Loading...
HomeMy WebLinkAboutC701.Landscape Details4"12"CULTIVATED SOIL UNDISTURBED SOIL NOTE: BREAK THROUGH ANY EXISTING "HARD-PAN" AND REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION AND POSITIVE DRAINAGE. 18" U.N.O. SLOPE 3" MULCH LAYER (SEE GENERAL NOTES) SHRUB (PER PLAN) PLANTING SOIL MIX (SEE GENERAL NOTES) PLANTING PROCEDURE 1. LAYOUT BED AND OUTLINE WITH SPADE EDGE. PLACE SOIL FROM SPADE EDGE WITHIN BED. 2. ROTOTILL BED TO 12" DEPTH. SPREAD 3" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL PLANTING SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS, MULCH AND WATER THOROUGHLY. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. FINISH GRADE ROW SPACING STEEL LAWN EDGING MULCH (SEE GENERAL NOTES) 2 1 VERTICAL EDGE 4"3" NOTE: SPADE EDGE SHALL CREATE A CLEAN SEPARATION BETWEEN AREAS; AND SHALL CREATE SMOOTH & EVEN LINES (AS INDICATED ON THE PLANS) NOTE: SPADE EDGE DETAIL SHALL BE USED AT ALL LAWN EDGES & AT EDGES OF MULCHED AREAS (FOR CONTAINMENT) LAWN AREA PLANTING OR MULCHED AREA EXISTING GRADE OR GRADE OF PLANTING AREA 1. EXCAVATE ROOTBALL PIT 2. ADD EXCAVATED SOIL & TAMP. SET TREE SUCH THAT TOP OF ROOTBALL IS 2-3" HIGHER THAN FINISHED GRADE. 3. BACKFILL WITH SOIL MIX & "WATER IN" 4. COMPLETE BACKFILLING, CONSTRUCT SAUCER, SPADE EDGE & ADD MULCH 5. STAKE & GUY SECURELY (AS REQUIRED) ADD EXCAVATED SOIL AS NEEDED TO BRING TREE TO FINISHED GRADE. TAMP LIGHTLY BUT THOROUGHLY PRIOR TO SETTING TREE TO PREVENT SETTLING. SCARIFY BASE OF PLANT PIT WHEN EXCAVATING PIT. BREAK THROUGH & LOOSEN ALL "HARDPAN" (REMOVE AS NECESSARY TO FACILITATE DRAINAGE)6"MIN.PLANTING SOIL MIX (SEE GENERAL NOTES) 12"12" 12" MIN. 8" GENERAL NOTES: 1. SEE GENERAL NOTES FOR DRAINAGE REQUIREMENTS PRIOR TO PLANTING. 2. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. 3. IMMEDIATELY SOAK WITH WATER. 4. DO NOT BREAK ROOTBALL. 2-3" SPADE EDGE 3" MULCH LAYER (SEE GENERAL NOTES) EARTH SAUCER 1-1/2" MULCH LAYER FINISHED GRADE PLANTING PROCEDURE KEEP MULCH OFF TRUNK OF TREE 4"12"CULTIVATED SOIL UNDISTURBED SOIL NOTE: BREAK THROUGH ANY EXISTING "HARD-PAN" AND REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION AND POSITIVE DRAINAGE. 12" U.N.O. SLOPE 3" MULCH LAYER (SEE GENERAL NOTES) GROUNDCOVER (PER PLAN) PLANTING SOIL MIX (SEE GENERAL NOTES) SPADE EDGE PLANTING PROCEDURE 1. LAYOUT BED AND OUTLINE WITH SPADE EDGE. PLACE SOIL FROM SPADE EDGE WITHIN BED. 2. ROTOTILL BED TO 12" DEPTH. SPREAD 4" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL PLANTING SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS, MULCH AND WATER THOROUGHLY. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. FINISH GRADE ROW SPACING PLOT DATE: 6/19/2019 12:54 PMPLOT SCALE: 1:2.5849EDIT DATE: 3/22/2019EDITED BY: LHUGGLERDRAWING FILE: P:\2017\02968\D. Drawings\Civil\Construction Documents\2017.02968.CE.C700.LP.dwg7260 Shadeland Station | Indianapolis, Indiana 46256 TEL 317.547.5580 | FAX 317.543.0270 www.structurepoint.com Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: REVISION SCHEDULE NO.DESCRIPTION DATE 02/19/2019 ---- 2017.02968 CARMEL HOTEL, OFFICE AND GARAGE DEVELOPMENT 12166 N. MERIDIAN ST. CARMEL, INDIANA APPROVAL PENDINGNOT FOR CONSTRUCTIONC701 LANDSCAPE DETAILS GROUNDCOVER PLANTING DETAIL03 C701 NOT TO SCALE SHRUB PLANTING DETAIL02 C701 NOT TO SCALE TREE PLANTING DETAIL01 C701 NOT TO SCALE SPADE EDGE DETAIL04 C701 NOT TO SCALE VEGETATIVE SWALE SEED MIX05 C701 NOT TO SCALE