Loading...
HomeMy WebLinkAboutC511 - PLAN AND PROFILE (STORM)FHVWWWWWWWWWWWFDCWWWWWWWWWWWWWWWWWGGGGGGGGGGGGGGT 4"6"DOMFIREW W W WG P WS 6" C.O. C.O. C.O. RDRDRDRD RDRD C.O. 725 RIM=865.80 725A RIM=865.25 724 RIM=864.00 724A RIM=866.80 724B RIM=868.00 723 RIM=866.00 722 RIM=865.25 721 RIM=865.25 721A RIM=867.20 712 RIM=864.00 711 RIM=864.00 713 RIM=864.00 18' OF 12" RCP @1.37% 60' OF 12" RCP @1.24% 145' OF 30" RCP @0.61% 9 1 ' O F 1 2 " RCP@1 . 2 1%88' OF 30" RCP@0.60%107' OF 12" RCP@1.26 % 37' OF 12" RCP @3.42% 119' OF 12" RCP @1.47% 46' OF 30" RCP @0.54%NO PARKINGNO PA R KI N G 134' OF 12" PVC @0.25% 315' OF 12" PVC @0.25% 721B RIM=864.50 77' OF 12" RCP @1.36%STR. #722 MH 4' DIA.; R-3010TC: 865.25INV. IN 857.11 (30" RCP (N))INV. OUT 857.11 (30" RCP (E))STR. #723 MH 4' DIA.; R-3010TC: 866.00INV. IN 857.42 (30" RCP (N))INV. OUT 857.64 (30" RCP (S))STR. #724 MH 5' DIA.; R-3010TC: 864.00INV. IN 857.70 (30" RCP (N))INV. IN 859.00 (12" RCP (W))INV. OUT 857.70 (30" RCP (S))STR. #721 MH 5' DIA.; R-3010TC: 865.25INV. IN 856.23 (30" RCP (W))INV. IN 857.65 (12" RCP (NW))INV. OUT 856.23 (36" RCP (E)) 47' 0.59% 30" RCP 88' 0.60% 30" RCP 145' 0.61% 30" RCP 18095 Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANANEWFORCARMEL CLAY SCHOOLSCARMEL ELEMENTARY SCHOOLSDrawing Title: 06-21-19 SO MK STORM SEWER PLAN STORM SEWER PROFILE ALIGNMENT 724-721 1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A. STANDARDS FOR WORKER SAFETY. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING TREES. GENERAL NOTES SCALE: 1" = 30' SCALE:HORZ.: 1"=30' VERT.: 1"=5' LEGEND Existing Grade New Grade Granular Backfill C511 PLAN & PROFILE (STORM) NOTE* INSTALL FULL DEPTH GRANULAR BACKFILL WHEN UTILITY IS WITHIN 5' OF PAVEMENT.