HomeMy WebLinkAboutRieth-Riley/Eng/CO #7/164,830.51/96th and Keystone Parkway – Project # 16- ENG-05 City of Carmel Project 16-ENG-05
96th Street and Keystone Parkway
CHANGE ORDER # 07 Zir
c, NI
a
The purpose of this change order is to address existing item overruns. See attachments for more information on the overruns.
Contract Price prior to this Change Order $28,697,297.92
Contract Price will be increased/decreased by this Change Order $164,830.51
New Contract Price including this Change Order $28,862,128.43
Amount Adjusted Contract Cumulative % Change
Price from Original Contract
Original Contract $28,793,000.00 $28,793,000.00 N/A
CO 01 $25,843.67 $28,818,843.67 0.09%
CO 02 $3,481.80 $28,822,325.47 0.10%
CO 03 $0.00 $28,822,325.47 0.10%
CO 04 $46,996.32 $28,869,321.79 0.26%
CO 05 ($172,023.87) $28,697,297.92 -0.33%
CO 06 $68,110.98 $28,765,408.90 -0.10%
CO 07 $164,830.51 $28,862,128.43 0.47%
CITY OF CARMEL
TO: CONTRACT CHANGE ORDER NO.: 7
DATE: 1/8/2019
PROJECT NAME: 16-ENG-05
CITY REQ.NO.:
CITY PO NO.:
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
The purpose of this change order is to address existing item overruns.See attachments for more information on the
overruns.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (+)OR(-) DAYS
31 $11,518.00
40 $6,525.75
51 $73,885.18
112 $41,666.58
151 $1,170.00
169 ($2,500.00)
178 $2,000.00
209 $1,332.00
218 $2,444.00
224 $300.00
249 $1,989.00
319 $10,000.00
322 $2,000.00
323 $12,500.00
II. The following referenced Documents further describe the changes outlined in Paragraph I,and
are to be considered a part of this Change Order: R.F.P.: W.D.C.No.:
Other:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 28,697,297.92
Contract Price will be increased/decreased by this Change Order $ 164,830.51
New Contract Price including this Change Order $ 28,862,128.43
Contract Time Prior to this Change Order Days 5/31/2019 Completion Date
Net increased/decreased resulting from this Change Ordei 0 Days
Current Contract Time including this Change Ord 0 Days 5/31/2019 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions
incurred at any time resulting from the performance of the changed work.
Version 2016-08-31 AR-6
The Above Changes Are The .Above Changes Are A proved:
Recommended Accepted:
American Structurepcoint Inc. Rieth-Riley Construction Co. Inc
ENGINEER CONTRACTOR
7260 Shadeland Station Indianapolis, IN 46221
Address Address Mar • n url:e 1c1 r
Lor Member
Indianapolis.IN 4626 Indianapolis, IN 46221 • •
--
City/State/Zip CityiState!Zip 3?r _ shoran . C i:y
agincer
_ By: _ l �.TTC
i.''ho e:(3 t 7)401-0263 Phone:017) 518-2500 IA .4
C .stine S. Pauley lerk-
Treasurer
Date: % /5' Date: I i'L I ,.,t'j Date: 7/3-4 9
1
Versirn,20I A-08-31 AR-6
11.
j■ SAMCPICAN TRUCTUREPOINT American Structurepoint, Inc.
• Change Order Details
96th Street and Keystone Parkway
Description: 16-ENG-05
Construction of a roundabout interchange at the
intersection of 96th Street and Keystone Parkway,
including the reconstruction of Keystone Parkway
from I-465 to 98th Street, and reconstruction of 96th
Street from Haverstick Road to Enterprise Drive.
The Project includes new construction of a twospan
bridge over 96th Street.
Change Order: 7 Date Created: 05/09/2019
Status: Pending Approval Date Approved:
Type: Changed Conditions
Summary: Existing Item Overruns
Change Order Description: The purpose of this change order is to address existing item overruns.
Work covered in this change order includes the following:
0031 - B Borrow:
The designer did not include the backfill of the tank removals in the item
quantity calculations. This change order covers the quantity of additional B
Borrow that was used to backfill the underground storage tank removals at
Parcels No. 10 and 12.
0040 - Compacted Agg. No. 53 Temporary for Driveways:
With the delay of the contract, Phase 2 will remain in place over the winter
months. There is a significant drop off to the north of the 96th St. westbound
traffic that we did not want to leave open throughout the winter months. It was
agreed upon to use the Compacted Agg. No. 53 Temporary for Driveways item
to create a stone shoulder along this edge.
0051 -- HMA for Temporary Pavement. D
HMA for Temporary Pavement, D has overrun due to MOT changes required in
order to work around existing utilities that had not yet been relocated.
Originally, the outside lanes of 96th Street and the Keystone Ramps were to be
constructed in Phase 2. Due to conflicts with existing IPL poles, Phase 2 was
altered to construct the north half of 96th Street (WB lanes) first in Phase 2a.
In Phase 2b, traffic was shifted to the newly constructed WB lanes in order to
begin constructing the south half of 96th Street. Additional temporary
pavement was required to make up the elevation difference across existing
Keystone Parkway on both the east and west sides of the intersection.
Additionally, in the original MOT plan, 96th Street traffic would have been
diverted to the Keystone Ramps at this point, so there would not have been a
need for this additional temporary pavement. An additional 911.6 Tons of HMA
for temporary pavement were used in order to perform this phase change.
0112 - Field Office:
The Field Office item was set for 12 months in the original contract for this
project. This item needed to be extended due to contract time overrun. A period
of 18 months will be added, per this change order, in order to extend the Field
Office item through spring of 2020, as agreed upon with the City of Carmel.
