Loading...
HomeMy WebLinkAboutP2.2- - Second Floor Plumbin Plan -Area B2 4.'4.2 4.3 4.6 4.7 5.1 6 I I I I I I I 16 4.1 — — — — —— ,13.95� CORRIDOR 201 STAFF LOUNGE I I 242 — — F RELEASED FOR CONSTRUCTION A Floor Plunil Plan -Area B Subject to compliance with all regulations of State and Local Codes City of Camel 1�01NGIDI 16 IF q u W 16 Pq MECH ll - 2 CORRIDOR 205 CORRIDOR 238 OR g2 TYPE C zd6 ORK AREA 20CORRIDOR SUB STERIL 1 14 251 OR g3 TYPE C 12111] N! GENERAL NOTES (REQUIRED TO COMPLETE THE SCOPE OF WORK) A. ALL CONTRACT DOCUMENTS (SPECIFICATIONS AND DRAWINGS) ARE COMPLIMENTARY AND MUST BE USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION. ALL CONFLICTS SHALL BE BROUGHT TO THE ARCHITECTS OR ENGINEERS ATTENTION IN ORDER TO ALLOW A CLARIFICATION TO BE ISSUED. ANY WORK COMPLETED WITHOUT THE CLARIFYING INFORMATION IS AT THE CONTRACTORS FINANCIAL RISK. B. THE CONTRACTOR SHALL PROVIDE AND FURNISH ALL MATERIALS AND ACCESSORIES TO CREATE A FULLY OPERATIONAL, CODE COMPLIANT AND TESTED SYSTEM. ALL MATERIALS AND ACCESSORIES REQUIRED TO CREATE THE FULLY OPERATIONAL SYSTEM SHALL BE INCLUDED IN THE COST OF THIS PROJECT. C. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR MAY AT THEIR OPTION MODIFY THE PIPE ROUTING IN ORDER TO CREATE A SYSTEM THAT MEETS THE INTENT OF THIS SET OF CONSTRUCTION DOCUMENTS. D. THE CONTRACTOR SHALL INCLUDE ALL ITEMS THAT ARE REQUIRED TO ENSURE THAT THE ENTIRE SYSTEM IS FUNCTIONING IN COMPLIANCE WITH THE APPLICABLE CODES, AND MANUFACTURES INSTALLATION RECOMMENDATIONS AND OR REQUIREMENTS. E. ALL CUTTING, DRILLING AND PATCHING OF WALLS, FLOORS ANDIOR STRUCTURAL MEMBERS FOR THE INSTALLATION OF THE PLUMBING AND FIRE PROTECTION SYSTEMS SHALL BE PROVIDED AS PART OF THE SCOPE OF THIS PROJECT. F. STRUCTURAL COMPONENTS SHALL NOT BE CUT, DRILLED OR MODIFIED IN ANYWAY WITHOUT THE STRUCTURAL ENGINEERS REVIEW AND PRIOR WRITTEN APPROVAL. G. PROVIDE FIRE STOPPING WHERE PIPES PENETRATE FIRE RATED FLOORS AND WALLS. FIRE STOPPING MATERIALS AND METHODS SHALL BE PER LOCAL AND STATE CODES AND REQUIREMENTS. H. ALL PLUMBING SYSTEMS SHALL BE INSTALLED PER THE CURRENT PLUMBING CODE FOR THE LOCATION OF THE WORK BEING INSTALLED. I. ALL PLUMBING EQUIPMENT,PIPING,FIXTURES, AND PIPE ACCESSORIES SHALL BE NSF 61, ANNEX G COMPLIANT. J. ALL PIPING LOCATED WITHIN A RETURN AIR PLENUM SHALL COMPLY WITH A 25150 FLAME SMOKE RATING. ANY EXISTING PIPING DISCOVERED WITHIN A RETURN AIR PLENUM THAT DOES NOT COMPLY WITH THIS REQUIREMENT SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR FURTHER CLARIFICATION. K. ALL EXTERIOR WALL PENETRATIONS SHALL BE SEALED WATER AND WEATHER TIGHT BY THE APPROPRIATE TRADE COMPETENT IN COMPLETING THIS WORK. THE COST OF THIS WORT( SHALL BE INCLUDED IN THE SCOPE OF THIS PROJECT. L. DO NOT ATTACH ANY CONSTRUCTION TO THE ROOF DECK JOIST BRIDGING, JOIST CROSS BRACING, PIPING, CONDUIT, DUCTWORK OR ANY OTHER NON-STRUCTURAL ITEM. M. DO NOT WELDOR DRILL INTO STRUCTURAL STEEL OR JOIST; INSTEAD USE CLAMPS, TIE WIRE, THRU-BOLTS WITH WASHERS N. DO NOT USE ANY PVC, PLASTIC,ETC. IN PLENUM OR DEMISING WALLS UNLESS FIRE 7 8 9 9.3(99.45 9.8 110.2 WRAPPED. ALL WOOD BLOCKING AND NAILERS, CONCEALED OR NOT SHALL BE FIRE RETARDANT TREATED. 0. DO NOT PENETRATE BUILDING WALLS FOR ANY DUCTING OR VENTING; ROUTE THROUGH ROOF USING LANDLORDS ROOFING CONTRACTOR. P. VENT THROUGH ROOF INSTALLATION; ALL ROOFING WORK SHALL BE COMPLETED BY THE LANDLORDS ROOFING CONTRACTOR. THE COST SHALL BE INCLUDED IN THE SCOPE OF THIS PROJECT. Q. PIPING BELOW GROUND SHALL BE SERVICE -WEIGHT CAST IRON OR SCHEDULE 40 PVC. NO -HUB PIPING OR FERNCO CONNECTIONS ARE NOT PERMITTED BELOW GRADE. R. DOMESTIC WATER PIPING ABOVE GRADE SHALL BE TYPE 'L'WATER TUBE. S. ALL PIPING SHALL BE PROPERLY SUSPENDED BY THE STRUCTURE PER THE LOCAL T — CODES. e e J1 T. ALLPIPING INSULATED SHALLBEWITH PLENUM RATED MATERIALS. A.1 U. FLOOR GRAINS SHALL BE PROVDED WITH TRAP PRIMERS. TRAP PRIMER PIPES SHALL BE WATER SOFTENE FIELD ROUTED AND FIELD INSTALLED. 262 V. ALLSHUT-DOWN OF UTILITIESAND FIRE PROTECTION SYSTEMS SHALL BEARRANGED WITH NO LESS THAN SEVEN(7) DAYS NOTICE TO THE LANDLORD. WORK MAY NOT CONSULT COMMENCE UNLESS WRITTEN APPROVAL IS PROVIDED BY THE OWNER. 202A TANK STORAGE W. ALL DOMESTIC WATER BRANCH PIPES SERVING FIXTURES OR EQUIPMENT WITH FAST 216 I ACTING OR ELECTRONIC VALVES SHALL BE PROVIDED WATER HAMMER ARRESTORS. FAN ROOM X. ALL BRANCH PIPES FROM DOMESTIC WATER MAINS SHALL BE PROVIDED QUARTER TURN FULL PORT BALL VALESONT EBRATANDLOCUST PE ADJACENTTOMAIN. DJACE �\ �\ Y. CONTRACTOR SHALL CAMERA