Loading...
HomeMy WebLinkAbout42240025 - WWC 25 - Truss DetailsDE DANSCO ENGINEERING, LLC P.O. Box 3400 Apollo Beach, FL 33572 Telephone (813) 645-0166 Facsimile (813) 645-9698 The truss drawing(s) attached have been prepared by Dansco Engineering, LLC under my direct supervision and control based on the parameters provided by Stark Truss Inc. Job: truss design(s) 6602-W1 5/8/19 Samuel A. Greenberg, P.E. Indiana Reg. #19700485 Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length is the distance from the top chord to bottom chord. The seal on these drawings indicate acceptance of professional engineering responsibility solely for the truss components shown. The suitability and use of this component for any particular building is the responsibility of the building designer, per ANSI/TPI 1-2007 Chapter 2. Warning !—Verify design parameters and read notes before use. These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication, quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate Institute, 583 D’Onofrio Drive, Madison, WI 53719 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J01 TrussType JACK-OPEN Qty 6 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:362019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-6i?tWpLVFhzKB083bzpErlJzTNp71UMu349KNrzIZAb Scale=1:16.9 W1 T1 B1 1 2 5 6 3 4 3x4 3x4 2-0-0 2-0-0 -1-5-12 1-5-12 2-0-0 2-0-0 1-7-12-9-12-4-22-9-17.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.22 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=184/0-6-0(min. 0-1-8), 3=18/Mechanical, 4=11/Mechanical Max Horz5=71(LC 13) Max Uplift5=-15(LC 16), 3=-42(LC 16), 4=-11(LC 13) MaxGrav5=228(LC 22), 3=36(LC 30), 4=32(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-5-12 to 1-6-4,Interior(1) 1-6-4 to 1-11-14zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 15 lb uplift at joint 5, 42 lb uplift at joint 3 and 11 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J02 TrussType Jack-OpenGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:372019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-avZFj9M80_5BoAjF8gKTOzr6Yn9mmxc1IkvuvHzIZAa Scale=1:16.6 W1 T1 B1 1 2 5 6 3 4 2x4 2x4 2-3-11 2-3-11 -1-8-8 1-8-8 2-3-11 2-3-11 1-7-12-8-55.7412 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.33 0.08 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 -0.02 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-3-11 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=155/0-9-6(min. 0-1-8), 3=-5/Mechanical, 4=-0/Mechanical Max Horz5=67(LC 11) Max Uplift5=-42(LC 12), 3=-54(LC 16), 4=-14(LC 27) MaxGrav5=229(LC 18), 3=31(LC 8), 4=25(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 42 lb uplift at joint 5, 54 lb uplift at joint 3 and 14 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51 Trapezoidal Loads(plf) Vert: 2=-2(F=24,B=24)-to-3=-36(F=7,B=7), 5=0(F=10,B=10)-to-4=-14(F=3,B=3) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J03 TrussType Jack-Open Qty 25 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:392019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-WHh?8rOOYcLv2TteG5MxTOxOjalnEr5Kl2O?_AzIZAY Scale=1:34.2 W1 T1 B1 1 2 5 6 7 8 3 4 5x12MT18H 3x4 5-1-0 5-1-0 -0-11-12 0-11-12 5-1-0 5-1-0 1-7-15-9-145-4-15-9-1410.0012 PlateOffsets(X,Y)-- [5:0-8-8,0-0-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.60 0.43 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.08 -0.11 0.15 (loc) 4-5 4-5 3 l/defl >739 >534 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 17 lb FT= 20% GRIP 185/144 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-1-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=236/0-6-0(min. 0-1-8), 3=111/Mechanical, 4=55/Mechanical Max Horz5=179(LC 16) Max Uplift3=-144(LC 16), 4=-14(LC 16) MaxGrav5=270(LC 2), 3=158(LC 30), 4=94(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 5-0-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)All plates areMT20 plates unless otherwiseindicated. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 5 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 144 lb uplift at joint 3 and 14 lb uplift at joint 4. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J04 TrussType Jack-Open Qty 3 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:402019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-?UFOLBP0JvTmfdSqqptA0bTeB_5czILT_i7YWczIZAX Scale=1:34.5 W1 T1 B1 B2 B31 2 3 8 7 6 9 10 4 5 3x4 3x4 1.5x4 3x5 5x6 2-6-0 2-6-0 5-1-0 2-7-0 -0-11-12 0-11-12 2-6-0 2-6-0 5-1-0 2-7-0 1-7-15-9-144-9-145-4-11-0-010.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.30 0.39 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.09 -0.11 -0.09 (loc) 6 6 4 l/defl >640 >516 n/a L/d 240 180 n/a PLATES MT20 Weight: 20 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 *Except* B2: 2x4SPFStud WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-1-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=236/0-6-0(min. 0-1-8), 4=102/Mechanical, 5=64/Mechanical Max Horz8=179(LC 16) Max Uplift4=-112(LC 16), 5=-45(LC 16) MaxGrav8=270(LC 2), 4=140(LC 30), 5=87(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-3-2,Interior(1) 2-3-2 to 5-0-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 112 lb uplift at joint 4 and 45 lb uplift at joint 5. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J05 TrussType Jack-Open Qty 2 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:412019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-TgpmZXPe4DbdHn11NWPPYp0p2OUyilbdCMt523zIZAW Scale=1:23.5 W1 T1 B1 1 2 5 6 3 43x4 3x4 0-2-0 0-2-0 2-11-8 2-9-8 -0-11-12 0-11-12 2-11-8 2-11-8 1-7-14-0-103-6-134-0-1010.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.29 0.19 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.01 -0.05 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 11 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-11-8 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=166/0-3-8(min. 0-1-8), 3=58/Mechanical, 4=28/Mechanical Max Horz5=107(LC 16) Max Uplift3=-91(LC 16), 4=-35(LC 13) MaxGrav5=191(LC 2), 3=88(LC 30), 4=52(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 2-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 91 lb uplift at joint 3 and 35 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J06 TrussType Jack-Open Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:422019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-xsN8mtQGrXjUvxbDxDwe50Z?forvRCrmR0cfbVzIZAV Scale=1:20.6 W1 T1 B1 1 2 5 3 43x4 3x4 0-2-0 0-2-0 2-3-3 2-1-3 -0-11-12 0-11-12 2-3-3 2-3-3 1-7-13-5-112-11-143-5-1110.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.24 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 -0.03 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-3-3 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=146/0-3-8(min. 0-1-8), 3=39/Mechanical, 4=19/Mechanical Max Horz5=86(LC 13) Max Uplift3=-73(LC 16), 4=-34(LC 13) MaxGrav5=168(LC 2), 3=64(LC 30), 4=38(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 73 lb uplift at joint 3 and 34 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J07 TrussType Jack-Open Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:432019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-P3wW_DRucqrLW5APVxRteE5BQBC3Af5wggMC7xzIZAU Scale=1:16.2 W1 T1 B1 1 2 5 3 4 3x4 2x4 0-2-0 0-2-0 1-2-9 1-0-9 -0-11-12 0-11-12 1-2-9 1-2-9 1-7-12-7-32-1-62-7-310.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.17 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.01 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 6 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 1-2-9 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)3=2/Mechanical, 4=5/Mechanical, 5=125/0-3-8(min. 0-1-8) Max Horz5=66(LC 13) Max Uplift3=-44(LC 16), 4=-40(LC 13), 5=-4(LC 12) MaxGrav3=28(LC 14), 4=28(LC 14), 5=162(LC 22) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 44 lb uplift at joint 3, 40 lb uplift at joint 4 and 4 lb uplift at joint 5. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J08 TrussType DiagonalHipGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:442019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-tFUuBYSXM8zC8Elb3ey6AReJxbUev5L3vK5mfNzIZAT Scale=1:22.8 W1 T1 B1 1 2 5 6 7 8 9 3 10 11 12 43x4 3x4 0-2-0 0-2-0 4-11-12 4-9-12 -1-8-8 1-8-8 4-11-12 4-11-12 1-7-13-11-100-4-103-7-03-11-105.7412 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.38 0.26 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.09 0.07 -0.11 (loc) 4-5 4-5 3 l/defl >654 >815 n/a L/d 240 180 n/a PLATES MT20 Weight: 16 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-11-12 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=154/0-6-1(min. 0-1-8), 3=76/Mechanical, 4=34/Mechanical Max Horz5=92(LC 16) Max Uplift5=-184(LC 16), 3=-128(LC 16), 4=-59(LC 9) MaxGrav5=184(LC 2), 3=98(LC 53), 4=78(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 184 lb uplift at joint 5, 128 lb uplift at joint 3 and 59 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 77 lb down and 131 lb up at 1-7-4, and 82 lb down and 38 lb up at 2-2-5, and 83 lb down and 77 lb up at 4-0-4 on top chord, and 45 lb down and 37 lb up at 1-7-4, and 43 lb down and 45 lb up at 2-2-5, and 12 lb down and 45 lb up at 4-0-4 on bottomchord.The design/selection of such connection device(s)is the responsibility of others. 10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51 Concentrated Loads(lb) Vert: 6=43(B) 10=1(B) 11=1(F) 12=0(F) Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J08 TrussType DiagonalHipGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:442019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-tFUuBYSXM8zC8Elb3ey6AReJxbUev5L3vK5mfNzIZAT LOADCASE(S)Standard Trapezoidal Loads(plf) Vert: 2=-2(F=24,B=24)-to-3=-63(F=-6,B=-6), 5=0(F=10,B=10)-to-4=-25(F=-2,B=-2) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J09 TrussType Jack-Open Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:452019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-LR2HOuS97S52mOKocMTLjfAWC?tneYbD7_rJCqzIZAS Scale=1:14.7 W1 T1 B1 1 2 5 3 4 3x4 2x4 0-2-0 0-2-0 1-3-2 1-1-2 -1-5-12 1-5-12 1-3-2 1-3-2 1-7-12-3-147.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.22 0.07 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 0.00 -0.01 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 1-3-2 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)3=-22/Mechanical, 4=-0/Mechanical, 5=182/0-3-8(min. 0-1-8) Max Horz5=61(LC 13) Max Uplift3=-68(LC 22), 4=-33(LC 13), 5=-19(LC 16) MaxGrav3=11(LC 12), 4=20(LC 14), 5=253(LC 22) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 68 lb uplift at joint 3, 33 lb uplift at joint 4 and 19 lb uplift at joint 5. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J10 TrussType Jack-Open Qty 23 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:462019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-pecfcETnulDvNYv_A3_aFsjcqP89N?qMMeaskGzIZAR Scale=1:30.5 W1 T1 B1 1 2 5 6 7 3 4 5x6 3x4 4-8-0 4-8-0 -0-11-12 0-11-12 4-8-0 4-8-0 1-7-15-5-120-5-134-11-155-5-1210.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.55 0.38 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.06 -0.08 0.12 (loc) 4-5 4-5 3 l/defl >922 >678 n/a L/d 240 180 n/a PLATES MT20 Weight: 16 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-8-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=222/0-6-0(min. 0-1-8), 3=101/Mechanical, 4=50/Mechanical Max Horz5=165(LC 16) Max Uplift3=-133(LC 16), 4=-14(LC 16) MaxGrav5=254(LC 2), 3=145(LC 30), 4=86(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 4-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 133 lb uplift at joint 3 and 14 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J11 TrussType Jack-Open Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:482019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-m0kP1wV1QNUdds3NIU12LHo?4CtorvKfqy3zo9zIZAP Scale=1:25.1 W1 T1 B1 1 2 5 6 7 3 4 4x4 3x4 3-4-1 3-4-1 -0-11-12 0-11-12 3-4-1 3-4-1 1-7-14-4-710.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.37 0.25 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.02 -0.05 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 12 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-4-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=178/0-6-0(min. 0-1-8), 3=68/Mechanical, 4=32/Mechanical Max Horz5=120(LC 16) Max Uplift3=-100(LC 16), 4=-17(LC 16) MaxGrav5=205(LC 2), 3=102(LC 30), 4=60(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 3-3-5zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint 3 and 17 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J12 TrussType Jack-Open Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:492019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-ECInEGWfBgcUE0eZrCYHtULC1cEhaMao2cpWLbzIZAO Scale=1:19.3 W1 T1 B1 1 2 5 3 4 3x4 3x4 1-11-4 1-11-4 -0-11-12 0-11-12 1-11-4 1-11-4 1-7-13-2-70-5-132-8-103-2-710.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.23 0.14 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.02 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 8 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 1-11-4 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=138/0-6-0(min. 0-1-8), 3=30/Mechanical, 4=15/Mechanical Max Horz5=80(LC 13) Max Uplift3=-65(LC 16), 4=-22(LC 16) MaxGrav5=160(LC 2), 3=55(LC 30), 4=38(LC 14) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 65 lb uplift at joint 3 and 22 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J13 TrussType DiagonalHipGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:502019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-iPsAScWHy_kLsADlPv3WQiuHE0T1JpqyHGY4t1zIZAN Scale=1:31.4 W1 T1 B1 1 2 5 6 7 8 9 3 10 11 12 4 3x5 4x4 7-11-9 7-11-9 -1-8-8 1-8-8 3-11-12 3-11-12 7-11-9 3-11-12 1-7-15-4-110-6-134-9-155-4-125.7412 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.52 0.58 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.23 -0.38 -0.13 (loc) 4-5 4-5 3 l/defl >400 >245 n/a L/d 240 180 n/a PLATES MT20 Weight: 31 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=303/0-9-6(min. 0-1-8), 3=262/Mechanical, 4=101/Mechanical Max Horz5=168(LC 12) Max Uplift5=-148(LC 16), 3=-294(LC 12), 4=-2(LC 12) MaxGrav5=347(LC 2), 3=350(LC 44), 4=162(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-5=-288/175 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 148 lb uplift at joint 5, 294 lb uplift at joint 3 and 2 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 85 lb down and 67 lb up at 3-5-7, and 122 lb down and 87 lb up at 4-7-0, and 110 lb down and 111 lb up at 5-10-12 on top chord, and 23 lb down and 32 lb up at 3-5-7, and 25 lb down and 24 lb up at 4-7-0, and 34 lb down and 36 lb up at 5-10-12 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51 Concentrated Loads(lb) Vert: 9=-7(B) 10=0(B) 11=-1(F) 12=-8(B) Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J13 TrussType DiagonalHipGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:502019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-iPsAScWHy_kLsADlPv3WQiuHE0T1JpqyHGY4t1zIZAN LOADCASE(S)Standard Trapezoidal Loads(plf) Vert: 2=-3(F=24,B=24)-to-3=-101(F=-25,B=-25), 5=-0(F=10,B=10)-to-4=-40(F=-10,B=-10) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss J14 TrussType Jack-Open Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:512019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-AbPYfyXwjIsCUJnyzcalyvQWGQuB2G45WwIdPTzIZAM Scale=1:21.8 W1 T1 B1 1 2 5 6 7 8 3 4 3x4 3x4 3-8-7 3-8-7 -1-5-12 1-5-12 3-8-7 3-8-7 1-7-13-9-03-4-13-9-07.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.31 0.20 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.03 0.04 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-8-7 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=225/0-6-0(min. 0-1-8), 3=71/Mechanical, 4=33/Mechanical Max Horz5=97(LC 16) Max Uplift5=-14(LC 16), 3=-78(LC 16), 4=-4(LC 16) MaxGrav5=260(LC 2), 3=99(LC 30), 4=65(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-5-12 to 1-6-4,Interior(1) 1-6-4 to 3-7-11zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 14 lb uplift at joint 5, 78 lb uplift at joint 3 and 4 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB01 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:522019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-enzwsHYYUb_35TM8XK5_V7zhpqEXniuEka1BxwzIZAL Scale=1:18.4 0-1-120-1-12T1 T2 T1 B1 W1 1 2 3 4 5 6 7 8 9 10 3x4 3x4 2x4 2x41.5x4 1.5x4 10-6-3 10-6-3 10-6-3 10-6-3 0-4-131-3-51-5-10-1-100-4-130-1-1010.0012 PlateOffsets(X,Y)-- [2:0-2-1,0-1-0], [3:0-2-0,Edge], [5:0-2-0,Edge], [6:0-2-1,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.26 0.19 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 25 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=195/9-2-12(min. 0-1-9), 6=195/9-2-12(min. 0-1-9), 8=375/9-2-12(min. 0-1-9) Max Horz2=30(LC 15) Max Uplift2=-33(LC 16), 6=-34(LC 17), 8=-53(LC 13) MaxGrav2=219(LC 39), 6=219(LC 39), 8=534(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-272/116, 5-6=-273/116 WEBS 4-8=-418/155 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 5-11-6,Interior(1) 5-11-6 to 8-9-11,Exterior(2) 8-9-11 to 10-3-5 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 33 lb uplift at joint 2, 34 lb uplift at joint 6 and 53 lb uplift at joint 8. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB02 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:532019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-6_XI4dZAFv6wjdxK41cD2KWvfDamWAdOzEnkUMzIZAK Scale=1:18.4 0-1-120-1-12T1 T2 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 3x4 3x4 2x4 2x41.5x4 1.5x4 10-6-3 10-6-3 3-1-4 3-1-4 7-4-14 4-3-10 10-6-3 3-1-4 0-4-132-5-52-7-10-1-100-4-130-1-1010.0012 PlateOffsets(X,Y)-- [2:0-2-1,0-1-0], [3:0-2-0,Edge], [5:0-2-0,Edge], [6:0-2-1,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.13 0.19 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 27 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=233/9-2-12(min. 0-1-8), 6=233/9-2-12(min. 0-1-8), 8=272/9-2-12(min. 0-1-8) Max Horz2=60(LC 15) Max Uplift2=-64(LC 16), 6=-64(LC 17), 8=-7(LC 13) MaxGrav2=346(LC 39), 6=346(LC 39), 8=375(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-9=-303/122, 6-10=-303/122 WEBS 4-8=-260/100 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 64 lb uplift at joint 2, 64 lb uplift at joint 6 and 7 lb uplift at joint 8. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB03 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:542019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-aA5gHzZo0DEnLnWWel8SaY20Jdw0FdIXCuWH0ozIZAJ Scale=1:23.0 0-1-120-1-12T1 T2 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 3x4 3x4 2x4 2x41.5x4 1.5x4 10-6-3 10-6-3 4-6-1 4-6-1 6-0-1 1-6-0 10-6-3 4-6-1 0-4-133-7-53-9-10-1-100-4-130-1-103-5-1110.0012 PlateOffsets(X,Y)-- [2:0-2-1,0-1-0], [3:0-2-0,Edge], [5:0-2-0,Edge], [6:0-2-1,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.32 0.19 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.02 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 29 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=253/9-2-12(min. 0-1-12), 6=253/9-2-12(min. 0-1-12), 8=203/9-2-12(min. 0-1-12) Max Horz2=-91(LC 14) Max Uplift2=-90(LC 16), 6=-97(LC 17) MaxGrav2=437(LC 39), 6=437(LC 39), 8=261(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-9=-384/143, 6-10=-384/143 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 3-2-14,Interior(1) 3-2-14 to 4-6-1,Exterior(2) 4-6-1 to 6-0-1zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 90 lb uplift at joint 2 and 97 lb uplift at joint 6. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB04 TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:552019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-2Mf3VJaQnWMeyx5jCSfh7lbDT1Ij_3nhRYGrYFzIZAI Scale=1:58.1 0-1-150-1-15T1 T2 T1 B1 ST1ST1ST1 ST1 ST1 ST1 T3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 3x4 3x4 3x4 3x4 5x6 3x4 32-1-1 32-1-1 2-5-6 2-5-6 29-7-10 27-2-4 32-1-1 2-5-6 0-4-51-1-91-5-20-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [3:0-2-0,Edge], [12:0-2-0,Edge], [18:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.23 0.10 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 13 14 13 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 78 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=31(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13 MaxGravAllreactions 250 lb orless at joint(s) 2, 13 except 18=324(LC 1), 19=408(LC 38), 20=457(LC 38), 21=392(LC 38), 17=408(LC 38), 16=457(LC 38), 15=392(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 6-19=-328/115, 5-20=-377/121, 4-21=-312/104, 9-17=-328/114, 10-16=-377/121, 11-15=-312/103 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 6-8-5,Interior(1) 6-8-5 to 29-7-10,Exterior(2) 29-7-10 to 31-9-6 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Provide adequate drainage to preventwater ponding. 8)All plates are 1.5x4MT20 unless otherwiseindicated. 9)Gablerequirescontinuous bottomchord bearing. 10)Gablestudsspaced at 4-0-0 oc. 11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13. 13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 14)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB05 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:572019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-?lnpw?cgI8cLCEF5Jth9CAgZBrzESz8_urlyd7zIZAG Scale=1:58.1 0-1-150-1-15T1 T2 T1 B1 ST2ST2ST2ST1 ST2 ST2 ST1 T3 B11 2 3 4 5 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 26 27 3x4 3x4 3x4 3x4 5x6 3x4 32-1-1 32-1-1 5-3-11 5-3-11 26-9-6 21-5-11 32-1-1 5-3-11 0-4-52-9-93-1-20-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [4:0-2-0,Edge], [11:0-2-0,Edge], [18:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.22 0.10 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 14 14 13 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 91 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=-74(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13 MaxGravAllreactions 250 lb orless at joint(s) 2, 13 except 18=440(LC 38), 19=445(LC 38), 20=430(LC 38), 21=369(LC 39), 17=445(LC 38), 16=430(LC 38), 15=369(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 8-18=-360/115, 7-19=-365/117, 5-20=-349/111, 3-21=-274/114, 9-17=-365/117, 10-16=-349/111, 12-15=-274/107 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 5-3-11,Exterior(2) 5-3-11 to 31-2-14, Interior(1) 31-2-14 to 31-9-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB06 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:39:582019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-TxKB7LdJ3RkCqOqItbCOkODjEEJVBPO77VUV9azIZAF Scale=1:56.9 0-1-150-1-15T1 T2 T1 B1 ST3ST3ST2 ST1 ST3 ST2 ST1 B11 2 3 4 5 6 7 8 9 10 11 18 17 16 15 14 13 12 19 20 21 22 23 24 25 26 3x4 5x6 6x6 6x6 3x4 32-1-1 32-1-1 8-1-15 8-1-15 23-11-1 15-9-2 32-1-1 8-1-15 0-4-54-5-94-9-20-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [15:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.26 0.09 0.16 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 10 11 10 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 102 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=-118(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2, 15, 16, 17, 14, 13, 10 except 18=-139(LC 16), 12=-138(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 10 except 15=430(LC 38), 16=467(LC 38), 17=294(LC 39), 18=473(LC 39), 14=467(LC 38), 13=294(LC 39), 12=473(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 6-15=-350/111, 5-16=-387/128, 3-18=-387/180, 7-14=-387/128, 9-12=-387/179 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 8-1-15,Exterior(2) 8-1-15 to 28-0-8, Interior(1) 28-0-8 to 31-9-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 15, 16, 17, 14, 13, 10 except(jt=lb) 18=139, 12=138. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB07 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:002019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-PKSyY1eZb3_w3izg??EsqpI402?xfHxQapzcDSzIZAD Scale=1:57.4 0-1-150-1-15T1 T2 T1 B1 ST3ST3 ST2 ST1 ST3 ST2 ST1 B11 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 2425 2627 28 29 30 3x4 3x4 3x4 5x6 3x4 32-1-1 32-1-1 11-0-4 11-0-4 21-0-13 10-0-9 32-1-1 11-0-4 0-4-56-1-96-5-20-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [5:0-2-0,Edge], [9:0-2-0,Edge], [17:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.25 0.10 0.28 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 13 13 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 109 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=-161(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 17, 18, 16 except 19=-111(LC 16), 20=-126(LC 16), 15=-107(LC 17), 14=-127(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 12 except 17=467(LC 38), 18=372(LC 38), 19=432(LC 39), 20=436(LC 39), 16=372(LC 38), 15=432(LC 39), 14=436(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 7-17=-387/133, 6-18=-292/104, 4-19=-354/161, 3-20=-347/165, 8-16=-292/85, 10-15=-354/157, 11-14=-347/166 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 11-0-4,Exterior(2) 11-0-4 to 25-3-11, Interior(1) 25-3-11 to 31-9-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 17, 18, 16 except(jt=lb) 19=111, 20=126, 15=107, 14=127. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB08 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:022019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-Ljaizigp7gEeI0736QHKvEOQeshN7B0j27SjILzIZAB Scale=1:58.5 0-1-150-1-15T2 T3 T2 B1 ST4ST3 ST2 ST1 ST3 ST2 ST1 T1 B1 T1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 22 21 20 19 18 17 16 23 24 25 26 27 28 3x4 3x4 3x4 3x4 3x4 5x6 3x4 32-1-1 32-1-1 13-10-9 13-10-9 18-2-8 4-3-15 32-1-1 13-10-9 0-4-57-9-98-1-20-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [7:0-2-0,Edge], [9:0-2-0,Edge], [19:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.24 0.10 0.31 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 15 15 14 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 114 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud*Except* ST4: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=-205(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2, 19, 20, 18 except 21=-132(LC 16), 22=-122(LC 16), 17=-134(LC 17), 16=-121(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 14 except 19=364(LC 38), 20=389(LC 39), 21=459(LC 39), 22=396(LC 47), 18=389(LC 39), 17=459(LC 39), 16=396(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 8-19=-284/85, 6-20=-309/125, 4-21=-380/182, 3-22=-313/160, 10-18=-309/116, 12-17=-380/184, 13-16=-313/160 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 13-10-9,Exterior(2) 13-10-9 to 18-2-8, Interior(1) 22-5-7 to 31-9-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 19, 20, 18 except(jt=lb) 21=132, 22=122, 17=134, 16=121. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB09 TrussType Piggyback Qty 4 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:032019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-pv84A2gRu_NVw9iFg8oZRRwc9F0gseEsGnCGqnzIZAA Scale=1:62.5 T2 T2 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1 B1 T1 T1 1 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 24 25 26 3x4 4x4 3x4 3x4 5x6 3x4 32-1-1 32-1-1 16-0-8 16-0-8 32-1-1 16-0-8 0-4-59-2-119-4-50-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [17:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.19 0.09 0.24 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 13 13 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 116 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud*Except* ST4: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-17 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=-240(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2 except 18=-135(LC 16), 19=-120(LC 16), 20=-124(LC 16), 16=-135(LC 17), 15=-121(LC 17), 14=-124(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 12, 2 except 17=293(LC 33), 18=358(LC 30), 19=336(LC 30), 20=338(LC 30), 16=358(LC 31), 15=336(LC 31), 14=337(LC 31) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 6-18=-278/182, 4-19=-257/170, 3-20=-251/164, 8-16=-277/182, 10-15=-257/171, 11-14=-250/163 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 16-0-8,Exterior(2) 16-0-8 to 19-0-8 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)All plates are 1.5x4MT20 unless otherwiseindicated. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 18=135, 19=120, 20=124, 16=135, 15=121, 14=124. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB10 TrussType Piggyback Qty 1 Ply 2 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:052019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-mHGrbkiiQbdD9TsenZq1Xs?y73jtKaT9k5hNvgzIZA8 Scale=1:62.5 T2 T2 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1 T1 T1 B11 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 24 25 26 3x4 4x4 3x4 3x4 5x6 3x4 32-1-1 32-1-1 16-0-8 16-0-8 32-1-1 16-0-8 0-4-59-2-119-4-50-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [17:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.09 0.05 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 12 13 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 232 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud*Except* ST4: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=-240(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2 except 18=-135(LC 16), 19=-120(LC 16), 20=-124(LC 16), 16=-135(LC 17), 15=-121(LC 17), 14=-124(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 12 except 17=293(LC 33), 18=358(LC 30), 19=336(LC 30), 20=338(LC 30), 16=358(LC 31), 15=336(LC 31), 14=337(LC 31) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 6-18=-278/182, 4-19=-257/170, 3-20=-251/164, 8-16=-277/182, 10-15=-257/171, 11-14=-250/163 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-11 to 3-3-11,Interior(1) 3-3-11 to 16-0-8,Exterior(2) 16-0-8 to 19-0-8 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 6) Unbalancedsnowloads have been considered for this design. 7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 8)All plates are 1.5x4MT20 unless otherwiseindicated. 9)Gablerequirescontinuous bottomchord bearing. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 18=135, 19=120, 20=124, 16=135, 15=121, 14=124. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 13)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer.Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB10 TrussType Piggyback Qty 1 Ply 2 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:052019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-mHGrbkiiQbdD9TsenZq1Xs?y73jtKaT9k5hNvgzIZA8 LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB11 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:072019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-igNb0QjyyCtxPn00v_sVcH5GOtOZoQYSBPATzYzIZA6 Scale=1:57.4 0-1-150-1-15T1 T2 T1 B1 ST4ST3 ST2 ST1 ST3 ST2 ST1 B11 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 24 25 26 27 28 3x4 3x4 3x4 5x6 3x4 32-0-15 32-0-15 13-5-7 13-5-7 18-7-6 5-1-15 32-0-15 13-5-9 0-4-57-6-117-10-40-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [6:0-2-0,Edge], [8:0-2-0,Edge], [17:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.24 0.10 0.35 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 13 13 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 113 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=198(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 2, 17, 18, 16, 12 except 19=-134(LC 16), 20=-121(LC 16), 15=-136(LC 17), 14=-120(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 12 except 17=400(LC 38), 18=380(LC 39), 19=459(LC 39), 20=409(LC 39), 16=381(LC 39), 15=459(LC 39), 14=409(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 7-17=-320/99, 5-18=-300/110, 4-19=-380/184, 3-20=-325/160, 9-16=-300/98, 10-15=-380/186, 11-14=-324/159 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-9 to 3-3-9,Interior(1) 3-3-9 to 13-5-7,Exterior(2) 13-5-7 to 22-10-5, Interior(1) 22-10-5 to 31-9-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 17, 18, 16, 12 except(jt=lb) 19=134, 20=121, 15=136, 14=120. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB12 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:082019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-AsxzDmkajW?o0xbDThOk8VdR4GkoXvIbQ3v1W_zIZA5 Scale=1:56.9 0-1-150-1-15T1 T2 T1 B1 ST3ST3 ST2 ST1 ST3 ST2 ST1 B11 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 24 25 26 27 28 3x4 3x4 3x4 5x6 3x4 32-0-15 32-0-15 10-7-3 10-7-3 21-5-11 10-10-8 32-0-15 10-7-4 0-4-55-10-116-2-40-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [5:0-2-0,Edge], [9:0-2-0,Edge], [17:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.24 0.10 0.26 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 13 13 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 108 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=155(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 17, 18, 16, 15 except 19=-103(LC 16), 20=-128(LC 16), 14=-128(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 12 except 17=463(LC 38), 18=383(LC 38), 19=417(LC 39), 20=440(LC 39), 16=383(LC 38), 15=417(LC 39), 14=439(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 7-17=-383/130, 6-18=-303/104, 4-19=-339/152, 3-20=-350/167, 8-16=-303/91, 10-15=-339/148, 11-14=-350/168 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-9 to 3-3-9,Interior(1) 3-3-9 to 10-7-3,Exterior(2) 10-7-3 to 25-8-9, Interior(1) 25-8-9 to 31-9-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 17, 18, 16, 15 except(jt=lb) 19=103, 20=128, 14=128. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB13 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:102019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-6F3keRmqF7FVGEkba6QCEwjnR4PJ?qautNO8atzIZA3 Scale=1:58.1 0-1-150-1-15T1 T2 T1 B1 ST2ST2ST2 ST1 ST2 ST2 ST1 T3 B11 2 3 4 5 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 3x4 3x4 3x4 3x4 5x6 3x4 32-0-15 32-0-15 7-8-14 7-8-14 24-3-15 16-7-1 32-0-15 7-9-0 0-4-54-2-114-6-40-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [4:0-2-0,Edge], [11:0-2-0,Edge], [18:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.25 0.09 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 14 14 13 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 100 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=-111(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2, 18, 19, 20, 17, 16, 13 except 21=-127(LC 16), 15=-125(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 13 except 18=430(LC 38), 19=464(LC 38), 20=344(LC 38), 21=450(LC 39), 17=465(LC 38), 16=343(LC 38), 15=450(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 8-18=-350/111, 6-19=-384/131, 5-20=-265/102, 3-21=-362/166, 9-17=-384/128, 10-16=-264/80, 12-15=-362/164 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-9 to 3-3-9,Interior(1) 3-3-9 to 7-8-14,Exterior(2) 7-8-14 to 28-6-14, Interior(1) 28-6-14 to 31-9-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 18, 19, 20, 17, 16, 13 except(jt=lb) 21=127, 15=125. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB14 TrussType Piggyback Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:112019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-aRd6snnS?RNMtOJo8pxRm7FygUlWkIf1618h6JzIZA2 Scale=1:58.1 0-1-150-1-15T1 T2 T1 B1 ST2ST2ST2ST1 ST2 ST2 ST1 T3 B11 2 3 4 5 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 26 27 3x4 3x4 3x4 3x4 5x6 3x4 32-0-15 32-0-15 4-10-9 4-10-9 27-2-4 22-3-10 32-0-15 4-10-11 0-4-52-6-112-10-40-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [4:0-2-0,Edge], [11:0-2-0,Edge], [18:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.22 0.10 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 14 14 13 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 90 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=68(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13 MaxGravAllreactions 250 lb orless at joint(s) 2, 13 except 18=442(LC 38), 19=441(LC 38), 20=446(LC 38), 21=361(LC 39), 17=441(LC 38), 16=445(LC 38), 15=361(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 8-18=-362/115, 7-19=-361/115, 5-20=-365/117, 3-21=-266/103, 9-17=-361/116, 10-16=-365/119, 12-15=-266/95 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-9 to 3-3-9,Interior(1) 3-3-9 to 4-10-9,Exterior(2) 4-10-9 to 31-2-12, Interior(1) 31-2-12 to 31-9-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss PB15 TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:132019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-XqksHTojX2d47iTAFEzvrYLIvHRvCCEKZLdoBCzIZA0 Scale=1:58.1 0-1-150-1-15T1 T2 T1B1ST1ST1ST1ST1ST1ST1 T3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 3x4 3x4 3x4 3x4 10x103x83x83x8 3x8 3x8 3x8 3x4 32-0-15 32-0-15 2-0-5 2-0-5 30-0-8 28-0-3 32-0-15 2-0-7 0-4-50-10-111-2-40-1-100-4-50-1-107.0012 PlateOffsets(X,Y)-- [3:0-2-0,Edge], [7:0-1-12,0-0-0], [12:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.23 0.10 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 13 14 13 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 76 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 30-4-12. (lb)-Max Horz2=24(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13 MaxGravAllreactions 250 lb orless at joint(s) 2, 13 except 18=324(LC 1), 19=396(LC 38), 20=457(LC 38), 21=405(LC 38), 17=396(LC 38), 16=457(LC 38), 15=404(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 6-19=-316/115, 5-20=-377/119, 4-21=-322/105, 9-17=-316/114, 10-16=-377/119, 11-15=-322/104 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-9 to 6-3-3,Interior(1) 6-3-3 to 30-0-8,Exterior(2) 30-0-8 to 31-9-4zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Provide adequate drainage to preventwater ponding. 8)Gablerequirescontinuous bottomchord bearing. 9)Gablestudsspaced at 4-0-0 oc. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 18, 19, 20, 21, 17, 16, 15, 13. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 13)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T01 TrussType Common Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:142019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-?0IEUppLIMlxks2MpyV8OmtLCheixdXUo?MLjezIZA? Scale=1:56.7 T1 T1 B1 W3 W2W2 W1 W1 B1 1 2 3 4 5 8 7 6 9 10 11 12 13 14 8x8 4x4 8x8 4x6 5x8 1.5x41.5x4 4x6 9-6-0 9-6-0 19-0-0 9-6-0 4-10-12 4-10-12 9-6-0 4-7-4 14-1-4 4-7-4 19-0-0 4-10-12 1-7-19-6-11-7-110.0012 PlateOffsets(X,Y)-- [1:0-1-9,0-1-12], [5:0-1-9,0-1-12], [6:Edge,0-2-0], [7:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.71 0.64 0.21 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.46 0.02 (loc) 7 6-7 6 l/defl >999 >482 n/a L/d 240 180 n/a PLATES MT20 Weight: 82 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud*Except* W3: 2x4 HF/SPF No.2, W1: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-8-7 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=656/0-6-0(min. 0-1-8), 6=656/0-6-0(min. 0-1-8) Max Horz8=-257(LC 12) Max Uplift8=-78(LC 16), 6=-78(LC 17) MaxGrav8=742(LC 2), 6=742(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-9=-756/143, 2-9=-615/161, 2-10=-589/168, 10-11=-561/174, 3-11=-552/191, 3-12=-552/191, 12-13=-561/174, 4-13=-589/168, 4-14=-615/160, 5-14=-756/143, 1-8=-621/152, 5-6=-621/152 BOT CHORD 7-8=-117/555, 6-7=-66/467 WEBS 3-7=-115/450 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 9-6-0,Exterior(2) 9-6-0 to 12-6-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8, 6. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T01GE TrussType Common SupportedGable Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:162019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-xPQ?vVqbqz?f_9ClxMXcTBzoGVRbPWOnGJrSnXzIZ9z Scale=1:60.5 W1 T1 T1 W1 B1 ST5 ST4 ST3 ST2 ST1 ST4 ST3 ST2 ST1 B2 W2 1 2 3 4 5 6 7 8 9 10 11 12 13 24 23 22 21 20 19 18 17 16 15 14 2526 27 3x4 3x5 4x4 3x5 3x43x4 19-0-0 19-0-0 -0-11-12 0-11-12 9-6-0 9-6-0 19-0-0 9-6-0 19-11-12 0-11-12 1-7-19-6-11-7-110.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.29 0.17 0.31 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.01 (loc) 13 13 14 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 110 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud*Except* ST4: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 18-19. JOINTS 1Brace at Jt(s): 25, 26, 27 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 19-0-0. (lb)-Max Horz24=-281(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 22, 16 except 24=-157(LC 12), 14=-142(LC 13), 21=-142(LC 16), 23=-288(LC 16), 17=-143(LC 17), 15=-284(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 21, 22, 18, 17, 16 except 24=302(LC 31), 14=290(LC 30), 19=252(LC 30), 23=275(LC 14), 15=264(LC 15) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3)-0-11-12 to 2-0-4,Exterior(2) 2-0-4 to 9-6-0, Corner(3) 9-6-0 to 12-6-0zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb). 9)Gablestudsspaced at 2-0-0 oc. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 22, 16 except (jt=lb) 24=157, 14=142, 21=142, 23=288, 17=143, 15=284. 12) Non Standard bearingcondition. Reviewrequired. 13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T02 TrussType Roof SpecialGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:182019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-toYlKAsrMaFNDTM82nZ4Yc20NI_6tIj3jdKZrPzIZ9x Scale=1:64.9 0-1-120-1-12T1 T2 T3 T4 B1 W3 W4 W5 W4 W6 W7 W8 W9 W8 W7 W1 W2 W1 W10B2 1 2 3 4 5 6 7 8 9 17 16 15 14 13 12 11 10 18 19 20 21 22 23 24 25 26 27 28 29 3031 6x6 6x6 4x4 3x5 3x6 3x6 4x4 5x12 1.5x4 5x6 4x10 3x10 3x5 3x4 4x6 1.5x4 1-4-13 1-4-13 6-7-13 5-3-0 11-10-13 5-3-0 13-10-13 2-0-0 20-0-0 6-1-3 26-1-4 6-1-4 29-6-0 3-4-13 -0-11-12 0-11-12 1-4-13 1-4-13 6-7-13 5-3-0 11-10-13 5-3-0 13-10-13 2-0-0 20-0-0 6-1-3 26-1-4 6-1-4 29-6-0 3-4-13 1-7-12-7-59-6-11-7-12-7-510.0012 PlateOffsets(X,Y)-- [2:0-2-14,0-2-0], [3:0-3-15,Edge], [5:0-2-1,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.83 0.74 0.77 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.26 -0.58 0.09 (loc) 14-15 14-15 10 l/defl >999 >607 n/a L/d 240 180 n/a PLATES MT20 Weight: 141 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 *Except* B1: 2x4SPF 1650F 1.5E WEBS 2x4SPFStud*Except* W4,W9: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-4-6 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 6-12 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)17=1143/0-6-0(min. 0-2-0), 10=1054/0-6-0(min. 0-1-15) Max Horz17=272(LC 9) Max Uplift17=-408(LC 12), 10=-167(LC 12) MaxGrav17=1283(LC 36), 10=1163(LC 59) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-806/262, 3-18=-2839/724, 18-19=-2839/724, 4-19=-2841/724, 4-20=-2841/724, 20-21=-2840/724, 21-22=-2839/724, 5-22=-2839/724, 5-6=-2856/581, 6-23=-1286/262, 23-24=-1075/273, 7-24=-1032/297, 7-25=-1022/315, 25-26=-1075/291, 8-26=-1196/287, 8-9=-1153/205, 2-17=-1305/404, 9-10=-1138/177 BOT CHORD 16-17=-261/249, 16-27=-344/838, 27-28=-344/838, 15-28=-344/838, 15-29=-848/3437, 29-30=-848/3437, 30-31=-848/3437, 14-31=-848/3437, 13-14=-509/2189, 12-13=-509/2189, 11-12=-121/871 WEBS 3-16=-713/194, 3-15=-533/2354, 4-15=-621/204, 5-15=-1170/164, 5-14=-2178/523, 6-14=-336/1790, 6-12=-1641/521, 7-12=-230/1025, 8-11=-267/112, 2-16=-265/1062, 9-11=-123/932 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 17=408, 10=167. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T02 TrussType Roof SpecialGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:192019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-M_67XWtU7uOErdwKcV4J5pbB6iKLclzDyH46NszIZ9w NOTES- 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 136 lb down and 144 lb up at 1-4-13, 73 lb down and 35 lb up at 3-5-14, 73 lb down and 35 lb up at 5-5-14, 73 lb down and 35 lb up at 7-5-14, and 73 lb down and 35 lb up at 9-5-14, and 73 lb down and 35 lb up at 10-5-4 on top chord, and 37 lb down and 46 lb up at 1-4-13, 20 lb down and 20 lb up at 3-5-14, 20 lb down and 20 lb up at 5-5-14, 20 lb down and 20 lb up at 7-5-14, and 20 lb down and 20 lb up at 9-5-14, and 20 lb down and 20 lb up at 10-5-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-3=-51, 3-5=-61, 5-7=-51, 7-9=-51, 10-17=-20 Concentrated Loads(lb) Vert: 3=26(B) 16=3(B) 27=1(B) 28=1(B) 29=1(B) 30=1(B) 31=1(B) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T03 TrussType Roof Special Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:202019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-qAgVlsu6uCW5SnVWACbYe17KJ6diLCEMAxpfwIzIZ9v Scale=1:60.0 0-1-120-1-12T1 T2 T3 T4 B1 W3 W4 W5 W6 W7 W8 W9 W1 W2 W1 W10 B2 1 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 17 18 19 20 21 22 23 5x6 5x8 4x6 2x4 1.5x4 4x63x54x12 1.5x4 3x10 4x4 3x5 3x5 2-9-10 2-9-10 8-0-0 5-2-6 13-3-10 5-3-10 20-0-0 6-8-7 29-6-0 9-6-0 -0-11-12 0-11-12 2-9-10 2-9-10 8-0-0 5-2-6 13-3-10 5-3-10 20-0-0 6-8-7 25-10-0 5-10-0 29-6-0 3-8-0 1-7-13-9-59-6-11-7-13-9-510.0012 PlateOffsets(X,Y)-- [3:0-3-0,0-2-1], [5:0-4-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.93 0.92 0.77 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.40 -1.09 0.08 (loc) 10-12 10-12 9 l/defl >878 >322 n/a L/d 240 180 n/a PLATES MT20 Weight: 136 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 *Except* T3: 2x4SPF 1650F 1.5E BOT CHORD2x4SPF 1650F 1.5E WEBS 2x4SPFStud*Except* W7,W8: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 2-2-0 oc bracing. WEBS 1 Row at midpt 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)14=1169/0-6-0(min. 0-2-0), 9=1061/0-6-0(min. 0-1-13) Max Horz14=272(LC 13) Max Uplift14=-221(LC 16), 9=-131(LC 16) MaxGrav14=1280(LC 40), 9=1167(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-15=-1149/201, 3-15=-1105/211, 3-16=-2230/335, 4-16=-2232/335, 4-17=-2232/335, 5-17=-2230/335, 5-18=-1277/214, 18-19=-1094/218, 6-19=-1048/241, 6-20=-1013/255, 20-21=-1105/232, 21-22=-1105/229, 7-22=-1219/226, 2-14=-1246/253 BOT CHORD 13-14=-253/259, 12-13=-225/905, 11-12=-453/2384, 10-11=-453/2384, 9-10=-136/846 WEBS 3-13=-446/69, 3-12=-161/1599, 4-12=-616/191, 5-12=-631/158, 5-10=-1828/476, 6-10=-136/1041, 2-13=-104/1003, 7-9=-1247/218 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 2-9-10,Exterior(2) 2-9-10 to 5-9-10, Interior(1) 13-3-10 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=221, 9=131. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T04 TrussType Roof Special Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:212019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-IMDuyCukfVey4w4jjw7nAEgXSW?A4fXWPaZDSkzIZ9u Scale=1:63.0 0-1-120-1-12T1 T2 T3 T4 B1 W3 W4 W5 W4 W6 W7 W8 W1 W2 W1 W9 B2 1 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 17 18 19 20 21 22 23 24 25 26 5x6 6x6 4x4 1.5x4 2x4 4x63x54x10 1.5x4 3x8 4x4 4x6 4x4 4-2-6 4-2-6 9-5-6 5-3-0 14-8-6 5-3-0 20-0-0 5-3-10 29-6-0 9-6-0 -0-11-12 0-11-12 4-2-6 4-2-6 9-5-6 5-3-0 14-8-6 5-3-0 20-0-0 5-3-10 25-10-0 5-10-0 29-6-0 3-8-0 1-7-14-11-59-6-11-7-14-11-510.0012 PlateOffsets(X,Y)-- [2:0-2-14,0-2-0], [3:0-3-0,0-2-1], [5:0-2-1,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.71 0.78 0.77 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.25 -0.70 0.07 (loc) 10-12 10-12 9 l/defl >999 >502 n/a L/d 240 180 n/a PLATES MT20 Weight: 142 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 *Except* B2: 2x4SPF 1650F 1.5E WEBS 2x4SPFStud*Except* W7: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-2-2 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-9-4 oc bracing. WEBS 1 Row at midpt 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)14=1164/0-6-0(min. 0-2-1), 9=1066/0-6-0(min. 0-1-13) Max Horz14=272(LC 13) Max Uplift14=-221(LC 16), 9=-131(LC 16) MaxGrav14=1245(LC 40), 9=1167(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-15=-1281/205, 15-16=-1249/216, 3-16=-1214/232, 3-17=-1848/318, 17-18=-1848/318, 4-18=-1850/318, 4-19=-1850/317, 5-19=-1848/318, 5-20=-1202/239, 20-21=-1103/240, 21-22=-1066/248, 6-22=-1039/262, 6-23=-1009/258, 23-24=-1096/236, 24-25=-1101/235, 7-25=-1215/229, 2-14=-1204/253 BOT CHORD 13-14=-265/287, 12-13=-209/976, 11-12=-316/1830, 10-11=-316/1830, 9-10=-141/847 WEBS 3-13=-262/67, 3-12=-123/1168, 4-12=-620/189, 5-12=-331/112, 5-10=-1427/382, 6-10=-172/1118, 2-13=-75/998, 7-9=-1242/233 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 4-2-6,Exterior(2) 4-2-6 to 7-2-6, Interior(1) 14-8-6 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=221, 9=131. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T05 TrussType Roof Special Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:232019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-ElLeNuw_B7ufJEE5rL9FFfluMJgtYZ8ptu2KWdzIZ9s Scale=1:63.0 0-1-120-1-12T1 T2 T3 T4 B1 W3 W4 W5 W4 W6 W7 W8 W1 W2 W1 W9 B2 1 2 3 4 5 6 7 8 14 13 12 11 10 9 25 15 16 17 18 19 20 21 22 23 24 5x6 5x6 4x4 1.5x4 3x4 3x63x44x8 1.5x4 3x8 4x4 6x6 3x6 5-7-3 5-7-3 10-10-3 5-3-0 16-1-3 5-3-0 20-0-0 3-10-13 29-6-0 9-6-0 -0-11-12 0-11-12 5-7-3 5-7-3 10-10-3 5-3-0 16-1-3 5-3-0 20-0-0 3-10-13 25-10-2 5-10-2 29-6-0 3-7-15 1-7-16-1-59-6-11-7-16-1-510.0012 PlateOffsets(X,Y)-- [2:0-2-12,0-1-8], [3:0-3-0,0-2-1] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.68 0.83 0.76 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.19 -0.49 0.06 (loc) 9-10 9-10 9 l/defl >999 >716 n/a L/d 240 180 n/a PLATES MT20 Weight: 148 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud*Except* W4,W7: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-10-9 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)14=1159/0-6-0(min. 0-2-2), 9=1071/0-6-0(min. 0-1-15) Max Horz14=272(LC 13) Max Uplift14=-221(LC 16), 9=-131(LC 16) MaxGrav14=1276(LC 41), 9=1167(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-15=-1323/217, 15-16=-1277/221, 3-16=-1273/244, 3-17=-1581/308, 17-18=-1581/308, 4-18=-1583/308, 4-19=-1583/308, 5-19=-1581/308, 5-20=-1168/260, 20-21=-1099/266, 6-21=-1086/283, 6-22=-1089/265, 22-23=-1097/242, 7-23=-1211/236, 2-14=-1222/256 BOT CHORD 13-14=-283/352, 12-13=-186/988, 11-12=-220/1487, 10-11=-220/1487, 9-10=-146/847 WEBS 3-12=-120/889, 4-12=-620/189, 5-10=-1254/342, 6-10=-210/1197, 2-13=-91/954, 7-9=-1235/248 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 5-7-3,Exterior(2) 5-7-3 to 8-7-3, Interior(1) 16-1-3 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=221, 9=131. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T06 TrussType Roof Special Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:242019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-ixv0aExcyQ0WxOpHO2gUotI0sj2JG0Wy5Ynt33zIZ9r Scale=1:63.0 0-1-120-1-12T1 T2 T3 T4 B1 W3 W4 W5 W6 W7 W8 W9 W1 W2 W11 W10 B2 1 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 17 1819 20 21 22 23 24 5x6 4x4 1.5x4 3x4 3x44x43x8 1.5x4 5x6 3x10 4x4 4x8 3x6 7-0-0 7-0-0 13-0-5 6-0-5 17-6-0 4-5-11 20-0-0 2-6-0 29-6-0 9-6-0 -0-11-12 0-11-12 7-0-0 7-0-0 13-0-5 6-0-5 17-6-0 4-5-11 20-0-0 2-6-0 25-10-2 5-10-2 29-6-0 3-7-15 1-7-17-3-59-6-11-7-17-3-510.0012 PlateOffsets(X,Y)-- [2:0-2-8,0-1-12], [3:0-3-0,0-2-1] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.89 0.69 0.75 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.55 0.05 (loc) 9-10 9-10 9 l/defl >999 >631 n/a L/d 240 180 n/a PLATES MT20 Weight: 156 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud*Except* W4,W6,W7,W8: 2x4 HF/SPF No.2, W1: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-12, 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)14=1155/0-6-0(min. 0-2-3), 9=1073/Mechanical Max Horz14=273(LC 13) Max Uplift14=-222(LC 16), 9=-130(LC 16) MaxGrav14=1313(LC 41), 9=1164(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-15=-1310/204, 15-16=-1277/213, 16-17=-1246/228, 3-17=-1240/251, 3-18=-1385/302, 18-19=-1385/302, 4-19=-1387/302, 4-20=-1387/302, 5-20=-1385/302, 5-21=-1123/285, 6-21=-1056/299, 6-22=-1080/268, 22-23=-1088/245, 7-23=-1202/239, 2-14=-1251/264 BOT CHORD 13-14=-314/492, 12-13=-156/963, 11-12=-140/1223, 10-11=-140/1223, 9-10=-147/842 WEBS 3-12=-139/648, 4-12=-633/193, 5-12=-86/302, 5-10=-1198/327, 6-10=-243/1257, 2-13=-123/882, 7-9=-1220/256 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 7-0-0,Exterior(2) 7-0-0 to 10-0-0, Interior(1) 17-6-0 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=222, 9=130. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T07 TrussType Roof Special Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:252019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-A8TOoaxEik8NZYOUylBjL4qFV7OZ?Tn5KCXQbVzIZ9q Scale=1:60.0 0-1-120-1-12T1 T2 T3 T4 B1 W3 W4 W5 W6 W7 W8 W9 W10 W1 W2 W1 W11 B2 1 2 3 4 5 6 7 8 9 15 14 13 12 11 10 16 17 18 19 20 21 22 23 24 25 5x6 5x6 4x4 1.5x4 3x43x4 4x4 3x8 1.5x4 3x8 4x4 2x4 3x5 3x6 8-4-13 8-4-13 13-7-13 5-3-0 18-10-13 5-3-0 20-0-0 1-1-3 29-6-0 9-6-0 -0-11-12 0-11-12 3-7-3 3-7-3 8-4-13 4-9-10 13-7-13 5-3-0 18-10-13 5-3-0 20-0-0 1-1-3 25-10-2 5-10-2 29-6-0 3-7-15 1-7-18-5-59-6-11-7-18-5-510.0012 PlateOffsets(X,Y)-- [4:0-3-0,0-2-1] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.58 0.69 0.75 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.55 0.06 (loc) 10-11 10-11 10 l/defl >999 >635 n/a L/d 240 180 n/a PLATES MT20 Weight: 167 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4 HF/SPF No.2 *Except* W3,W10,W1,W2,W11: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-5-15 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-13, 6-11 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)15=1149/0-6-0(min. 0-2-3), 10=1081/Mechanical Max Horz15=272(LC 13) Max Uplift15=-221(LC 16), 10=-131(LC 16) MaxGrav15=1345(LC 41), 10=1167(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 3-18=-1245/269, 4-18=-1205/292, 4-19=-1206/305, 19-20=-1206/305, 5-20=-1207/305, 5-21=-1207/305, 21-22=-1206/305, 6-22=-1205/305, 6-7=-1149/305, 7-23=-1121/262, 23-24=-1122/239, 8-24=-1207/234, 2-15=-292/128 BOT CHORD 14-15=-246/842, 13-14=-120/931, 12-13=-77/1029, 11-12=-77/1029, 10-11=-144/843 WEBS 4-14=-13/261, 4-13=-158/508, 5-13=-620/183, 6-13=-112/327, 6-11=-1252/344, 7-11=-275/1359, 3-15=-1251/222, 8-10=-1219/249 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 8-4-13,Exterior(2) 8-4-13 to 11-4-13, Interior(1) 18-10-13 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 15=221, 10=131. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T08 TrussType Hip Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:272019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-7Wb9DFzVELO5orYs4ADBQVwa8x2XTShOnW0XgOzIZ9o Scale=1:60.2 0-1-120-1-12T1 T2 T3 B1 W3 W4 W5 W5 W4 W3 W1 W2 W1 W2 B2 1 2 3 4 5 6 7 8 13 12 11 10 9 14 15 16 17 18 19 20 21 22 23 24 25 5x6 5x6 2x4 3x53x8 4x4 3x4 3x8 4x4 2x4 3x6 3x6 9-9-10 9-9-10 19-8-7 9-10-13 29-6-0 9-9-10 -0-11-12 0-11-12 4-0-8 4-0-8 9-9-10 5-9-2 14-9-0 4-11-7 19-8-7 4-11-7 25-5-9 5-9-2 29-6-0 4-0-8 1-7-19-7-59-9-11-7-19-7-510.0012 PlateOffsets(X,Y)-- [4:0-3-0,0-2-1], [6:0-3-0,0-2-1] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.70 0.78 0.40 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.19 -0.49 0.06 (loc) 9-10 9-10 9 l/defl >999 >719 n/a L/d 240 180 n/a PLATES MT20 Weight: 154 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud*Except* W4,W5: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-5-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-12, 5-10, 3-13, 7-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)13=1142/0-6-0(min. 0-2-5), 9=1082/Mechanical Max Horz13=277(LC 13) Max Uplift13=-131(LC 16), 9=-106(LC 17) MaxGrav13=1417(LC 39), 9=1358(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 3-16=-1328/241, 16-17=-1225/249, 4-17=-1133/282, 4-18=-869/283, 18-19=-869/282, 5-19=-870/282, 5-20=-871/281, 20-21=-870/281, 6-21=-869/281, 6-22=-1134/285, 22-23=-1227/245, 7-23=-1330/244 BOT CHORD 12-13=-239/998, 11-12=-146/1025, 10-11=-146/1025, 9-10=-150/1004 WEBS 4-12=-38/431, 5-12=-325/193, 5-10=-323/193, 6-10=-41/433, 3-13=-1429/200, 7-9=-1438/243 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 9-9-10,Exterior(2) 9-9-10 to 23-11-5, Interior(1) 23-11-5 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 13=131, 9=106. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T09 TrussType PiggybackBase Qty 2 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:282019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-bj8XQb_7?fWyQ?63dulQyjSm5KOiCmiY0Al5CqzIZ9n Scale=1:59.9 T1 T2 T3 B1 W3 W4 W5 W5 W4 W3 W1 W2 W1 W2 B2 1 2 3 4 5 6 7 8 13 12 11 10 9 14 15 16 17 18 19 20 21 22 23 4x4 4x4 3x4 3x53x8 4x4 3x4 3x8 4x4 3x4 3x6 3x6 9-5-15 9-5-15 20-0-1 10-6-3 29-6-0 9-5-15 -0-11-12 0-11-12 3-11-15 3-11-15 9-5-15 5-6-0 14-9-0 5-3-1 20-0-1 5-3-1 25-6-1 5-6-0 29-6-0 3-11-15 1-7-19-6-01-7-19-6-010.0012 PlateOffsets(X,Y)-- [4:0-2-4,0-2-0], [6:0-2-4,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.62 0.79 0.99 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.19 -0.48 0.06 (loc) 9-10 9-10 9 l/defl >999 >727 n/a L/d 240 180 n/a PLATES MT20 Weight: 153 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud*Except* W4,W5: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-11-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-12, 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)13=1145/0-6-0(min. 0-2-5), 9=1085/Mechanical Max Horz13=273(LC 13) Max Uplift13=-128(LC 16), 9=-103(LC 17) MaxGrav13=1421(LC 39), 9=1362(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 3-15=-1302/242, 15-16=-1266/242, 4-16=-1162/281, 4-17=-896/280, 17-18=-896/280, 5-18=-896/280, 5-19=-897/279, 19-20=-897/279, 6-20=-897/279, 6-21=-1163/284, 21-22=-1281/245, 7-22=-1304/240, 2-13=-269/127 BOT CHORD 12-13=-243/976, 11-12=-156/1062, 10-11=-156/1062, 9-10=-150/983 WEBS 4-12=-39/443, 5-12=-342/194, 5-10=-341/195, 6-10=-42/445, 3-13=-1390/198, 7-9=-1402/242 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 9-5-15,Exterior(2) 9-5-15 to 24-3-0, Interior(1) 24-3-0 to 29-4-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 13=128, 9=103. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T10 TrussType PiggybackBase Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:292019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-3vivdx?lmzep29hFBbGfVw?x2kjqxEchFqVekHzIZ9m Scale=1:59.4 T1 T2 T3 B1 W3 W4 W5 W5 W4 W3 W1 W2 W7 W6 B2 1 2 3 4 5 6 7 8 13 12 11 10 9 14 15 16 17 18 19 20 21 22 4x4 4x4 1.5x4 3x53x8 4x4 3x4 3x8 3x4 3x4 3x6 3x5 9-5-15 9-5-15 20-0-1 10-6-3 28-8-0 8-7-15 -0-11-12 0-11-12 3-11-15 3-11-15 9-5-15 5-6-0 14-9-0 5-3-1 20-0-1 5-3-1 25-6-1 5-6-0 28-8-0 3-1-15 1-7-19-6-02-3-69-6-010.0012 PlateOffsets(X,Y)-- [4:0-2-4,0-2-0], [6:0-2-4,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.61 0.79 0.95 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.18 -0.47 0.05 (loc) 12-13 12-13 9 l/defl >999 >725 n/a L/d 240 180 n/a PLATES MT20 Weight: 151 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud*Except* W4,W5: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-0-12 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-12, 5-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)13=1114/0-6-0(min. 0-2-4), 9=1058/0-6-0(min. 0-2-2) Max Horz13=283(LC 13) Max Uplift13=-126(LC 16), 9=-94(LC 17) MaxGrav13=1383(LC 39), 9=1302(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 3-15=-1251/235, 15-16=-1163/242, 4-16=-1121/275, 4-17=-865/273, 17-18=-865/273, 5-18=-865/273, 5-19=-829/270, 19-20=-829/270, 6-20=-829/270, 6-21=-1075/267, 21-22=-1173/228, 7-22=-1195/223, 2-13=-267/127 BOT CHORD 12-13=-254/944, 11-12=-169/1013, 10-11=-169/1013, 9-10=-144/767 WEBS 4-12=-35/417, 5-12=-305/195, 5-10=-378/192, 6-10=-31/391, 7-10=-102/283, 3-13=-1343/190, 7-9=-1355/255 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 9-5-15,Exterior(2) 9-5-15 to 24-3-0, Interior(1) 24-3-0 to 28-6-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9 except(jt=lb) 13=126. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T11 TrussType Common Qty 3 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:302019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-X5GHrH?NXGmgfJGRlJnu18Y6C88_gs8qUUEBGjzIZ9l Scale=1:45.5 T1 T2 B1 W2 W3 W1 W41 2 3 4 5 9 8 7 6 10 11 12 13 14 15 4x4 3x8 4x4 4x4 1.5x4 1.5x4 1.5x4 3x6 0-8-0 0-8-0 0-10-0 0-2-0 6-6-0 5-8-0 12-11-8 6-5-8 -0-11-12 0-11-12 0-10-0 0-10-0 6-6-0 5-8-0 12-11-8 6-5-8 1-7-17-0-11-7-810.0012 PlateOffsets(X,Y)-- [6:Edge,0-3-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.58 0.48 0.23 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.12 -0.20 0.01 (loc) 6-7 6-7 6 l/defl >999 >713 n/a L/d 240 180 n/a PLATES MT20 Weight: 49 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)6=417/Mechanical, 8=537/0-4-0(min. 0-1-8) Max Horz8=208(LC 13) Max Uplift6=-49(LC 17), 8=-81(LC 16) MaxGrav6=471(LC 2), 8=610(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-250/138, 3-10=-407/304, 10-11=-361/320, 11-12=-301/324, 4-12=-275/343, 4-13=-259/332, 13-14=-280/309, 14-15=-282/307, 5-15=-406/306, 5-6=-381/283 WEBS 3-8=-452/333, 4-7=-256/197 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 6-6-0,Exterior(2) 6-6-0 to 9-6-0zone; cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 8. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T11GE TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:312019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-?Iqg2d0?IauXHTreJ0I7aL4JEYXLPJ9_i8_lp9zIZ9k Scale=1:45.8 T1 T2 B1 W2 W3 W1 W4 ST2 ST1 ST2 ST1 1 2 3 4 5 13 12 11 10 9 8 7 6 18 19 20 21 22 23 4x6 3x5 3x4 3x4 3x4 0-8-0 0-8-0 0-10-0 0-2-0 6-6-0 5-8-0 12-11-8 6-5-8 -0-11-12 0-11-12 0-10-0 0-10-0 6-6-0 5-8-0 12-11-8 6-5-8 1-7-17-0-11-7-810.0012 PlateOffsets(X,Y)-- [6:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.50 0.28 0.24 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.00 (loc) 6-7 6-7 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 67 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 12-3-8 except(jt=length) 12=0-4-0, 12=0-4-0. (lb)-Max Horz12=208(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 10, 8, 7 except 6=-179(LC 16), 12=-219(LC 17), 11=-146(LC 13) MaxGravAllreactions 250 lb orless at joint(s) 10, 11, 8, 7 except 6=252(LC 30), 12=401(LC 31), 12=331(LC 1), 9=306(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 3-18=-268/200, 5-23=-252/202, 5-6=-301/213 WEBS 3-12=-465/389, 4-9=-266/0 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-11-12 to 2-0-4,Interior(1) 2-0-4 to 6-6-0,Exterior(2) 6-6-0 to 9-6-0zone; cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablestudsspaced at 2-0-0 oc. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 10, 8, 7 except (jt=lb) 6=179, 12=219, 11=146. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T12 TrussType MonopitchGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:322019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-TUO2Gz1d3u0OvdQqskpM7ZdV8yoJ8g37xojILbzIZ9j Scale=1:20.1 T1 W5 B1 W3 W4 W1 W2 1 2 3 4 7 6 5 8 9 10 1.5x4 2x4 8x8 4x4 3x5 4x4 3-10-0 3-10-0 7-8-0 3-10-0 -1-10-12 1-10-12 3-10-0 3-10-0 7-8-0 3-10-0 1-1-103-0-103.0012 PlateOffsets(X,Y)-- [6:0-3-8,0-4-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.42 0.62 0.59 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.06 0.01 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 38 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-6-13 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=963/0-4-0(min. 0-1-12), 5=853/0-6-0(min. 0-1-8) Max Horz7=90(LC 8) Max Uplift7=-275(LC 8), 5=-204(LC 8) MaxGrav7=1098(LC 2), 5=967(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-1406/217, 2-7=-877/244 BOT CHORD 6-10=-257/1332, 5-10=-257/1332 WEBS 3-6=-81/745, 3-5=-1469/283, 2-6=-164/1363 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1;Min. flatroofsnowload governs. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=275, 5=204. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 8) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 451 lb down and 69 lb up at 1-11-4, and 451 lb down and 69 lb up at 3-11-4, and 451 lb down and 69 lb up at 5-11-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-4=-51, 5-7=-20 Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T12 TrussType MonopitchGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:332019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-xgyQTJ2GqB8FWm?0QRKbfmAguL8Yt7JHASTst2zIZ9i LOADCASE(S)Standard Concentrated Loads(lb) Vert: 6=-397(B) 9=-397(B) 10=-397(B) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T13 TrussType Jack-Closed Qty 6 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:332019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-xgyQTJ2GqB8FWm?0QRKbfmAbeLB4tEZHASTst2zIZ9i Scale=1:23.5 W1 T1 W4 B1 W2 W3 1 2 3 4 7 6 5 8 9 10 4x4 5x8 3x4 1.5x4 6x6 3x4 6-0-1 6-0-1 9-10-0 3-9-15 -1-10-12 1-10-12 6-0-1 6-0-1 9-10-0 3-9-15 1-1-103-7-23.0012 PlateOffsets(X,Y)-- [2:0-3-10,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.76 0.39 0.19 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.09 -0.12 0.01 (loc) 6-7 6-7 5 l/defl >999 >993 n/a L/d 240 180 n/a PLATES MT20 Weight: 37 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-3-10 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=465/0-4-0(min. 0-1-8), 5=454/0-6-0(min. 0-1-8) Max Horz7=110(LC 12) Max Uplift7=-253(LC 12), 5=-251(LC 12) MaxGrav7=532(LC 2), 5=512(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-7=-445/315, 2-8=-466/368, 8-9=-452/382, 3-9=-381/384 BOT CHORD 6-7=-434/400, 5-6=-434/400 WEBS 3-5=-447/488 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-10-12 to 1-1-4,Interior(1) 1-1-4 to 9-8-4zone;cantileverleft exposed ; endverticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1;Min. flatroofsnowload governs. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=253, 5=251. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 8) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 181 lb down and 164 lb up at 8-9-12 on top chord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-4=-51, 5-7=-20 Concentrated Loads(lb) Vert: 10=-140 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T14 TrussType MonopitchGirder Qty 1 Ply 2 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:352019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-u34Au_3WMpPym49PYsN3kBF3D9lTL1qadmyyywzIZ9g Scale=1:50.5 T1 W5 B1 W3 W4 W1 W2 1 2 3 6 5 4 7 8 9 10 11 3x5 1.5x4 2x4 4x4 5x6 8x8 4-5-10 4-5-10 9-4-1 4-10-7 4-5-10 4-5-10 9-4-1 4-10-7 3-1-08-6-67.0012 PlateOffsets(X,Y)-- [5:0-3-8,0-4-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.24 0.84 0.59 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.11 0.01 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 120 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4SPFStud*Except* W5: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-4 REACTIONS.(lb/size)6=3291/0-6-0(min. 0-2-10), 4=3495/0-6-0(min. 0-2-12) Max Horz6=182(LC 9) Max Uplift6=-293(LC 12), 4=-486(LC 12) MaxGrav6=3312(LC 2), 4=3523(LC 18) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-1957/139, 1-6=-2119/153 BOT CHORD 5-10=-275/1664, 10-11=-275/1664, 4-11=-275/1664 WEBS 2-5=-244/2581, 2-4=-2499/413, 1-5=-130/1977 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-5-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 6=293, 4=486. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1149 lb down and 145 lb up at 0-6-12, 1147 lb down and 151 lb up at 2-6-12, 1338 lb down and 126 lb up at 4-6-12, and 1342 lb down and 123 lb up at 6-6-12, and 1345 lb down and 119 lb up at 8-6-12 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T14 TrussType MonopitchGirder Qty 1 Ply 2 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:352019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-u34Au_3WMpPym49PYsN3kBF3D9lTL1qadmyyywzIZ9g LOADCASE(S)Standard Uniform Loads(plf) Vert: 1-3=-51, 4-6=-20 Concentrated Loads(lb) Vert: 5=-1338(F) 8=-1059(F) 9=-1061(F) 10=-1342(F) 11=-1345(F) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T15 TrussType Roof SpecialGirder Qty 1 Ply 3 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:462019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-3AELClCQmBnOamVWhg3ehWCzTbeTQz1B9z62rnzIZ9V Scale=1:102.7 W1 T1 W1 B1 B2 B3 B2 B4 W3 W2 W4 W5 W4 W7 W6 W8 W9 W8 W9 W8 W9 W8 W9 W8 W9 W8 W9 W8 W9 W8 W9 T2T2T2 B5B5B5 T2123456 7 8 9 10 11 12 13 14 15 16 17 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 8x8 5x6 4x6 5x6 3x10 3x6 5x6 5x6 4x6 6x8 8x8 5x8 2x4 6x68x10 4x8 4x8 2x4 4x8 3x6 2x4 4x8 3x6 4x8 2x4 4x8 3x6 4x8 2x4 6x8 4x64x64x6 6x86x8 2-6-0 2-6-0 6-4-0 3-10-0 10-2-0 3-10-0 15-4-8 5-2-8 20-8-11 5-4-4 26-0-15 5-4-4 31-5-3 5-4-4 36-9-6 5-4-4 42-1-10 5-4-4 47-5-14 5-4-4 52-10-2 5-4-4 58-4-1 5-6-0 2-6-0 2-6-0 6-4-0 3-10-0 10-2-0 3-10-0 15-4-8 5-2-8 20-8-11 5-4-4 26-0-15 5-4-4 31-5-3 5-4-4 36-9-6 5-4-4 42-1-10 5-4-4 47-5-14 5-4-4 52-10-2 5-4-4 58-4-1 5-6-0 5-7-151-0-0PlateOffsets(X,Y)-- [31:0-7-12,0-6-4], [33:0-5-8,0-4-4], [35:Edge,0-5-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.11 0.37 0.75 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.45 -0.59 0.15 (loc) 24-26 24-26 18 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 1449 lbFT= 20% GRIP 185/144 LUMBER- TOP CHORD2x6SP 2400F 2.0E BOT CHORD2x8SP 2400F 2.0E*Except* B2: 2x4SP 2400F 2.0E WEBS 2x4SPFStud*Except* W1: 2x4SP 2400F 2.0E,W7: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)35=3648/0-6-0(min. 0-1-8), 18=3669/0-6-0(min. 0-1-8) Max Horz35=-196(LC 8) Max Uplift35=-2446(LC 8), 18=-2477(LC 9) MaxGrav35=3811(LC 2), 18=3835(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-35=-3719/2489, 1-2=-2136/1482, 2-36=-5242/3483, 3-36=-5242/3483, 3-37=-5242/3483, 4-37=-5242/3483, 4-5=-8278/5467, 5-38=-8278/5467, 38-39=-8278/5467, 6-39=-8278/5467, 6-40=-10021/6537, 40-41=-10021/6537, 41-42=-10021/6537, 7-42=-10021/6537, 7-8=-10021/6537, 8-43=-10021/6537, 9-43=-10021/6537, 9-44=-10894/7097, 44-45=-10894/7097, 45-46=-10894/7097, 10-46=-10894/7097, 10-47=-10894/7097, 11-47=-10894/7097, 11-48=-10894/7097, 12-48=-10894/7097, 12-49=-8783/5741, 49-50=-8783/5741, 13-50=-8783/5741, 13-51=-8783/5741, 14-51=-8783/5741, 14-15=-8783/5741, 15-52=-3693/2446, 52-53=-3693/2446, 53-54=-3693/2446, 16-54=-3693/2446, 16-55=-3693/2446, 55-56=-3693/2446, 17-56=-3693/2446, 17-18=-3717/2446 BOT CHORD 2-33=-3363/2281, 33-57=-1621/2252, 32-57=-1619/2239, 32-58=-5562/8290, 31-58=-5563/8298, 4-31=-1753/2824, 30-59=-735/1112, 59-60=-735/1112, 29-60=-735/1112, 28-29=-5651/8512, 28-61=-5651/8512, 61-62=-5651/8512, 27-62=-5651/8512, 27-63=-7171/10866, 63-64=-7171/10866, 26-64=-7171/10866, 26-65=-7171/10866, 65-66=-7171/10866, 25-66=-7171/10866, 24-25=-7171/10866, 24-67=-6748/10239, 67-68=-6748/10239, 68-69=-6748/10239, 23-69=-6748/10239, 23-70=-6748/10239, 70-71=-6748/10239, 22-71=-6748/10239, 21-22=-4377/6630, 21-72=-4377/6630, 20-72=-4377/6630, 20-73=-4377/6630, 73-74=-4377/6630, 74-75=-4377/6630, 19-75=-4377/6630 WEBS 1-33=-2788/4172, 2-32=-2864/4376, 3-32=-408/319, 4-32=-4388/2871, 29-31=-5082/7651, 6-31=-340/247, 6-29=-1832/1354, 6-27=-1369/2090, 7-27=-473/432, 9-27=-1170/787, 9-26=-34/369, 10-24=-473/431, 12-24=-591/907, 12-23=-25/359, 12-22=-2017/1336, 13-22=-482/441, 15-22=-1948/2982, 15-20=-33/359, 15-19=-4069/2667, 16-19=-531/493, 17-19=-3308/5074 Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T15 TrussType Roof SpecialGirder Qty 1 Ply 3 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:462019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-3AELClCQmBnOamVWhg3ehWCzTbeTQz1B9z62rnzIZ9V NOTES- 1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc. Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-9-0 oc, 2x4- 1 row at 0-9-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone; cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 35=2446, 18=2477. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 139 lb down and 134 lb up at 2-4-13, 130 lb down and 103 lb up at 4-4-13, 130 lb down and 103 lb up at 6-4-13, 130 lb down and 103 lb up at 8-4-13, 139 lb down and 134 lb up at 10-4-13, 139 lb down and 134 lb up at 12-4-13, 139 lb down and 134 lb up at 14-4-13, 139 lb down and 134 lb up at 16-4-13, 139 lb down and 134 lb up at 18-4-13, 139 lb down and 134 lb up at 20-4-13, 139 lb down and 134lb up at 22-4-13, 139 lb down and 134 lb up at 24-4-13, 139 lb down and 134 lb up at 26-4-13, 139 lb down and 134 lb up at 28-4-13, 139 lb down and 134 lb up at 30-4-13, 139 lb down and 134 lb up at 32-4-13, 139 lb down and 134 lb up at 34-4-13, 139 lb down and 134 lb up at 36-4-13, 139 lb down and 134 lb up at 38-4-13, 139 lb down and 134 lb up at 40-4-13, 139 lb down and 134 lb up at 42-4-13, 139 lb down and 134 lb up at 44-4-13, 139 lb down and 134 lb up at 46-4-13, 139 lb down and 134lb up at 48-4-13, 139 lb down and 134 lb up at 50-4-13, 139 lb down and 134 lb up at 52-4-13, and 139 lb down and 134 lb up at 54-4-13, and 139 lb down and 134 lb up at 56-4-13 on top chord, and 56 lb down and 34 lb up at 2-4-4, 65 lb down and 65 lb up at 4-4-13, 65 lb down and 65 lb up at 6-4-13, 65 lb down and 65 lb up at 8-4-13, 56 lb down and 34 lb up at 10-3-12, 56 lb down and 34 lb up at 12-4-13, 56 lb down and 34 lb up at 14-4-13, 56 lb down and 34 lb up at 16-4-13, 56 lb down and 34 lb up at 18-4-13, 56 lb down and 34 lb up at 20-4-13, 56 lb down and 34 lb up at 22-4-13, 56 lb down and 34 lb up at 24-4-13, 56 lb down and 34 lb up at 26-4-13, 56 lb down and 34 lb up at 28-4-13, 56 lb down and 34 lb up at 30-4-13, 56 lb down and 34 lb up at 32-4-13, 56 lb down and 34 lb up at 34-4-13, 56 lb down and 34 lb up at 36-4-13, 56 lb down and 34 lb up at 38-4-13, 56 lb down and 34 lb up at 40-4-13, 56 lb down and 34 lb up at 42-4-13, 56 lb down and 34 lb up at 44-4-13, 56 lb down and 34 lb up at 46-4-13, 56 lb down and 34 lb up at 48-4-13, 56 lb down and 34 lb up at 50-4-13, 56 lb down and 34 lb up at 52-4-13, and 56 lb down and 34 lb up at 54-4-13, and 56 lb down and 34 lb up at 56-4-13 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-17=-61, 34-35=-20, 31-33=-20, 18-30=-20 Concentrated Loads(lb) Vert: 34=-35(F) 2=-59(F) 4=-59(F) 28=-35(F) 32=-45(F) 3=-49(F) 31=-35(F) 13=-59(F) 22=-35(F) 14=-59(F) 11=-59(F) 8=-59(F) 21=-35(F) 25=-35(F) 36=-49(F) 37=-49(F) 38=-59(F) 39=-59(F) 40=-59(F) 41=-59(F) 42=-59(F) 43=-59(F) 44=-59(F) 45=-59(F) 46=-59(F) 47=-59(F) 48=-59(F) 49=-59(F) 50=-59(F) 51=-59(F) 52=-59(F) 53=-59(F) 54=-59(F) 55=-59(F) 56=-59(F) 57=-45(F) 58=-45(F) 59=-35(F) 60=-35(F) 61=-35(F) 62=-35(F) 63=-35(F) 64=-35(F) 65=-35(F) 66=-35(F) 67=-35(F) 68=-35(F) 69=-35(F) 70=-35(F) 71=-35(F) 72=-35(F) 73=-35(F) 74=-35(F) 75=-35(F) 76=-35(F) 77=-35(F) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T16 TrussType Hip Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:482019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-?ZM5dRDgIo16p4evo566mxHBDOIMuqNUdHb8vgzIZ9T