Loading...
HomeMy WebLinkAboutRiviera - Lot 56 - Legacy RidgeFront Elevation AArtist Rendering Only. See Construction Drawings and Selection Sheets for Finish Materials, Colors, and Specifications.Set No. 0314A0Reversed (Left-Hand Garage) OrientationBasement FoundationLot 56, Legacy Ridge 14360 Arnett Drive, Carmel, IN 46033The Riviera AIntegrated Plan OptionsJob NotesTHIS PLAN SET REFLECTS THE FOLLOWING CHECKED OPTIONS:Plan RevisionsEstate Riviera A 0314A0 T-1Title Page Selected OptionsEstate Riviera A 0314A0 Front Elevation ALegacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 A1.1Elevations Right ElevationRear ElevationLeft ElevationExterior Trim KeyNote:Note: Selected OptionsEstate Riviera A 0314A0 Roof Plan ALegacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 A1.2Roof Plan Garage SlabBasement SlabSelected OptionsEstate Riviera A 0314A0 Foundation Plan AArea CalculationsLegacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 A2.1Foundation Plan DenBathUnfinishedUtility Rm.ClosetWalk-InBasementFinishedStorageUnfinishedEstate Riviera A 0314A0 Legacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 A2.2Foundation PlanFinished Basement Great Rm.FoyerCasual Dining2-StoryDining Rm.Covered PorchKitchenFamilyFoyerPowderRoomWalk-InClosetWalk-InPantryClosetWalk-InCloset5th Bdrm.SuiteBdrm. 5Bath3-CarGarageArea CalculationsSelected OptionsEstate Riviera A 0314A0 First Floor Plan ALegacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 A3.1First Floor Plan Note:General Notes: Owner's SuiteBedroom 2Bedroom 3Bedroom 4LoftClosetWalk-InClosetWalk-InLaundryClosetWalk-InHall BathOwner'sBathBelowOpen toClosetWalk-InSittingRoomBath 3ClosetWalk-InWalk-inClosetSelected OptionsEstate Riviera A 0314A0 Second Floor Plan ALegacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 A3.2Second Floor Plan Bedroom 3LaundryDining2-StoryFoyerLoftBasementAtticEstate Riviera A 0314A0 Legacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 A4.1Building SectionBuilding SectionAll Estate Riviera A 0314A0 Legacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 A4.3Exterior DetailsColumn BasePlan Section at at Porch ColumnSectionBracket Detail Estate Riviera A 0314A0 Legacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 AD-5Shower DetailsWalk-In ShowerPlan at Walk-In ShowerElevation at Walk-In ShowerInterior at Selected OptionsEstate Riviera A 0314A0 Foundation Electrical ALegacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 E2.1Foundation Elec.Electrical Legend Estate Riviera A 0314A0 Legacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 E2.2Foundation Elec.Finished BasementElectrical Legend Selected OptionsEstate Riviera A 0314A0 First Floor Electrical ALegacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 E3.1First Floor Elec.Electrical Legend Selected OptionsEstate Riviera A 0314A0 Second Floor Electrical ALegacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 E3.2Second Floor Elec.Electrical Legend Selected OptionsEstate Riviera A 0314A0 First Floor Framing ALegacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 S1.1First Floor Framing Legend BelowOpen toEstate Riviera A 0314A0 Second Floor Framing ALegacy Ridge, Lot 56 14360 Arnett Drive, Carmel, IN 46033 S1.2Second Flr. Framing Legend AD-4All Houses Family Org. Built-In's SAMSection at Built-InsPlan Section at Built-InsElevation at Built-Ins All Houses Floor Framing DetailsD-3All Collections Typical Rim Board ClosureTypical Squash Block DetailTypical Point-Load DetailHanger Detail at Solid BeamI-Joist Brick Cantilever DetailTypical I-Joist Cantilever DetailHanger Detail at I-JoistBrick Cantilever DetailTypical I-Joist Load-Bearing Cantilever Detail Community & Home Site Construction Manager Frame Check Garage FC CM Attic Access location correct per Print, access has 14 inch sides if an insulated attic. Check size of Gables Access. FC CM Post plumb and strapped to beam at top FC CM Garage beam will be sealed to prevent air infiltration to floor space after Drywall is hung FC CM Walls in Attic have sheathing installed FC CM All panels are taped in Attic & Verticals Taped. FC CM House band board in garage attic has insulated sheathing installed FC CM House wrap installed at Band system in Garage and pulled down FC CM Truss bracing installed if required FC CM 2x Framing for trusses/girders nailed directly house to framing without foam sheathing between frame members FC CM Truss hanger’s nailed completely with required