IN PECTA D LOCATE ALL SANITARY PIPE LOCATED _ - _ — — Tt �A 85) BELOW SLAB, ADVISE OWNER OF ANY DEFECTS PRIOR TO STARTING ANY WORK. ALL . CAMERA INSPECTIONS AND LOCATING SHALL BE COMPLETED PRIOR TO INSTALLATION — tvCPUMP — — D-B �/ OFANYPIPE. CONTRACTOR MAY MODIFY ROUTING OF PIPE, KEEP AS -BUILT STORAGE DOCUMENTS THROUGHOUT THE ENTIRE PROJECT. 267 — — — — 6 — — OF B 2 B 2 REFER TO ALL RISER DIAGRAMS FOR ADDITIONAL INFORMATION 219 ON PIPE SIZING AND ROUTING. j JR00 STAIR 0 CONTRACTOR SHALL FIELD VERIFYALL MAINS IN FLOOR BELOW PRIOR TO BID LAS 1112'EV EL OR CONSULT M3 CORRIDOR 231 19 CORRIDOR BIO HAZA 211 213A 12'EA 1'E 0 1 265 6 PLAN NOTES WORK SPCE Rp 270 B.6 (B.6 1 2'SDN-2'VRISE,12'DWH6 DCWO4.CONNECTTS, 12'DHW B DCWTO NEARETCTIVE MAINS OF 12' EA V EV SAME SIZE OR LARGER IN FLOOR BELOW. PROVIDE SHUT-OFF VALVES AT MAIN. 5 9 1'SCW 2 MODIFY EXISTING ROUGH -IN PIPING TOP COMODATE NEW SINK. CORRIDOR 3 1' SCW DROP, 314' DHW DN TO SERVE STERILIZER. CONNECT DHW TO NEAREST ACTIVE MAIN OF d— 6 —� 1'EV 210 SAMESIZE OR IARGERINFLOORBELOW. PROVIDEPRESSURE TYPE BACKFLOW PREVENTION FOR O p SOW AND DHW AND ROUTE DRAIN LINES TO EXISTING FLOOR DRAIN. CONNECT PER 16 16 3 MANUFACTURERS REQUIREMENTS. PROVIDE PRESSURE TYPE VACUUM BREAKER,PRESSURE 1 12' SON B.9 V 13.9� REDUCING VALVE (40 PSIG SOW, 40 PSIG DHW), FLOW CONTROL VALVE (5 GPM SOW, 0.4 GPM Al CONS T OFFICE OFFICE JAN in SOW 232 717 T EQUIPMENT STORAGE -_ WATER HAMMER CONNECT AND PRESSURE GAUGE. REFERDETAIL REFER TO DETAIL SON Dk1 ,� 227 227B 221A 21d 220 SHEET P6-1BCT PER MANUFACTURERS REQUIREMENTS. . 16 4 OONNECT2N TO EXISTING VENT PIPING. 3 11 ElLi 5 e eEl I NURSE MANAGE 5 THE EXISTING SPACE HASA SPRINKLER SVSTEMALREADV IN PLACE. MODIFY EXISTING SPRINKLER CENTRAL STERILE 112' CORRIDOR 26] SYSTEM TO ACCOMMODATE NEW ARCHITECHTURAL FLOOR PLAN LAYOUT AND CEILING GRID. 233 229 CERRITO COORDINATE PIPE ROUTING WITH ALL OTHER TRADES. DECONT INA ION PREIPOST OP RO M PREIPOST OP ROOM PREROST OP R00 PREIPOST UP PREIPOST OP R00 OFFIC 266 6 INSTALL MEDICAL GRADE AIR, H TANKWITH PRESSURE REGULATOR, SET TO 15 PSIG, STRAPTANK TH THREADED 26 16 72• ] 0 0 0 0 0 0 FITTINGTOWO ALLOW FOR OWNER TO MAKE ROUTE PIPE TO WHERE INDICATED NAL CONNECTIONS. PROVIDE HIS SYSTEM SHA1/2'BAL VALVELLBEINSTALLED 222 T23 T24 225 T 227 16 PER NFPA 99, HOWEVER IT IS NOT TO BE CONSIDEREDA NFPA 99 SYSTEM FOR CERTIFICATION. 