HomeMy WebLinkAboutMinutes TAC 06-19-19Page 8 of 11
City of Carmel Technical Advisory Committee June 19, 2019
be changed. She added that an all EIFS hotel does not fall in line with the architectural standards of
the US-31 overlay. Mr. Jacob said he thinks the entire first floor is brick. Ms. Keesling said the
general thought is the Department is OK with a more modern design, but this doesn’t fit in with the
overall design of the area, and EIFS should only be used as an accent material, so no more than 10%
of the overall material.
9:55 a.m. Docket No. 19050020 Z: Rezone S-1/Residential to S-2/Residential
Docket No. 19050021 PP: Troy Estates Subdivision
Docket No. 19050022 V: UDO Section 2.06 Min. 35 ft. front yard setback, 25 ft. requested.
The applicant seeks rezone, primary plat, and a variance for a new subdivision consisting of 36 lots on
23.3 acres. The site is located at 4100 141st St. The site is currently zoned S-1/Residential with a
proposed change to S-2/Residential. Filed by Nelson & Frankenberger, LLC on behalf of Lennar Homes
of Indiana.
Jon Dobosiewicz and Matt Pleasant with Nelson & Frankenberger, and Ty Rinehart with Lennar
presented the project.
Sam Clark – Hamilton County Surveyor’s Office
- Mr. Clark said the review comments have been sent to Stoeppelwerth.
Daren Mindham – City of Carmel Urban Forestry
- Comments have been submitted on Project Dox. There were comments regarding open space
requirements, and also possibly requiring a woodlands evaluation for the southeast corner of the
development.
Alex Jordan – City of Carmel Engineering
- Comments sent on Project Dox. Mr. Jordan said he is requesting a drainage report for the ponds,
and more details on the BMP plan. He also asked if a wetlands delineation has been done on the site.
Mr. Pleasant said this has not been completed at this time.
Dave McCoy – City of Carmel Addressing
- No comments.
David Littlejohn – City of Carmel Alternative Transportation
- Comments submitted on Project Dox. No further comments at this time.
Nick Mishler – City of Carmel Commercial Building Permits
- No comments.
Alexia Lopez – City of Carmel Planning & Zoning
- Ms. Lopez said the comments have been submitted on Project Dox. She said the larger comments
involved trying to reduce the cul-de-sacs if possible so there is more connectivity on the site. Also, as
Mr. Mindham indicated earlier, the amount of open space does not meet the typical standards.
Rachel Keesling – City of Carmel Planning & Zoning
- No comments.