nails FC CM Garage door opening correct size and location FC CM Smart trim at bottom of door at concrete is ¼ inch off of concrete FC CM Anchor bolts in garage plate installed 12 inches from each plate end at foundation and not more than 6 foot on center and 12 inches from corner. Garage Portal frame 2x2 square washers in place at door. Nuts tight. FC CM Garage steps are of equal rise to top of door threshold from garage floor. Not more than 8 ¼ rise FC CM Sill sealer installed under wall or floor system between house and garage FC CM Garage door bucks installed floor to ceiling in 1 piece 2x6 minimum. Buck is not to be in contact with concrete Nailed 12 inches on center FC CM Garage door buck installed above door 1 piece 2x6. 2x10 installed above center of door to ceiling for garage door opener nailed 12 inches on center FC CM Estate/Side load electrical panel walls build if required. Note these walls may not be on print. FC CM OSB is cut back 2 inches on each side of ridge, Ripper row no less than 2' at Peak. FC CM Bowed studs are marked. Note these markings may be visible to customer if garage in not finished FC CM Garage to house door set with 3 shims on each side and/or Exerior Service Door. FC CM Drywall nailer in place on ceiling and corners/check for insulation access. FC CM Garage door Portal framing correct per IRC 2008 Indiana amendments. Truss to girder connection 1/4" or less Solid Bearing. FC CM Truss Drawings and print hung in Garage FC CM Girder truss bearing is complete to foundation Frame, House Interior FC CM Garage to house door set with correct reveal 6 shims total FC CM Bowed studs checked and marked in orange on the stud and floor with a B FC CM Check each room per print for wall and door opening placement FC CM Check each room for window placement. FC CM Check walls for plumpness mark correction using OOP OOL FC CM Windows centered in the opening shim sides if needed window to sit on sill with 1/8 bumper on bottom. Does the window operate smoothly FC CM Mark each doorway with correct door size and swing Example of how to mark… 2/6 RH with an arrow. FC CM Mark in writing if an opening wraps in drywall wright the word out Drywall wrap or do not drywall or Wood wrap. FC CM Add cabinet dimensions to verify correct wall length FC CM Layout CL of range hood location vertical and horizontal. FC CM Layout cabinet locations in kitchens and baths. Verify correct space for cabinets FC CM Think about outlet/switch location in kitchen. Are all location either under cabinets or outside of cabinets? This has to do with backsplash tile FC CM Think about the locations for the outlets in bathrooms, no outlets in side splashed or behind mirrors. FC CM Check ½ wall height to be certain it is tall enough to allow casing and vanity side splash to not interfere same applies in home office area FC CM Check to be sure toilet and shower drains do not interfere it the Joist locations FC CM Verify correct walls or no walls are installed at stairway, walls vs rails. FC CM Check floor joist layout for correct placement FC CM Check roof truss layout for correctness FC CM Check for correct truss bracing, note you will need truss drawings for this. Additionally correct overlapping is required at brace connections FC CM Shower pan blocking is in place FC CM Stud placement in a shower location is to be no more than 16 inches O.C FC CM Drywall nailers are in place in corners all locations FC CM Drywall nailers are in place at ceilings. Parallel wall to trusses should be cross blocked 2 foot OC laid out for drywall placement FC CM Floor decking nailed and glued Nails 4 in the field 6 on the seams missed nails need pulled FC CM Floor joist are nailed and glue is present in hangers FC CM Air sealing in dead cavities is complete FC CM Stairs are secures with 2-16d nails from back of stringer. No visible nails from the top. FC CM Roof decking is gapped on 4 foot ends 1/8 to ¼ inch. Nailed 4 in the field 6 on the edge FC CM Exterior doors are to be shimmed with 3 places each side for a 6/8 door 4 each for a taller door or a door with a transom. FC CM Ensure finish width of Halls, landings will be 36 inches. FC CM Nailers for Tub Flange (32 inches for tub shower & 34 inches for fiberglass shower) Frame Checklist Frame Business Partner Frame Check Basement FC CM Post plumb and tabs wrapped around the top FC CM Post locations are correct, point loads from above in floor system installed FC CM Beam is bearing in