the parameters of the regulated drain to the City of Carmel Engineering Department. 5. Please provide an outlet request form for the direct discharge to the Meridian Suburban Regulated Drain, 6. This project will require a utility crossing permit for the construction of the Sanitary Sewer System across the Meridian Suburban Regulated Drain. Please submit a crossing permit request with payment to our office. 7. The scope of work for this project includes the reduction of a 75 foot easement to 30 feet. This will require a nonenforcement agreement to be approved by the Hamilton county Drainage board. 8. The scope of work for this project includes the reconstruction of a portion of the Meridian Suburban Drain. This will require the following items: Petition for regulated drain relocation, Engineer's estimate and all associated bonds for 120% of the construction cost. 9. Per Hamilton County Structural Standard D-18, no "doghouse" structures are allowed on regulated drains. 10. Please note additional comments may be warranted at a later date. Should you have any questions, I can be reached at Samuel.clark@hamiltoncounty.in.gov Sincerely, Sam Clark Plan Reviewer CC: Alex Jordan —Carmel Engineering John Duffy —Carmel Engineering Alexia Lopez —Carmel Planning Angie Conn —Carmel Planning MSKTD & Associates 1 Sherri Wilson From:Sherri Wilson Sent:Thursday, June 20, 2019 4:24 PM To:Dave Huffman; David Lucas; Jason Lemaster; health@hamiltoncounty.in.gov; jason.kirkman@charter.com; Meri Seedorf; Quentin Walker; Dan Davenport; Rodney Johnson (rodney.johnson@aes.com); Chris Kehl; Ron Farrand; Brian Wente (bw1917 @att.com); Christopher Bluto Cc:Rachel Keesling; Angie Conn; Alexia Lopez; Jennifer Lasch; Bob Harmeyer Subject:Franciscan Orthopedic Center of Excellence / Digital TAC submittal Attachments:C0-1 COVER SHEET.pdf Dear Carmel TAC Members: You are receiving this email as digital/pdf files have been designated on the Carmel TAC Members listing. The link below will take you to the Cripe Sharefile where you may download the Franciscan Orthopedic Center of Excellence plans for Carmel ADLS and Development Plan submittal. Please note that for Carmel submittals each sheet is required to be a separate file. Attached is the Cover Sheet for your convenience in locating the proposed project. https://cripe.sharefile.com/d-sf20d57f5b35442a8 Please contact us with any questions or comments. Thank you! Sherri Sherri Wilson Permit Specialist Cripe An Employee Owned Company 3939 Priority Way South Drive, Suite 200 Indianapolis, IN 46240 Phone: 317.844.6777 x0 Mobile: 317.370.2187 swilson@cripe.biz www.cripe.biz Cripe is BIM Proficient – Utilizing 3D Laser Scanning |Civil 3D|Revit Architecture Follow us on: O:\2018\180235\20000\DOCS\ENGR\PERMITS\TRANSMITTALS\TRANSMITTAL_ADDRESSINGGIS_2019-06-19.DOCX TRANSMITTAL Date: 6/19/19 Cripe Job #: 180235-20000 To: City of Carmel Addressing Coordinator/GIS Tech 3 Civic Square, 3rd Floor Carmel, IN 46032 Attention : Dave McCoy – 317-571-2566 RE: Franciscan Orthopedic Center of Excellence Between 106th and 111th east of Illinoi St We are sending you the following items via: ePlan and Courier Shop Drawings Prints X Plans Samples Specifications Copy of Letter Change Order Attached Report Other Copies Date Description 1 6/19/19 Site Plan THESE ARE TRANSMITTED as checked below: X For Approval Submit Approved as Submitted Copies for Approval For Your Use Return Approved as Noted Copies for Distribution As Requested Not Approved Reviewed for Compliance Signature Requested Resubmit Corrected Prints For Review and Comment Notice: The drawing/computer files listed above are the property of Cripe and are transmitted for reproduction use only. Any modification or reuse of the documents without written permission from Cripe is prohibited. Any person or entity using these documents for any purpose other than the project for which they were originally intended, with or without permission from Cripe, by their use agrees to indemnify and hold harmless Cripe from any loss, including, but not limited to attorney's fees occurring from their use. 3939 Priority Way South Drive, Suite 200 Indianapolis, IN 46240 317.844.6777 FAX: 317.706.6451 www.cripe.biz Remarks: Site plan for the Carmel ADLS/ TAC submittal. c: Scanned file Signed: Sherri Wilson, swilson@cripe.biz Transmittal Only: O:\2018\180235\20000\DOCS\ENGR\PERMITS\TRANSMITTALS\TRANSMITTAL_CARMEL FIRE DEPT_2019-06-19.DOCX TRANSMITTAL Date: 6/19/19 Cripe Job #: 180235-20000 To: City of Carmel Fire Department 2 Civic Square Carmel, IN 46032 Attention : Chris Ellison – 317-571-2600 RE: Franciscan Orthopedic Center of Excellence Between 106th and 111th east of Illinoi