0151 - Pipe. Type 5. Circular. 12 in.:
During construction of the storm sewer at the NE corner of Keystone Parkway,
an existing drain was discovered coming from the Penske lot that was not
Change Order Details: 96th Street and Keystone Page 1 of 3 06/10/2019
Parkway
identified in the plans. In order to maintain drainage for this parcel, the drain
needed to be tied into a storm sewer structure. Therefore, 30 LFT of Type 5,
12in., circular pipe was added to connect the drain into Structure 305B.
00169 -- Inlet. Type HA with Slotted Drain and 0178 - Inlet HA5:
Due to constructability reasons, Structure 117 was changed from Inlet, Type
HA with Slotted Drain to Inlet HA5. The slotted drain would have fallen within
a D-1 expansion joint in the extended moment slab on Ramp SWR. Therefore, a
field decision was made to eliminate the slotted drain at this particular
structure. This change order will adjust the pay quantities accordingly.
0209 - Construction Sign C, 0218 - Construction Sign A. 0224 - Barricade III-B:
Construction signs and barricades have overrun due to additional MOT needs
discovered throughout construction, which includes but is not limited to the
addition of MOT measures for the Threel Road closure which was omitted from
the plans.
0249 - Overhead Sign Structure. Cable Span. Remove:
The City of Carmel requested that the cable span structure at Hazel Dell be
removed during the 96th Street corridor construction. This work was not within
the original scope of work, so the Overhead Sign Structure, Cable Span,
Remove item will overrun by one.
0319 --Tapping Sleeve with Valve. 0322 -- Connection. 0323 -- 16" Line Stop
While in the process of installing storm Structure 312 on the NW corner of the
Keystone and 96th Street intersection, it was discovered that the existing force
main would be in the way of installing the 48" pipe running west from the
structure. This force main was set to be relocated in the next phase of work,
but upon further investigation, we learned that this relocation was not feasible
in the next phase of work as it would require excavating under the newly
constructed off-ramp. After multiple meetings with TRICO, City of Carmel,
Rieth-Riley, Gradex, and American Structurepoint, it was decided to partially
relocate the force main in the current phase. The force main would be lowered
at Structure 312, under the 48" pipe, and extending south of the new ramp
construction. At this point, it can be accessed easily during the next phase of
construction. An additional tapping sleeve, connection, and 16" line stop were
required in order to perform this work.
A contract time adjustment is not required for this work.
Awarded Project Amount: $28,793,000.00
Authorized Project Amount: $28,765,408.90
Change Order Amount: $164,830.51
Revised Project Amount: $28,930,239.41
Increases/Decreases
Line Number Item Unit Unit Price Current (manse Revised
Quantity Amount Quantity Aunt Quantity Amorat
Section: 1 -801-08400
0310 31 CYS $26.000 18,694.00 $486,044.00 443.00 $11,518.00 19,137.00 $497,562.00
B BORROW
0400 40 TON $35.000 785.00 $27,475.00 186.45 $6,525.75 971.45 $34,000.75
COMPACTED AGGREGATE NO. 53 TEMPORARY FOR DRIVEWAYS
0510 51 TON $81.050 1,082.00 $87,696.10 911.60 $73,885.18 1,993.60 $161,581.28
HMA FOR TEMPORARY PAVEMENT, D
Change Order Details: 96th Street and Keystone Page 2 of 3 06/10/2019
Parkway
Line Number Item Unit Unit Price Current Change Revised
Quantity Amount Quantity Amount Quantity Amount
1120 112 MOS $2.314.810 16.00 s37,036.9G 18.00 $41,666.58 34.00 $78,703.54
FIELD OFFICE:, B
1510 151 LFT 539.000 34.00 $1.326.00 30.00 $1,170.0G 64.00 $2,496.00
PIPE.TYPE 5,CIRCULAR. 12 IN.
1690 169 EACH 52,500.000 11.00 $27,500.00 -1.00 -$2,500.00 10.00 $25.000.0,.'
INLET.TYPE HA WITH SLOTTED DRAIN.
1780 178 EACH s2.000.000 36.00 $72,000.00 1.00 $2,000.00 37.00 $74,000.00
INLET, HAS
2090 209 EACH $272,000 8.00 $1,776.00 6.00 $1.332.00 14.00 53,108.00
CONSTRUCTION SIGN, C
2180 218 EACH $188.000 51.00 59,588.00 13.00 $2,444.00 64.00 $12,032.07
CONSTRUCTION SIGN,A
2240 224 LFT $15.000 204.00 13,050.00 20.00 $300.00 224.00 $3,360.00
31- '.ICADE,III-B
2490 249 EACH $1,989.000 4.00 S7,956.00 1.00 $1,989.00 5 00 $9,945.00
OVERHEAD SIGN STRUCTURE. CABLE SPAN, REMOVE
3190 319 L&C11 $10.000.000 2.00 $20,000.00 1.00 $10,000.00 3 00 s30,000.00
LIPPING SLEEVE WITH VALVE
3220 322 EACH $2,000.000 5.00 $10,000.00 1.00 52,000.00 6.00 S12.000.00
CONNECTION
3230 323 EACH $12,500.000 2.00 $25,000.00 1.00 $12,500.00 3.00 537,500.00
16"LINE STOP
(11 items) Totals 5816,458.11ui $164,830.51 $981,288.5'
Recommended for Processing:
%r//7'
Resident Project Representative Date
Contractor Date
Owner Date
C.iance Order Details: 96th Street and Keystone Page 3 of 3 06/10/2019
Parkway