SANITARY SEWER PERMIT 999913225
Final Subdivision Sanctuary at 116th St
2018-1367 Section Number 2B
_ _.
............................................................... _...... ......... ..... _..........
Sanctuary at 116th Street Section 2B Lot Number 81
CESO Inc. Address Number
Lift Station 16 Zionsville Presbyterian Station Address 2
Treatment Plant CTRWD WWTP Street
Parcel Acreage 0.28 City
EDU in Gallons 310 Zip Code
County
Local Sewer Charge - District Contribution
0.00
910.251//
910.25Y
901.39/
guilder
Plan Review and Inspection
0.00
.- ••
....................__ ........_.................._.................._..
Application Fee
15 0. 00 _
Phone Number
EDU Fee
1908.00
Owner
Interceptor Fee
0.00
....... .
phone Number
Other Fees
0.00
Fees Due ......... _..... .- ..........
I .......... . _._.......
2058.00
Occupant
Invoice Number
Phone Number
11904
West Road
Zionsville
....
46077
Hamilton
Ryan Homes
317-371-6577
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has:
Grease Trap
Grease Interceptor
Grit Interceptor
Grinder Station
Slab Foundation
Crawl Space
Basement
Main ID:
Manhole IDs USMH
YES Lid Elevation
First Floor Elevation
Water Service City of Carmel I Basement Elevation
Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by:
SNT846-SNT847
SNT-846 /
906.96 `�
SNT-847 DSMH
907.35,
910.251//
910.25Y
901.39/
901.39 ✓
3.29
2.901, Ft.
Ejector Pump Only
TriCo currently requires that an W inspection is performed and a Certificate of Compliance is issued prior to occupancy /
sale of a proper-ty. Please review attached 1/1 Permit.
j� Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure.
The terms of the conditional permit, if any, are listed below.
Plans have been submitted.
All fees have been paid.
No certificate of insurance required.
No additional permits required.
No manhole core permit required. W
The facility is not classified as a FOG facility.
(Notes)
By signing below, I attest that I am familiar with the District's specifications and agree to accept responsibility for all work done under this permit.
Builder/ Owner Signature Phone Number
Printed
i
Approved By i
Ryan H an, strict Engine- 04/01/2019
Permit is valid f r ON -YEAR from the date issued. Permit valid only with TriCo seal in red ink.