HomeMy WebLinkAboutT111 2nd Floor Cover SheetGENERAL PROJECT NOTES
].BUILDING CODE COMPLIANCE: ALL WORREHALL COMPLY WITH THE
REQUIREMENTS OF THE EXISTING BUILDING CONSTRUCTION TYPE AS
DEFINED BY SECTION 601 OF THE INDIANA BUILDING CODE. ALL WORK
SHALL COMPLY WITH THE REQUIREMENTS OF ALL APPLICABLE STATE AND
LOCAL BUILDING CODES. CONTRACTORS ARE RESPONSIBLE FOR
VERIFYING THE CURRENT APPLICABLE BUILDING CODES) FOR THEIR
RESPECTIVE SCOPE OF WORK. ENSURE THAT ALL MATERIALS AND LABOR
ARE IN ACCORDANCE WITH THE BEST QUALITY STANDARDS OF EACH
RESPECTIVE TRADE W NETHER SPECIFIED OR NOT. THE GENERAL
CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL WORK IS IN
ACCORDANCE WITH ALL FEDERAL STATE AND LOCAL BUILDING
CODES, AND STANDARDS FOR GENERAL, MECHANICAL, AND
ELECTRICAL CONSTRUCTION.
2. CONTRACTOR SITE VISITS: CONTRACTORS) SHALL VISIT THE WORK
SITE PRIOR TO COMMENCEMENT. THE DRAWINGS CONTAINED HEREIN
MAY NOT BE ALL INCLUSIVE OF EXISTING CONDITIONS OR NEW WORK
REQUIREMENTS. CONTRACTORS) SHALL MAKE THEMSELVES FAMILIAR
WITH THE WORK SITE IN THE FIELD IN ORDER TO BE FULLY AWARE OF THE
REQUIREMENTS OF THE SCOPE OF WORK.
3. CONTRACTOR FIELD VERIFICATION: FIELD VERIFY ALL DIMENSIONS
AND MEASUREMENTS. INFORM THE GENERAL CONTRACTOR BEFORE
BEGINNING ANY CONSTRUCTION IF EXISTING CONDITIONS PREVENT
OBTAINING RESULTS AS SHOWN OR SPECIFIED. DO NOT SCALE
DRAWINGS. NOTED DIMENSIONS TAKE PRECEDENCE. VERIFY EXISTING
CONDITIONS INDICATED ON THE DRAWINGS AND REPORTANY
DISCREPANCY THROUGH THE GENERAL CONTRACTOR TO SCHOTT
DESIGN, INC.
4. GENERAL CONTRACTOR COORDINATION WITH OWNER: THE GEN ERAL
CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING ALL
ON -SITE ACTIVITIES; SUCH AS, BUT NOT LIMITED TO, WORK SCHEDULE,
MATERIALS STORAGE AND HANDLING, DELIVERIES, ACCESS TO THE
WORK SITE, TRAFFIC CONTROL, AND BUILDING/PUBLIC SAFETY
PROCEDURES DURING CONSTRUCTION. THE CONTRACTOR SHALL ALSO
COORDINATE WORK BY OTHERS" WITH HIS/HER OWN ACTIVITIES AS
NECESSARY TO EXECUTE THE OVERALL PROJECT SCOPE. THE GEN ERAL
CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY
WORKING HOURS, WEEKEND HOURS AND HOURS THAT MAY BE WORKED
PRIOR TO AND DURING HOLIDAYS, LANDLORD RESERVES THE RIGHT TO
RESTRICT CONSTRUCTION TO NIGHTS AND WEEKENDS WHEN THAT
CONSTRUCTION 15 DEEMED TO INTERFERE WITH THE OPERATIONS OF
ADJACENT TENANTS.
5. PROJECT MATERIAL LEAD TIMES: FOR THOSE ITEMS TO BE ORDERED
REQUIRING LEAD TIME, THE CONTRACTOR SHALL COORDINATE THE
PROJECT SCHEDULE ACCORDINGLY AND COMMUNICATE TO THE
OWNER, TENANT, AND SCHOTT DESIGN WHEN DECISIONS MUST BE
RENDERED IN ORDER FOR THE CONTRACTOR TO MEET THE PROJECT
SCHEDULE. THE OWNER, TENANT, OR DESIGNER/ARCHITECT IS NOT
RESPONSIBLE FOR DELAYS RESULTING FROM THE CONTRACTOR'S
FAILURE TO COMMUNICATE MATERIAL LEAD TIMES.
6. MATERIAL SUBSTITUTIONS: SUBSTITUTIONS FOR SPECIFICALLY NAMED
PRODUCTS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL FROM
THE DESIGNER. SUBMIT REQUESTS FOR SUBSTITUTIONS WITH APPROPRIATE
SUPPORT INFORMATION TO THE DESIGNER. ALLOW REASONABLY
SUFFICIENT TIME FOR THE DESIGN ER TO REVIEW THE REQUEST AND
RENDER A DECISION.
7. SAFE WORK AREA: SCHOTT DESIGN, INC., SHALL NOT HAVE CONTROL
OVER, OR BE IN CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR A
CONTRACTOR'S CONSTRUCTION MEANS METHODS SCHEDULES
SEQUENCES, OR SAFETY. THE CONTRACTORS SHALL BE RESPONSIBLE
FOR MAINTAINING A SAFE ENVIRONMENT FOR WORKERS AND THE
PUBLIC AT ALL TIMES.
