Loading...
HomeMy WebLinkAboutA013 - 6GGFIN. MAIN LEVEL FINISHED BASEMENT LEVEL T.O. PLATE (MAIN) T.O. FOUNDATION T.O. PLATE (GARAGE) LAP SIDING PER SPECS 1X8 TRIM BOARD, W/ METAL DRIP EDGE STUCCO TEXTURED HARDIE PANEL 5/4X6 TRIM BOARDW/ METAL DRIP EDGE 10" SQUARE BOX COLUMNS BRICK PER SPECS 1X6 CORNER BOARD, TYP. LAP SIDING PER SPECS 9" 12" 9" 12" 1X6 FRIEZE BOARD TYP. METAL CHIMNEY CAP 1X6 TRIM BOARD 1X6 TRIM BOARD W/ METAL DRIP EDGE SLOPED BRICK ROWLOCK SILL TO BOTTOM OF HEADER8' - 0"TO BOTTOM OF HEADER8' - 10"TO TOP OF GUTTERBOARD8' - 6 3/4"5" 12" FIN. UPPER LEVEL T.O. PLATE (UPPER) 14" / 12"14" / 12"14" / 12"A3 5 1X8 RAKE BOARD, TYP 5/4X6 TRIM BOARDW/ METAL DRIP EDGE 10' - 0"1' - 11 3/8"2 1/4"1' - 1 3/4" 2" 1' - 3 3/4"3' - 0"5 1/4"2 1/2" 2' - 2 1/4" 2"CUSTOMER: PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Wedgewood Building Co., LLC 317.669.6300 32 First Street NE Carmel, IN 46032 www.wedgewoodbc.com Copyright c 2019 Wedgewood Building Co. LLC. 5/28/2019 1:30:07 PM A3 Wedgewood Building Co. Spec Residence Lot #6 - Grannan Grove EXTERIOR ELEVATIONS WBC 1/4" = 1'-0" 1 RIGHT ELEVATION 2 EXTERIOR 3D VIEW (LEFT 1)3 EXTERIOR 3D VIEW (LEFT 2)Rev.No. Date Description 1/2" = 1'-0"5 BRACKET DETAIL ELEVATION NOTES: 1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL. By Andrew Lund at 1:30 pm, May 28, 2019 06/06/19 Mike Sheeks