pocket at least 3 inches FC CM Squash block are in place from over beam if there is a load bearing wall above. FC CM No visible gaps in basement rim board FC CM Floor joist laid out per print, LVL beans if needed are located in correct location. FC CM Look for nails that have missed the joist and remove them FC CM Joist hangers are secure with correct nails and joist are glued FC CM Straps at bottom plate secured with 2 nails each strap on top and spaced 12 inches from plate ends and corners 6 feet on center. FC CM Basement is clean no debris FC CM Basement stairs are shimmed ½ inch from wall. There are no visible nails from top through stringer. All nails are driven through 2x from under stairs. 3 Nails per step. FC CM Stair Head height is correct. At minimum 6’8 inches in a plane diagonal line to stair header plumb. FC CM Nosing not at top of stairs at first floor but is present and basement landing if stair case has a landing FC CM Basement wall at basement landing is furred out with 2x material and wall is covered with insulation board or house wrap. This depends on the space available. FC CM Unfinished basement stair walls have 2x4 stud’s 16 inch OC on all 3 sides to close accessibility FC CM Basement wall secured to floor with concrete nails and walls are plumb. Finished Basement FC CM Door opening plumb and marked with 2 inch over call size of door 2 inches taller FC CM 2x4 studs 16 inches OC treated bottom plate FC CM Drywall nailers present in in corners and at ceiling FC CM All unfinished space must have a door opening into the area. FC CM Bulkheads build shall be no lower than 7’ 1 inch from concrete floor. FC CM Fire block weed cap above framed wall filling gap to bottom of joists. Daylight Walkout Basement FC CM To the bottom of a daylight window there in not more than 42 inches to the opening. FC CM 100% braced sheathing used. Wall must meet bracing requirements of 2008 IRC. This means consideration for full 4 foot sheets. Wall cannot be all windows. Proper nailing pattern of braced sheathing. FC CM Sill sealer is located under exterior walls. Walls are bolted per the 2008 IRC 12” plate ends 6 ‘OC FC CM Any stud distance from concerate wall & each step wall face will need to have concrete wall insulation installed. Exterior FC CM All horizontal seams flashed with house wrap a minimum of 6 inches hanging out FC CM Holes and cuts in sheathing repair by tape or damaged sheathing replaced FC CM Window tape install on 3 sides, 2 sides first and top last. Top must be even past the sides. No tape or sealer on bottom. FC CM Over hangs on home correct per print. Eyebrows installed per print FC CM Windows correct per print and are in alignment FC CM Exterior trim to be installed no closer to a shingled roof than 1 inch. Account for shingle thickness FC CM All trim installed has the vertical ran past the horizontal at the intersections. FC CM All horizontal smart trim used in board and batten style application must be installed prior to MDF board and have drip cap installed over the horizontal 5/4 trim board. Board batten panel is to be installed between the horizontals with ¾ trim over MDF to create the vertical. FC CM Azeck trim installed at under doors on basement homes FC CM 1x2 trim installed at horizontal brick transitions FC CM Window mantles install with Ice and water behind. Ice and water to extend 6 inches past sides and top and is taped at top FC CM House wrap install with overlaps of 6 inches horizontal and vertical FC CM Vertical seams of house wrap need taped with correct brand seathing tape FC CM House warp install on all inside & outside corners FC CM House wrap install with cap nails no more that 32inch square FC CM Raptor roof paper installed professionally verticle laps are to be a minimum of 4 inches, horizontal laps 6 inches, cap nails at seams 12 inches OC 24 inch cap nails on seams. FC CM Raptor paper to be installed to create a valley that sheds water by laps FC CM Roofer to install roof edge under raptor at eaves and over paper gables. Plan nail placement accordingly FC CM Roof less than 4/12 must have 2 layers of felt. FC CM Exterior door trim to be taped as windows. FC CM Exterior doors to be sat on rubber membrane that drapes to the exterior FC CM Rubber membrane to be installed so after concrete is poured it will be between the concrete and the house FC CM Gutter overhang or porch tiding back to verticle wall should have Ice & Water installed @ transition. Notes: