Loading...
HomeMy WebLinkAboutGN- Truss Drawing (1)VERIFY BEAM SIZES AND ACTUAL LOCATIONS PRELIMINARY ONLY - INCOMPLETE PLAN HAS NO DETAILS OR SECTIONS, HEEL HEIGHTS, OVERHANG DIMENSIONS, FLOOR DEPTH, BEAM SIZES AND THERE ARE DIMENSIONAL DISCREPANCIES AT THE "OUTDOOR LIVING AREA" AS WELL AS THE RIGHT ELEVATION IS INCORRECT IN THIS AREA. ARCHITECT AND BUILDER TO VERIFY ALL FOR PRODUCTION. CHANGES TO "AS BID" ROOF WILL REQUIRE PRICE ADJUSTMENT. COMPLETED PLAN REQUIRED TO ORDER. 22 1/2" WIDE ATTIC ACCESS TO BE ROTATED90DEGREESATGARAGEAND HOUSE. HEEL HEIGHTS AND OVERHANG DETAILS SCALED FROM CLOSE TO 1/8" SCALE PLANS. 20-10-0-10 LOADING @ 2' O.C. SEE TRUSS DESIGNS FOR HEEL HEIGHTS AND OVERHANG LENGTHS. ASSUME TRUSS TAILS HELD BACK 2 1/4" FOR 1X FASCIA AND 2X SUB-FASCIA - VERIFY. ASSUME 12" GABLE EAVES - NO DROPPED GABLES. VERIFY WINDOW R.O. IN FRONT GABLE. ELEVATIONS AND ROOF PLAN HAVE OVERHANG LENGTH DISCREPANCIES. LOW ROOF HAS 18" EAVE OVERHANGS, PER ELEV.. 24" STEP HVAC TRAY SHEATHING LEDGERS BY BLDR.SHEATHINGLEDGERSBYBLDR. SHEATHINGLEDGERSBYBLDR. DBL.2X8LEDGERBYBLDR. (BOTTOMATWALLSILLPLATE) HTU26HTU26 HTU26 HTU26 HTU26 HTU26HTU26 HARDWARE 20 - HTU26 110 - H2.5A 4 - TBE4 2X4 MSR 2400 TOP PLATE REQUIRED UNDER TG02 2X4 MSR 2400 TOP PLATE REQUIRED UNDER TG02 2-TBE4 2-TBE4 GE01 T01 TG01 GE02T02T02ATG02GE03T03AGE04GE05 GE06GE07 T07A GE07A V01 V02 V03V04V05V06V07V08V09V10V11GE08V12V13V14V15V16T04 (3) T03(2) T03(2) T03A(6)T05(2)T05A(2) T06(6)T07(8)T07(5)23-00-00 4-00-002-04-00 29-04-007-00-00 11-02-0029-04-0022-08-08 46-07-08 6-08-00 76-00-00 5-06-00 12-00-00 5-06-00 11-06-08 34-09-08 6-08-00 76-00-00 11-02-00 11-06-12 1-11-04 2-00-00 2-00-00 18-06-08 10-09-08 11-10-00 IRC2006 TPI2002 20TCLL- 10TCDL- 10BCDL OLDTOWNDESIGNGROUP 1/4"=1' June11,2019 JG B19901766CUSTOMER:JOB: LOCATION: JOB#: DATE:DESIGNER:DESIGNINFORMATION: SCALE:9028OldSR67South Mooresville,IN46158 (317)834-5380 Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements.IIIFARMHOUSEA VANHOUTTE/READ LOT#87ATSUNRISE 07/01/19 Mike Sheeks