7 FIELD VERIFY EXACT MOUNTING LOCATION OF AIR VALVE WITH OWNER PRIOR TO INSTALLATION OF ANY PIPE. CORRIDOR CORRIDOR OFFICE 8 PC SHALL ROUTE INTAKE AND EXHAUST FOR AIR COMPRESSOR UP THROUGH THE ROOF AND 1'EV 5 'EV 7 112 EA 128 263 LOCATIONS. EQUIPMENT LOCATED ON THE ROOF TERMINATE. ROUTE PER MANUFACTURERS RAND AWAY FROM ANOA R I NTAKEORDINATE EAND TEXHAUST ION WITH ALL 5 9 1' DI, 1' SOW DROP, 1' CHIN ON TO SERVE WASHER. PROVIDE PRESSURE TYPE BACKFOLW PREVENTION FOR (— NEAREST LINE ACTIVE MAI N OF SAME SIZE OR LARGER ID CHI AND ON FLOOR BELOW.ROVDE PRESSURE-1. CONNECT D DUHIN O NG VALVE, MEDZB M I SOIL TILE TY II FLOW CONTROL, WATER HAMMER, PRESSURE GAUGE AND SHUT-OFF VALVE ON WATER LINES 1 BIOHAZARD REIPOST OP R00 PREIPOST OPR SERVING STERILIZER. CONNECT PER MANUFACTURERS REQUIREMENTS. REFER TO DETAIL 5 ON 1 SK-7 255 I REIPOST OP ROOM 260 TOILE SHEET P6-I B. 2'V 258 l RK STATION 10 MODI FY IXISTI NG DI WATER PI PI NG I N THIS AREA TO ACCOMMODATE NEW WASHER. ROUTE NEW DI — PCONN FROM NEW DI BOLL PMENT CONFI GU RATI ON TO EASTNG CONNECTION POI NT AND ORkI TYPE D 252 SUBSTE LE 112. SOW — ❑ 11 TSCW DROP,3l4'DHW DN TO SERVE STERILIZER PROVIDE BACNFOLW PREVENTION FOR SCIN AND DHW AND ROUTE DRAIN LINES TO FS-1. CONNECT DHW TO NEAREST ACTIVE MAIN OF SAME SIZE OR 254 F�-1-1 STORAGE LARGER IN FLOOR BELOW. CONNECT PER MANUFACTURERS REQUIREMENTS. EQUIPMENTSTORAGE PREIPOST OP RO ADA TOILET Iq RPZ-7 457 CORRDO 72 1'SCVVDROP TOSERVE STERILIZER. MODIFY EXISTING DHW CONNECTION TEACCOMINESTONEW 15 I_14'SCW — —256 — 261— 219 —276 — — — STERILIZE. PRORDRAIN.0 CONNELOW CT PER TION MANUFOR ACTURER REQUIND REMENTS. PROVIDE DRAIN LINESU D.4 D,4 EXISTINGFLOORBDRAIN.0 PRESSURE REDUCING VALVE LRE(4 REQUIR0 PSIG N, 40S.G DFIDE PRESSURE 5 TYPE I FLOW MED R M CONTROL VALVE IS REFER TO DE.4 GPM HW), WATER IB. CON ECTARRPER MANUFACTURERS GAUGE. 12"EA TIENTR ON 269 REFER EMENTAILREFER TO DETALSON SHEEP PGIB. CONNECT PER MANUFACTURERS REQUIREMENTS 1312'EA — — D.5 D.5 13 CONNECT I'SCW TO EXISTING SCAT MAIN. "SON 12'EA\ O 14 11T SOW TO SERVE HUMIDIFIER. P SON TOILET 75 CONNECT 31d'SCVV TO EXISTING SCIN MAIN. El UBS E NURSE SION SCRUB AREA 7 1PRISTINE PLUMBING FIXTURE PROVIDE ABBE 7017MIXING VALVELVE TO TO SERVE SCRUB SINKS. 16 285 E283 _3 FRi M5 WORK AT 18 112'DOW, 3'4'DHW FROM FLOOR BELOW TO SERVE NEW CLINIC SINK. CONNECT TO NEAREST ECOVERY 2 3 ACTIVE PIPE OF SAME SIZE OR LARGER AND PROVIDE SHUT-OFF VALVES WITH -IN 6' OF I❑ 4 Yfll 2'V 2'V SUB STERILE 290 TOILET CONNECTION POINT. 4'SDN-2V RISE. CONNECT 4'TO NEAREST ACTIVE MAIN 4'OR LARGER. L 7V 2.V 3K4 SK-7 1 29 I 271 CONNECT 2'V TO NEAREST ACTIVE VENT PIPE IN CEILING SPACE. 1 19 RELOACTE EXISTING EQUIPMENT VACUUM PUMP INSTALLED IN PHASE ONE OF THIS PROJECT TO ^ F PUMP WITH EXISTING CONDITIONS WITHIN THIS 12 V&7 5 272 ROOM. THIS LOCATION. ROVDE I-012R EQUIPMENT VACUUM LLIINE WITH SHUT-OFF VALVE. ROUTE VACUUM VENT TOR g4 TYPE OR5 OR6 PATIENT RECOVERY LINE UP THROUGH ROOF AND TERMINATE PIPE TURNED DOWN WITH BUG SCREEN. COORDINATE 249 280 282 27d FROMT ANY AIR INTAKE AND EXHAUST LOCATIONS ION OF VACUUM VENT WITH ALL OTHER EQUIPMENT LOCATED ON THE ROOF AND AWAY LQS 20 PROVIDE in EQUIPMENT VACUUM PIPE DOWN THROUGH THE FLOOR TO SERVE EQUIPMENT VACUUM 5 ❑ L SYSTEM INSTALLED IN PHASE I OF THIS PROJECT. 21 PROVIDE AN EQUIPMENT VACUUM OUTLET AT EACH OF THE PREVIOUSLY EXISTING STATIONS. EACH I RECOVERY W IlET LOCATION SHALL HAVE ASHUT-OFF VALVE LOCATED IN THE CEILING SPACE ABOVE. 289 22 PROVIDE AN AIR OUTLET AT EACH OFTHEPREVIOUSLV EXISTING NITROGEN STATIONS LOCATED WITHIN THIS ROOM, EACH OUTLET LOCATION SHALL HAVE A112 THREADED FITTING TO ALLOW FOR nit I I RECOVERY OWNER TO MAKE FIN& CONNECTIONS. PROVIDE SHUT-OFF VALVE LOCATED IN THE CEILING SPACE L �7 288 ABOVE. 23 CONNECT I-112'SCW TO EXISTING SOW PIPE. 24 CONNECT V4'SCW TO EXISTING SOW PIPE. E.7 E.7 25 PROVI DE 112' AI R CONNECTION TO EOUI PMENT. PROVI DE SHUT-OFF VALVE AND PRESSURE 5 — REGULATOR SET PER MANUFACTURERS RECOMMENDATIONS. KEY PLAN MSKTD & Associates Architecture I Engineering I Interior Design 1715 Magnavox Way 930 North Meridian Fort Wayne, IN 46804 Indianapolis, IN 46204 260.432.9337 1 317.917.1190 W.vv.mskUl PE10708732 STATE a TO VJ V d�d•r� }r O ^3 W O^ Y . L /� � 4-1 ��r�� lV ^\ W i ^^ rn�i C' L' \ LU U) / O rr/�/'A v5J O nnnnnnnnnn z O 0 W M O VJ VJ PROJECT NO. DATE 7335 05-07-19 REV. DATE SET DESCRIPTION SHEET TITLE Second Floor Plumbing Plan - Area B SHEET NUMBER P2 M 2-2 B DATE: V//V`U/-IU