B. GENERAL CONTRACTOR CLEANUP PROCEDURES: THE GENERAL
CONTRACTOR SHALL ESTABLISH WITH THE LANDLORD CLEANUP
PROCEDURES AND GUIDELINES TO BE FOLLOWED ON A DAILY BASIS IN
ORDER TO CONDUCT BUSINESS IN A SAFE AND CLEAN ENVIRONMENT,
9. STAGING PARKING DUMPSTERS RESTROOMS: THE GENERAL
CONTRACTOR SHALL COORDINATE WITH THE LANDLORD AN AREA FOR
STAGING OF CONSTRUCTION MATERIALS, EQUIPMENT, DUMPSTER AND
PARKING CONSTRUCTION AN D DELIVERY VEHICLES. THE USE OF EXISTING
REST ROOM FACILITIES SHALL BE APPROVED BY THE LANDLORD. ONLY
THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS.
10. DUST CONTROL: THE GENERAL CONTRACTOR SHALL USE DUST
PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT OPERATIONS
DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS
SHALL BE CONSTRUCTED OF 2X4 WOOD STUDS @ 24"O.C., INSULATION
AND 6 MIL VAPOR BARRIER ON EACH SIDE.
11. PROJECT INSTALLATION CONFLICTS: CONTACT THE DESIGNER
IMMEDIATELY IF, IN THE FIELD, CONFLICTS ARE DISCOVERED BETWEEN
COMPONENTS OF DIFFERENT SYSTEMS THAT PREVENT THE INSTALLATION
OF THOSE COMPONENTS AS INDICATED ON THE DRAWINGS. Q.E.
WHERE EXISTING MECHANICAL DUCTWORK MAY PREVENT THE
INSTALLATION OF LIGHTING FIXTURES AS INDICATED ON THE CEILING
PLAN).
12. SCHOTT DESIGN HAZARDOUS MATERIALS WAIVER: SCHOTT DESIGN,
INC., IS NOT RESPONSIBLE FOR THE IDENTIFICATION, DISCOVERY,
PRESENCE, HANDLING, REMOVAL, DISPOSAL OF, OR EXPOSURE TO ANY
PERSONS, THAT OF HAZARDOUS MATERIALS IN ANY FORM ON THE
PROJECT SITE.
13, WOOD BLOCKING IN WALLS: PROVIDE FIRETREATEDWOOD
BLOCKING IN WALLS FOR ALL WALL HUNG ITEMS INCLUDING
MILLWORK, WALL STOPS, CABINETRY, ETC,
14, SHOP DRAWINGS: SHOP DRAWINGS OR CATALOG CUTS MUST BE
SUBMITTED TO SCHOTT DESIGN, INC. FOR APPROVAL ON ALL MATERIALS
OR ITEMS WHERE THE CONTRACTOR CHOOSES TO DEVIATE FROM WHAT
IS SHOWN ON THE DRAWINGS, OR IF THE DRAWINGS DO NOT INDICATE
A SPECIFIC MANUFACTURER OR MODEL NUMBER, EXPEDITE
PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO ALLOW
SUFFICIENTTIME FOR CHECKING, APPROVAL, ORDERING, FABRICATION,
AND DELIVERY OF MATERIALS AND EQUIPMENT.
15. PROJECT APPROVALS: ALL DETAILS, MATERIALS, AND INSTALLATIONS
ARE SUBJECT TO FIRST APPROVAL BY SCHOTT DESIGN, INC., AND FINAL
APPROVAL BY THE OWNER.
16. CHANGE ORDERS: REVIEW AND COORDINATE ALL NEW WORK AND
EXISTING CONDITIONS WITH ALL OTHER TRADES. FIELDWORK ORDERS &
CHANGE ORDERS WILL NOT BE APPROVED FOR ANY CONDITIONS OR
CONFLICTS THAT COULD HAVE BEEN ACCOUNTED FOR BY THE BIDDER
DURING PRE -BID FIELD INSPECTION AND AFTER AWARD OF CONTRACT,
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
aT, City OF
Camel
IVT�LJtON�DMK
DATE: \ 07/01/19
17. FURNITURE AND EQUIPMENT EXCLUSIONS: FURNITURE, OFFICE EQUIPMENT
OFFICE PARTITION SYSTEMS REFRIGERATORS VENDING MACHINES AND
OTHER SIMILAR ITEMS SHOWN DASHED ON THIS DRAWING AND NOT
ATTACHED TO THE BUILDING ARE FOR REFERENCE ONLY AND ARE NOT TO BE
PROVIDED AS PART OF THE WORK UNLESS SPECIFICALLY STATED TO BE
PROVIDED,
18. WALL PATCHING: PATCH ALL GYPSUM WALLBOARD AT AREAS OF
ELECTRICAL, DATA AND SWITCH DEVICES BEING REMOVED. PATCH HOLE WITH
DRYWALL, TAPE, SPACKLE AND PREPARE FOR FINISH.
19. CONSTRUCTION CLEANING: EXECUTE THOROUGH FINAL CLEAN AND
INSPECTION OF THE SPACE UPON COMPLETION OF THE PROJECT. ALL
SURFACES, FIXTURES, AND EQUIPMENT SHALL BE CLEAN, AND THE SPACE SHALL
BE TURNED OVER TO THE OWNER IN A CONDITION THAT REPRESENTS THE
HIGHEST LEVEL OF CARE AND PROFESSIONALISM. ENSURE ALL GENERAL
CONTRACTOR INSTALLED APPLIANCES WORK & DO NOT LEAK.
20, O&MMATERIALS: PROVIDE TO THE OWNER ALL OPERATION AND/OR
MAINTENANCE MANUALS, OR INSTRUCTIONS FOR ALL EQUIPMENT AND
SYSTEMS AT THE COMPLETION OF THE PROJECT,
21, PLAN DIMENSIONS: ALL PLAN DIMENSIONS ARE FROM FACE OF EXISTING
FINISH TO FACE OF NEW GYPSUM BOARD WALL, OR FACE TO FACE OF NEW
GYPSUM BOARD WALL, DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS
GOVERN.
22. WINDOW BLINDS: CONTRACTOR TO PROVIDE AN ALLOWANCE FOR
CLEANING EXISTING WINDOW BLINDS, REPLACE ANY DAMAGED OR MISSING
WINDOW BLINDS WITH NEW TO MATCH BUILDING STANDARD.
23. PERMITTING: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFYING THE REQUIREMENTS REGARDING LOCAL PLAN REVIEW, PERMITS,
NSPECTIONS, AND FEES. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR SUBMITTING ALL REQUIRED DRAWINGS AND SUPPORTING DOCUMENTS TO
THE LOCAL BUILDING OFFICIAL AND/OR PERMIT DEPARTMENT. ALL REQUIRED
LOCAL PERMIT FEES SHALL BE PAID BY THE GENERAL CONTRACTOR UNLESS
STIPULATED OTHERWISE IN THE OWNER/CONTRACTOR AGREEMENT.
24. FIRE SEALING: FIRE SEAL ALL PENETRATIONS THROUGH RATED WALLS,
FLOORS, AND CEILINGS WITH APPROVED FIRE -RATED CAULK AS DIRECTED BY
LOCAL JURISDICTIONS. CONTRACTOR TO BE AWARE THAT EXISTING
CONDITIONS ARE NOT NECESSARILY AN INDICATOR OF BUILDING TYPE.
BUILDING TYPE LISTED ON LI OO IS BASED UPON AVAILABLE INFORMATION AND
FIELD VERIFICATION.
25. WALL PENETRATIONS: WHERE STRUCTURAL BEAMS, DUCTWORK, ETC.
PENETRATE SOUND OR FIRE RATED PARTITIONS, GYPSUM WALLBOARD WALL TO
BE SCRIBED TO FIT TIGHT, CAULKED AN D FIRE DAMPERED IF REQUIRED.
26. FLOOR LEVELING: CONTRACTOR TO ALLOW FOR UNLEVEL FLOOR
CONDITIONS. ALL EXISTING FLOOR AND WALL SU BSTRATES SHALL BE LEVELED
AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES.
ADJUST DOORS AND FRAMES AS REQUIRED.
27. REPAIR GYPSUM WALLBOARD: WHERE DEMOLITION HAS OCCURRED AT
REMAINING WALLS. REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION.
PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR
ADJOIN TO EXISTING CORE WALLS.
28. EQUIPMENT INSTALLATION: ALL EQUIPMENT AND/OR FIXTURES SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS OR INSTRUCTIONS.
FINISH NOTES
I. STATE BUILDING COMPLIANCE FOR FINISHES: ALL FINISHES SHALL COMPLY
WITH CHAPTER (INTERIOR FINISHES) OF THE INDIANA BUILDING CODE FOR
CLASS A FIRE RATINGS.
2. GYPSUM ASSOCIATION CONFORMITY: FOR ALL NEW DRYWALL
INSTALLATIONS, INSTALL AS RECOMMENDED BY THE GYPSUM ASSOCIATION.
(SUCH AS, CONTROL JOINTS, FINISH LEVELS, FASTENERS, TAPING DETAILS,
CORNER BEADS, ETC.) PROVIDE NEW CEMENT BACKER BOARD AS A
SUBSTRATE FOR NEW WALL TILE PER MANUFACTURER'S RECOMMENDATIONS
3. COVER PLATES: REFERENCE REFLECTED CEILING PLAN AND ELECTRICAL
PLAN FOR COLOR OF ELECTRICAL AND DATA DEVICES AND PLATES. REMOVE
ALL PLATES BEFORE PAINTING AND REATTACHED AFTERWARDS. CONTRACTOR
TO CONFIRM DESIRED COLOR PRIOR TO PURCHASING NEW.
4. PAINTING: ALL AREAS RECEIVING PAINT ARE TO RECEIVE PRIMER COAT
AND TWO (2) FINISH COATS.
5. FLOORING TRANSITION STRIPS: FOR CHANGE IN FLOOR FINISH MATERIAL,
PROVIDE TRANSITION STRIP AT DOOR OPENINGS AS NOTED ON FINISH PLAN
UNLESS NOTED OTHERWISE (I.E. WHERE VCT MEETS CARPET).
6. DELIVERY OF COMPREHENSIVE WORK PRODUCT: WHERE LIMITS OF WORK
ARE SHOWN, OTHER INCIDENTAL WORK LIKE PAINTING WHERE NEW OUTLETS
HAVE BEEN INSTALLED, IS CONSIDERED PART OF THE SCOPE OF WORK.
PROVIDE A COMPLETE AND FINISHED PRODUCT READY FOR TENANT AND
BUILDING OWNER.
7. WALL DEMOLITION: REFINISH SURFACES TO MATCH EKISTI NG WHERE
DEMOLITION HAS OCCURRED. REPAIR GYPSUM WALLBOARD WHERE
DEMOLITION HAS OCCURRED AT REMAINING WALLS. REPAI R ANY GYPSUM
BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN
DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS.
8. TELEPHONE BOARDS: WHERE PHONE BOARD IS PROVIDED, PAINT BOARD
WITH FIRE RETARDANT PAINT TO MATCH ADJACENT WALL FINISH.
9. MILLWORK SAMPLES: SUBMIT FINISH SAMPLE OF MILLWORK (STAINED OR
PAINTED AS SPECIFIED) TO SCHOTT DESIGN FOR REVI EW AND APPROVAL
PRIOR TO THE FINISHING PROCESS OF ALL MILLWORK.
10. INTERIOR ELEVATION DETAILS: REFERENCE INTERIOR ELEVATION &
SECTIONS WHERE PROVIDED FOR ADDITIONAL FINISH INFORMATION.
11. PAINT & ADHESIVE VOC'S: ALL PAINTS AND ADHESIVES/SEALANTS SHALL
HAVE ZERO VOC CONTENT.
12. ADHESIVE MANUFACTURER RECOMMENDATIONS: ALL
ADHESIVES/SEALANTS TO BE USED AS RECOMMENDED BY PRODUCT
MANUFACTURER.
MECHANICAL & ELECTRICAL NOTES
I. DESIGN/BUILD MEP: THE MECHANICAL ELECTRICAL AND PLUMBING
SCOPES OF WORK ARE LIMITED TO BASIC DESIGN -BUILD ALTERATIONS
WHICH ARE OUTLINED IN THESE PLANS. THE DESIGN -BUILD CONTRACTORS
FOR EACH TRADE MUST NOTIFY THE ARCHITECT IF THEY FIND THAT THE
SCOPE OF WORK EXCEEDS THE LEVEL OF MECHANICAL, ELECTRICAL OR
PLUMBING WORK INDICATED ON THESE DRAWINGS SO THAT ANY
NECESSARY ENGINEERING CAN OCCUR AND ADDITIONAL PLANS CAN BE
FILED OR IF ADDITIONAL INFORMATION IS NEEDED IN ORDER TO DO THE
WORK IN THE FIELD. THE MECHANICAL, ELECTRICAL AND PLUMBING
DESIGN -BUILD CONTRACTORS SHALL COMPLY WITH ALL APPLICABLE
STATE AND LOCAL BUILDING CODES.
FIRE SUPPRESSION AND FIRE ALARM SYSTEMS SHALL BE INSTALLED BY THE
APPROPRIATE DESIGN -BUILD CONTRACTOR AND MUST COMPLY WITH ALL
APPLICABLE STATE AND LOCAL BUILDING CODES, FIRE SUPPRESSION
AND FI RE ALARM DESIGN -BUILD CONTRACTORS ARE RESPONSIBLE FOR
COMPLETING AND FILING THEIR PLANS AND OBTAINING THEIR PERMITS,
2. DESIGN/BUILD HVAC: MECHANICAL WORK IS LIMITED TO
DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. NO NEW
MAIN MECHANICAL APPLIANCES OR MAIN EQUIPMENT ARE BEING
PROVIDED. ALL MECHANICAL WORK IS LIMITED TO RELOCATION OF
DIFFUSERS AND FLEX DUCT PER NEW WALL LAYOUT. NO NEW HARD
DUCTWORK OR EQUIPMENT IS BEING ADDED; MECHANICAL
CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS
REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY
WITH THE INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE
CODES.
3. HVAC HEAT LOADS: VERIFY HEAT LOADS OF ANY SPECIAL EQUIPMENT
IN THE TENANT SPACE, AND PROVIDE ADDITIONAL AIR FLOW IF REQUIRED.
CONFIRM WITH OWNER PRIOR TO ANY PURCHASE OF NEW EQUIPMENT.
REVISE ZONING IF REQUIRED. DO NOT DESIGN ANY SINGLE OFFICE
SPACE TO BE ON A SPLIT ZONE UNLESS APPROVED BY BUILDING
OWN ER/LANDLORD. CONTRACTOR TO ENSURE THAT ALL HVAC ZONES
ARE LOCATED APPROPRIATELY SUCH THAT NO SPLIT ZONES ARE IN
OFFICES OR CONFERENCE ROOMS.
4. HVAC DIFFUSER LOCATIONS: RELOCATE AIR -SUPPLY DIFFUSERS AND
RETURN -AIR GRILLES AS REQUIRED, PROVIDE PROPER AIR SUPPLY FOR
DIFFUSERS AND RETURN AIR FROM RETURN AIR GRILLES. CONTRACTOR IS
TO PLACE LOCATION OF DIFFUSERS AND RETURN AIR GRILLES AS
REQUIRED BY CODE.
S. HVAC THERMOSTAT LOCATIONS: POSITION LOCATION OF ALL
THERMOSTATS WHERE APPROPRIATE PER MECHANICAL DESIGN.
COORDINATE WITH TENANT AND BUILDING OWNER FOR FURNITURE
PANEL OR OTHER CONFLICTS.
6. DESIGN/BUILD ELECTRICAL: ELECTRICAL WORK IS LIMITED TO
DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. ALL
ELECTRICAL WORK IS LIMITED TO ADDITIONS OR RELOCATIONS OF
ELECTRICAL OUTLET DEVICES AND LIGHTING THAT DO NOT EXCEED THE
CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING.
ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF
ADDITIONAL W ORK IS REQUI RED SO THAT ADDITIONAL PLANS CAN BE
FILED AND MUST COMPLY WITH ALL APPLICABLE CODES.
7. ELECTRICAL CODE COMPLIANCE: COMPLY WITH THE INDIANA
ELECTRICAL AND MECHANICAL CODE AND ALL OTHER APPLICABLE
CODES.
8. ELECTRICAL CIRCUITING: SIZE AND CIRCUIT ELECTRICAL POWER ITEMS.
PROVIDE OR REUSE ELECTRICAL POWER AND DATA OUTLETS AS
REQUIRED.
9. GFI OUTLETS: ALL ELECTRICAL OUTLETS WITHIN 6'-0" OF WATER ARE TO
BE GE.C.I.
10. PHONE AND DATA ACCOMMODATIONS: AT EACH PHONE AND DATA
JACK, PROVIDE PULL STRING FROM ABOVE CEILING TO BOX, TENANT'S
DATA CONTRACTOR IS RESPONSIBLE FOR PULLING CONDUCTORS AND
PROVIDING APPROPRIATE TERMINALS AT FACE PLATE,
11. ELECTRICAL SWITCH PLATES: PROVIDE COLORED FACEPLATES FOR
ELECTRICAL OUTLETS & SWITCH PLATES TO MATCH EXISTING, UNLESS
OTHERWISE NOTED. ELECTRICIAN TO FIELD VERIFY PRIOR TO PURCHASE.
12. WORK STATION POWER: PROVIDE JUNCTION BOXES OR POWER POLES
AT WORKSTATIONS WHERE SHOWN. REFER TO THE PLAN FOR THE
APPROPRIATE DESIGNATIONS. DATA WILL BE RUN BY THE TENANT'S DATA
VENDOR. ELECTRICIAN TO MAKE FINAL CONNECTION FROM
WORKSTATION WHIP TO JUNCTION BOX. THE FURNITURE VENDOR IS TO BE
RESPONSIBLE FOR WIRING THE BASE PANELS OF THE WORKSTATIONS.
CONTRACTOR TO COORDINATE WITH TENANT ON WORKSTATION
FURNITURE SPECIFICATIONS TO OBTAIN CIRCUITRY REQUIREMENTS PRIOR
TO RUNNING ELECTRICAL CONDUITS TO JUNCTION BOXES.
13. LIGHTING CIRCUITS: VERIFY EXISTING LIGHTING CIRCUITING. SIZE NEW
CIRCUITS AS REQUIRED. PROVIDE NEW OR REVISE EXISTING CIRCUITING
FOR NEW LAYOUT OF LIGHT FIXTURES.
14. ELECTRICAL OUTLETS: ENSURE THAT ALL MOUNTING HEIGHTS OF
ELECTRICAL DEVICES MEET A.D.A. REQUIREMENTS,
15. LIGHTING SWITCH PLATES: WHERE MULTIPLE SWITCHES ARE SHOWN,
PROVIDE (1) GANG BOX WITH A SINGLE COVERPLATE.
16. LIGHT FIXTURE PLACEMENT: CENTER CEILING ELEMENTS IN CEILING
TILES, INCLUDING RECESSED DOWN LIGHTS, SMOKE DETECTORS,
SPRINKLER HEADS, AND EXIT SIGNS UNLESS OTHERWISE NOTED.
17. EMERGENCY LIGHTING: PROVIDE EMERGENCY LIGHTING IN TENANT
SPACE AS REQUIRED PER NEMA AND IBC. EMERGENCY BATTERY PACKS
OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE
REQUIRED IF THE SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES
SHOWN ON PLAN ARE FOR REFERENCE ONLY.
18, FIRE ALARM SYSTEM: PROVIDE ALARM NOTIFICATION APPLIANCES
(HORNS/STROBES), EMERGENCY SPEAKERS, SMOKE DETECTORS, FIRE
PULLS, AND ANY OTHER REQUIRED ALARM & DETECTION SYSTEMS AS
NECESSARY TO MEET ALL APPLICABLE CODES (INTERNATIONAL BUILDING
CODE, INTERNATIONAL FIRE CODE, NFPA). IN RECEPTION AREAS,
CONFERENCE ROOMS AND OTHER HIGH PROFILE AREAS WITHI N SUITE,
ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BY SDI OR
TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT I N
CONTRACTOR RELOCATING THESE ITEMS AT THEIR EXPENSE.
20. FIRE ALARM DEVICE LOCATIONS: COORDINATE WITH THE
OWNER TENANT PRIOR TO INSTALLATION OF FIRE DETECTION DEVICES
REGARDING ALL DEVICE LOCATIONS i0 AVOID CONFLICT WITH FEATURE
WALLS (CONFERENCE ROOMS AND RECEPTION AREAS) AND
TENANT -INSTALLED ITEMS I.E. PRESENTATION BOARDS A V EQUIPMENT
AND PROJECTION SCREENS).
21. EXISTING LIGHT FIXTURE RELAMP: IF REQUIRED AND AS NECESSARY
PROVIDE NEW BALLASTS AND LAMPS IN ALL LIGHTS IN EXISTING SPACES.
CONSULT WITH LANDLORD.
22. HVAC CONTRACTOR AIR BALANCE: CONTRACTOR TO PERFORM AIR
BALANCE UPON COMPLETION OF HVAC SCOPE. PROVIDE REPORT TO
LANDLORD.
23. HVAC FLEXDUCT: FLEX DUCT MUST MEET ASHRAE STANDARD
BUILDING CODES FOR FLEX DUCT LENGTH.
24. ELECTRICAL CIRCUITS: AREAS WITHIN ELECTRICAL SCOPE MUST BE
POWERED BY THE ELECTRICAL PANEL FROM THE FLOOR ON WHICH
CONSTRUCTION OCCURS.
25. SUPPLEMENTAL HVAC/ELECTRICAL: IN THE EVENT THAT ANY
SUPPLEMENTAL HVAC EQUIPMENT OR ABOVE BUILDING STANDARD
ELECTRICAL POWER FACILITIES ARE INSTALLED (SUCH AS IN AN IT SERVER
ROOM) CONTRACTOR SHOULD FURNISH AND INSTALL ADDITIONAL
ELECTRICAL AND BTU SUB -METERING SO AS TO ENABLE OWNER TO
MONITOR TENANT'S UTILITY CONSUMPTION (IN RELATION TO THE SUBJECT
EQUIPMENT) GOING FORWARD. THE MAKE AND MODEL OF
CONTRACTOR'S PROPOSED METERS SHOULD BE REVIEWED AND
APPROVED BY OWNER PRIOR TO CONTRACTOR INSTALLATION.
26. ENGINEERED MEP DRAWINGS: WHEN REQUIRED BY STATE BUILDING
CODE, THE CONTRACTORS) SHALL PROVIDE DESIGN/BUILD DRAWINGS
FOR MECHANICAL, PLUMBING, ELECTRICAL, OR FIRE SUPPRESSION.
DRAWINGS SHALL BE CERTIFIED BY A LICENSED ENGINEER AND SUBMITTED
BY THE CONTRACTOR FOR STATE DESIGN REVIEW.
27. EQUIPMENT INSTALLATIONS: ALL EQUIPMENT AND/OR FIXTURES SHALL
BE INSTALLED IN STRICT ACCORDANCE WITH THE MAN UFACTURER'5
RECOMMENDATIONS OR INSTRUCTIONS.
28. BUILDING DIRECTORY: THE BUILDING AUTOMAT ION SYSTEM GRAPHIC
AND PROGRAMMING TO BE UPDATED WITH NEW TENANT'S INFORMATION
FOR FUTURE USE.
29. ELECTRICAL PANELS: ALL ELECTRICAL PANELS TO GET UPDATED
CIRCUIT SCHEDULES.
FIRE PROTECTION NOTES
I. FIRE EXTINGUISHERS: CONTRACTOR TO ENSURE ALL NEW AND
EXISTING FIRE EXTINGUISHERS ARE INSTALLED ACCORDING TO NFPA 10.
COORDINATE WITH OWNER/LANDLORD ON EXTINGUISHER TYPE AND
HOUSING. MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANY POINT TO
A VISIBLE EXTINGUISHER.
II:IiYw]Rw1TlOaLHB[wlls�_199\LwPJ\�OJO:IRiIOaLHA9 70J3Rq 7gH7c[NIRIIIF:
2. DESIGN BUILD FIRE PROTECTION SYSTEM: FIRE PROTECTION WORK IS
TO BE PROVIDED BY DESIGN/BUILD SERVICES UNDER THE GENERAL
CONTRACT. PROVIDE A COMPLETE WORKING SYSTEM. SCHOTT
DESIGN, INC., 15 NOF RES PON 51 ELF FOR THE DESIGN, INSTALLATION, OR
RENOVATION OF THE FIRE SPRINKLER SYSTEM.
3. FIRE PROTECTION SYSTEM CODE COMPLIANCE: THE DESIGN/BUILD
CONTRACTOR SHALL COMPLY WITH THE INDIANA BUILDING CODE THE
INDIANA FIRE CODE AND ALL OTHER APPLICABLE LAWS CODES RULES
AND REGULATIONS THATAPPLY TO DESIGN AND INSTALLATION OF FIRE
SPRINKLER/FIRE SUPPRESSION SYSTEMS.
4. FIRE PROTECTION DESIGN DRAWINGS: THE FIRE PROTECTION
CONTRACTOR SHALL GENERATE ALL REQUIRED DRAWINGS, AND SHALL
FILE THOSE DRAWINGS, AND RELATED DOCUMENTS, WITH THE STATE AND
LOCAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT.
5. SPRINKLER HEADS: PROVIDE NEW OR RELOCATE EXISTING SPRINKLER
HEADS AS REQUIRED. PROVIDE MISSING COVER/ESCUTCHEON PLATES
FOR SPRINKLER HEADS WHERE APPLICABLE. FIELD VERIFY EXISTING
CONDITIONS PRIOR TO THE START OF WORK.
DOCUMENT APPROVAL
DECONSTRUCTION NOTES
I. DECONSTRUCTION DEFINITION: CAREFULLY DISMANTLE SPACES WITH
THE GOAL OF MAXIMIZING THE REUSE POTENTIAL OF ITS COMPONENTS.
2. DECONSTRUCTION MANAGEMENT CHECKLIST: ALL ITEMS SHOWN ON
THE DECONSTRUCTION PLAN HAVE BEEN CAREFULLY CONSIDERED FOR
RECOVERY, REUSE, AND RECYCLING WITH THE BEST INTENT TO DIVERT
ITEMS FROM THE LAN DFILL. REFER TO DECONSTRUCTION MANAGEMENT
CHECKLIST FOR SPECIFIC INSTRUCTIONS,
3. RECYCLING: GENERAL CONTRACTOR IS RESPONSIBLE FOR
RECYCLING ANY AND ALL POSSIBLE PROJECT MATERIAL WASTE AND
COORDINATING THE APPROPRIATE HAULING CONTAINERS WITH THE
WASTE MANAGEMENT SUB -CONTRACTOR.
4. EXISTING STRUCTURAL ELEMENTS OF BUILDING: NO STRUCTURAL OR
LOAD -BEARING CONSTRUCTION SHALL BE REMOVED DEMOLISHED OR
DAMAGED AS A RESULT OF THIS PROJECT UNLESS SPECIFICALLY NOTED
OTHERWISE ON THE DRAWINGS. PROTECT ALL EXISTING STRUCTURAL
MEMBERS DURING DEMOLITION CONSTRUCTION. THE CONTRACTOR
SHALL VERIFY IN THE FIELD, PRIOR TO DEMOLITION, THAT ALL ITEMS
NOTED TO BE DEMOLISHED ARE NOT STRUCTURAL. CONTACT SCHOTT
DESIGN IMMEDIATELY IF THE CONTRACTORS) IN THE FIELD SUSPECT
THAT AN ITEM NOTED FOR DEMOLITION APPEARS TO BE STRUCTURAL OR
OTHERWISE LOAD -BEARING. BEWARE OF STRUCTURAL COLUMNS
AND/OR BEAMS THAT MAY BE CONCEALED BEHIND FINISHES THAT ARE
NOTED FOR REMOVAL. EXERCISE CAUTION WHEN DEMOLISHING
BUILDING FINISHES OR PARTITIONS ADJACENT TO OR AROUND
STRUCTURAL MEMBERS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
INADVERTENT DAMAGE TO THE BUILDING STRUCTURAL SYSTEM.
5. EQUIPMENT, FIXTURE, FINISH RE -USE: WHERE EQUIPMENT, FIXTURES,
OR FINISHES ARE MOVED FROM ANY OTHER PART OF THE BUILDING TO
BE REUSED IN THE PROJECT AREA, THE CONTRACTOR SHALL INCLUDE IN
THEIR SCOPE OF WORK ANY NECESSARY PATCHING OR REPAIRING OF
THE REMAINING AREAS FROM WHERE THE ITEMS WERE RELOCATED,
UNLESS OTHERWISE DIRECTED BY OWNER.
6. DECONSTRUCTION PLANS: REMOVE ALL EXISTING WALLS AND
DOORS WHERE INDICATED BY NOTE, SYMBOL, OR DASHED LINES, NOTE
THAT SOME ITEMS HAVE NOT BEEN SHOWN ON DECONSTRUCTION
PLAN, VISIT AREA OF WORK TO ASSURE EXTENT OF DECONSTRUCTION,
7. FIELD VERIFICATION OF EXISTING CONDITIONS: REMOVE ALL
CARPET, VINYL BASE, VCi, WALL FABRIC, AND ANY OTHER FINISHES AS
REQUIRED FOR NEW CONSTRUCTION. CONTRACTOR TO FIELD VERIFY
EXISTING CONDITIONS. REFER TO FINISH PLAN/SCHEDULE FOR
CLARIFICATION OF EXISTING FINISHES TO REMAIN.
8. PROTECTION OF BUILDING ELEMENTS TO REMAIN: USE CARE TO
PROTECT EXISTING BUILDING ELEMENTS INDICATED ON THE DRAWINGS
TO REMAIN SUCH AS, BUT NOT LIMITED TO, EXISTING CEILING GRID,
TILES, FI RE S U PPRESSI ON EQUIPMENT, DIFFUSERS, LIGHT FI XTU RES,
EQUIPMENT, CASEWORK, AND FINISHES. THE CONTRACTOR SHALL
REPLACE AND/OR REPAI R, AT THE CONTRACTOR'S COST, ANY SUCH
ELEMENTS DAMAGED DURING CONSTRUCTION THAT COULD HAVE
OTHERWISE BEEN REASONABLY PROTECTED AND MAINTAINED IN
GOOD CONDITION FOR THE OWNER'S USE IN THE PROJECT.
9. REMOVAL OF ABANDONED CABLING& WIRING: PER THE INDIANA
ELECTRICAL CODE (SPREAD OF FIRE OR PRODUCTS OF COMBUSTION)
REMOVE ALL ACCESSIBLE PORTIONS OF ABANDONED CABLES AND
WIRING INCLUDING BUT NOT LIMITED TO: DATA WIRING,
COMMUNICATIONS WIRING, FIRE ALARM CABLES, AUDIO CABLES,
COAXIAL CABLES, FIBER OPTIC CABLES/RACEWAYS, AND PLTC CABLES
REFER TO SECTION 300.21. ANY SUCH CABLE OR WIRING SHOULD BE
PULLED AND REMOVED BACK TO THEIR MAIN SOURCES ON THE FLOOR
Q.E. ELECTRICAL PANELS, PHONE BOARDS, ETC.)
10. PROTECTION OF ABANDONED/TERMINATED BUILDING SYSTEM
ELEMENTS: WHERE FIXTURES OR EQUIPMENT ARE REMOVED FROM ANY
ELECTRICAL, PLUMBING, MECHANICAL, OR VOICE/DATA SYSTEMS, ALL
REMAINING TERMINATIONS SHALL BE CLOSED AND PROTECTED IN
STRICT ACCORDANCE WITH INDUSTRY STANDARDS AND GOVERNING
SAFETY REGULATIONS OR PROCEDURES, MARK, LABEL, OR FLAG ALL
TERMINATED SYSTEMS FOR FUTURE REFERENCE. CONTRACTOR TO
PROVIDE AN "AS-BUILTSET INDICATING THE LOCATION OF ALL
PERMANENTLY ABANDONED SYSTEMS.
11. HAZARDOUS MATERIALS: GENERAL CONTRACTOR IS RESPONSIBLE
FOR IDENTIFYING ANY AND ALL ITEMS THAT MAY CONTAIN HAZARDOUS
OR HARMFUL MATERIALS. ALL IDENTIFIED ITEMS MUST BE PROPERLY
DISPOSED OF PER EPA AND IDEM RULES AND REGULATIONS.
12. COSTS: GENERAL CONTRACTOR TO PROVIDE ANY COST RELATED
TO SORTING AND RECYCLING, AS WELL AS ALL SCRAP METAL INCOME,
AS PART OF THE DEMOLITION/DECONSTRUCTION BASE BID.
13. RECEIPTS: GENERAL CONTRACTOR MUST OBTAIN AND PROVIDE TO
OWNER RECEIPTS ON ALL RECYCLED ITEMS INCLUDING CREDIT FOR
METALS.
TENANT/CLIENT, UPON SIGNATURE, APPROVES ALL ASPECTS OF THE SCOPE OF WORK CONTAINED IN
THESE DOCUMENTS.
TENANT/CLIENT COMPANY NAME
TENANT REPRESENTATIVE SIGNATURE TENANT REPRESENTATIVE PRINTED NAME
ALL COSTS INCURRED DUE TO ANY CHANGES REQUESTED AFTER SIGN -OFF OF THESE DOCUMENTS SHALL BE THE FULL RESPONSIBILITY OF THE
TENANT/CLIENT,
THESE DRAWINGS, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOTT DESIGN)
MILL/CASEWORK NOTES
I. CASEWORK/MILLORK: CASEWORK AND MILLWORK GENERALLY
INDICATED ON THESE DRAWINGS ARE TO BE PROVIDED UNDER THE
GEN ERAL CONTRACT.
2. AWI COMPLIANCE: UNLESS INDICATED OTHERWISE, COMPLY WITH
ARCHITECTURAL WOODWORK INSTITUTE (A.W.I.) CURRENT STANDARDS
FOR CUSTOM GRADE WOODWORK.
3. MILLWORK SHOP DRAWINGS: FURNISH SHOP DRAWINGS ON ALL
MILLWORK AND CASEWORK FOR APPROVAL BY THE TENANT AND
SCHOTT DESIGN PRIOR TO FABRICATION.
4. MILLWORK FIELD VERIFICATION: WHERE CASEWORK AND MILLWORK
ARE TO BE INSTALLED, VERIFY ALL DIMENSIONS ON PLANS AGAINST
DIMENSIONS OF AS -BUILT CONDITIONS IN FIELD. REPORT ANY
DISCREPANCIES TO SCHOTT DESIGN THROUGH THE GENERAL
CONTRACTOR. MAKE ADJUSTMENTS TO CASEWORK AND MILLWORK
TO FIT FIELD CONDITIONS UNLESS DOI NG SO WILL SIGNIFICANTLY ALTER
THE INTENT OF THE DESIGN SHOWN ON THE DRAWINGS.
5. DRAWING REVIEW AND DISCREPANCIES: VERIFY FINISHES (LAMINATE
VENEER, STAINS, ETC.) ON THE SECTIONS AND ELEVATION DRAWINGS
WITH FINISHES INDICATED ON THE FINISH PUN/SCHEDULES.
IMMEDIATELY REPORT ANY DISCREPANCIES TO SCHOTT DESIGN
THROUGH THE GENERAL CONTRACTOR.
6. MILLWORK REQUIREMENTS: REFER TO MILLWORK SECTIONS&
ELEVATIONS. UNLESS OTHERWISE SHOWN, PLASTIC LAMINATE CLAD,
COUNTERTOPS WITH 4" BACKSPLASHES WHERE INDICATED.
BACKSPLASHES TO BE FI ELD APPLIED. REFER TO MILLWORK SECTIONS &
ELEVATIONS FOR CABINETRY SPECIFICATIONS(CUSTOM PLASTIC
LAMINATE OR PRE -MANUFACTURED STOCK CABINETRY). EDGES OF
PLASTIC LAMINATE COUNTERTOPS, CABINETS AND DRAWERS TO BE
PLASTIC LAMINATE AND NOT PVC OR OTHER STOCK PLASTIC EDGING
UNLESS NOTED OTHERWISE.
7. MILLWORK WALL BLOCKING: TO PROVIDE BLOCKING IN WALLS FOR
ALL MILLWORK, WALL STOPS, HARDWARE, AND CABINETRY WHERE
SPECIFIED. ALL WOOD BLOCKING TO BE FIRE RATED.
R
NORF
41
? @ g 3
g.
e
8 y S
T y zm Peveni £
•PwkWq
aw AN
zeiiiBEIIIEF
•:
9
.rrsnmr .semv
„m �
R
R
E
e
COLLEGE
COMMONS
a
VICINITY
MAP
NOT TO SCALE
KEY PLAN - 2ND FLOOR _ N
HOT TO SCALE
INDEX OF DRAWINGS
ITII COVER SHEET AND GENERAL PROJECT NOTES
LIDO LIFESAFETYPLAN
AIII DECONSTRUCTION/ARCHITECTURAL FLOOR PLAN
AI21 ELECTRICAL PLAN / REFLECTED CEILING PLAN
A211 FINISH PLAN/DOOR SCHEDULE
THIS DRAWING, AND THE IDEAS,
DESIGNS AND CONCEPTS CONTAINED
H ERBN, ARE TH E EXCLUSIVE
INTELLECTUAL PROPERTY OF SCH07
DESIGN, INC, AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART WITHOUTTHE WRITTEN
CONSENT OF SCH07 DEIGN.
V0
CX>
CV
LLLLLLLL� �
L� z
OJ
0
r
r
in
ZNQ
W
Lu
o
~
z
LLJ
r
�
V Z
5111 z
Z�>
Q cn
z
z
ILLJ
n
Q`
r O CV
2
ISSUE
DATE
DESCRIPTION
DS.02.19
REVIEW SET
DS.06.19
PERMITSET
EVISIONS
ARK
DATE
DB
DESCRIPTION
NEER
H 80�_
No.
70 AR10700017 ,
CC STATE OF
TFRED PR��
PROJECT NUMBER
2019.187
PROD. MGR DRAWN BY
ACM/CB CB
2ND FLOOR
COVER SHEET AND
GENERAL NOTES
T111