St We are sending you the following items via: ePlan and Courier Shop Drawings Prints X Plans Samples Specifications Copy of Letter Change Order Attached Report Other Copies Date Description 1 6/19/19 Development Plans THESE ARE TRANSMITTED as checked below: X For Approval Submit Approved as Submitted Copies for Approval For Your Use Return Approved as Noted Copies for Distribution As Requested Not Approved Reviewed for Compliance Signature Requested Resubmit Corrected Prints For Review and Comment Notice: The drawing/computer files listed above are the property of Cripe and are transmitted for reproduction use only. Any modification or reuse of the documents without written permission from Cripe is prohibited. Any person or entity using these documents for any purpose other than the project for which they were originally intended, with or without permission from Cripe, by their use agrees to indemnify and hold harmless Cripe from any loss, including, but not limited to attorney's fees occurring from their use. 3939 Priority Way South Drive, Suite 200 Indianapolis, IN 46240 317.844.6777 FAX: 317.706.6451 www.cripe.biz Remarks: Hard copy plans for the Carmel ADLS/TAC submittal. c: Scanned file Signed: Sherri Wilson, swilson@cripe.biz Transmittal Only: O:\2018\180235\20000\DOCS\ENGR\PERMITS\TRANSMITTALS\TRANSMITTAL_CARMEL POST OFFICE_2019-06-19.DOCX TRANSMITTAL Date: 6/19/19 Cripe Job #: 180235-20000 To: Carmel Post Office United States Post Office 275 Medical Drive Carmel, IN 46032 Attention : Postmaster RE: Franciscan Orthopedic Center of Excellence Between 106th and 111th east of Illinoi St We are sending you the following items via: US Mail Shop Drawings Prints Plans Samples Specifications Copy of Letter Change Order X Attached Report Other Copies Date Description 1 6/19/19 CD w/PDF Plans THESE ARE TRANSMITTED as checked below: X For Approval Submit Approved as Submitted Copies for Approval For Your Use Return Approved as Noted Copies for Distribution As Requested Not Approved Reviewed for Compliance Signature Requested Resubmit Corrected Prints For Review and Comment Notice: The drawing/computer files listed above are the property of Cripe and are transmitted for reproduction use only. Any modification or reuse of the documents without written permission from Cripe is prohibited. Any person or entity using these documents for any purpose other than the project for which they were originally intended, with or without permission from Cripe, by their use agrees to indemnify and hold harmless Cripe from any loss, including, but not limited to attorney's fees occurring from their use. 3939 Priority Way South Drive, Suite 200 Indianapolis, IN 46240 317.844.6777 FAX: 317.706.6451 www.cripe.biz Remarks: PDF plans for the Carmel ADLS/TAC submittal. c: Scanned file Signed: Sherri Wilson, swilson@cripe.biz Transmittal Only: O:\2018\180235\20000\DOCS\ENGR\PERMITS\TRANSMITTALS\TRANSMITTAL_CARMEL UTILITIES_2019-06-19.DOCX TRANSMITTAL Date: 6/19/19 Cripe Job #: 180235-20000 To: City of Carmel Utilities 30 West Main St., Suite 220 Carmel, IN 46032 Attention : John Duffy, Joe Faucett, Jason Stewart RE: Franciscan Orthopedic Center of Excellence Between 106th and 111th east of Illinoi St We are sending you the following items via: ePlan and Courier Shop Drawings Prints X Plans Samples Specifications Copy of Letter Change Order Attached Report Other Copies Date Description 3 6/19/19 Utility Plans THESE ARE TRANSMITTED as checked below: X For Approval Submit Approved as Submitted Copies for Approval For Your Use Return Approved as Noted Copies for Distribution As Requested Not Approved Reviewed for Compliance Signature Requested Resubmit Corrected Prints For Review and Comment Notice: The drawing/computer files listed above are the property of Cripe and are transmitted for reproduction use only. Any modification or reuse of the documents without written permission from Cripe is prohibited. Any person or entity using these documents for any purpose other than the project for which they were originally intended, with or without permission from Cripe, by their use agrees to indemnify and hold harmless Cripe from any loss, including, but not limited to attorney's fees occurring from their use. 3939 Priority Way South Drive, Suite 200 Indianapolis, IN 46240 317.844.6777 FAX: 317.706.6451 www.cripe.biz Remarks: Hard copy plans for the Carmel ADLS/TAC submittal. c: Scanned file Signed: Sherri Wilson, swilson@cripe.biz Transmittal Only: O:\2018\180235\20000\DOCS\ENGR\PERMITS\TRANSMITTALS\TRANSMITTAL_DUKE ENERGY_2019-06-19.DOCX TRANSMITTAL Date: 6/19/19 Cripe Job #: 180235-20000 To: Duke Energy 16475 Southpark Dr Westfield, IN 46074 Attention : Matt Dayhuff – 317-896-6704 RE: Franciscan Orthopedic Center of Excellence Between 106th and 111th east of Illinoi St We are sending you the following items via: Courier Shop Drawings Prints X Plans Samples Specifications Copy of Letter Change Order Attached Report Other Copies Date Description 1 6/19/19 Development Plan 1 6/19/19 CD w/PDFs THESE ARE TRANSMITTED as checked below: X For Approval Submit Approved as Submitted Copies for Approval For Your Use Return Approved as Noted Copies for Distribution As Requested Not Approved Reviewed for Compliance Signature Requested Resubmit Corrected Prints For Review and Comment Notice: The drawing/computer files listed above are the property of Cripe and are transmitted for reproduction use only. Any modification or reuse of the documents without written permission from Cripe is prohibited. Any person or entity using these documents for any purpose other than the project for which they were originally intended, with or without permission from Cripe, by their use agrees to indemnify and hold harmless Cripe from any loss, including, but not limited to attorney's fees occurring from their use. 3939 Priority Way South Drive, Suite 200 Indianapolis, IN 46240 317.844.6777 FAX: 317.706.6451 www.cripe.biz Remarks: Hard copy and PDF plans for the Carmel ADLS/TAC submittal. c: Scanned file Signed: Sherri Wilson, swilson@cripe.biz Transmittal Only: O:\2018\180235\20000\DOCS\ENGR\PERMITS\TRANSMITTALS\TRANSMITTAL_HAMCO SURVEYOR_2019-06-19.DOCX TRANSMITTAL Date: 6/19/19 Cripe Job #: 180235-20000 To: Hamilton County Surveyor’s Office 1 Hamilton County Square, Suite 188 Noblesville, IN 46060 Attention : Jerry Liston – 317-776-8495 RE: Franciscan Orthopedic Center of Excellence Between 106th and 111th east of Illinoi St We are sending you the following items via: Courier Shop Drawings Prints X Plans Samples Specifications Copy of Letter Change Order Attached Report Other Copies Date Description 1 6/19/19 Development Plan 1 6/19/19 Drainage Report THESE ARE TRANSMITTED as checked below: X For Approval Submit Approved as Submitted Copies for Approval For Your Use Return Approved as Noted Copies for Distribution As Requested Not Approved Reviewed for Compliance Signature Requested Resubmit Corrected Prints For Review and Comment Notice: The drawing/computer files listed above are the property of Cripe and are transmitted for reproduction use only. Any modification or reuse of the documents without written permission from Cripe is prohibited. Any person or entity using these documents for any purpose other than the project for which they were originally intended, with or without permission from Cripe, by their use agrees to indemnify and hold harmless Cripe from any loss, including, but not limited to attorney's fees occurring from their use. 3939 Priority Way South Drive, Suite 200 Indianapolis, IN 46240 317.844.6777 FAX: 317.706.6451 www.cripe.biz Remarks: Hard copy plans for the Carmel ADLS/TAC submittal. c: Scanned file Signed: Sherri Wilson, swilson@cripe.biz Transmittal Only: O:\2018\180235\20000\DOCS\ENGR\PERMITS\TRANSMITTALS\TRANSMITTAL_DUKE ENERGY_2019-06-19.DOCX TRANSMITTAL Date: 6/19/19 Cripe Job #: 180235-20000 To: TriCo Regional Sewer Utility 10701 N College Ave., Suite A Indianapolis, IN 46280 Attention : Ryan Hartman – 317-844-9200 RE: Franciscan Orthopedic Center of Excellence Between 106th and 111th east of Illinoi St We are sending you the following items via: Courier Shop Drawings Prints X Plans Samples Specifications Copy of Letter Change Order Attached Report Other Copies Date Description 1 6/19/19 Development Plans THESE ARE TRANSMITTED as checked below: X For Approval Submit Approved as Submitted Copies for Approval For Your Use Return Approved as Noted Copies for Distribution As Requested Not Approved Reviewed for Compliance Signature Requested Resubmit Corrected Prints For Review and Comment Notice: The drawing/computer files listed above are the property of Cripe and are transmitted for reproduction use only. Any modification or reuse of the documents without written permission from Cripe is prohibited. Any person or entity using these documents for any purpose other than the project for which they were originally intended, with or without permission from Cripe, by their use agrees to indemnify and hold harmless Cripe from any loss, including, but not limited to attorney's fees occurring from their use. 3939 Priority Way South Drive, Suite 200 Indianapolis, IN 46240 317.844.6777 FAX: 317.706.6451 www.cripe.biz Remarks: Hard copy and PDF plans for the Carmel ADLS/TAC submittal. c: Scanned file Signed: Sherri Wilson, swilson@cripe.biz Transmittal Only: