Loading...
HomeMy WebLinkAbout19060173 ApplicationOFFICE USE ONLY -y G\.tq ar CgyMF CITY OF CARMEL PERMIT# ty�Pr�FRpyp� RESIDENTIAL PERMIT APPLICATION 4 rNeIANN Please complete form and email to permits(cDcarmel.in.gov as an attachment. If you have any questions, please call Building & Code Services at (317) 571.2444. RECORD OF NAMETheSmart Pergola PHONE317-987-7736 ease STREET Brighton Ave CITY STATE STATEIN "P46032 E-MAIL ADDRESSCIBudio@TheSmartPergola.Com BEST METHOD I OF CONTACT ❑ PHONE E-MAIL PLUMBING NAME STATE OF INDIANA CONTRACTOR NA LICENSE NUMBER UTILITIES - NAME SEWER WATER EXCAVATOR NA UTILITY UTILITY sa PROPERTY - NAME PHONEMiller PHONE 317-418-8271 OWNER ADDRE5s2510 Colony Ct 71ndianapolis STATEINZIP46280 PROJECT PARCEL NUMBER17-14-07-04-01-018.000 LOCATION NUMBER2•f SUBDIVISION LAKEWOOD GARDENS FLOOD ZONE ADDRE5s2510 Colony Ct CITY STATESTATEIN ZIP46280 DOES SUBDIVISION HAVE A HOMEOWNERS ASSOCIATION? ❑ YES (LETTER OF H.O.A. APPROVAL REQUIRED) ❑' NO TYPE OF EACH UNIT WILL REQUIRE M SINGLE FAMILY ElTWO El70WNHOME STRUCTURE FAMILY SEPARATE APPLICATION PROJECT. ❑ NEW STRUCTURE ❑ REMODEL 8 ACCESSORY BUILDING DETAILS ❑ ADDITION ❑ Room ❑ Porch ❑ Deck ❑ GARAGE ❑ Attached ❑ Detached FOUNDATION TYPE El ElWalkout ElSLAB ElCRAWL ElPOSPBEAM 8 POSTIPIER COSTOF CONSTRUCTION $ 1 7 740 ENERGY CODE ❑ PRESCRIPTIVE ❑ TOTAL UA ❑ PERFORMANCE EXCLUDING LAND)r TOTAL SQUARE 11 92 :PORCHES (GARAGES BASEMENT 1192 FOOTAGE` iFLOOR ADVANCED STRUCTURAL COMPONENTS REPORTING This sectlon Is required in order to comply with the requirements of IC 22-11-21 (Public Law 104, 2018) as it relates to the use of Advanced Structural Components (lightweight I -joists or lightweight roof trusses) In Class I and Class II Construction that: 1. Have less mass cross -sectional area than sawn lumber of equivalent proportions used In an equivalent application; and 2. Are assembled from combustible or noncombustible materials, or both "This does not include a structural assembly, joist or truss that provides at least 1 hour of fire resistance under ASTM El 19` Does this project Include any Advanced Structural Components? ❑ Yes (Section Below Required) 8 No Type of Advanced Structural Component (Select all that apply) Location(s) In Structure ❑ Lightweight I -Joists ❑ Lightweight Roof Trusses -Class I structure permits are subject to the. .completing construction. As of Indiana General Administrative Rules (GAR 6751AC 12) regarding expiration time frames for beginning and Ordinance (Z-625-11) and amendments, adopted under authority of I.C. 36.7 et seq, General Assembly of the State of Indiana, and all Acts amendatory thereto. I further certify that only kitchen, bath, and floor drains are connected to the Sanitary sewer. I further certfy that the construction will not be Used or occupied until a Certificate of Occupancy or of: Substantial Completion has been Issued by the Department of Community Services, Carmel, Indiana. C1auzU&'8e*t&U 06/21 /2019 Signature of Owneror Authorized Agent' Date