Scale=1:110.5 0-1-150-1-15T1 T2 T5 B1 B2 B3 B4 B5 W5 W4 W8W7 W9 W11 W10 W12 W13 W12 W14 W12W15W12 W14 W12 W13 W16 W17 W18 W1 W2 HW2 T4T3 B7B6B6 W6 1 23 4 5 6 7 8 9 10 11 12 13 14 15 16 17 343332 31 30 29 28 27 26 25 2423 22 21 20 19 18 39 40 41 42 43 44 45 8x8 8x8 6x8 5x12 5x6 5x6 3x4 3x6 8x10 6x6 8x10 2x4 6x8 3x6 6x12MT18H 10x12 4x4 4x4 4x4 5x6 8x8 4x4 2x4 6x8 6x6 1-4-12 1-4-12 2-6-0 1-1-4 3-1-7 0-7-7 6-4-11 3-3-4 10-2-0 3-9-5 16-3-6 6-1-6 21-6-3 5-2-13 29-6-15 8-0-11 34-3-10 4-8-11 42-4-5 8-0-11 47-5-6 5-1-1 52-9-0 5-3-9 58-4-1 5-7-1 1-4-12 1-4-12 2-6-0 1-1-4 3-1-7 0-7-7 6-4-11 3-3-4 10-2-0 3-9-5 16-3-6 6-1-6 21-6-3 5-2-13 29-6-15 8-0-11 34-3-10 4-8-11 42-4-5 8-0-11 47-5-6 5-1-1 52-9-0 5-3-9 58-4-1 5-7-1 5-8-17-3-157-5-141-1-111-0-07-3-157.0012 PlateOffsets(X,Y)-- [1:0-2-8,0-2-4], [4:0-6-0,0-3-4], [17:0-4-12,0-0-2], [26:0-3-4,0-5-4], [28:0-7-8,0-3-12], [29:0-3-0,0-2-4], [31:0-3-12,0-4-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.61 0.40 0.95 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.29 -0.73 0.27 (loc) 24-25 24-25 17 l/defl >999 >955 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 527 lb FT= 20% GRIP 185/144 185/148 LUMBER- TOP CHORD2x8SP 2400F 2.0E BOT CHORD2x6SP 2400F 2.0E*Except* B2,B4: 2x4SP 2400F 2.0E WEBS 2x4SPFStud*Except* W8,W11,W10,W13,W14,W15: 2x4 HF/SPF No.2 W1: 2x4SP 2400F 2.0E SLIDER Right 2x6SP 2400F 2.0E 2-6-0 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-1-15 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 31-32. WEBS 1 Row at midpt 2-33, 6-29, 7-28, 9-26, 10-25, 13-21, 4-31 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)17=2244/0-6-0(min. 0-1-15), 34=2302/0-6-0(min. 0-2-1) Max Horz34=-241(LC 14) Max Uplift17=-300(LC 12), 34=-383(LC 13) MaxGrav17=2318(LC 2), 34=2456(LC 37) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-728/211, 2-3=-1056/264, 3-4=-1022/256, 4-5=-2451/493, 5-39=-2449/492, 6-39=-2449/492, 6-40=-3612/700, 7-40=-3612/700, 7-8=-4167/779, 8-9=-4167/779, 9-10=-4746/908, 10-11=-5073/975, 11-12=-5073/975, 12-41=-4982/943, 13-41=-4982/943, 13-42=-4167/761, 42-43=-4167/761, 14-43=-4164/761, 14-44=-3511/609, 15-44=-3526/584, 15-45=-3360/529, 16-45=-3461/506, 16-17=-1002/157, 1-34=-2614/458 BOT CHORD 32-33=-84/371, 30-31=-296/1150, 29-30=-295/1147, 28-29=-722/3622, 6-28=-201/1333, 26-27=-97/565, 25-26=-897/4746, 24-25=-902/5073, 23-24=-835/4982, 22-23=-835/4982, 21-22=-619/4165, 20-21=-416/3085, 19-20=-416/3085, 18-19=-373/2807, 17-18=-373/2807 WEBS 2-33=-1914/332, 31-33=-176/388, 2-31=-314/1796, 4-29=-492/2662, 5-29=-377/104, 6-29=-2094/435, 26-28=-715/3648, 7-28=-899/226, 7-26=-12/368, 9-26=-1071/229, 9-25=0/491, 10-25=-427/87, 12-24=-118/315, 12-22=-644/279, 13-22=-318/1197, 13-21=-1325/422, 14-21=-411/1808, 14-19=-97/263, 15-19=-237/407, 1-33=-346/2143, 4-31=-1847/325 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 7-4-5,Interior(1) 7-4-5 to 47-5-6,Exterior(2) 47-5-6 to 51-8-5 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates areMT20 plates unless otherwiseindicated.Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T16 TrussType Hip Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:492019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-TlwTqnEI369zRED5ModLJ8qMzoebdHddrxLiR6zIZ9S NOTES- 7)All plates are 4x6MT20 unless otherwiseindicated. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 17=300, 34=383. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T17 TrussType Hip Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:502019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-xyUr27FwqQIq3OoHwV8arMNVjCzWMjbn4b4F_ZzIZ9R Scale=1:107.3 0-1-150-1-15T1 T2 T4 B2 W3 W4 W5 W4 W5 W4 W5 W4 W5 W4 W3 W6 W7W1W2 HW2 T2T3 T5 B1B3B3B1 1 2 3 4 5 6 7 8 9 10 11 12 13 25 24 23 22 21 20 19 18 17 16 15 14 30 31 32 33 34 35 36 37 38 39 6x8 6x6 5x6 5x6 6x6 4x10 2x4 4x4 4x4 4x4 6x6 4x4 2x43x4 5x12 5x6 5x6 5-11-11 5-11-11 13-7-6 7-7-10 21-4-12 7-9-6 29-2-2 7-9-6 36-11-8 7-9-6 44-7-2 7-7-10 51-3-14 6-8-12 58-4-1 7-0-4 5-11-11 5-11-11 13-7-6 7-7-10 21-4-12 7-9-6 29-2-2 7-9-6 36-11-8 7-9-6 44-7-2 7-7-10 51-3-14 6-8-12 58-4-1 7-0-4 5-8-18-11-159-1-141-1-118-11-157.0012 PlateOffsets(X,Y)-- [2:0-3-4,0-2-4], [13:0-7-1,0-0-3], [22:0-2-7,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.74 0.49 0.97 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.27 -0.64 0.16 (loc) 19 19-20 13 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 404 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x6SP 2400F 2.0E WEBS 2x4 HF/SPF No.2 *Except* W7: 2x4SPFStud,W1: 2x6SPF No.2 SLIDER Right 2x6SPF No.2 2-6-0 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-8-12 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-24, 2-23, 3-23, 5-20, 6-20, 6-19, 8-17 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)25=2277/0-6-0(min. 0-2-0), 13=2224/0-6-0(min. 0-1-15) Max Horz25=-290(LC 14) Max Uplift25=-305(LC 13), 13=-242(LC 12) MaxGrav25=2395(LC 37), 13=2324(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-30=-1777/327, 30-31=-1746/335, 2-31=-1702/352, 2-32=-3089/559, 32-33=-3090/559, 3-33=-3093/558, 3-34=-3874/677, 4-34=-3874/677, 4-5=-3874/677, 5-6=-3874/677, 6-7=-4164/730, 7-35=-4164/730, 8-35=-4164/730, 8-36=-3947/685, 9-36=-3944/685, 9-10=-3344/591, 10-37=-3395/570, 11-37=-3429/566, 11-38=-3518/545, 38-39=-3535/524, 12-39=-3572/514, 12-13=-1173/110, 1-25=-2350/385 BOT CHORD 23-24=-328/1539, 22-23=-557/3090, 21-22=-557/3090, 20-21=-557/3090, 19-20=-647/4164, 18-19=-517/3944, 17-18=-517/3944, 16-17=-315/2959, 15-16=-315/2959, 14-15=-368/2969, 13-14=-368/2969 WEBS 2-24=-1275/306, 2-23=-467/2334, 3-23=-1589/444, 3-20=-265/1276, 5-20=-465/221, 6-20=-455/99, 8-19=-193/494, 8-17=-968/390, 9-17=-391/1482, 9-15=-43/467, 11-15=-489/242, 1-24=-315/2069 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 5-11-11,Exterior(2) 5-11-11 to 48-10-0,Interior(1) 48-10-0 to 58-4-1zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates are 4x6MT20 unless otherwiseindicated. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 25=305, 13=242. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T17 TrussType Hip Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:502019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-xyUr27FwqQIq3OoHwV8arMNVjCzWMjbn4b4F_ZzIZ9R LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T18 TrussType Hip Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:522019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-uKbcSoGAM1YYIhyg1wA2xnSrf0cbqez4XvZM2RzIZ9P Scale=1:108.5 0-1-150-1-15T1 T2 T4 T5 B1 W3 W4 W5 W6 W7 W6 W7 W6 W7 W6 W7 W6 W5 W8 W9 W10 W11 W1 W2 W13W12 T2T3 B1B1B1B2 1 2 3 4 5 6 7 8 9 10 11 12 13 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 29 30 3132 33 34 35 36 37 38 39 40 41 6x6 6x6 4x4 6x6 6x6 4x4 4x8 2x4 4x4 4x4 4x4 6x6 4x4 4x4 5x8 6x8 6x8 5x6 3-9-9 3-9-9 8-10-0 5-0-8 15-3-15 6-5-15 21-11-9 6-7-11 28-7-4 6-7-11 35-2-15 6-7-11 41-8-13 6-5-15 48-5-15 6-9-2 53-10-2 5-4-4 58-4-1 4-5-15 3-9-9 3-9-9 8-10-0 5-0-8 15-3-15 6-5-15 21-11-9 6-7-11 28-7-4 6-7-11 35-2-15 6-7-11 41-8-13 6-5-15 48-5-15 6-9-2 53-10-2 5-4-4 58-4-1 4-5-15 5-8-110-7-153-9-210-9-142-7-1010-7-157.0012 3.0012 PlateOffsets(X,Y)-- [3:0-3-12,0-2-8], [12:0-5-0,0-2-12], [14:Edge,0-2-0], [15:0-3-8,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.71 0.64 0.91 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.23 -0.55 0.17 (loc) 21 21-23 14 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 421 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4 HF/SPF No.2 *Except* W3,W9,W10,W11,W2: 2x4SPFStud,W1,W13: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-8-4 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-27, 3-26, 3-24, 4-24, 6-23, 7-23, 7-21, 9-19, 11-18 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)28=2236/0-6-0(min. 0-3-10), 14=2191/0-6-0(min. 0-3-10) Max Horz28=-340(LC 12) Max Uplift28=-230(LC 13), 14=-210(LC 17) MaxGrav28=2317(LC 39), 14=2315(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-29=-1282/282, 2-29=-1238/286, 2-30=-2054/402, 3-30=-1996/429, 3-31=-2791/540, 31-32=-2791/540, 4-32=-2793/539, 4-33=-3310/613, 5-33=-3310/613, 5-6=-3310/613, 6-7=-3310/613, 7-8=-3505/640, 8-34=-3505/640, 9-34=-3505/640, 9-35=-3372/620, 35-36=-3370/620, 10-36=-3370/621, 10-37=-3159/577, 11-37=-3204/552, 11-38=-3393/535, 38-39=-3402/515, 39-40=-3426/510, 12-40=-3446/508, 12-41=-2900/415, 13-41=-2944/409, 1-28=-2271/362, 13-14=-2235/358 BOT CHORD 27-28=-211/295, 26-27=-276/1078, 25-26=-328/1785, 24-25=-328/1785, 23-24=-450/2791, 22-23=-470/3505, 21-22=-470/3505, 20-21=-393/3370, 19-20=-393/3370, 18-19=-314/2740, 17-18=-401/2945, 16-17=-401/2945, 15-16=-399/2760 WEBS 2-27=-1510/301, 2-26=-242/1257, 3-26=-921/271, 3-24=-374/1880, 4-24=-1453/398, 4-23=-223/1025, 6-23=-397/188, 7-23=-406/98, 9-21=-176/369, 9-19=-864/360, 10-19=-331/1177, 10-18=-81/557, 11-18=-605/233, 12-16=-18/307, 12-15=-1332/257, 1-27=-288/1897, 13-15=-418/3043 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 8-10-0,Exterior(2) 8-10-0 to 45-11-12, Interior(1) 45-11-12 to 53-10-2zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates are 4x6MT20 unless otherwiseindicated. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T18 TrussType Hip Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:522019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-uKbcSoGAM1YYIhyg1wA2xnSrf0cbqez4XvZM2RzIZ9P NOTES- 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 28=230, 14=210. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T19 TrussType PiggybackBase Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:542019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-qjjMtUIRteoGX?629LCW0CXAKpGTIXCN?D2T7KzIZ9N Scale=1:106.2 T1 T2 T4 T5 B1 W3 W4 W5 W6 W5 W6 W5 W6 W5 W6 W5 W6 W5 W7 W8 W9 W10 W1 W2 W12 W11 T2T3 B1B1B1B2 1 2 3 4 5 6 7 8 9 10 11 12 13 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 29 3031 32 33 34 35 36 37 38 39 40 41 6x8 4x6 6x8 6x6 4x6 4x6 6x6 4x6 6x6 4x8 2x4 4x6 8x8 6x8 3x10MT18H 8x8 4x6 5x65x64x6 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 48-5-14 7-1-15 53-10-2 5-4-4 57-2-1 3-3-15 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 48-5-14 7-1-15 53-10-2 5-4-4 57-2-1 3-3-15 5-8-13-9-211-0-122-11-211-0-127.0012 3.0012 PlateOffsets(X,Y)-- [3:0-6-0,0-3-0], [10:0-5-4,0-3-0], [12:0-3-0,0-3-4], [14:0-5-0,0-2-0], [15:0-3-8,0-4-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.76 0.74 0.99 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.23 -0.55 0.18 (loc) 21 19-21 14 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 421 lb FT= 20% GRIP 185/144 197/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4 HF/SPF No.2 *Except* W3,W8,W9,W10,W2: 2x4SPFStud,W1,W12: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-10-5 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-3-15 oc bracing. WEBS 1 Row at midpt 2-27, 3-26, 3-24, 4-24, 6-22, 7-21, 9-21, 9-19, 11-18 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)28=2325/0-6-0(min. 0-3-12), 14=3329/0-6-0(min. 0-5-6) Max Horz28=-348(LC 12) Max Uplift28=-244(LC 13), 14=-444(LC 17) MaxGrav28=2406(LC 2), 14=3437(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-29=-1330/275, 29-30=-1319/291, 2-30=-1284/295, 2-31=-2209/441, 3-31=-2144/459, 3-32=-2868/571, 4-32=-2868/571, 4-33=-3392/654, 5-33=-3392/654, 5-6=-3392/654, 6-7=-3624/694, 7-8=-3624/694, 8-34=-3624/694, 9-34=-3624/694, 9-35=-3570/696, 35-36=-3570/696, 10-36=-3570/696, 10-37=-3489/693, 37-38=-3531/674, 11-38=-3719/686, 11-39=-4152/758, 39-40=-4203/766, 12-40=-4462/801, 12-41=-3037/553, 13-41=-3114/559, 1-28=-2360/374, 13-14=-3344/636 BOT CHORD 27-28=-237/302, 26-27=-309/1119, 25-26=-364/1872, 24-25=-364/1872, 23-24=-490/2868, 22-23=-490/2868, 21-22=-542/3392, 20-21=-470/3570, 19-20=-470/3570, 18-19=-417/3051, 17-18=-629/3639, 16-17=-629/3639, 15-16=-590/3101 WEBS 2-27=-1565/320, 2-26=-255/1268, 3-26=-876/274, 3-24=-394/1905, 4-24=-1501/415, 4-22=-245/1086, 6-22=-803/285, 6-21=-123/498, 7-21=-380/179, 9-19=-720/326, 10-19=-296/992, 10-18=-156/932, 11-18=-1199/365, 12-16=-46/674, 12-15=-2473/519, 1-27=-301/1971, 13-15=-692/3809 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 9-2-14,Exterior(2) 9-2-14 to 44-3-15, Interior(1) 44-3-15 to 53-10-2zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates areMT20 plates unless otherwiseindicated. 7)All plates are 4x4MT20 unless otherwiseindicated.Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T19 TrussType PiggybackBase Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:542019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-qjjMtUIRteoGX?629LCW0CXAKpGTIXCN?D2T7KzIZ9N NOTES- 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 28=244, 14=444. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-10=-61, 10-38=-51, 13-41=-51, 14-28=-20 Trapezoidal Loads(plf) Vert: 38=-181-to-12=-224, 12=-224-to-41=-231 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T20 TrussType PiggybackBase Qty 3 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:562019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-m5r6IAJhPG2_nJFRGmF_5ddXvd_dmTOfSXXZBCzIZ9L Scale=1:102.1 T1 T2 T4 T5 B1 W3 W4 W5 W6 W5 W6 W5 W6 W5 W6 W5 W6 W5 W7 W8 W9 W10 W1 W2 W12W11 T2T3 B1B1B1B2 1 2 3 4 5 6 7 8 9 10 11 12 13 28 27 26 25 24 23 22 21 20 19 18 17 16 1514 29 3031 32 33 34 3536 37 38 39 40 6x8 6x8 6x8 3x4 6x6 5x6 4x4 4x4 4x4 2x4 4x8 4x4 4x4 4x4 5x6 6x8 6x8 6x12MT18H 8x8 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 48-5-14 7-1-15 53-10-2 5-4-4 55-0-1 1-1-15 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 48-5-14 7-1-15 53-10-2 5-4-4 55-0-1 1-1-15 5-8-13-9-211-0-123-5-1011-0-127.0012 3.0012 PlateOffsets(X,Y)-- [3:0-5-12,0-3-0], [10:0-5-4,0-3-0], [12:0-5-12,0-3-0], [13:0-4-0,0-3-12], [14:0-5-8,Edge], [15:0-2-4,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.69 0.63 0.88 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.20 -0.47 0.15 (loc) 21 21-22 14 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 414 lb FT= 20% GRIP 185/144 197/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4 HF/SPF No.2 *Except* W3,W8,W9,W10,W2: 2x4SPFStud,W1,W12: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-5-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-11-12 oc bracing. WEBS 1 Row at midpt 2-27, 3-26, 3-24, 4-24, 6-22, 7-21, 9-19, 11-18 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)28=2197/0-6-0(min. 0-3-9), 14=3269/0-6-0(min. 0-5-4) Max Horz28=-345(LC 12) Max Uplift28=-232(LC 13), 14=-438(LC 12) MaxGrav28=2274(LC 39), 14=3361(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-29=-1258/259, 29-30=-1249/275, 2-30=-1214/278, 2-31=-2083/411, 3-31=-2018/429, 3-32=-2683/527, 4-32=-2683/527, 4-33=-3132/593, 5-33=-3132/593, 5-6=-3132/593, 6-7=-3287/615, 7-8=-3287/615, 8-34=-3287/615, 9-34=-3287/615, 9-35=-3158/598, 35-36=-3158/598, 10-36=-3158/598, 10-37=-2927/561, 37-38=-2969/541, 11-38=-3158/547, 11-39=-2996/499, 39-40=-3049/526, 12-40=-3308/553, 12-13=-1161/232, 1-28=-2230/353, 13-14=-3063/496 BOT CHORD 27-28=-268/300, 26-27=-334/1058, 25-26=-385/1765, 24-25=-385/1765, 23-24=-504/2683, 22-23=-504/2683, 21-22=-549/3132, 20-21=-452/3158, 19-20=-452/3158, 18-19=-335/2561, 17-18=-438/2639, 16-17=-438/2639, 15-16=-182/938 WEBS 2-27=-1475/305, 2-26=-244/1188, 3-26=-813/265, 3-24=-374/1757, 4-24=-1375/398, 4-22=-225/933, 6-22=-672/268, 6-21=-103/345, 7-21=-379/179, 9-21=-151/344, 9-19=-847/338, 10-19=-310/1140, 10-18=-97/593, 11-18=-686/275, 11-16=-905/237, 12-16=-301/1999, 12-15=-2764/532, 1-27=-284/1864, 13-15=-449/2666 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 9-2-14,Exterior(2) 9-2-14 to 44-3-15, Interior(1) 44-3-15 to 53-10-2zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates areMT20 plates unless otherwiseindicated. 7)All plates are 4x6MT20 unless otherwiseindicated.Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T20 TrussType PiggybackBase Qty 3 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:562019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-m5r6IAJhPG2_nJFRGmF_5ddXvd_dmTOfSXXZBCzIZ9L NOTES- 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 28=232, 14=438. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-10=-61, 10-38=-51, 14-28=-20 Trapezoidal Loads(plf) Vert: 38=-181-to-12=-225, 12=-225-to-13=-231 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T21 TrussType PiggybackBase Qty 2 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:582019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-iUztjsLxxtIi0cPqOBHSA2iusQi?EKEywr0gG5zIZ9J Scale=1:99.4 T1 T2 T4 T5 B1 W3 W4 W5 W6 W5 W6 W5 W6 W5 W6 W5 W6 W5 W7 W8 W9 W10 W1 W2 W12W11 T2T3 B1B1B1B2 1 2 3 4 5 6 7 8 9 10 11 12 13 28 27 26 25 24 23 22 21 20 19 18 17 16 1514 29 3031 32 33 34 3536 37 38 39 40 6x8 6x8 8x8 3x4 5x6 4x4 4x4 4x4 4x4 2x4 4x8 4x4 5x6 5x6 5x6 5x6 5x8 3x4 8x8 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 45-11-0 4-7-1 53-10-2 7-11-2 55-0-1 1-1-15 3-9-8 3-9-8 9-2-14 5-5-7 15-8-15 6-6-1 22-1-4 6-4-5 28-5-9 6-4-5 34-9-14 6-4-5 41-3-15 6-6-1 45-11-0 4-7-1 53-10-2 7-11-2 55-0-1 1-1-15 5-8-13-9-211-0-123-5-1011-0-127.0012 3.0012 PlateOffsets(X,Y)-- [3:0-5-4,0-3-0], [10:0-5-12,0-3-0], [12:0-6-12,0-5-0], [13:0-4-0,0-4-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.60 0.45 0.99 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.30 0.07 (loc) 21-22 21-22 14 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 426 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x6SPF No.2 *Except* T4: 2x6SP 2400F 2.0E BOT CHORD2x6SPF No.2 WEBS 2x4 HF/SPF No.2 *Except* W3,W10,W2,W11: 2x4SPFStud,W1,W12: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-10-4 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 16-18. WEBS 1 Row at midpt 2-27, 3-26, 4-24, 6-22, 6-21, 7-21, 9-19, 10-18, 11-16, 12-16 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)28=1721/0-6-0(min. 0-2-13), 16=2925/0-6-0(min. 0-4-11), 14=819/0-6-0(min. 0-1-8) Max Horz28=-345(LC 12) Max Uplift28=-193(LC 13), 16=-408(LC 12), 14=-154(LC 17) MaxGrav28=1788(LC 39), 16=2995(LC 39), 14=951(LC 50) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-29=-985/212, 29-30=-955/228, 2-30=-938/232, 2-31=-1607/329, 3-31=-1534/347, 3-32=-1972/406, 4-32=-1972/406, 4-33=-2129/422, 5-33=-2129/422, 5-6=-2129/422, 6-7=-1992/395, 7-8=-1992/395, 8-34=-1992/395, 9-34=-1992/395, 9-35=-1574/342, 35-36=-1574/342, 10-36=-1574/342, 10-37=-881/260, 11-37=-905/235, 11-38=-71/500, 38-39=-74/485, 12-40=-412/68, 12-13=-398/90, 1-28=-1748/277, 13-14=-851/71 BOT CHORD 27-28=-270/300, 26-27=-315/825, 25-26=-351/1350, 24-25=-351/1350, 23-24=-446/1972, 22-23=-446/1972, 21-22=-468/2129, 20-21=-323/1574, 19-20=-323/1574, 18-19=-141/662, 15-16=-90/426 WEBS 2-27=-1128/251, 2-26=-202/882, 3-26=-572/232, 3-24=-296/1189, 4-24=-890/331, 4-22=-148/377, 6-21=-272/83, 7-21=-372/177, 9-21=-199/839, 9-19=-1347/375, 10-19=-348/1743, 10-18=-1236/285, 11-18=-261/1523, 11-16=-2638/522, 12-16=-534/170, 12-15=-1168/358, 1-27=-219/1453, 13-15=-215/1216 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 9-2-14,Exterior(2) 9-2-14 to 44-3-15, Interior(1) 44-3-15 to 53-10-2zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates are 4x6MT20 unless otherwiseindicated. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T21 TrussType PiggybackBase Qty 2 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:40:592019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-BgWFwCMZiBQYem_0yuohjFF3cq2EznU68VmEoXzIZ9I NOTES- 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 28=193, 16=408, 14=154. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-10=-61, 10-38=-51, 14-28=-20 Trapezoidal Loads(plf) Vert: 38=-181-to-12=-225, 12=-225-to-13=-231 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T22 TrussType PiggybackBase Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:002019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-ft4d8YNCTUYPGwZCVcJwFTnDoELtiGGFN9VnK_zIZ9H Scale=1:84.5 T1 T2 T4 B1 W3 W4 W5 W6 W5 W6 W5 W7 W5 W6 W5 W6 W5 W1 W2 W9 W8 T2T3 B1B2 1 2 3 4 5 6 7 8 9 10 11 22 21 20 19 18 17 16 15 14 13 12 23 24 25 26 27 28 29 30 31 5x8 3x6 5x8 3x4 3x6 3x5 4x6 3x5 4x6 3x5 3x5 3x5 2x4 4x8 3x5 5x6 5x6 5x6 3x4 4x6 3x6 3x6 4-9-3 4-9-3 9-2-14 4-5-11 15-5-13 6-2-15 21-7-0 6-1-3 28-11-13 7-4-13 35-1-0 6-1-3 41-3-15 6-2-15 46-2-0 4-10-1 4-9-3 4-9-3 9-2-14 4-5-11 15-5-13 6-2-15 21-7-0 6-1-3 28-11-13 7-4-13 35-1-0 6-1-3 41-3-15 6-2-15 46-2-0 4-10-1 5-8-111-0-128-2-1411-0-127.0012 PlateOffsets(X,Y)-- [3:0-5-8,0-2-0], [10:0-6-0,0-2-4], [11:0-3-0,0-1-8], [12:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.70 0.68 0.89 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.17 -0.46 0.12 (loc) 16-17 16-17 12 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 307 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4 HF/SPF No.2 *Except* W1,W2: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-8-14 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 7-8-4 oc bracing. WEBS 1 Row at midpt 2-21, 3-20, 4-19, 5-17, 5-16, 8-16, 9-14, 10-14, 10-13, 1-22, 11-12 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)22=1769/0-6-0(min. 0-3-0), 12=1800/0-6-0(min. 0-3-4) Max Horz22=382(LC 13) Max Uplift22=-188(LC 13), 12=-231(LC 12) MaxGrav22=1835(LC 2), 12=1981(LC 37) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-23=-1172/240, 2-23=-1128/255, 2-3=-1629/354, 3-24=-1997/400, 24-25=-1997/400, 4-25=-1997/400, 4-26=-2195/436, 5-26=-2195/436, 5-6=-2069/429, 6-7=-2069/429, 7-8=-2069/429, 8-27=-2069/429, 9-27=-2069/429, 9-28=-1663/379, 28-29=-1663/379, 10-29=-1663/379, 10-30=-944/293, 30-31=-1000/267, 11-31=-1007/265, 1-22=-1791/307, 11-12=-1942/333 BOT CHORD 21-22=-352/331, 20-21=-404/985, 19-20=-426/1373, 18-19=-515/1997, 17-18=-515/1997, 16-17=-538/2195, 15-16=-382/1663, 14-15=-382/1663, 13-14=-204/829 WEBS 2-21=-1060/239, 2-20=-213/803, 3-20=-587/248, 3-19=-305/1243, 4-19=-956/336, 4-17=-170/470, 5-17=-270/231, 8-16=-416/197, 9-16=-213/843, 9-14=-1322/374, 10-14=-354/1664, 10-13=-1275/322, 1-21=-228/1509, 11-13=-278/1629 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-2-14,Exterior(2) 9-2-14 to 45-6-14, Interior(1) 45-6-14 to 46-0-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 22=188, 12=231. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T23 TrussType PiggybackBaseGirder Qty 1 Ply 2 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:022019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-bFCOZDOS?6o7VEjbd1MOKutUx26dABNYrT_uPszIZ9F Scale=1:84.2 T1 T2 T4 B1 W3 W4 W5 W6 W5 W6 W5 W6 W5 W6 W5 W6 W5 W6 W5 W1 W2 W8 W7 T2T3 B1B2 1 2 3 4 5 6 7 8 9 10 11 12 24 23 22 21 20 19 18 17 16 15 14 13 25 26 27 28 29 8x8 6x8 4x8 6x10 3x10MT18H 6x8 6x6 12x12 12x12 5x6 4x4 5x6 4x4 2x4 6x8 5x6 6x6 6x6 6x8 6x8 3x6 6x8 4x8 6x8 4-3-14 4-3-14 9-2-14 4-11-0 14-8-4 5-5-5 19-11-13 5-3-9 25-3-7 5-3-9 30-7-0 5-3-9 35-10-10 5-3-9 41-3-15 5-5-5 44-0-0 2-8-1 4-3-14 4-3-14 9-2-14 4-11-0 14-8-4 5-5-5 19-11-13 5-3-9 25-3-7 5-3-9 30-7-0 5-3-9 35-10-10 5-3-9 41-3-15 5-5-5 44-0-0 2-8-1 5-8-111-0-129-6-111-0-127.0012 PlateOffsets(X,Y)-- [1:0-3-8,0-2-4], [3:0-5-4,0-3-0], [11:0-7-4,0-2-12], [14:0-3-8,0-3-0], [15:0-3-8,0-3-0], [22:0-3-8,0-8-0], [23:0-3-8,0-6-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.98 0.28 0.79 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.17 -0.35 0.05 (loc) 21-22 21-22 13 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 944 lb FT= 20% GRIP 185/144 197/144 LUMBER- TOP CHORD2x6SPF No.2 BOT CHORD2x10SP 2400F 2.0E WEBS 2x4 HF/SPF No.2 *Except* W3: 2x4SPFStud,W1,W8: 2x6SPF No.2, W2: 2x4SPF 1650F 1.5E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-10-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-23, 4-19, 5-18, 9-16, 10-15, 11-14, 12-13 REACTIONS.(lb/size)24=12064/0-6-0(min. 0-5-0), 13=3897/0-6-0(min. 0-1-11) Max Horz24=388(LC 56) Max Uplift24=-2250(LC 9), 13=-715(LC 9) MaxGrav24=12113(LC 33), 13=4131(LC 33) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-7174/1415, 2-3=-9581/1868, 3-25=-7930/1542, 4-25=-7930/1542, 4-5=-6941/1334, 5-6=-5790/1097, 6-7=-5790/1097, 7-8=-5790/1097, 8-9=-5790/1097, 9-10=-4464/873, 10-11=-2905/604, 11-12=-1211/329, 1-24=-11323/2137, 12-13=-4040/712 BOT CHORD 24-26=-374/311, 26-27=-374/311, 23-27=-374/311, 23-28=-1455/6125, 28-29=-1455/6125, 22-29=-1455/6125, 21-22=-1802/8322, 20-21=-1695/7930, 19-20=-1695/7930, 18-19=-1488/6941, 17-18=-971/4464, 16-17=-971/4464, 15-16=-647/2905, 14-15=-261/954 WEBS 2-23=-4426/759, 2-22=-748/3811, 3-22=-1259/5597, 3-21=-1467/1042, 4-21=-872/2019, 4-19=-2403/687, 5-19=-472/2065, 5-18=-2543/529, 7-18=-315/154, 9-18=-615/2943, 9-16=-2965/695, 10-16=-716/3445, 10-15=-3633/811, 11-15=-834/4222, 11-14=-3331/735, 1-23=-1779/9687, 12-14=-679/3489 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x6- 2 rowsstaggered at 0-7-0 oc. Bottomchordsconnected as follows: 2x10- 4 rowsstaggered at 0-2-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 6) Unbalancedsnowloads have been considered for this design. 7)Provide adequate drainage to preventwater ponding. 8)All plates areMT20 plates unless otherwiseindicated. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T23 TrussType PiggybackBaseGirder Qty 1 Ply 2 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:022019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-bFCOZDOS?6o7VEjbd1MOKutUx26dABNYrT_uPszIZ9F NOTES- 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 24=2250, 13=715. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 979 lb down and 165 lb up at 1-0-12, 766 lb down and 233 lb up at 3-0-12, 1126 lb down and 251 lb up at 5-0-12, and 1116 lb down and 269 lb up at 7-0-12, and 8571 lb down and 1621 lb up at 9-1-8 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-11=-61, 11-12=-51, 13-24=-20 Concentrated Loads(lb) Vert: 22=-8571(B) 26=-979(B) 27=-766(B) 28=-1126(B) 29=-1116(B) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T24 TrussType PiggybackBase Qty 7 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:042019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-XeK8_vQiXj2rkXtzkSOsQJys?rkhe6mrInT?TlzIZ9D Scale=1:66.9 W1 T1 T3 B1 W2 W3 W2 W3 W2 W3 W2 W3 W5 W4 T1T2 B1B2 1 2 3 4 5 6 7 8 15 14 13 12 11 10 9 16 17 18 19 3x4 5x6 3x4 8x12MT18H 5x6 3x4 5x8 1.5x4 3x4 4x6 6x6 3x4 5x6 3x4 3x4 8-1-2 8-1-2 16-0-7 7-11-6 23-11-13 7-11-6 32-0-15 8-1-2 34-9-0 2-8-1 8-1-2 8-1-2 16-0-7 7-11-6 23-11-13 7-11-6 32-0-15 8-1-2 34-9-0 2-8-1 11-0-129-6-111-0-127.0012 PlateOffsets(X,Y)-- [7:0-8-8,0-2-0], [13:0-3-0,0-3-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.88 0.56 0.73 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.12 -0.32 0.04 (loc) 14-15 14-15 9 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 226 lb FT= 20% GRIP 185/144 185/144 LUMBER- TOP CHORD2x4SPF 1650F 1.5E*Except* T3: 2x6SPF No.2, T2: 2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4 HF/SPF No.2 *Except* W1: 2x4SPF 1650F 1.5E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-4-5 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-15, 1-14, 2-14, 4-13, 6-11, 7-11, 7-10, 8-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)15=1391/Mechanical, 9=1368/0-6-0(min. 0-2-9) Max Horz15=-65(LC 17) Max Uplift15=-299(LC 12), 9=-236(LC 12) MaxGrav15=1681(LC 34), 9=1567(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-15=-1610/338, 1-16=-976/181, 2-16=-976/181, 2-17=-1256/248, 3-17=-1256/248, 3-4=-1256/248, 4-5=-1260/251, 5-18=-1260/251, 6-18=-1260/251, 6-19=-1159/228, 7-19=-1159/228, 7-8=-439/84, 8-9=-1562/232 BOT CHORD 13-14=-175/976, 12-13=-200/1159, 11-12=-200/1159, 10-11=-55/383 WEBS 1-14=-302/1617, 2-14=-1133/348, 2-13=-115/509, 4-13=-456/216, 6-11=-864/296, 7-11=-245/1291, 7-10=-1243/279, 8-10=-207/1422 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 32-0-15,Exterior(2) 32-0-15 to 34-7-4 zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)Provide adequate drainage to preventwater ponding. 5)All plates areMT20 plates unless otherwiseindicated. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 15=299, 9=236. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T25 TrussType Flat Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:052019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-?quWBFQKI1AiMhSAI9v5yWV1uF2LNd?_XRDY?BzIZ9C Scale=1:69.9 W1 T1 W1 B1 W2 W3 W2 W3 W2 W3 W2 T1T2 B1B2 1 2 3 4 5 6 7 14 13 12 11 10 9 8 15 16 3x4 4x6 3x5 4x6 3x43x44x6 3x4 3x8 1.5x4 3x4 4x6 3x5 3x4 8-9-2 8-9-2 17-4-8 8-7-6 25-11-14 8-7-6 34-9-0 8-9-2 8-9-2 8-9-2 17-4-8 8-7-6 25-11-14 8-7-6 34-9-0 8-9-2 10-5-1LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.87 0.66 0.47 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.16 -0.41 0.04 (loc) 8-9 8-9 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 198 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4 HF/SPF No.2 *Except* W1: 2x4SPF 1650F 1.5E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-14, 7-8, 1-13, 2-13, 4-11, 6-9, 7-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)14=1392/Mechanical, 8=1392/0-6-0(min. 0-2-5) Max Uplift14=-290(LC 12), 8=-290(LC 12) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-14=-1316/332, 1-15=-946/197, 2-15=-946/197, 2-3=-1228/255, 3-4=-1228/255, 4-5=-1228/255, 5-6=-1228/255, 6-16=-946/197, 7-16=-946/197, 7-8=-1316/332 BOT CHORD 12-13=-197/946, 11-12=-197/946, 10-11=-197/946, 9-10=-197/946 WEBS 1-13=-299/1437, 2-13=-908/343, 2-11=-90/434, 4-11=-497/235, 6-11=-90/434, 6-9=-908/343, 7-9=-299/1437 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 34-7-4zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3)Provide adequate drainage to preventwater ponding. 4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 5) Refer to girder(s) for truss to trussconnections. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=290, 8=290. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T26 TrussType Flat Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:062019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-T1RuObRy3KJZ_r0MstQKVk1CbfO86zd8l5y5YdzIZ9B Scale=1:61.6 W1 T1 W1 B1 W2 W1 W2 W1 W2 W1 W2 T1T2 B1B2 1 2 3 4 5 6 7 14 13 12 11 10 9 8 15 16 3x4 4x6 3x5 4x6 3x43x44x6 3x4 3x8 1.5x4 3x4 4x6 3x5 3x4 8-9-2 8-9-2 17-4-8 8-7-6 25-11-14 8-7-6 34-9-0 8-9-2 8-9-2 8-9-2 17-4-8 8-7-6 25-11-14 8-7-6 34-9-0 8-9-2 8-9-1LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.87 0.69 0.90 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.16 -0.42 0.04 (loc) 13-14 13-14 8 l/defl >999 >978 n/a L/d 240 180 n/a PLATES MT20 Weight: 183 lb FT= 20% GRIP 185/148 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-14, 7-8, 2-13, 4-11, 6-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)14=1392/Mechanical, 8=1392/0-6-0(min. 0-2-5) Max Uplift14=-290(LC 12), 8=-290(LC 12) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-14=-1316/332, 1-15=-1132/236, 2-15=-1132/236, 2-3=-1469/305, 3-4=-1469/305, 4-5=-1469/305, 5-6=-1469/305, 6-16=-1132/236, 7-16=-1132/236, 7-8=-1316/332 BOT CHORD 12-13=-236/1132, 11-12=-236/1132, 10-11=-236/1132, 9-10=-236/1132 WEBS 1-13=-325/1561, 2-13=-907/343, 2-11=-98/472, 4-11=-497/235, 6-11=-98/472, 6-9=-907/343, 7-9=-325/1561 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 34-7-4zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3)Provide adequate drainage to preventwater ponding. 4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 5) Refer to girder(s) for truss to trussconnections. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=290, 8=290. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T27 TrussType HalfHipGirder Qty 1 Ply 3 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:092019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-ub711dTrLFh8rJlxX?_17MfqusU2JJvaS2Bl9yzIZ98 Scale=1:90.5 0-1-15T1 T2 W5 B1 W1 W2 W3 W4W5 W6 W7 W8 W5 W8 W5 W8 W5 W9 W5 W10 W5 W8 W5 W8 T2T3 B3B3B2HW112 3 4 5 6 7 8 9 10 11 12 13 14 15 28 27 26 25 24 23 22 21 20 19 18 17 16 32 33 34 35 36 37 3839 40 41 10x10 6x8 6x6 12x12 5x6 8x8 8x8 6x6 12x12 4x10 6x8 6x8 6x10 6x10 6x10 6x8 8x86x12MT18H 4-9-8 4-9-8 9-4-2 4-6-10 11-9-14 2-5-12 16-1-8 4-3-10 20-9-8 4-8-0 25-4-8 4-7-0 29-11-9 4-7-0 36-0-6 6-0-13 41-8-3 5-7-13 46-3-4 4-7-0 51-0-0 4-8-12 -1-5-12 1-5-12 4-9-8 4-9-8 9-4-2 4-6-10 11-9-14 2-5-12 16-1-8 4-3-10 20-9-8 4-8-0 25-4-8 4-7-0 29-11-9 4-7-0 36-0-6 6-0-13 41-8-3 5-7-13 46-3-4 4-7-0 51-0-0 4-8-12 1-7-16-10-97-0-86-10-97.0012 PlateOffsets(X,Y)-- [2:0-0-12,0-0-7], [2:0-9-13,0-0-14], [2:Edge,0-6-7], [25:0-6-0,0-8-8], [26:0-3-8,0-3-8], [27:0-3-8,0-4-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.36 0.35 0.99 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.27 -0.58 0.12 (loc) 23-25 23-25 16 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 1601 lbFT= 20% GRIP 185/144 244/190 LUMBER- TOP CHORD2x8SP 2400F 2.0E*Except* T1: 2x10SP 2400F 2.0E BOT CHORD2x10SP 2400F 2.0E WEBS 2x4SPFStud*Except* W7: 2x6SP 2400F 2.0E,W9,W10: 2x4 HF/SPF No.2 WEDGE Left: 2x8SP 2400F 2.0E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)16=5500/0-6-0(min. 0-1-9), 2=12626/0-6-0(min. 0-3-8) Max Horz2=253(LC 11) Max Uplift16=-1063(LC 9), 2=-2172(LC 9) MaxGrav16=5747(LC 31), 2=12626(LC 1) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-17594/3117, 3-4=-18932/3456, 4-5=-19332/3552, 5-33=-22833/4193, 6-33=-22833/4193, 6-34=-22840/4196, 7-34=-22840/4196, 7-8=-18452/3422, 8-9=-18452/3422, 9-10=-18452/3422, 10-11=-11817/2193, 11-12=-11817/2193, 12-35=-11817/2193, 13-35=-11817/2193, 13-14=-3982/772, 14-15=-3982/772, 15-16=-5553/1045 BOT CHORD 2-36=-2737/14400, 36-37=-2737/14400, 28-37=-2737/14400, 28-38=-2737/14400, 38-39=-2737/14400, 27-39=-2737/14400, 27-40=-3185/16765, 26-40=-3185/16765, 26-41=-3655/19332, 25-41=-3655/19332, 24-25=-3989/21020, 23-24=-3989/21020, 22-23=-3989/21020, 21-22=-3044/15787, 20-21=-3044/15787, 19-20=-3044/15787, 18-19=-1515/7763, 17-18=-1515/7763 WEBS 3-28=-585/206, 3-27=-697/3071, 4-27=-253/1287, 4-26=-1315/6906, 5-26=-4375/895, 5-25=-1204/6260, 6-25=-366/179, 7-25=-969/3262, 7-23=-57/619, 7-22=-4345/942, 10-22=-807/4478, 10-19=-5681/1078, 11-19=-340/168, 13-19=-1149/6093, 13-18=0/268, 13-17=-6353/1217, 14-17=-418/145, 15-17=-1237/6662 NOTES- 1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x10- 2 rowsstaggered at 0-9-0 oc, 2x8- 2 rowsstaggered at 0-9-0 oc, 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x10- 2 rowsstaggered at 0-6-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 3 rowsstaggered at 0-4-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T27 TrussType HalfHipGirder Qty 1 Ply 3 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:092019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-ub711dTrLFh8rJlxX?_17MfqusU2JJvaS2Bl9yzIZ98 NOTES- 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12in accordancewithIBC 1608.3.4. 6) Unbalancedsnowloads have been considered for this design. 7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 8)Provide adequate drainage to preventwater ponding. 9)All plates areMT20 plates unless otherwiseindicated. 10)All plates are 3x6MT20 unless otherwiseindicated. 11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 16=1063, 2=2172. 13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 14) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 900 lb down and 128 lb up at 2-0-12, 779 lb down and 137 lb up at 4-0-12, 856 lb down and 150 lb up at 6-0-12, 978 lb down and 167 lb up at 8-0-12, 766 lb down and 233 lb up at 10-0-12, 1040 lb down and 189 lb up at 12-0-12, and 954lb down and 148 lb up at 14-0-12, and 7763 lb down and 1449 lb up at 16-1-8 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-4=-51, 4-15=-61, 16-29=-20 Concentrated Loads(lb) Vert: 26=-1040(F) 25=-7763(F) 36=-900(F) 37=-779(F) 38=-856(F) 39=-978(F) 40=-766(F) 41=-954(F) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T28 TrussType HalfHipGirder Qty 1 Ply 2 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:202019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-3jIBKNckme3af?52gpgc3hcmQIF8OJSBzGLr0pzIZ8z Scale=1:91.8 0-1-15T1 T2 W7 B1 W3 W4 W5 W6 W7 W8 W7 W6 W7 W8 W7 W9 W7 W8 W7 W6 W7 W8 W7 W6 W1 W2 T2T3 B1B3B2 T2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 32 33 34 35 3637 38 39 40 41 42 43 44 45 46 47 4849 5051 52 53 5455 56 5758 59 60 61 62 63 6465 5x6 3x4 6x63x104x8 4x8 2x4 4x8 2x4 4x8 2x4 2x4 4x8 2x4 4x8 2x4 4x10 2x4 4x10 5x8 5x6 3-5-8 3-5-8 6-8-0 3-2-8 10-10-6 4-2-5 16-6-13 5-8-8 20-10-15 4-4-1 26-7-6 5-8-8 30-9-2 4-1-12 36-5-10 5-8-8 40-9-11 4-4-1 46-6-3 5-8-8 51-0-0 4-5-13 -1-5-12 1-5-12 3-5-8 3-5-8 6-8-0 3-2-8 10-10-6 4-2-5 16-6-13 5-8-8 20-10-15 4-4-1 26-7-6 5-8-8 30-9-2 4-1-12 36-5-10 5-8-8 40-9-11 4-4-1 46-6-3 5-8-8 51-0-0 4-5-13 1-7-15-3-135-5-125-3-137.0012 PlateOffsets(X,Y)-- [17:0-3-0,0-4-4], [20:0-2-6,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.14 0.26 0.87 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.43 -0.56 0.13 (loc) 23-25 23-25 17 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 749 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SP 2400F 2.0E BOT CHORD2x6SP 2400F 2.0E WEBS 2x4SPFStud*Except* W1: 2x6SP 2400F 2.0E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-9-15 oc bracing. REACTIONS.(lb/size)17=3113/0-6-0(min. 0-1-8), 31=3064/0-6-0(min. 0-1-8) Max Horz31=208(LC 9) Max Uplift17=-2181(LC 9), 31=-1876(LC 9) MaxGrav17=3386(LC 71), 31=3259(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-3655/2246, 3-4=-4429/2837, 4-32=-3823/2490, 32-33=-3824/2491, 5-33=-3826/2491, 5-34=-7480/4838, 34-35=-7480/4838, 6-35=-7480/4838, 6-36=-7480/4838, 36-37=-7480/4838, 7-37=-7480/4838, 7-38=-7480/4838, 8-38=-7480/4838, 8-39=-8492/5476, 39-40=-8492/5476, 9-40=-8492/5476, 9-10=-8492/5476, 10-41=-8492/5476, 11-41=-8492/5476, 11-42=-6933/4473, 42-43=-6933/4473, 12-43=-6933/4473, 12-44=-6933/4473, 13-44=-6933/4473, 13-45=-6933/4473, 14-45=-6933/4473, 14-46=-2779/1784, 46-47=-2779/1784, 15-47=-2779/1784, 2-31=-3130/1836 BOT CHORD 30-31=-426/475, 29-30=-2032/3069, 29-50=-3806/5719, 50-51=-3806/5719, 28-51=-3806/5719, 28-52=-3806/5719, 27-52=-3806/5719, 27-53=-3806/5719, 26-53=-3806/5719, 26-54=-5411/8215, 54-55=-5411/8215, 25-55=-5411/8215, 25-56=-5411/8215, 24-56=-5411/8215, 23-24=-5411/8215, 23-57=-5326/8111, 57-58=-5326/8111, 22-58=-5326/8111, 22-59=-5326/8111, 59-60=-5326/8111, 21-60=-5326/8111, 20-21=-3542/5388, 20-61=-3542/5388, 19-61=-3542/5388, 19-62=-3542/5388, 62-63=-3542/5388, 18-63=-3542/5388, 18-64=-1792/2747, 64-65=-1792/2747, 17-65=-1792/2747 WEBS 3-30=-1107/739, 3-29=-891/1279, 4-29=-871/1589, 5-29=-2941/1889, 5-28=0/319, 5-26=-1492/2288, 6-26=-474/393, 8-26=-1151/770, 8-25=-6/305, 8-23=-222/324, 9-23=-423/384, 11-23=-355/541, 11-22=-1/290, 11-21=-1588/1050, 12-21=-461/410, 14-21=-1477/2272, 14-19=-7/299, 14-18=-3519/2298, 15-18=-1473/2500, 15-17=-4079/2616, 2-30=-1718/2855 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x6- 2 rowsstaggered at 0-9-0 oc, 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-9-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design.Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T28 TrussType HalfHipGirder Qty 1 Ply 2 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:212019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-XvrZYjdNWxBRH9gFEWBrcu9xAibN7miLCw5OZGzIZ8y NOTES- 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone; cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12in accordancewithIBC 1608.3.4. 6) Unbalancedsnowloads have been considered for this design. 7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 8)Provide adequate drainage to preventwater ponding. 9)All plates are 4x6MT20 unless otherwiseindicated. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 17=2181, 31=1876. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 397 lb down and 456 lb up at 6-8-0, 131 lb down and 142 lb up at 8-11-4, 131 lb down and 142 lb up at 10-11-4, 131 lb down and 142 lb up at 12-11-4, 131 lb down and 142 lb up at 14-11-4, 131 lb down and 142 lb up at 16-11-4, 131 lb down and 142 lb up at 18-11-4, 131 lb down and 142 lb up at 20-11-4, 131 lb down and 142 lb up at 22-11-4, 131 lb down and 142 lb up at 24-11-4, 131 lb down and 142lb up at 26-11-4, 131 lb down and 142 lb up at 28-11-4, 131 lb down and 142 lb up at 30-11-4, 131 lb down and 142 lb up at 32-11-4, 131 lb down and 142 lb up at 34-11-4, 131 lb down and 142 lb up at 36-11-4, 131 lb down and 142 lb up at 38-11-4, 131 lb down and 142 lb up at 40-11-4, 131 lb down and 142 lb up at 42-11-4, 131 lb down and 142 lb up at 44-11-4, 131 lb down and 142 lb up at 46-11-4, and 131 lb down and 142 lb up at 48-11-4, and 118 lb down and 137 lb up at 50-10-4 on top chord, and 103 lb down and 37 lb up at 6-8-0, 51 lb down and 34 lb up at 6-11-4, 51 lb down and 34 lb up at 8-11-4, 51 lb down and 34 lb up at 10-11-4, 51 lb down and 34lb up at 12-11-4, 51 lb down and 34 lb up at 14-11-4, 51 lb down and 34 lb up at 16-11-4, 51 lb down and 34 lb up at 18-11-4, 51 lb down and 34 lb up at 20-11-4, 51lb down and 34 lb up at 22-11-4, 51 lb down and 34 lb up at 24-11-4, 51 lb down and 34 lb up at 26-11-4, 51 lb down and 34 lb up at 28-11-4, 51 lb down and 34 lb up at 30-11-4, 51 lb down and 34 lb up at 32-11-4, 51 lb down and 34 lb up at 34-11-4, 51 lb down and 34 lb up at 36-11-4, 51 lb down and 34 lb up at 38-11-4, 51 lb down and 34 lb up at 40-11-4, 51 lb down and 34 lb up at 42-11-4, 51 lb down and 34 lb up at 44-11-4, 51 lb down and 34 lb up at 46-11-4, and 51 lb down and 34 lb up at 48-11-4, and 67 lb down and 24 lb up at 50-10-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-4=-51, 4-16=-61, 17-31=-20 Concentrated Loads(lb) Vert: 4=-242(B) 16=-80(B) 17=-40(B) 29=-67(B) 5=-47(B) 28=-30(B) 8=-47(B) 25=-30(B) 22=-30(B) 11=-47(B) 19=-30(B) 14=-47(B) 13=-47(B) 10=-47(B) 20=-30(B) 24=-30(B) 32=-47(B) 34=-47(B) 35=-47(B) 36=-47(B) 38=-47(B) 39=-47(B) 40=-47(B) 41=-47(B) 42=-47(B) 43=-47(B) 44=-47(B) 46=-47(B) 47=-47(B) 48=-47(B) 49=-47(B) 50=-30(B) 51=-30(B) 52=-30(B) 53=-30(B) 54=-30(B) 55=-30(B) 56=-30(B) 57=-30(B) 58=-30(B) 59=-30(B) 60=-30(B) 61=-30(B) 62=-30(B) 63=-30(B) 64=-30(B) 65=-30(B) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T30GE TrussType Roof Special SupportedGable Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:222019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-?6Pyl3e?HFKIuIFRoEj486i2a6?msP5URaqx5izIZ8x Scale=1:38.8 T1 T2 B1 B2 B3 W2 W3 W4 W3 W2 W1 W5 ST4 ST5ST3 ST2 ST1 ST6 ST7 ST8 ST9 ST101 2 3 4 5 18 17 16 15 14 13 12 11 10 9 8 7 6 29 30 31 32 3x5 4x4 3x5 5x6 5x6 3x5 3x8 3x5 6-7-0 6-7-0 9-11-0 3-4-0 13-3-0 3-4-0 19-9-0 6-6-0 6-7-0 6-7-0 9-11-0 3-4-0 13-3-0 3-4-0 19-9-0 6-6-0 1-2-66-11-131-3-02-0-07.0012 4.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.42 0.06 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.01 (loc) 18 16 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 93 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 19-9-0. (lb)-Max Horz18=191(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 14, 10, 12 except 18=-102(LC 16), 6=-123(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 18, 6, 6, 13, 15, 16, 17, 11, 9, 8, 7 except 14=255(LC 33), 10=255(LC 34), 12=306(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-18=-259/158, 5-6=-259/157 WEBS 2-12=-259/233, 4-12=-253/228 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-11-0,Exterior(2) 9-11-0 to 13-1-4 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)All plates are 1.5x4MT20 unless otherwiseindicated. 7)Gablestudsspaced at 2-0-0 oc. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 14, 10, 12 except (jt=lb) 18=102, 6=123. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T31 TrussType Roof Special Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:232019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-UIzKzPed2ZS9WSqdMxEJhJEDsVEGbl6egEaVd8zIZ8w Scale=1:45.8 0-1-120-1-12W1 T1 T2 T2 T3 W7B1 B2 B3 W2 W3 W4 W5 W5 W4 W3 W6 1 2 3 4 5 6 7 11 10 9 8 12 13 14 3x5 1.5x4 6x6 4x6 6x6 1.5x4 3x5 5x12 5x12 1.5x4 1.5x4 2-8-0 2-8-0 6-7-0 3-11-0 13-3-0 6-8-0 17-2-0 3-11-0 19-9-0 2-7-0 2-8-0 2-8-0 6-7-0 3-11-0 9-11-0 3-4-0 13-3-0 3-4-0 17-2-0 3-11-0 19-9-0 2-7-0 2-7-56-11-132-7-52-0-00-7-57.0012 4.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.39 0.49 0.56 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.30 0.18 (loc) 9-10 9-10 8 l/defl >999 >785 n/a L/d 240 180 n/a PLATES MT20 Weight: 89 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-6-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-9-13 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)11=714/Mechanical, 8=713/0-6-0(min. 0-1-8) Max Horz11=-205(LC 14) Max Uplift11=-108(LC 16), 8=-107(LC 17) MaxGrav11=920(LC 40), 8=924(LC 40) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-2035/270, 3-13=-2036/352, 4-13=-1955/369, 4-14=-1944/335, 5-14=-2025/318, 5-6=-2024/246 BOT CHORD 10-11=-321/1368, 9-10=-133/1073, 8-9=-238/1334 WEBS 2-11=-1775/275, 2-10=0/394, 3-10=-343/183, 4-10=-206/1060, 4-9=-208/1043, 5-9=-343/183, 6-9=0/416, 6-8=-1750/283 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 2-8-0,Interior(1) 2-8-0 to 9-11-0,Exterior(2) 9-11-0 to 13-1-4, Interior(1) 17-2-0 to 19-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=108, 8=107. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T32 TrussType Roof Special Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:252019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-Qg54O5gtaAismmz0TMGnmkKZiJvF3ggx7Y3ci1zIZ8u Scale=1:45.8 0-1-120-1-12W1 T1 T2 T2 T3 W7 B1 B2 B3 W2 W3 W4 W5 W5 W4 W3 W6 1 2 3 4 5 6 7 11 10 9 8 12 13 14 15 16 17 4x6 3x4 6x6 4x6 6x6 3x4 5x6 5x12 5x12 1.5x4 1.5x4 4-8-0 4-8-0 6-7-0 1-11-0 13-3-0 6-8-0 15-2-0 1-11-0 19-9-0 4-7-0 4-8-0 4-8-0 6-7-0 1-11-0 9-11-0 3-4-0 13-3-0 3-4-0 15-2-0 1-11-0 19-9-0 4-7-0 3-9-56-11-133-9-52-0-01-9-57.0012 4.0012 PlateOffsets(X,Y)-- [8:0-2-12,Edge], [11:0-2-15,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.36 0.52 0.49 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.31 0.19 (loc) 9-10 9-10 8 l/defl >999 >750 n/a L/d 240 180 n/a PLATES MT20 Weight: 93 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-0-13 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-7-6 oc bracing. WEBS 1 Row at midpt 2-11, 6-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)11=734/Mechanical, 8=733/0-6-0(min. 0-1-8) Max Horz11=-219(LC 14) Max Uplift11=-117(LC 16), 8=-117(LC 17) MaxGrav11=799(LC 40), 8=801(LC 40) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-13=-1790/315, 3-13=-1759/327, 3-14=-1812/383, 4-14=-1743/397, 4-15=-1734/334, 5-15=-1802/320, 5-16=-1749/276, 6-16=-1780/264 BOT CHORD 10-11=-421/1507, 9-10=-211/985, 8-9=-320/1489 WEBS 2-11=-1794/307, 4-10=-224/896, 4-9=-171/882, 6-8=-1781/335 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-11-0,Exterior(2) 9-11-0 to 13-1-4, Interior(1) 15-2-0 to 19-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=117, 8=117. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T33 TrussType Roof Special Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:262019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-utfSbRhVLUqjNwYC13n1JysdbjELo7f4MCo9ETzIZ8t Scale=1:45.8 0-1-120-1-12W1 T1 T2 T2 T3 W6 B1 B2 B3 W2 W3 W4 W4 W3 W5 1 2 3 4 5 9 8 7 6 10 11 12 13 14 15 16 17 4x6 4x4 7x14MT18H 4x6 6x16MT18H 4x4 5x6 4x8 4x8 6-7-0 6-7-0 13-3-0 6-8-0 19-9-0 6-6-0 6-8-0 6-8-0 9-11-0 3-3-0 13-2-0 3-3-0 19-9-0 6-7-0 4-11-56-11-134-11-52-0-02-11-57.0012 4.0012 PlateOffsets(X,Y)-- [2:0-11-4,0-1-4], [4:1-0-0,0-1-4], [5:Edge,0-3-8], [6:0-2-12,Edge], [7:0-3-4,0-1-8], [8:0-3-4,0-1-8], [9:0-2-15,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.80 0.53 0.51 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.33 0.19 (loc) 7-8 7-8 6 l/defl >999 >709 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 94 lb FT= 20% GRIP 185/144 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud*Except* W2,W5: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-2-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-0-13 oc bracing. WEBS 1 Row at midpt 2-9, 4-6 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)9=754/Mechanical, 6=753/0-6-0(min. 0-1-8) Max Horz9=-233(LC 14) Max Uplift9=-130(LC 16), 6=-130(LC 17) MaxGrav9=876(LC 40), 6=874(LC 40) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-9=-296/90, 2-12=-1605/443, 12-13=-1590/452, 3-13=-1576/461, 3-14=-1563/362, 14-15=-1576/353, 4-15=-1591/344, 5-6=-292/90 BOT CHORD 8-9=-484/1416, 7-8=-281/841, 6-7=-385/1404 WEBS 2-9=-1601/310, 3-8=-296/992, 3-7=-168/972, 4-6=-1592/380 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-11-0,Exterior(2) 9-11-0 to 13-2-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates areMT20 plates unless otherwiseindicated. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 9=130, 6=130. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T34 TrussType Roof Special Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:272019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-M3Dqpmh76nya?47ObnIGr9PqQ7VhXY?DasYimvzIZ8s Scale=1:45.8 0-1-120-1-12W1 T1 T2 T2 T3 W8 B1 B2 B3 W2 W3 W4 W5 W6 W5 W4 W3 W7 1 2 3 4 5 6 7 14 13 12 11 10 9 8 15 16 17 18 19 20 3x5 3x4 4x8 4x6 4x8 3x4 3x5 5x6 5x6 3x10 3x4 3x6 3x4 3x10 6-7-0 6-7-0 8-8-0 2-1-0 9-11-0 1-3-0 11-2-0 1-3-0 13-3-0 2-1-0 19-9-0 6-6-0 6-7-0 6-7-0 8-8-0 2-1-0 9-11-0 1-3-0 11-2-0 1-3-0 13-3-0 2-1-0 19-9-0 6-6-0 6-1-56-11-136-1-52-0-04-1-57.0012 4.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.67 0.84 0.63 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.24 0.17 (loc) 12-13 13-14 8 l/defl >999 >959 n/a L/d 240 180 n/a PLATES MT20 Weight: 111 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud*Except* W2,W7: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-3-14 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-4-5 oc bracing. WEBS 1 Row at midpt 2-14, 6-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)14=774/Mechanical, 8=774/Mechanical Max Horz14=-247(LC 14) Max Uplift14=-147(LC 16), 8=-146(LC 17) MaxGrav14=998(LC 40), 8=997(LC 40) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-14=-261/78, 2-17=-1092/224, 3-17=-1088/224, 3-4=-1154/247, 4-5=-1156/265, 5-18=-1088/230, 6-18=-1092/230, 7-8=-257/78 BOT CHORD 13-14=-454/1295, 12-13=-413/1189, 11-12=-345/1073, 10-11=-345/1073, 9-10=-331/1179, 8-9=-358/1284 WEBS 2-14=-1600/249, 2-13=-118/571, 3-12=-290/57, 4-11=-164/861, 5-10=-295/80, 6-9=-31/563, 6-8=-1593/365 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-11-0,Exterior(2) 9-11-0 to 11-2-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 14=147, 8=146. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T35 TrussType Roof Special Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:282019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-qFnD06imt54RdDib8UpVONx1GWyGG1ANpWHGJMzIZ8r Scale=1:43.4 W1 T1 W6 B1 B2 B3 W2 W3 W4 W3 W5 T2 1 2 3 4 5 9 8 7 6 10 11 3x5 3x4 3x4 3x4 3x5 5x6 5x12 3x8 3x4 6-7-0 6-7-0 13-3-0 6-8-0 19-9-0 6-6-0 6-7-0 6-7-0 13-3-0 6-8-0 19-9-0 6-6-0 7-3-52-0-05-3-54.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.54 0.43 0.51 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.22 0.09 (loc) 8-9 7-8 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 104 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud*Except* W2,W4,W5: 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-5-11 oc bracing. WEBS 1 Row at midpt 2-9, 4-6 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)9=786/Mechanical, 6=786/Mechanical Max Horz9=-272(LC 14) Max Uplift9=-213(LC 12), 6=-213(LC 13) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-736/190, 3-4=-736/190 BOT CHORD 8-9=-436/861, 7-8=-399/782, 6-7=-336/808 WEBS 2-9=-1089/259, 2-8=-64/454, 4-7=-81/454, 4-6=-1087/368 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 19-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3)Provide adequate drainage to preventwater ponding. 4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 5) Refer to girder(s) for truss to trussconnections. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 9=213, 6=213. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T36 TrussType HalfHip Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:292019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-ISKbDSjOePCIENHniCLkxaU9awI9?TeW2A1prozIZ8q Scale=1:49.7 0-1-12T1 T2 W8 B1 B2 B3 W3 W4 W5 W6 W5 W7 W1 W2 T3 1 2 3 4 5 6 11 10 9 8 7 12 134x6 5x6 5x8 3x8 3x4 3x4 5x6 5x12 3x5 3x4 1-5-13 1-5-13 6-7-0 5-1-3 13-3-0 6-8-0 19-9-0 6-6-0 1-5-13 1-5-13 6-7-0 5-1-3 13-3-0 6-8-0 19-9-0 6-6-0 7-4-48-5-58-7-18-5-52-0-06-5-510.0012 4.0012 PlateOffsets(X,Y)-- [1:0-2-12,0-1-8], [2:0-3-0,0-2-1], [4:0-1-12,0-0-0], [5:0-4-0,Edge], [5:0-0-0,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.76 0.39 0.56 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.21 0.07 (loc) 8-9 8-9 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 125 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4 HF/SPF No.2 *Except* W5: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-4-12 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-9-2 oc bracing. WEBS 1 Row at midpt 6-7, 2-10, 1-11 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=786/Mechanical, 11=773/Mechanical Max Horz11=317(LC 13) Max Uplift7=-231(LC 13), 11=-169(LC 12) MaxGrav7=1146(LC 34), 11=1060(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-281/226, 2-12=-845/240, 3-12=-847/240, 3-4=-877/155, 4-5=-860/150, 5-13=-860/150, 6-13=-860/150, 6-7=-1088/281, 1-11=-1035/203 BOT CHORD 10-11=-377/404, 9-10=-365/457, 8-9=-408/860 WEBS 2-10=-971/237, 2-9=-162/1042, 3-9=-616/244, 4-8=-698/216, 6-8=-306/1177, 1-10=-102/959 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 5-8-11,Interior(1) 5-8-11 to 19-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=231, 11=169. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T37 TrussType HalfHip Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:302019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-meuzRok0PiK9sXszGvszTo1J3Kfwkt8gHqmNNEzIZ8p Scale=1:59.0 0-1-12T1 T2 W7 B1 B2 B3 W3 W4 W5 W4 W6 W1 W2 T3 1 2 3 4 5 6 10 9 8 7 11 12 3x4 5x6 3x4 3x8 3x4 3x5 5x6 5x12 3x4 1.5x4 2-10-10 2-10-10 6-7-0 3-8-6 13-3-0 6-8-0 19-9-0 6-6-0 2-10-10 2-10-10 6-7-0 3-8-6 13-3-0 6-8-0 19-9-0 6-6-0 7-4-49-7-59-9-19-7-52-0-07-7-510.0012 4.0012 PlateOffsets(X,Y)-- [2:0-3-0,0-2-1] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.77 0.36 0.73 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.18 0.06 (loc) 9-10 9-10 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 126 lb FT= 20% GRIP 185/148 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-11-11 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-6-2 oc bracing. WEBS 1 Row at midpt 6-7, 3-8, 2-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=784/Mechanical, 10=761/Mechanical Max Horz10=364(LC 13) Max Uplift7=-249(LC 13), 10=-128(LC 12) MaxGrav7=1136(LC 34), 10=974(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-689/235, 3-11=-731/135, 4-11=-731/135, 4-5=-717/132, 5-12=-717/132, 6-12=-717/132, 6-7=-1078/314 BOT CHORD 9-10=-431/563, 8-9=-426/698 WEBS 2-9=-115/895, 3-9=-570/252, 4-8=-713/224, 6-8=-331/1075, 2-10=-1005/183 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 7-1-8,Interior(1) 7-1-8 to 19-7-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=249, 10=128. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T38 TrussType HalfHipGirder Qty 1 Ply 2 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:322019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-j10jsUlGxKat5r0MNKuRYD6dl8M?Cndzk7FTS7zIZ8n Scale=1:62.5 0-1-12T1 T2 W7 B1 W3 W4 W5 W4 W5 W6 W1 W2 B2 1 2 3 4 5 11 10 9 8 7 6 12 13 14 15 16 17 18 19 6x6 5x83x10MT18H6x810x1010x10 3x4 1.5x4 12x12 8x8 6x6 4-3-6 4-3-6 9-3-8 5-0-2 14-5-6 5-1-14 19-9-0 5-3-10 4-3-6 4-3-6 9-3-8 5-0-2 14-5-6 5-1-14 19-9-0 5-3-10 7-4-410-9-510-11-110-9-510.0012 PlateOffsets(X,Y)-- [1:0-2-12,0-1-8], [2:0-3-15,Edge], [7:0-6-0,0-6-4], [8:0-3-8,0-6-0], [10:0-3-8,0-6-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.95 0.32 0.73 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.20 0.01 (loc) 7-8 7-8 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 385 lb FT= 20% GRIP 185/144 185/148 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x8SP 2400F 2.0E WEBS 2x4 HF/SPF No.2 *Except* W7: 2x6SPF No.2, W6: 2x4SPF 1650F 1.5E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-5-9 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-6, 3-7, 1-11 REACTIONS.(lb/size)6=8255/Mechanical, 11=7639/Mechanical Max Horz11=137(LC 12) Max Uplift6=-1601(LC 9), 11=-1429(LC 9) MaxGrav6=8591(LC 30), 11=7783(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-3666/710, 2-12=-4344/834, 3-12=-4347/834, 3-4=-3460/649, 4-5=-3460/649, 5-6=-7201/1373, 1-11=-7249/1328 BOT CHORD 9-10=-589/2830, 9-14=-589/2830, 8-14=-589/2830, 8-15=-833/4345, 15-16=-833/4345, 16-17=-833/4345, 7-17=-833/4345 WEBS 2-10=-1093/190, 2-8=-642/3479, 3-8=-392/1511, 3-7=-1981/415, 4-7=-506/164, 5-7=-1454/7757, 1-10=-1031/5644 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc. Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-5-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 6) Unbalancedsnowloads have been considered for this design. 7)Provide adequate drainage to preventwater ponding. 8)All plates areMT20 plates unless otherwiseindicated. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10) Refer to girder(s) for truss to trussconnections. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 6=1601, 11=1429. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T38 TrussType HalfHipGirder Qty 1 Ply 2 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:322019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-j10jsUlGxKat5r0MNKuRYD6dl8M?Cndzk7FTS7zIZ8n NOTES- 13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1372 lb down and 310 lb up at 1-11-4, 1372 lb down and 310 lb up at 3-11-4, 1661 lb down and 319 lb up at 5-11-4, 1661 lb down and 319 lb up at 7-11-4, 1661 lb down and 319 lb up at 9-11-4, 1661 lb down and 319 lb up at 11-11-4, 1661lb down and 319 lb up at 13-11-4, and 1661 lb down and 319 lb up at 15-11-4, and 1661 lb down and 319 lb up at 17-11-4 on bottomchord.The design/selection ofsuchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-5=-61, 6-11=-20 Concentrated Loads(lb) Vert: 9=-1661(B) 10=-1372(B) 13=-1372(B) 14=-1661(B) 15=-1661(B) 16=-1661(B) 17=-1661(B) 18=-1661(B) 19=-1661(B) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T39 TrussType Jack-ClosedGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:332019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-BDa63qmuidikj?bYx1Pg5Qfx_XjmxNJ6zn?1_ZzIZ8m Scale=1:26.6 0-1-15W1 T1 T2 W5 B1 W2 W3 W4 1 2 3 4 7 6 5 8 9 1.5x4 1.5x4 4x4 3x5 3x4 5x6 0-2-0 0-2-0 4-2-11 4-0-11 7-6-0 3-3-5 -1-5-12 1-5-12 4-2-11 4-2-11 7-6-0 3-3-5 1-7-13-10-114-0-103-10-117.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.35 0.16 0.13 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.02 -0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 39 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=357/0-3-8(min. 0-1-8), 5=326/0-6-0(min. 0-1-8) Max Horz7=157(LC 11) Max Uplift7=-202(LC 12), 5=-391(LC 9) MaxGrav7=529(LC 32), 5=390(LC 67) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-7=-498/223, 2-3=-304/208 WEBS 3-5=-274/268 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=202, 5=391. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 135 lb down and 157 lb up at 4-2-11, and 94 lb down and 94 lb up at 5-4-13, and 79 lb down and 95 lb up at 7-4-4 on top chord, and 73 lb down and 99 lb up at 4-2-11, and 20 lb down and 50 lb up at 5-4-13, and 33 lb down and 44 lb up at 7-4-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Continued on page 2 DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T39 TrussType Jack-ClosedGirder Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:342019 Page2 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-fP8UHAnWTxqbL89kVlwvdeB6kx3?gpZFBRlaW?zIZ8l LOADCASE(S)Standard Uniform Loads(plf) Vert: 1-2=-51, 2-3=-51, 3-4=-61, 5-7=-20 Concentrated Loads(lb) Vert: 4=-29(F) 6=0(F) 5=-18(F) 8=-4(F) 9=-8(F) DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T40 TrussType Jack-Closed Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:342019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-fP8UHAnWTxqbL89kVlwvdeB7Bx2lgpGFBRlaW?zIZ8l Scale=1:36.0 W1 T1 W4 B1 W2 W3 1 2 3 4 7 6 5 8 9 3x4 3x5 3x6 1.5x4 3x6 3x5 0-2-0 0-2-0 3-3-13 3-1-13 7-1-0 3-9-3 7-6-0 0-5-0 -1-5-12 1-5-12 3-3-13 3-3-13 7-1-0 3-9-3 7-6-0 0-5-0 1-7-15-8-65-6-117.0012 PlateOffsets(X,Y)-- [4:0-2-14,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.32 0.24 0.15 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.04 -0.05 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 40 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud*Except* W4: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-7-15 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=344/0-3-8(min. 0-1-8), 5=243/0-6-0(min. 0-1-8) Max Horz7=234(LC 13) Max Uplift7=-60(LC 16), 5=-97(LC 16) MaxGrav7=394(LC 2), 5=274(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-7=-322/267 BOT CHORD 6-7=-337/314, 5-6=-337/314 WEBS 3-5=-292/331 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-5-12 to 1-6-4,Interior(1) 1-6-4 to 7-3-4zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7, 5. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T41 TrussType Jack-Closed Qty 11 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:352019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-7cisUWo9DFySyIkx3SS8ArkHtLOqPGdPQ5U82SzIZ8k Scale=1:37.5 W1 T1 W4 B1 W2 W3 1 2 3 4 7 6 5 8 9 3x4 3x5 2x4 1.5x4 3x4 3x5 0-2-0 0-2-0 3-3-13 3-1-13 7-6-0 4-2-2 -1-5-12 1-5-12 3-3-13 3-3-13 7-6-0 4-2-2 1-7-15-11-97.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.32 0.25 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.03 -0.06 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 37 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=347/0-3-8(min. 0-1-8), 5=246/0-6-0(min. 0-1-8) Max Horz7=186(LC 16) Max Uplift7=-17(LC 16), 5=-141(LC 16) MaxGrav7=397(LC 2), 5=277(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-7=-325/202 WEBS 3-5=-263/308 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-5-12 to 1-6-4,Interior(1) 1-6-4 to 7-4-4zone;cantileverleft exposed ; endverticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7 except(jt=lb) 5=141. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T42 TrussType Common Qty 4 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:362019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-boFEhron_Y4IaSJ7cAzNj3HWFlmN8lGYflEhbuzIZ8j Scale=1:21.1 T1 T1 B1 W1 1 2 3 4 5 6 13 14 2x4 2x4 1.5x4 4x4 2-11-0 2-11-0 5-10-0 2-11-0 -0-10-12 0-10-12 2-11-0 2-11-0 5-10-0 2-11-0 6-8-12 0-10-12 0-5-132-11-00-5-1310.0012 PlateOffsets(X,Y)-- [2:0-4-0,0-0-6], [4:0-4-0,0-0-6] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.09 0.10 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 6-9 6-9 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 21 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-10-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=252/0-4-0(min. 0-1-8), 4=252/0-4-0(min. 0-1-8) Max Horz2=-83(LC 14) Max Uplift2=-48(LC 16), 4=-48(LC 17) MaxGrav2=287(LC 2), 4=287(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 2-11-0,Exterior(2) 2-11-0 to 5-10-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss T42GE TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:372019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-3_pcvBpPlsC9CcuJAtUcFGpg996ztCtiuPzE7KzIZ8i Scale=1:20.7 T1 T1 B1 ST1 1 2 3 4 5 6 4x4 2x4 2x41.5x4 5-10-0 5-10-0 -0-10-12 0-10-12 2-11-0 2-11-0 5-10-0 2-11-0 6-8-12 0-10-12 0-5-132-11-00-5-1310.0012 PlateOffsets(X,Y)-- [2:0-2-10,0-1-0], [4:0-2-10,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.14 0.07 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 0.00 (loc) 5 5 4 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 21 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-10-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=168/5-10-0(min. 0-1-8), 4=168/5-10-0(min. 0-1-8), 6=169/5-10-0(min. 0-1-8) Max Horz2=-83(LC 14) Max Uplift2=-57(LC 16), 4=-67(LC 17) MaxGrav2=194(LC 2), 4=194(LC 2), 6=186(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3)-0-10-12 to 2-1-4,Exterior(2) 2-1-4 to 2-11-0, Corner(3) 2-11-0 to 5-10-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Gablerequirescontinuous bottomchord bearing. 8)Gablestudsspaced at 2-0-0 oc. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V01 TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:382019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-XBN?6Xq1WAL0pmTWkb?roUMqVYKOcfZr63jofnzIZ8h Scale=1:22.6 T1 T1 B1 1 2 34 5 6 7 2x4 3x4 2x4 7-11-7 7-11-7 4-1-7 4-1-7 7-11-7 3-10-0 0-0-43-5-30-2-1410.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.23 0.64 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 21 lb FT= 20% GRIP 185/148 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=262/7-11-7(min. 0-1-8), 3=262/7-11-7(min. 0-1-8) Max Horz1=-81(LC 14) Max Uplift1=-35(LC 16), 3=-34(LC 17) MaxGrav1=296(LC 2), 3=296(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 4-1-7,Exterior(2) 4-1-7 to 7-1-7zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V02 TrussType Valley Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:392019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-0NxNKtrfHTTtRw2iIIW4Khv1aylyL6p_LjSLBDzIZ8g Scale=1:16.5 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-5 0-0-5 5-5-4 5-4-15 2-8-10 2-8-10 5-5-4 2-8-10 0-0-42-3-30-0-410.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.08 0.23 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 13 lb FT= 20% GRIP 185/148 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-5-4 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=164/5-4-11(min. 0-1-8), 3=164/5-4-11(min. 0-1-8) Max Horz1=-50(LC 14) Max Uplift1=-22(LC 16), 3=-22(LC 17) MaxGrav1=185(LC 2), 3=185(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V03 TrussType Valley Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:402019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-UZVlXDsH2nbk33dur01JtvRDQM8K4Z38aNCukfzIZ8f Scale=1:8.3 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-5 0-0-5 2-7-11 2-7-6 1-3-13 1-3-13 2-7-11 1-3-13 0-0-41-1-30-0-410.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.01 0.03 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT= 20% GRIP 185/148 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-7-11 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=65/2-7-1(min. 0-1-8), 3=65/2-7-1(min. 0-1-8) Max Horz1=-20(LC 12) Max Uplift1=-9(LC 16), 3=-9(LC 17) MaxGrav1=73(LC 2), 3=73(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V04 TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:412019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-yl37lZsvp5jbgDC5PjYYQ6_IDmSZp?5Hp1xSG5zIZ8e Scale=1:37.1 T1 T2 W1 B1 ST2 ST11 2 3 4 5 8 7 6 9 10 11 3x4 3x4 2x4 1.5x41.5x4 1.5x4 1.5x4 1.5x4 14-0-1 14-0-1 6-3-15 6-3-15 14-0-1 7-8-2 0-0-41-7-06-0-123.0012 7.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.33 0.16 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 44 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 14-0-1. (lb)-Max Horz1=230(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 1, 6, 8 except 7=-128(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 1, 6 except 7=360(LC 29), 8=396(LC 22) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-9=-253/221 WEBS 4-7=-286/172, 2-8=-276/121 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 1-3-0 to 4-3-0,Interior(1) 4-3-0 to 13-10-5zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1;Min. flatroofsnowload governs. 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 6, 8 except (jt=lb) 7=128. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V05 TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:412019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-yl37lZsvp5jbgDC5PjYYQ6_HYmR3p?qHp1xSG5zIZ8e Scale=1:35.8 T1 W1 B1 ST1 1 2 3 5 4 6 7 8 2x4 1.5x4 1.5x41.5x4 1.5x4 9-8-6 9-8-6 0-0-45-7-147.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.44 0.19 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 33 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=146/9-8-6(min. 0-1-8), 4=87/9-8-6(min. 0-1-8), 5=405/9-8-6(min. 0-1-8) Max Horz1=209(LC 13) Max Uplift4=-34(LC 13), 5=-175(LC 16) MaxGrav1=179(LC 30), 4=116(LC 29), 5=485(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-6=-267/241, 6-7=-252/268, 2-7=-239/272 WEBS 2-5=-373/244 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-6-8 to 3-6-8,Interior(1) 3-6-8 to 9-6-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb) 5=175. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V06 TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:422019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-QydVyvtYaOrSINnHzQ4nyKXOb9kjYTYR1hh?oYzIZ8d Scale=1:25.5 T1 W1 B1 1 2 3 4 5 6 2x4 1.5x4 1.5x4 6-10-2 6-10-2 0-0-43-11-147.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.67 0.42 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 20 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=218/6-10-2(min. 0-1-8), 3=218/6-10-2(min. 0-1-8) Max Horz1=143(LC 13) Max Uplift1=-30(LC 16), 3=-74(LC 16) MaxGrav1=246(LC 2), 3=269(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-6-8 to 3-6-8,Interior(1) 3-6-8 to 6-8-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V07 TrussType Valley Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:432019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-u8Bu9FuALizJwXLTX8b0VX3h8Z9qHwoaGLQZK_zIZ8c Scale=1:14.5 T1 W1 B1 1 2 3 2x4 1.5x4 1.5x4 3-11-13 3-11-13 0-0-42-3-147.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.17 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-11-13 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=117/3-11-6(min. 0-1-8), 3=117/3-11-6(min. 0-1-8) Max Horz1=77(LC 13) Max Uplift1=-16(LC 16), 3=-39(LC 16) MaxGrav1=132(LC 2), 3=144(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V08 TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:442019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-MKkGNavo605AXhwf4r6F1lcqozTZ0N2kV?A6tQzIZ8b Scale=1:26.7 W1 T1 T2 B1 1 2 3 4 5 6 7 3x4 3x4 3x4 3x4 5-7-8 5-7-8 1-0-8 1-0-8 5-7-8 4-7-0 3-0-03-10-70-0-1010.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.31 0.21 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 18 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-7-8 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)4=182/5-7-8(min. 0-1-8), 3=182/5-7-8(min. 0-1-8) Max Horz4=-130(LC 12) Max Uplift4=-53(LC 17), 3=-18(LC 17) MaxGrav4=215(LC 30), 3=206(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 4-0-8,Interior(1) 4-0-8 to 5-3-7zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V09 TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:452019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-qXIeawvQtJD19rVseZdUay90lNpalqItjfvfPtzIZ8a Scale=1:23.5 W1 T1 T2 B1 1 2 3 4 5 6 2x4 3x4 3x4 3x4 5-1-1 5-1-1 1-0-8 1-0-8 5-1-1 4-0-8 2-6-03-4-70-0-410.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.23 0.16 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-1-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)4=161/5-1-1(min. 0-1-8), 3=161/5-1-1(min. 0-1-8) Max Horz4=-111(LC 12) Max Uplift4=-44(LC 17), 3=-17(LC 17) MaxGrav4=187(LC 30), 3=182(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 4-0-8,Interior(1) 4-0-8 to 4-8-3zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 4 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4, 3. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V10 TrussType GABLE Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:462019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-Ijs0oGw2edLun_42CG8j7AhDenA0UHY0yJfDxJzIZ8Z Scale=1:14.7 W1 T1 T2 B1 1 2 3 4 1.5x4 2x4 3x4 2x4 3-10-10 3-10-10 1-0-8 1-0-8 3-10-10 2-10-2 1-6-02-4-70-0-410.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.09 0.08 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT= 20% GRIP 185/144 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-10-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)4=118/3-10-10(min. 0-1-8), 3=118/3-10-10(min. 0-1-8) Max Horz4=-71(LC 12) Max Uplift4=-26(LC 17), 3=-14(LC 17) MaxGrav4=133(LC 2), 3=133(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V11 TrussType Valley Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:462019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-Ijs0oGw2edLun_42CG8j7AhEsnBaUHY0yJfDxJzIZ8Z Scale=1:8.8 T1 T2 B1 1 2 3 2x4 3x4 2x4 2-5-13 2-5-13 1-0-8 1-0-8 2-5-13 1-5-5 0-4-01-2-70-0-410.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.02 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT= 20% GRIP 185/148 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-5-13 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=74/2-5-13(min. 0-1-8), 3=74/2-5-13(min. 0-1-8) Max Horz1=-23(LC 12) Max Uplift1=-10(LC 16), 3=-10(LC 17) MaxGrav1=83(LC 2), 3=83(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V12 TrussType Valley Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:472019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-nvQO?cxgPxTlO8fEm_fyfNEORAUVDkoABzOmTlzIZ8Y Scale=1:16.9 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-5 0-0-5 5-7-9 5-7-4 2-9-12 2-9-12 5-7-9 2-9-12 0-0-42-4-20-0-410.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.09 0.25 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 14 lb FT= 20% GRIP 185/148 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-7-9 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=171/5-6-15(min. 0-1-8), 3=171/5-6-15(min. 0-1-8) Max Horz1=52(LC 13) Max Uplift1=-23(LC 16), 3=-23(LC 17) MaxGrav1=193(LC 2), 3=193(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 66025-W1 Dansco Engineering, LLC Date: 5/8/19 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1903720-12T Truss V13 TrussType Valley Qty 1 Ply 1 1903720-12TDWHWoodsideW.ClayLot25 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedMay813:41:482019 Page1 ID:94DzlFODDH3qPJ9mBY4ZpsyblCk-F6_nDyyJ9Ebb0IERJhABCbmaMat4yB1JQd8K0BzIZ8X Scale=1:8.7 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-5 0-0-5 2-9-15 2-9-10 1-5-0 1-5-0 2-9-15 1-5-0 0-0-41-2-20-0-410.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.02 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT= 20% GRIP 185/148 LUMBER- TOP CHORD2x4 HF/SPF No.2 BOT CHORD2x4 HF/SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-9-15 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=72/2-9-6(min. 0-1-8), 3=72/2-9-6(min. 0-1-8) Max Horz1=22(LC 13) Max Uplift1=-9(LC 16), 3=-9(LC 17) MaxGrav1=81(LC 2), 3=81(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard