Loading...
HomeMy WebLinkAboutA007 - PROPOSED ADDITION FIRST FLOOR PLANSB362118HB 2868 2470 28683060DH 210710 2840DH 3180 2840DH 5480 11140PT 307028682840DH UP CONCRETE ELEVATION 0" 7'-11" 1 8'-3 1 /2" 9'-1 1 1 /4" 3'-6 3/4" 4'-4 1 /4" 6'-2 3/8" 4'-6 1 /4"5'-5" 1'-10 1/4"3'-6 1/4"2'-1 1 1 /4" 5'-1 1 1 /4" 2'-0"2'-0"1 4'-9"16'-2 1/2"EXISTING MUDROOM 10' CLG. ENTRY HALL 10' CLG. BATHROOM 10' CLG. PATIO EXISTING PORCH 10'-1" CLG. GRILL ISLAND SECTION EXISTING GARAGE UP UP MICRO DRAIN POOL DECK OTHERS ROJECT SCOPE) F.F.E. = F.F.E. (EXIST.) = (NEW) A 7 A-1 5A-1 5 B-1 5B-15 A-18A-18 B-1 8B-18 A-1 9A-1 9B-1 9B-19 A-20A-20 B-20B-20 C-20C-20 B-23B-23 C-23C-23 A-24A-24 WALL TYPES EXISTING WALLS DEMO WALLS NEW WALLS EXISTING FOUNDATION WALLS NEW FOUNDATION WALLS ADDITIONNOTES:ADDITION NOTES: F/I 2X6 STUD WALLS @ 16" O.C. FOR NEW ENTRY HALL & BATHROOM. NEW EXTERIOR WALLS TO HAVE R-19 BATT INSULATION, 7/16" OSB SHEATHING, & HOUSEWRAP. ALL NEW DOORS & WINDOWS TO HAVE DOUBLE 2X8 HEADERS. F/I 2X4 STUD FRAMING TO ENCLOSE REMOVED WINDOWS IN EXISTING MUDROOM. F/I 2X8 RAFTERS @ 16" O.C. W/ 7/16" OSB DECKING FOR NEW ADDITION ROOF. F/I 2X6 CEILING JOISTS @ 16" O.C. FOR NEW ENTRY HALL & BATHROOM CEILINGS. NEW BATRHOOM & ENTRY HALL CEILINGS TO HAVE R-30 BATT INSULATION. F/I (2) NEW 31 1/2"W X 47 1/2"H PREFINISHED VINYL CLAD WOOD DOUBLE-HUNG WINDOWS IN NORTH WALL OF ADDITION AS SHOWN ON PLANS. F/I (1) NEW PREHUNG 36 1/8"W X 95 1/2"H PREFINISHED VINYL CLAD FULL GLASS DOOR W/ INCLUDED LOCKING HARDWARE IN NORTH WALL OF ADDITION AS SHOWN ON PLANS. F/I NEW BRICK WAINSCOT W/ ROWLOCK SILL AT NEW EXTERIOR WALLS OF ADDITION. SEE ELEVATIONS FOR DETAIL. NEW BRICK WAINSCOT & SILL TO MATCH EXISTING ON ADJACENT AREAS OF HOME AS CLOSELY AS POSSIBLE. F/I NEW FIBER CEMENT SIDING & TRIM AT EXTERIOR WALLS OF ADDITION. SEE ELEVATIONS FOR DETAIL. NEW SIDING & TRIM TO MATCH EXISTING ON HOME IN STYLE & TEXTURE AS CLOSELY AS POSSIBLE. F/I NEW FIBER CEMENT VENTED SOFFIT AT ADDITION ROOF EAVES. NEW SOFFIT TO MATCH EXISTING ON HOME IN STYLE & TEXTURE AS CLOSELY AS POSSIBLE. F/I NEW PLUMBING ROUGH-INS IN BATHROOM FOR SHOWER, TOILET, & VANITY. CONNECT TO EXISTING WATER SUPPLY & DRAIN LINES IN HOME. F/I NEW SEWAGE PUMP STATION IN BASEMENT STORAGE ROOM FOR NEW BATHROOM DRAIN LINES; SEE BASEMENT PLAN FOR DETAIL. F/I (1) NEW HVAC SUPPLY REGISTER IN BATHROOM FLOOR & (1) NEW HVAC SUPPLY REGISTER IN ENTRY HALL. CONNECT NEW DUCT RUN TO EXISTING HVAC TRUNK IN BULKHEAD IN BASEMENT STORAGE ROOM. F/I NEW 1/2" SMOOTH FINISH DRYWALL AT ALL NEW WALLS & CEILINGS IN BATHROOM & ENTRY HALL. PATCH DRYWALL AT REMOVED WINDOWS IN EXISTING MUDROOM. NEW OPENING BETWEEN EXISTING MUDROOM & NEW ENTRY HALL TO BE DRYWALL WRAPPED W/ NO CASING. F/I NEW 7" LUXURY VINYL PLANK FLOORING IN NEW ENTRY HALL & BATHROOM. F/I NEW PREHUNG SOLID CORE 32"W X 80"H DOOR W/ PRIVACY HARDWARE IN BATHROOM AS SHOWN ON PLANS. NEW DOOR & HARDWARE TO MATCH EXISTING IN HOME AS CLOSELY AS POSSIBLE W/ STOCK ITEMS. F/I NEW BASE MOLDING, SHOE MOLDING, & WINDOW & DOOR CASINGS IN NEW ENTRY HALL & BATHROOM. NEW TRIMS TO MATCH EXISTING IN HOME AS CLOSELY AS POSSIBLE W/ STOCK PROFILES. #1 of 33 Date: 05.02.19 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.McBroom ResidenceOutdoor Living AdditionFred & Carin McBroom14556 Jackie Spring Ct.Carmel, Indiana 46033Approved By: Date: SCALE: 1/4" = 1'7 FINAL Jordan Stocklin Designer jstocklin@caseindy.com PROPOSED ADDITION FIRST FLOOR PLAN Dave Null Lead Designer dnull@caseindy.com 05/16/19 Adam Schriner