Loading...
HomeMy WebLinkAboutMinutes TAC 06-19-19Page 8 of 11 City of Carmel Technical Advisory Committee June 19, 2019 be changed. She added that an all EIFS hotel does not fall in line with the architectural standards of the US-31 overlay. Mr. Jacob said he thinks the entire first floor is brick. Ms. Keesling said the general thought is the Department is OK with a more modern design, but this doesn’t fit in with the overall design of the area, and EIFS should only be used as an accent material, so no more than 10% of the overall material. 9:55 a.m. Docket No. 19050020 Z: Rezone S-1/Residential to S-2/Residential Docket No. 19050021 PP: Troy Estates Subdivision Docket No. 19050022 V: UDO Section 2.06 Min. 35 ft. front yard setback, 25 ft. requested. The applicant seeks rezone, primary plat, and a variance for a new subdivision consisting of 36 lots on 23.3 acres. The site is located at 4100 141st St. The site is currently zoned S-1/Residential with a proposed change to S-2/Residential. Filed by Nelson & Frankenberger, LLC on behalf of Lennar Homes of Indiana. Jon Dobosiewicz and Matt Pleasant with Nelson & Frankenberger, and Ty Rinehart with Lennar presented the project. Sam Clark – Hamilton County Surveyor’s Office - Mr. Clark said the review comments have been sent to Stoeppelwerth. Daren Mindham – City of Carmel Urban Forestry - Comments have been submitted on Project Dox. There were comments regarding open space requirements, and also possibly requiring a woodlands evaluation for the southeast corner of the development. Alex Jordan – City of Carmel Engineering - Comments sent on Project Dox. Mr. Jordan said he is requesting a drainage report for the ponds, and more details on the BMP plan. He also asked if a wetlands delineation has been done on the site. Mr. Pleasant said this has not been completed at this time. Dave McCoy – City of Carmel Addressing - No comments. David Littlejohn – City of Carmel Alternative Transportation - Comments submitted on Project Dox. No further comments at this time. Nick Mishler – City of Carmel Commercial Building Permits - No comments. Alexia Lopez – City of Carmel Planning & Zoning - Ms. Lopez said the comments have been submitted on Project Dox. She said the larger comments involved trying to reduce the cul-de-sacs if possible so there is more connectivity on the site. Also, as Mr. Mindham indicated earlier, the amount of open space does not meet the typical standards. Rachel Keesling – City of Carmel Planning & Zoning - No comments.