Loading...
HomeMy WebLinkAbout6GG - Sewer PermitProject WO Project Name Project Developer Lift Station Treatment Plant Parcel Acreage EDU in Gallons ENG4862014 Section Number Grannan Grove Lot Number Grannan Grove Development, LLC 14 Austin Oaks Station CTRWD W WTP Local Sewer Charge - District Contribution Plan Review and Inspection Application Fee EDU Fee Interceptor Fee Other Fees Fees Due Invoice Number 310 0.00 0.00 150.00 19D8.00 O.DO 0.00 2058.00 Address Number Address 2 Street City Zip Code County Builder Phone Number Owner Phone Number Occupant Phone Number 6 13997 Grannan Lane Carmel 46074 Wedgewood Building Company 317-669-6315 rLr^x NV I o: msrauanon or building sewer shall be per the specifications of the ThCo Regional Sewer Utility (see reverse) and any conditions noted below. All installations shall be inspected by TdCo personnel during "open trench" phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter TrICo'S sanitary sewer system. TnCo will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to TnCo's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which Is the subject of this permit. Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 8449200 24 hours in advance. All new construction will be placed on billing two months after connection has been made or when water is connected, whichever comes first. The building has: Main ID: GGa01-GG802 Grease Trap Slab Foundation Grease Interceptor Crawl Space Manhole IDs USMH G"01 GG -802 DSMH Grit Interceptor Basement YES Lid Elevation 914.59✓ 911.46 g/ Grinder Station First Floor Elevation 917.70 917.10 Water Service City of Carmel Basement Elevation 907.10 ✓ 907.10 Calculation is based on b Meahola Lid Sevefiam and the elevation of the First Floor 2,51 5.641 FL!. Per Ordinance 9-13-99 and the elevators provided, the substructure shall be plumbed by: Ejector Pump TnCo currently requires that an W inspection is performed and a Certificate of Compliance is issued prior to occupancy / sale of a proper-ty. Please review attached III Permit. Manholes shall remain accessible at all times. Buried manholes will be mrected by the Developer/Owner. r� The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer mein to structure. The terms of the conditional perml% If any, are listed below. By signing below, I attest that I ai Builder / Owner Signature Printed Name Approved By agfee to accept responsibility for all work time under this parmR Phone Number -1 105- Vj q - o-05 Permit is valid for pNEAEAR from the date issued. Permit valid SUMMARY OF LATERAL INSTALLATION REQUIREMENTS 1. Only one building may connect to the sewer main per lateral unless otherwise approved by TriCo. 2. Foundation drains, sump drains, downspouts and other storm water drains shall never be connected to the sanitary sewer. Site dewatering systems shall never be discharged to the sanitary sewer. 3. The existing sewer line from the building to the septic tank may only be reused if it is located under a building addition, patio, porch or paved driveway, and the line passes an air test that is observed by TnCo. Contact TnCo for more information about air testing requirements. The property owner is responsible for testing costs. 4. THCo shall inspect all new laterals or lateral repairs In their entirety. Final connection to the sanitary sewer must be observed by Trico. The property owner or contractor must notify TnCo prior to backfilling. Inspections must be scheduled at least 24 hours in advance. If an inspection fails and subsequent inspections are required, or ffthe contractor is not on site for the scheduled inspection, a $100 fee will be assessed and must be paid prior to scheduling the reinspection. 5. Septic system contents or effluent shall never be discharged to the sanitary sewer. Be advised that your county health department regulates septic systems. Upon connection to sanitary sewer, a septic tank must typically be abandoned, pumped clean, and filled completely with earthen material. Contact your county health department for more information on septic system and abandonment requirements, and to notify the department of any abandonment. 6. The following materials are acceptable for use in gravity sewer lateral installation or repair. PVC pipe: SDR 35 or SDR 26, ASTM D3034, 6' diameter PVC pipe, pressure rated: SDR 21, ASTM D2241, 6" diameter PVC restrained joint pipe for directional drilling: Cartago Greenline SDR 21, ASTM D2241, 6" diameter All gasketed joints shall meet ASTM D3212 All fittings shall be SDR26 or better Ductile iron mechanical joint fittings with proper hardware SDR 26 gasketed repair sleeves or Indiana Seal shear guard Femco and similar flexible couplings are only acceptable in certain circumstances and shall not be used without prior approval from TnCo Cieanouts: 6' threaded PVC caps Bedding: Use #8 crushed stone or fractured face aggregate The following materials are acceptable for use In low-pressure sewer lateral installation or repair: HDPE pipe for directional drilling: DR 11 IPS, 1.25" diameter, PE4710 Connections shall be made via electrofusion or using polypropylene or stainless steel compression fittings Electrofusion high volume tapping tee, rated 200 psi, PE4710 1.25' IPS full port 1/4 tum fusible PE ball valve, rated 200 psi Threaded swing check valve, 316 stainless steel, rated 200 psi Contact TriCo for acceptable pump station materials, equipment, pumps and other requirements 7. For gravity and low-pressure systems, the line leaving the building shall not exceed 3' in length before a cleanout must be added and the line is transitioned to 6" diameter SDR 35 PVC pipe. Glued joints are not allowed after 3'. No additional glued fittings are allowed between the building and the bansition/cleanout. For all gravity lines, cleanouts shall not be spaced more than 100' apart between the building and the sewer main. See TnCo's standard drawings for more information on cleanout installation. 8. Bedding material shall be placed from at least 6 inches below to 12 inches above the pipe surface. The trench shall be a minimum of 18" wide with at least 6" of clearance on both sides of the pipe. Material shall be placed over the pipe and tracer wire after inspection. Soft, unstable or unsuitable material found below and near the lateral, including any fill or foundation backfill material, must be removed and replaced with #8 stone. The contractor is solely responsible for establishing stable Pipe bedding conditions. 9. #10 -AWG solid copper tracer wire shall be laid on top of and run the enfire length of the lateral. All splicing of tracer wire shall use 3M splice kit model DBR/Y-6, King Innovation Dryconn Direct Bury Lug Aqua catalog #90220, or Tr Co approved 10. Laterals shall be installed at least 20' from water wells unless PVC pressure grade pipe is used. Any proposed installation requiring pressure pipe shall be reviewed by TnC0 prior to installation. Where a transition is made between SDR 35 pipe and pressure grade SDR 21 pipe, a ductile iron gasketed mechanical couplings must be used. 11. Laterals less than 5' deep shall be at least 24" from the property line. Laterals more than 5' deep shall be at least 36" from the property line. Where the lateral runs in Gose proximity to the property line the property corners must be accurately staked by a professional land surveyor prior to inspection. 12. Laterals running parallel to a building or structure shall be at least 36' from the face of a crawl space or slab on grade foundaton and 60' from the face of a basement foundation wall. Spacing requirements also apply with respect to the ancillary structure's foundation depth. Ancillary structures (e.g, window wells) and other utilities shall not be placed over or near the lateral. THCo may adjust requirements where future access to the lateral may be obstructed by other utildies. The contractor should call to discuss further lt he/she believes this could be an issue. 13. All infrastructure connected to TnCo's sewer system may be tested, inspected, or televised at TriCo's discretion, and must remain accessible and property maintained. 14. Call 811 or 1-800-3825544 before you dig. For more information go to www.indlana8l l.org. THCo Regional Sewer Utility 10701 North College Avenue Suite A Indianapolis, Indiana 46280 Phone (317}844-9200 Fax (317)-844-9203 Revised 03/19/2019 TdCo Regional Sewer Utility 10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-8449200 fax 317-8"-9203 www.tdco.eco Residential I g I Peet Ordinance 12-08-08 Lateral Location Owner Address if Different Owner / Occupant Information Address Number 13997 Owner Atldress 2 First Name Street Grannan Lane Lasf Name City Cannel Phone Number State IN _.__._.. Mobile Number Zip Code 48074 Fax Number Subdivision Grannan Grove Zip Code-- Email Address Section Number Lot Number 6 Permit Information Owner Address if Different Address Number Address 2 Street city State Zip Code-- Builderinformation Builder Wedgewood Building Company Phone Number 317-669-6315 Facility Features and Addition Information Slab Foundation Square Footage Crawl Space Water Type City of Carmel Basement YES Basement Status Ejector Pump Cleanout YES Main ID GG801-GG802 Ejector Pump YES Lift Station 14 Austin Oaks Station Sump Pump YES Grinder Station ■ This program requires prior to the sale/occupance of a property that the property owner/builder notify TriCo and schedule an inspection. The inspection will verify that: M Downspouts are not connected to the sanitary sewer • The sump pump is not connected to the sanitary sewer e Cleanout raps are in place and watertight • No yard drains are connected to the sanitary sewer There are no sinkholes or other indications that the sewer lateral is leaking • 5 Ton or greater HVAC units do not dishcarge condenstion to the sanitary sewer. If deficiencies are found, the property owner will be notified and must make corrections immediately. The property owner will need to schedule a follow up inspection. If a certificate of compliance is not issued within 30 days of the change in ownership, a se r surcharge^0 per month will be assessed and added to the sewer bill. Owner/Occupant Signature: Date: Approved By: _2. Date: