HomeMy WebLinkAboutC700 - LANDSCAPE PLAN5 TD
5 TD
5 TD5 TD
10 PS 10 PS
5 TD
5 TD
6 TD
10 PS
2 QC
10 PS 6 TD
1 CE
33 LB
1 TS
11 LB
38 LB
24 LB
1 LT
17 LB
35 LB
15 LB
1 LT
30 LB
25 LB
1 TS
86 LB
1 TS24 LB
1 AA
1 QC
11 PS
11 PS
10 PS
8 JS
8 JS
8 JS
3 CE
3 QC
1 QC
2 UV
2 QC
2 UV
1 LT
1 LT
1 CE
1 TS
3 AA
3 AA
4 CK
3 CK
1 LT
1 LT
LAWN SEED- SUN AND PARTIAL SHADE MIX48,704 sf
See general notes for additional lawn seed
mixes and installation requirements.
Festuca arundinacea / Turf Type Fescue Variety38,964 sf
Poa pratensis / Kentucky Bluegrass 9,741 sf
VEGETATIVE SWALE SEED MIX 4,620 sf
Seed to be installed at 32.3 PLS pounds per
acre.
See schedule on sheet C701 for species and
quantity information.
-
TURF AND SWALE PLANTING SCHEDULE
TREES QTY BOTANICAL NAME / COMMON NAME COND.
AA 7 Amelanchier canadensis `Autumn Brilliance` / Autumn Brilliance Serviceberry B & B
CE 5 Carpinus betulus / European Hornbeam B & B
CK 7 Cornus kousa / Kousa Dogwood B & B
LT 6 Liriodendron tulipifera / Tulip Tree B & B
QC 9 Quercus coccinea / Scarlet Oak B & B
TS 4 Tilia tomentosa / Silver Linden B & B
UV 4 Ulmus americana `Valley Forge` / American Elm B & B
SHRUBS QTY BOTANICAL NAME / COMMON NAME COND.
JS 32 Juniperus x pfitzeriana `Sea Green` / Sea Green Juniper CONT.
PS 72 Philadelphus x `Snowbell` / Snowbell Mock Orange CONT.
TD 40 Taxus x media `Densiformis` / Dense Yew CONT.
SHRUB AREAS QTY BOTANICAL NAME / COMMON NAME COND.
LB 418 Liriope muscari `Big Blue` / Big Blue Lilyturf CONT.
PLANT SCHEDULE
PLOT DATE: 6/19/2019 12:54 PMPLOT SCALE: 1:2.5849EDIT DATE: 3/22/2019EDITED BY: LHUGGLERDRAWING FILE: P:\2017\02968\D. Drawings\Civil\Construction Documents\2017.02968.CE.C700.LP.dwg7260 Shadeland Station | Indianapolis, Indiana 46256
TEL 317.547.5580 | FAX 317.543.0270
www.structurepoint.com
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
REVISION SCHEDULE
NO.DESCRIPTION DATE
02/19/2019
----
2017.02968
CARMEL HOTEL,
OFFICE AND
GARAGE
DEVELOPMENT
12166 N. MERIDIAN ST.
CARMEL, INDIANA
APPROVAL PENDINGNOT FOR CONSTRUCTIONC700
LANDSCAPE PLAN
1.CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS IN THE FIELD PRIOR
TO BEGINNING WORK. CONTRACTOR IS RESPONSIBLE FOR ANY
DAMAGE TO UTILITIES ASSOCIATED WITH WORK. UTILITIES SHALL BE
REPAIRED TO SATISFACTION OF THE UTILITY OWNER AND/OR
OPERATING AUTHORITY AT NO ADDITIONAL COST.
2.A MINIMUM OF 4" OF TOPSOIL (2
3 TOPSOIL, 1
3 MULCH AND SOIL
CONDITIONER) SHALL BE PLACED ON ALL AREAS TO BE SEEDED,
SODDED AND PLANTED. PLANTING SOIL MIX SHALL BE FREE FROM
SUBSOIL, VEGETATION, WEEDS OR ANY EXTRANEOUS OR
DELETERIOUS MATERIALS LARGER THAN 1". REMOVE ANY UNSUITABLE
AND EXCESS TOPSOIL, AS DETERMINED BY SOILS ENGINEER, FROM
THE SITE. FURNISH ANY ADDITIONAL TOPSOIL NEEDED AT NO
ADDITIONAL COST. ADDED TOPSOIL SHALL BE INCORPORATED INTO
EXISTING SOIL.
3.IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST,
THE PLAN SHALL DICTATE. IF IN QUESTION, CONTACT THE LANDSCAPE
ARCHITECT.
4.ALL PLANTING BEDS SHALL HAVE A 3" THICK LAYER OF SHREDDED
HARDWOOD BARK MULCH. NO UTILITY MULCH OR PROCESSED TREE
TRIMMINGS WILL BE ALLOWED. ALL PLANTING BEDS SHALL HAVE
PRE-EMERGENT HERBICIDE APPLIED AS PER MANUFACTURER'S
RECOMMENDATION, AFTER INSTALLATION IS COMPLETE.
5.FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY
LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS ARE TO
PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOODEN
STAKE INDICATING VARIETY AND SIZE OF TREE.
6.NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PLANTS
ARE SHOWN TO BE UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY
LANDSCAPE ARCHITECT PRIOR TO BID DATE IN WRITING. ALL PLANTS
SHALL BE INSPECTED AND TAGGED WITH PROJECT IDENTIFICATION AT
NURSERY OR CONTRACTOR'S OPERATION PRIOR TO MOVING TO JOB
SITE. PLANTS MAY ALSO BE INSPECTED AND APPROVED OR REJECTED
ON THE JOB SITE.
7.ALL PLANTS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR
NURSERY STOCK, 2004 EDITION, AS SET FORTH BY AMERICAN
ASSOCIATION OF NURSERYMEN.
8.PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE
PLACED WHERE THEY WILL NOT CONFLICT WITH CONSTRUCTION AND
AS DIRECTED BY OWNER.
9.ALL NEW LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A
PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE
ARCHITECT. AT END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD
OR UNSATISFACTORY BY LANDSCAPE ARCHITECT SHALL BE REPLACED
AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR.
10.ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED AS
SHOWN PER THE LANDSCAPE AND EROSION CONTROL PLANS.
11.LAWN AND SOD AREAS ARE TO BE GRADED UNIFORMLY WITHOUT ANY
UNDULATIONS OR IRREGULARITIES IN THE SURFACE PRIOR TO ANY
SEED OR SOD WORK.
12.ALL LAWN IS TO BE A BLEND PER THE PLANT SCHEDULE. SEED AREAS
ARE TO HAVE 0% NOXIOUS WEED AND FREE OF DISEASE.
13.PROTECT LAWN SEEDED AREAS WITH STRAW MULCH. SPREAD MULCH
UNIFORMLY AT A MINIMUM RATE OF 2 TONS PER ACRE TO FORM A
CONTINUOUS BLANKET 1 1
2 INCHES IN LOOSE THICKNESS OVER
SEEDED AREAS.
GENERAL NOTES:
Bufferyard A Design Standards Per 100 LF
3 Shade or Evergreen Trees, 2 Ornamental Trees, 15 Shrubs
Bufferyard C Design Standards Per 100 LF
7 Shade or Evergreen Trees, 3 Ornamental Trees, 25 Shrubs
North Perimeter: 400 LF (Bufferyard A)
All non-parking lot areas fall within the 10' telephone easement. No
tree plantings permitted.
The existing woods do provide a buffer.
East Perimeter: 250 LF (Bufferyard C)
REQUIRED: (17.5) Shade/Evergreen Trees + (7.5) Ornamental +
(62.5) Shrubs
PROVIDED: (10) Shade Trees + (14) Ornamental Trees + (63) Shrubs
(NOTE: Concrete walls, swale plantings, and utilities limit areas for tree
planting)
PARKING LOT INTERIOR PLANTING:
Parking Lot Interior Plantings shall be located within parking lots as
landscaped islands, medians, traffic delineators, at the end of parking bays,
and between rows or parking spaces in a manner such that no parking space
is located more than sixty-six (66) feet from a shade tree.
(1) Shade Tree + Five (5) Shrubs per (10) Parking Spaces
144 additional parking spaces
REQUIRED: (14.4) shade trees, (72) shrubs
PROVIDED: (18) Shade Trees + (80) Shrubs
STREET TREES:
Street trees not provided due to the 15' telephone easement along the right
of way.
ZONING REQUIREMENTS