HomeMy WebLinkAboutC701.Landscape Details4"12"CULTIVATED SOIL
UNDISTURBED SOIL
NOTE: BREAK THROUGH ANY EXISTING "HARD-PAN" AND
REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION
AND POSITIVE DRAINAGE.
18" U.N.O.
SLOPE
3" MULCH LAYER (SEE GENERAL NOTES)
SHRUB (PER PLAN)
PLANTING SOIL MIX (SEE GENERAL NOTES)
PLANTING PROCEDURE
1. LAYOUT BED AND OUTLINE WITH SPADE EDGE. PLACE SOIL FROM SPADE EDGE WITHIN BED.
2. ROTOTILL BED TO 12" DEPTH. SPREAD 3" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL
PLANTING SOIL MIX INTO TOP OF BED.
3. INSTALL PLANTS, MULCH AND WATER THOROUGHLY. DO NOT ALLOW AIR POCKETS TO FORM WHEN
BACKFILLING.
FINISH GRADE
ROW SPACING
STEEL LAWN
EDGING
MULCH
(SEE GENERAL NOTES)
2
1
VERTICAL EDGE
4"3"
NOTE:
SPADE EDGE SHALL CREATE A
CLEAN SEPARATION BETWEEN
AREAS; AND SHALL CREATE
SMOOTH & EVEN LINES (AS
INDICATED ON THE PLANS)
NOTE:
SPADE EDGE DETAIL
SHALL BE USED AT ALL
LAWN EDGES & AT EDGES
OF MULCHED AREAS
(FOR CONTAINMENT)
LAWN AREA PLANTING OR MULCHED AREA
EXISTING GRADE OR
GRADE OF PLANTING AREA
1. EXCAVATE ROOTBALL PIT
2. ADD EXCAVATED SOIL & TAMP.
SET TREE SUCH THAT TOP OF ROOTBALL
IS 2-3" HIGHER THAN FINISHED GRADE.
3. BACKFILL WITH SOIL MIX & "WATER IN"
4. COMPLETE BACKFILLING, CONSTRUCT
SAUCER, SPADE
EDGE & ADD MULCH
5. STAKE & GUY SECURELY (AS REQUIRED)
ADD EXCAVATED SOIL AS
NEEDED TO BRING TREE
TO FINISHED GRADE. TAMP
LIGHTLY BUT THOROUGHLY
PRIOR TO SETTING TREE
TO PREVENT SETTLING.
SCARIFY BASE OF PLANT
PIT WHEN EXCAVATING PIT.
BREAK THROUGH & LOOSEN
ALL "HARDPAN" (REMOVE AS
NECESSARY TO FACILITATE
DRAINAGE)6"MIN.PLANTING SOIL MIX
(SEE GENERAL NOTES)
12"12"
12" MIN.
8"
GENERAL NOTES:
1. SEE GENERAL NOTES FOR DRAINAGE
REQUIREMENTS PRIOR TO PLANTING.
2. DO NOT ALLOW AIR POCKETS TO
FORM WHEN BACKFILLING.
3. IMMEDIATELY SOAK WITH WATER.
4. DO NOT BREAK ROOTBALL.
2-3"
SPADE EDGE
3" MULCH LAYER (SEE GENERAL NOTES)
EARTH SAUCER
1-1/2" MULCH LAYER
FINISHED GRADE
PLANTING PROCEDURE
KEEP MULCH OFF TRUNK
OF TREE
4"12"CULTIVATED SOIL
UNDISTURBED SOIL
NOTE: BREAK THROUGH ANY EXISTING "HARD-PAN" AND
REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION
AND POSITIVE DRAINAGE.
12" U.N.O.
SLOPE
3" MULCH LAYER (SEE GENERAL NOTES)
GROUNDCOVER (PER PLAN)
PLANTING SOIL MIX (SEE GENERAL NOTES)
SPADE EDGE
PLANTING PROCEDURE
1. LAYOUT BED AND OUTLINE WITH SPADE EDGE. PLACE SOIL FROM SPADE EDGE WITHIN BED.
2. ROTOTILL BED TO 12" DEPTH. SPREAD 4" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL
PLANTING SOIL MIX INTO TOP OF BED.
3. INSTALL PLANTS, MULCH AND WATER THOROUGHLY. DO NOT ALLOW AIR POCKETS TO FORM WHEN
BACKFILLING.
FINISH GRADE
ROW SPACING
PLOT DATE: 6/19/2019 12:54 PMPLOT SCALE: 1:2.5849EDIT DATE: 3/22/2019EDITED BY: LHUGGLERDRAWING FILE: P:\2017\02968\D. Drawings\Civil\Construction Documents\2017.02968.CE.C700.LP.dwg7260 Shadeland Station | Indianapolis, Indiana 46256
TEL 317.547.5580 | FAX 317.543.0270
www.structurepoint.com
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
REVISION SCHEDULE
NO.DESCRIPTION DATE
02/19/2019
----
2017.02968
CARMEL HOTEL,
OFFICE AND
GARAGE
DEVELOPMENT
12166 N. MERIDIAN ST.
CARMEL, INDIANA
APPROVAL PENDINGNOT FOR CONSTRUCTIONC701
LANDSCAPE
DETAILS
GROUNDCOVER PLANTING DETAIL03
C701 NOT TO SCALE
SHRUB PLANTING DETAIL02
C701 NOT TO SCALE
TREE PLANTING DETAIL01
C701 NOT TO SCALE
SPADE EDGE DETAIL04
C701 NOT TO SCALE
VEGETATIVE SWALE SEED MIX05
C701 NOT TO SCALE