HomeMy WebLinkAboutEstimated Construction CostPete & Didi Ariens 10905 Crooked Stick Lane Carmel IN 46032 Garage Addition (Option 1)7/12/2019 BUDGET Permitting & Professional Service Fees Building Permit Fee(s)($4,736) Permit & Print Processing Fee(s)($150) Architectural Design Fee(s)($-  ) Engineering Fee(s)($1,850) Site Surveying Fee(s)($900) Building Variance Fee(s) TBD Builders Risk Insurance TBD Construction Labor & Material Dumpster Rental (Allowance)($2,992) Jobsite Toilet Rental (Allowance)($667) Furniture Moving N/A Equipment Rental (Allowance)($4,146) Excavation & Site Work ($15,000) Utility Connections (Sewer/Water/Electric)($24,350) Footings & Foundations ($16,100) Concrete Flat Work (Garage Apron & Breeze Way)($6,700) Epoxy Coating (Including Bath Floor)($6,250) Demolition & Site Prep Labor TBD Rough Carpentry Labor ($23,350) Exterior Siding & Trim Labor ($9,350) Framing & Site Prep Material ($38,889) Exterior Trim & Siding Material (Allowance)($13,605) Masonry Labor & Material (Pre-Field Walk)($22,650) Exterior Window/Door Install Labor & Setting Material (Pre-Field Walk)($2,834) Roofing Labor & Material (Pre-Field Walk)($23,350) Gutters Labor & Material (Allowance)($2,750) Finish Grade (Construction Grade W/ No Pulverized Topsoil)($3,550) Landscaping Labor & Material (Allowance) TBD Fencing Labor & Material (Allowance) TBD HVAC Labor & Material (Pre-Field Walk)($13,335) Electric Labor & Material (Pre-Field Walk)($15,000) Low Voltage Lighting Labor & Material (Allowance) TBD Plumbing Labor & Material (Pre-Field Walk)($8,350) Insulation Labor & Material (Pre-Field Walk)($9,030) Drywall Labor & Material (Pre-Field Walk)($8,545) Interior Trim & Millwork Material (Allowance)($4,862) Interior Trim Carpentry Labor (Pre-Field Walk)($2,800) Tile Install Labor (Allowance) N/A Tile Setting Material N/A Paint Labor & Material (Pre-Field Walk)($18,750) LVT Labor & Prep Material (Pre-Fieldwalk)($625) Carpet Cleaning TBD Job Site Cleaning (Final Cleaning Only)($667) General Supplies ($700) Material Allowances (Pre-Selections) Exterior Window & Door Material (Vinyl Allowance)($3,127) Exterior Entry Door Handle (Allowance)($471) Garage Door Material-Labor Included (Allowance)($4,242) Cabinetry (Pre-Assembled Allowance)($541) Cabinet Hardware (Allowance) Included Above Countertop/Solid Surface Material-Labor Included (Allowance) Included Above Plumbing Finish Material (Allowance)($1,862) Tile Material (Allowance) N/A LVT Material (Utility Room Allowance)($441) Carpet Material-Labor Included (Exercise Room Allowance)($5,524) Shower Glass Material- Labor Included (Allowance)($1,127) Mirror Material- Labor Included (Bathroom Allowance)($224) Appliances-Labor Included (Allowance) N/A Decorative Light Fixtures (Allowance)($3,249) Audio & Video Material-Labor Included (Allowance) TBD Change Orders See Approved Change Orders On BuilderTrend TBD Sub-Total ($327,641) Management Fee 15%($49,146) Total ($376,787) Milestone Payment Schedule 100%($376,787) Down Payment 10%-$37,679- Start of Foundation 20%-$75,357- Start of Framing 25%-$94,197- Rough Inspection Completion 20%-$75,357- Start of Paint 15%-$56,518- Completion 10%-$37,679- Owner Signature: ___________________________________Date: _________________________ Designer Signature: _________________________________Date: _________________________