HomeMy WebLinkAboutC511 - PLAN AND PROFILE (STORM)FHVWWWWWWWWWWWFDCWWWWWWWWWWWWWWWWWGGGGGGGGGGGGGGT
4"6"DOMFIREW W W WG P WS
6"
C.O.
C.O.
C.O.
RDRDRDRD RDRD
C.O.
725
RIM=865.80
725A
RIM=865.25
724
RIM=864.00
724A
RIM=866.80
724B
RIM=868.00
723
RIM=866.00
722
RIM=865.25
721
RIM=865.25
721A
RIM=867.20
712
RIM=864.00 711
RIM=864.00
713
RIM=864.00
18' OF 12" RCP
@1.37%
60' OF 12" RCP
@1.24%
145' OF 30" RCP
@0.61%
9
1
'
O
F
1
2
"
RCP@1
.
2
1%88' OF 30" RCP@0.60%107' OF 12" RCP@1.26
%
37' OF 12" RCP
@3.42%
119' OF 12" RCP
@1.47%
46' OF 30" RCP
@0.54%NO PARKINGNO PA
R
KI
N
G
134' OF 12" PVC
@0.25%
315' OF 12" PVC
@0.25%
721B
RIM=864.50
77' OF 12" RCP
@1.36%STR. #722 MH 4' DIA.; R-3010TC: 865.25INV. IN 857.11 (30" RCP (N))INV. OUT 857.11 (30" RCP (E))STR. #723 MH 4' DIA.; R-3010TC: 866.00INV. IN 857.42 (30" RCP (N))INV. OUT 857.64 (30" RCP (S))STR. #724 MH 5' DIA.; R-3010TC: 864.00INV. IN 857.70 (30" RCP (N))INV. IN 859.00 (12" RCP (W))INV. OUT 857.70 (30" RCP (S))STR. #721 MH 5' DIA.; R-3010TC: 865.25INV. IN 856.23 (30" RCP (W))INV. IN 857.65 (12" RCP (NW))INV. OUT 856.23 (36" RCP (E)) 47' 0.59% 30" RCP 88' 0.60% 30" RCP
145' 0.61% 30" RCP
18095
Project Number:
Drawing Number:
Certified By:
Checked ByDrawn ByIssue Date
Revisions:PROJECT:Scope Drawings:CARMEL, INDIANANEWFORCARMEL CLAY SCHOOLSCARMEL ELEMENTARY SCHOOLSDrawing Title:
06-21-19 SO MK
STORM SEWER PLAN
STORM SEWER PROFILE
ALIGNMENT 724-721
1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION
TO CONFORM TO APPLICABLE LOCAL AND STATE
STANDARDS.
2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE
PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A.
STANDARDS FOR WORKER SAFETY.
3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD
VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION
BEGINS.
4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING
TREES.
GENERAL NOTES
SCALE: 1" = 30'
SCALE:HORZ.: 1"=30'
VERT.: 1"=5'
LEGEND
Existing Grade New Grade Granular Backfill
C511
PLAN & PROFILE
(STORM)
NOTE*
INSTALL FULL DEPTH GRANULAR BACKFILL WHEN
UTILITY IS WITHIN 5' OF PAVEMENT.