Loading...
HomeMy WebLinkAboutC1.5 Utility PlanMONON CROSSING TOWNHOMES CARMEL, INC1.5REVISIONSUTILITY PLANUTILITY PLAN NOT FOR CONSTRUCTIONPRELIMINARY0'(IN FEET)GRAPHIC SCALE30'60'90'Call 811 or 800-382-5544 Before you Dig!BENCHMARK INFORMATION:INDIANAPOLIS - TERRE HAUTEMUNCIE - LAFAYETTE - NEW ALBANYwww.hwcengineering.comCARMEL GENERAL NOTES:”LEGEND:EXISTINGPROPOSEDUTILITY NOTES:SANITARY SEWER NOTES:STORM SEWER NOTES:SITE UTILITY PLAN KEYNOTES:#NOTE:SEE SHEET C1.8 FOR STORM SEWER DATATABLE.NOTE:CONTRACTOR SHALL PROTECT THE EXISTING CITY DUAL DUCTBANK IN THE RIGHT-OF-WAY. IN THE EVENT OF CONFLICT WITHTHE PROPOSED IMPROVEMENTS, RELOCATION OF THE DUAL DUCTBANK AND ALL ASSOCIATED/APPURTENANT/ANCILLARY ITEMSSHALL BE THE SOLE RESPONSIBILITY OF THE DEVELOPER SUBJECTTO REVIEW AND APPROVAL OF THE CITY.NOTE:ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES ANDBRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT AREINDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TOIMPROVE OR REPLACE ANY DRAINAGE STRUCTURES ANDBRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TOACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES,MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TOTHE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE ORREPLACE ANY DRAINAGE STRUCTURES AND BRIDGES WILL BEBORNE BY THE DEVELOPER.