HomeMy WebLinkAboutP1.2- - Second Floor Plumbin Demolition Plan -Area2
95� -
E.5 —
RELEASED FOR CONSTRUCTION id Floor Plumbir
Subject to compliance with all regulations
of State and Local Codes
City of Carmel
1K11TNGIa
— B.9
('2' First Floor Plumbing Plan - AreaB
U 1/8•=T-0'
4.'4.2 4.3 4.6 4.7 5.1 6 7 8 9 9.3 99.45 9.8 110.2
TT
I I I I I I I I I I I I I I I I I I
GENERAL NOTES
(REQUIRED TO COMPLETE THE SCOPE OF WORK)
A. ALL CONTRACT DOCUMENTS (SPECIFICATIONS AND DRAWINGS) ARE COMPLIMENTARY
AND MUST BE USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION
INFORMATION. ALL CONFLICTS SHALL BE BROUGHT TO THE ARCHITECTS OR ENGINEERS
ATTENTION IN ORDER TO ALLOW A CLARIFICATION TO BE ISSUED. ANY WORK
COMPLETED WITHOUT THE CLARIFYING INFORMATION IS AT THE CONTRACTORS
FINANCIAL RISK.
B. THE CONTRACTOR SHALL PROVIDE AND FURNISH ALL MATERIALS AND ACCESSORIES TO
CREATE A FULLY OPERATIONAL, CODE COMPLIANT AND TESTED SYSTEM. ALL
MATERIALS AND ACCESSORIES REDO I RED TO CREATE THE FULLY OPERATIONAL SYSTEM
SHALL BE INCLUDED IN THE COST OF THIS PROJECT.
C. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR MAY AT THEIR
OPTION MODIFY THE PIPE ROUTING IN ORDER TO CREATE A SYSTEM THAT MEETS THE
INTENT OF THIS SET OF CONSTRUCTION DOCUMENTS.
D. THE CONTRACTOR SHALL INCLUDE ALL ITEMS THAT ARE REQUIRED TO ENSURE THAT
THE ENTIRE SYSTEM IS FUNCTIONING IN COMPLIANCE WITH THE APPLICABLE CODES,
AND MANUFACTURES INSTALLATION RECOMMENDATIONS AND OR REQUIREMENTS.
E. ALL CUTTING, DRILLING AND PATCHING OF WALLS, FLOORS ANDIOR STRUCTURAL
MEMBERS FOR THE INSTALLATION OF THE PLUMBING AND FIRE PROTECTION SYSTEMS
SHALL BE PROVIDED AS PART OF THE SCOPE OF THIS PROJECT.
F. STRUCTURAL COMPONENTS SHALL NOT BE CUT, DRILLED OR MODIFIED IN ANYWAY
WITHOUT THE STRUCTURAL ENGINEERS REVIEW AND PRIOR WRITTEN APPROVAL.
G. PROVIDE FIRE STOPPING WHERE PIPES PENETRATE FIRE RATED FLOORS AND WALLS.
FIRE STOPPING MATERIALS AND METHODS SHALL BE PER LOCAL AND STATE CODES AND
REQUIREMENTS.
H. ALL PLUMBING SYSTEMS SHALL BE INSTALLED PER THE CURRENT PLUMBING CODE FOR
THE LOCATION OF THE WORK BEING INSTALLED.
I. ALL PLUMBING EQUIPMENT,PIPING,FIXTURES, AND PIPE ACCESSORIES SHALL BE NSF
61, ANNEX G COMPLIANT.
J. ALL PIPING LOCATED WITHIN A RETURN AIR PLENUM SHALL COMPLY WITH A 25150 FLAME
SMOKE RATING. ANY EXISTING PIPING DISCOVERED WITHIN A RETURN AIR PLENUM
THAT DOES NOT COMPLY WITH THIS REQUIREMENT SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT FOR FURTHER CLARIFICATION.
K. ALL EXTERIOR WALL PENETRATIONS SHALL BE SEALED WATER AND WEATHER TIGHT BY
THE APPROPRIATE TRADE COMPETENT IN COMPLETING THIS WORK. THE COST OF THIS
WORK SHALL BE INCLUDED IN THE SCOPE OF THIS PROJECT.
L. DO NOT ATTACH ANY CONSTRUCTION TO THE ROOF DECK JOIST BRIDGING, JOIST
CROSS BRACING, PIPING, CONDUIT, DUCTWORK OR ANY OTHER NON-STRUCTURAL TEM.
M. DO NOT WELD OR DRILL INTO STRUCTURAL STEEL OR JOIST; INSTEAD USE CLAMPS, TIE
WIRE, THRU-BOLTS WITH WASHERS
N. DO NOT USE ANY PVC,PLASTIC, ETC. IN PLENUM OR DEMISING WALLS UNLESS FIRE
WRAPPED. ALL WOOD BLOCKING AND NAILERS, CONCEALED OR NOT SHALL BE FIRE
RETARDANT TREATED.
0. DO NOT PENETRATE BUILDING WALLS FOR ANY DUCTING OR VENTING; ROUTE THROUGH
RMP I iSINn I ANnI nan5 RnnFINr. nnNTRAr.TnR
m
MSKTD
& Associates
Architecture I Engineering I Interior Design
1715 Magnavox Way 930 North Meridian
Fort Wayne, IN 46804 Indianapolis, IN 46204
260.432.9337 1 317.917.1190
w.vri.msktd.cwm
gpnn4U1p
s: `��Sp11 A. � 4oe
Is
�.� 3�e�G15iEgfo ej- �•Is
g • PE10708732
z:
PotL STATE a A"
INININE1111
W
O
E
N
^,
co
W
�
O
4-1
O
0
C
�
O
O
Q
4-1
C�
N
m
C/)
LU
cn
>
o
U)�
o
+-+
Z
o
O
O
L
M
(n
O
U)
PROJECT NO. DATE
7335 05-07-19
REV. DATE
SET DESCRIPTION
SHEET TITLE
Second Floor Plumbing
Demolition Plan - Area B
SHEET NUMBER
DATE: V//V`J/-I`J