HomeMy WebLinkAbout6GG - Sewer PermitProject WO
Project Name
Project Developer
Lift Station
Treatment Plant
Parcel Acreage
EDU in Gallons
ENG4862014 Section Number
Grannan Grove Lot Number
Grannan Grove Development, LLC
14 Austin Oaks Station
CTRWD W WTP
Local Sewer Charge - District Contribution
Plan Review and Inspection
Application Fee
EDU Fee
Interceptor Fee
Other Fees
Fees Due
Invoice Number
310
0.00
0.00
150.00
19D8.00
O.DO
0.00
2058.00
Address Number
Address 2
Street
City
Zip Code
County
Builder
Phone Number
Owner
Phone Number
Occupant
Phone Number
6
13997
Grannan Lane
Carmel
46074
Wedgewood Building Company
317-669-6315
rLr^x NV I o: msrauanon or building sewer shall be per the specifications of the ThCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TdCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TrICo'S sanitary sewer system. TnCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TnCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which Is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 8449200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has: Main ID: GGa01-GG802
Grease Trap Slab Foundation
Grease Interceptor Crawl Space Manhole IDs USMH G"01 GG -802 DSMH
Grit Interceptor Basement YES Lid Elevation 914.59✓ 911.46 g/
Grinder Station First Floor Elevation
917.70 917.10
Water Service City of Carmel Basement Elevation 907.10 ✓ 907.10
Calculation is based on b Meahola Lid Sevefiam and the elevation of the First Floor 2,51 5.641 FL!.
Per Ordinance 9-13-99 and the elevators provided, the substructure shall be plumbed by: Ejector Pump
TnCo currently requires that an W inspection is performed and a Certificate of Compliance is issued prior to occupancy /
sale of a proper-ty. Please review attached III Permit.
Manholes shall remain accessible at all times. Buried manholes will be mrected by the Developer/Owner.
r� The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer mein to structure.
The terms of the conditional perml% If any, are listed below.
By signing below, I attest that I ai
Builder / Owner Signature
Printed Name
Approved By
agfee to accept responsibility for all work time under this parmR
Phone Number -1 105- Vj q - o-05
Permit is valid for pNEAEAR from the date issued. Permit valid
SUMMARY OF LATERAL INSTALLATION REQUIREMENTS
1. Only one building may connect to the sewer main per lateral unless otherwise approved by TriCo.
2. Foundation drains, sump drains, downspouts and other storm water drains shall never be connected to the sanitary sewer.
Site dewatering systems shall never be discharged to the sanitary sewer.
3. The existing sewer line from the building to the septic tank may only be reused if it is located under a building addition, patio,
porch or paved driveway, and the line passes an air test that is observed by TnCo. Contact TnCo for more information about
air testing requirements. The property owner is responsible for testing costs.
4. THCo shall inspect all new laterals or lateral repairs In their entirety. Final connection to the sanitary sewer must be observed
by Trico. The property owner or contractor must notify TnCo prior to backfilling. Inspections must be scheduled at least 24
hours in advance. If an inspection fails and subsequent inspections are required, or ffthe contractor is not on site for the
scheduled inspection, a $100 fee will be assessed and must be paid prior to scheduling the reinspection.
5. Septic system contents or effluent shall never be discharged to the sanitary sewer. Be advised that your county health
department regulates septic systems. Upon connection to sanitary sewer, a septic tank must typically be abandoned,
pumped clean, and filled completely with earthen material. Contact your county health department for more information on
septic system and abandonment requirements, and to notify the department of any abandonment.
6. The following materials are acceptable for use in gravity sewer lateral installation or repair.
PVC pipe: SDR 35 or SDR 26, ASTM D3034, 6' diameter
PVC pipe, pressure rated: SDR 21, ASTM D2241, 6" diameter
PVC restrained joint pipe for directional drilling: Cartago Greenline SDR 21, ASTM D2241, 6" diameter
All gasketed joints shall meet ASTM D3212
All fittings shall be SDR26 or better
Ductile iron mechanical joint fittings with proper hardware
SDR 26 gasketed repair sleeves or Indiana Seal shear guard
Femco and similar flexible couplings are only acceptable in certain circumstances and shall not be used without
prior approval from TnCo
Cieanouts: 6' threaded PVC caps
Bedding: Use #8 crushed stone or fractured face aggregate
The following materials are acceptable for use In low-pressure sewer lateral installation or repair:
HDPE pipe for directional drilling: DR 11 IPS, 1.25" diameter, PE4710
Connections shall be made via electrofusion or using polypropylene or stainless steel compression fittings
Electrofusion high volume tapping tee, rated 200 psi, PE4710
1.25' IPS full port 1/4 tum fusible PE ball valve, rated 200 psi
Threaded swing check valve, 316 stainless steel, rated 200 psi
Contact TriCo for acceptable pump station materials, equipment, pumps and other requirements
7. For gravity and low-pressure systems, the line leaving the building shall not exceed 3' in length before a cleanout must be
added and the line is transitioned to 6" diameter SDR 35 PVC pipe. Glued joints are not allowed after 3'. No additional glued
fittings are allowed between the building and the bansition/cleanout. For all gravity lines, cleanouts shall not be spaced more
than 100' apart between the building and the sewer main. See TnCo's standard drawings for more information on cleanout
installation.
8. Bedding material shall be placed from at least 6 inches below to 12 inches above the pipe surface. The trench shall be a
minimum of 18" wide with at least 6" of clearance on both sides of the pipe. Material shall be placed over the pipe and tracer
wire after inspection. Soft, unstable or unsuitable material found below and near the lateral, including any fill or foundation
backfill material, must be removed and replaced with #8 stone. The contractor is solely responsible for establishing stable
Pipe bedding conditions.
9. #10 -AWG solid copper tracer wire shall be laid on top of and run the enfire length of the lateral. All splicing of tracer wire
shall use 3M splice kit model DBR/Y-6, King Innovation Dryconn Direct Bury Lug Aqua catalog #90220, or Tr Co approved
10. Laterals shall be installed at least 20' from water wells unless PVC pressure grade pipe is used. Any proposed installation
requiring pressure pipe shall be reviewed by TnC0 prior to installation. Where a transition is made between SDR 35 pipe and
pressure grade SDR 21 pipe, a ductile iron gasketed mechanical couplings must be used.
11. Laterals less than 5' deep shall be at least 24" from the property line. Laterals more than 5' deep shall be at least 36" from
the property line. Where the lateral runs in Gose proximity to the property line the property corners must be accurately
staked by a professional land surveyor prior to inspection.
12. Laterals running parallel to a building or structure shall be at least 36' from the face of a crawl space or slab on grade
foundaton and 60' from the face of a basement foundation wall. Spacing requirements also apply with respect to the
ancillary structure's foundation depth. Ancillary structures (e.g, window wells) and other utilities shall not be placed over or
near the lateral. THCo may adjust requirements where future access to the lateral may be obstructed by other utildies. The
contractor should call to discuss further lt he/she believes this could be an issue.
13. All infrastructure connected to TnCo's sewer system may be tested, inspected, or televised at TriCo's discretion, and must
remain accessible and property maintained.
14. Call 811 or 1-800-3825544 before you dig. For more information go to www.indlana8l l.org.
THCo Regional Sewer Utility
10701 North College Avenue Suite A
Indianapolis, Indiana 46280
Phone (317}844-9200 Fax (317)-844-9203
Revised 03/19/2019
TdCo Regional Sewer Utility
10701 N. College Avenue Suite A
Indianapolis, Indiana 46280
phone 317-8449200 fax 317-8"-9203 www.tdco.eco
Residential
I g I Peet Ordinance 12-08-08
Lateral Location
Owner Address if Different
Owner / Occupant Information
Address Number
13997
Owner
Atldress 2
First Name
Street
Grannan Lane
Lasf Name
City
Cannel
Phone Number
State
IN
_.__._..
Mobile Number
Zip Code
48074
Fax Number
Subdivision
Grannan Grove
Zip Code--
Email Address
Section Number
Lot Number
6
Permit Information
Owner Address if Different
Address Number
Address 2
Street
city
State
Zip Code--
Builderinformation
Builder
Wedgewood Building Company
Phone Number
317-669-6315
Facility Features and Addition Information
Slab Foundation
Square Footage
Crawl Space
Water Type
City of Carmel
Basement
YES
Basement Status
Ejector Pump
Cleanout
YES
Main ID
GG801-GG802
Ejector Pump
YES
Lift Station
14 Austin Oaks Station
Sump Pump
YES
Grinder Station
■ This program requires prior to the sale/occupance of a property that the property owner/builder notify TriCo and
schedule an inspection. The inspection will verify that:
M Downspouts are not connected to the sanitary sewer
• The sump pump is not connected to the sanitary sewer
e Cleanout raps are in place and watertight
• No yard drains are connected to the sanitary sewer
There are no sinkholes or other indications that the sewer lateral is leaking
• 5 Ton or greater HVAC units do not dishcarge condenstion to the sanitary sewer.
If deficiencies are found, the property owner will be notified and must make corrections immediately. The property
owner will need to schedule a follow up inspection. If a certificate of compliance is not issued within 30 days of the
change in ownership, a se r surcharge^0 per month will be assessed and added to the sewer bill.
Owner/Occupant Signature: Date:
Approved By: _2. Date: