Loading...
HomeMy WebLinkAboutA08.3 Storefront SectionsEXTERIOR STOREFRONT -VAPOR RETARDER NOTE G.C. TO INVESTIGATE EXISTING EXTERIOR WALL/BULKHEAD CONSTRUCTION TO DETERMINE WHETHER OR NOT A VAPOR RETARDER EXISTS. IF NO VAPOR RETARDER EXISTS, THEN G.C. TO REPORT FINDINGS BACK TO LBRANDS PROJECT MANAGER AND ARCHITECT OF RECORD FOR DIRECTION ON HOW TO PROCEED. SIDEWALK NOTE: G.C. TO VERIFY EXISTING/NEW SIDEWALK SLAB SLOPES AWAY FROM STOREFRONT 1/4" PER FOOT MAX. (1/8" PER FOOT MIN. AT ENTRY). IF EXISTING SLAB SLOPE DIFFERS, THEN G.C. MUST CONTACT BBW PROJECT MANAGER & ARCHITECT FOR RESOLUTION AND DIRECTION ON HOW TO PROCEED. NOTE: 1. FOR FRAMING SIZE, GAUGE AND CONFIGURATION, REFER TO STRUCTURAL DRAWINGS (FOR INTERNATIONAL PROJECTS COORDINATE WITH PARTNER) 2. ALL EXTERIOR WOOD BLOCKING TO BE PRESERVATIVE TREATED 8. ALL PLYWOOD TO BE OF EXTERIOR GRADE 4. ALL VERTICAL DIMENSIONS ARE FROM TOP OF FLOOR SLAB U.N.O. EXTERIOR STOREFRONT -VAPOR RETARDER NOTE G.C. TO INVESTIGATE EXISTING EXTERIOR WALL/BULKHEAD CONSTRUCTION TO DETERMINE WHETHER OR NOT A VAPOR RETARDER EXISTS. IF NO VAPOR RETARDER EXISTS, THEN G.C. TO REPORT FINDINGS BACK TO LBRANDS PROJECT MANAGER AND ARCHITECT OF RECORD FOR DIRECTION ON HOW TO PROCEED. SIDEWALK NOTE: G.C. TO VERIFY EXISTING/NEW SIDEWALK SLAB SLOPES AWAY FROM STOREFRONT 1/4" PER FOOT MAX. (1/8" PER FOOT MIN. AT ENTRY). IF EXISTING SLAB SLOPE DIFFERS, THEN G.C. MUST CONTACT BBW PROJECT MANAGER & ARCHITECT FOR RESOLUTION AND DIRECTION ON HOW TO PROCEED. NOTE: 1. FOR FRAMING SIZE, GAUGE AND CONFIGURATION, REFER TO STRUCTURAL DRAWINGS (FOR INTERNATIONAL PROJECTS COORDINATE WITH PARTNER) 2. ALL EXTERIOR WOOD BLOCKING TO BE PRESERVATIVE TREATED 3. ALL PLYWOOD TO BE OF EXTERIOR GRADE 4. ALL VERTICAL DIMENSIONS ARE FROM TOP OF FLOOR SLAB U.N.O. �Z 461 FROM ROAD �IJ PARAMUS NJ 07652 T1973.253.9393 < WWW.SARGARCH.COM �N EA EA _ Z Orn V J1 O MV N M CIO)Ui F. a N I— y N x Z E LL O V O W 0 ,,IZ^ 3 0 V Y 117 [n o v Q D Kp BRAKE MTL. PANEL WITH ADHESIVE OVER I/2' BRAKE MTL. PANEL WITH ADHESIVE OVER 1/2' 4? cu PERM APBARRI�P AIR BARRIER (INSTALL PERM -AD OVER 'GRACE 03�3 P'GRACE.T. PLYWOOD OVER BARRE AIRBAR (I%TALL W O PER MANUFACTURER'S RECOMMENDATIONS) OVER PER MANUFACTURER'S RECOMMENDATIONS) OVER Q' L 1/2" [13nm] DENS GLASS GOLD MT-2 -- 1/2' [13mrn] DENS GLASS GOLD MT-2 Q W CL N —Z (^— — IV-10" C4826mm] - ( _ IS'-10" C4826mm� (n r F- + ---- BA ("ET UL.KHEADI + - — — — B.O �jBUL.KHEAD L2x2x16 GA CLIP EA STUD W/ I L2x2xl6 GA CLIP EA STUD W/ + iTI 15_4 C4674mm]J\ 15_4 C4674mrn](2) #12 SCREWS EA LEG ----- BOMETAL BA -IN DY (2) #12 SCREWS EA LEG ----- B.O. METAL BANDALUMINUM WINDOW SYSTEM. KAWNEER TRIFAB ALUMINUM WINDOW SYSTEM. KAWNEER TRIFAB HORIZONTAL TUBE STEEL - SEE451T (CENTER PLANE) ALUMINUM WINDOW HORIZONTAL TUBE STEEL -SEEI451T (CENTER PLANE) ALUMINUM WINDOW STRUCTURAL DRAWINGS ( J SYSTEM (W/ BLACK GASKETS), 170% KYNAR, STRUCTURAL DRAWINGS ( J SYSTEM (W/ BLACK GASKETS), 070% KYNAR, 5, AAMA 2605, BONE WHITE UC 109BB0' FINISH 5' AAMA 2605, BONE WHITE UC 10%Wg FINISH METAL RAIL 1 ROLLER. n a s METAL RAIL 4 ROLLER. [I27mm.] MIN. A4E.a [I27mm.] MIN. sm.s 'a LED PANEL SYSTEM HUNG FROM ABOVE. LED PANEL SYSTEM HUNG FROM ABOVE. ` aa-J LED PANEL SYSTEM HUNG FROM ABOVE LED PANEL SYSTEM HUNG FROM ABOVE s � � K e � 5 � � y In INSULATED STARPHIRE GLASS 11 INSULATED STARPHIRE GLASS ' S y 5 9 9 n � 1 = 3 e G-q G_I 2d�o� �o adz` BF-16 SF-Ib � aMM ���o` FIN IHzl NTERIOR FACE MTENIOR FACE JUNCTION BOX FOR LED PANEL 3" C76mm] MIN. JUNCTION BOX FOR LED PANEL 3' C76mm3 MIN.; & c s e SYSTEM - REFER TO ELECTRICAL 5 [I27mm1 MAX. SYSTEM -REFER TO ELECTRICAL 5 C127mm] MAX. - Yt i n DRAWINGS. LOCATE JUNCTION BOX DRAWINGS. LOCATE JUNCTION BOX o e t - It ABOVE ACT SALES FLOOR CEILING WIREWAY BY SIGNAGE VENDOR TO BE ABOVE ACT SALES FLOOR CEILING WIREWAY BY SIGNAGE VENDOR TO BE "s%2 i+ g6€e8 B8%E ."s SHIMMED WITH WASHERS TO ALLOW FOR SHIMMED WITH WASHERS TO ALLOW FOR % e p„ 3 8 W s g j � 8 8 g j E TRB 09 DRAINAGE TRB 09 DRAINAGE gW H T-E83., ORewN IB" WHITE FACE -LIT ILLUMINATED LEDGE ewnxa+ W WHITE FACE -LIT ILLUMINATED LEDGE Wa��I Will $g S NESTED MTL STUD BEAM - REFER MOUNT SIGNAGE, SKINNY STROKE NESTED MTL. STUD BEAM - REFER MOUNT SIGNAGE, SKINNY STROKE: o n e e = w TO STRUCTURAL DRAWINGS (BATH 4 BODY WORKS SIGNAGE) TO STRUCTURAL DRAWINGS (BATH 4 BODY WORKS SIGNAGE) S - R ��RE EfS :Ec1RCP _ _ _ SLOPE ,_ x JJ,�REFER TO RCP _ _ _ — _ SLOPE W e � 0 T O.O. CEILING — 10 B C3251mm] B.O. CEILING 10'-8" C3251mm] .. d€€aT DOWN I/4' r------------ JJ,, DOWN I/4' r----- 5/8, GYP. BD. — B.O. TRANSOM OPFJN48 m " J B.O. TRANSOM 245m GY 5 8 c 3 WCB-IZGB —10-T: T.O. EL— DCE WCB GB - L-------- Re�Rr �S6S `-dagE. Jh, 10 7 3/4 C3245mm7J, b a LEDGEY O METAL SCREW, TYP + I METAL SCREW, TYP +Btsg� e �10'-I 1/8" C3076mm] " 10'-I I/8 C3076mm] _____ 10-0' C304&nm] '€ ¢"` € an ^ B.O. STEEL---- I _--__ 10-0 C304&nm�. B.O. STEEL----- I' }, B.O. SIGN LEI—X„E /T r- H.O. SIGN LEDGE /Y LyA}9C3 '-11 3/8' 032mmJ I/2" [I14mm7 463=II 3/8" C3032mmJ W 1/2" 014mm7 f w p T B.O SOFFIT I/8' -- 114" 1457mm] , B.O. SOFFIT 1/8, 1'-6" 1457mm3 O O O BRAKE MTL. PANEL FULLY ADHERED TO I/2 LEWE BRAKE MTL. PANEL FULLY ADHERED TO 1/2' Y N O [3mmI LEDGE [13rm] P.T. PLYWOOD OVER 'GRACE 211�3 IW [254mm7 [13m ] P.T. PLYWOOD OVER 'GRACE PERM -A -BARRIER' VP AIR BARRIER (INSTALL C PERM -A -BARRIER' VP AIR BARRIER (INSTALL V V)PER MANUFACTURERS RECOMMENDATIONS) `�" ,ass PER MANUFACTURERS RECOMMENDATIONS) NOVER 1/2' C13mm7 DENSGLASS GOLD Sim.O✓ER 1/2' C13mm] DENSGLASS GOLD TRB 08 V i s IT a I_Y HORIZONTAL TUBE STEEL - ieo°mT ONLY HORIZONTAL TUBE STEEL - T SEE STRUCTURAL DRAWINGS SEE STRUCTURAL DRAWINGS Tcn O Y GYP. BD. SOFFIT GYP. BD. SOFFIT . PT-IB PT-18 O W CB-12G LEASE LINE CB-12G ' f a J 0 N W � M O ENTRY DOORS. REFER TO O w 00 DOOR SCHEDULE SF-17 M m o FACE O 1" INSULATED STARPHIRE GLASS LEASE LINE W 03 J w UJ WItch SF-17 SALES EXTERIOR �`�( V C INTERIOR FACE 2 w Q M C4 M W 0 SALES EXTERIOR v vs V7 U N o d ALUMINUM WINDOW SYSTEM. KAWNEER TRIFAB 45IT (CENTER PLANE) ALUMINUM WINDOW REVISIONS: SYSTEM (W/ BLACK GASKETS), '70% KTNAR, � � � ecamxco er. care AAMA 2605, BONE WHITE UC 109BB0" FINI514 - q BRAKE MTL. PANEL WITH ADHESIVE OVER I _ � AC6.E P.T. PLYWOOD OVER 'GRACE PERM-A-BARRIEIE R' � Aros i VP AIR BARRIER (INSTALL PER _ R-19 BATT INSULATION i MANUFACTURER'S RECOMMENDATIONS) OVER r 1/2' DENS GLASS GOLD i� r -- WOOD BASE I^ EXISTING SIDEWALK - G.C. TO VERIFY 8-13 ICI EXISTING SIDEWALK - G.C. TO VERIFY I I SLAB SLOPES AWAY FROM O I I SLAB SLOPES AWAY FROM H-I3 STOREFRONT 114" PER FOOT MAX..(1/8' 1xcRtTaOY� I STOREFRONT I/4' PER FOOT MAX. (I/8' PER FOOT MIN. AT ENTRY) I PER FOOT MIN. AT ENTRY) DII I _ D,-OII J . _ _---- T.O. SLAB ---- I I— T.O. SLAB DATE ISSUED: 05/31 /2019 DESIGNED BY: JH REFER TO FINISH PLAN (E) SIDEWALK REFER TO FINISH PLAN (E) SIDEWALK DRAWN BY: YL TO REMAIN TO REMAIN CHECKED BY: YL STOREFRONT RELEASED FOR CONSTRUCTION SECTIONS Subject to compliance with all regulations of State and Local Codes DRAWING NUMBER: City of Carmel 'R - T _Os in a T_DR 1�n I C-LIT GINHGAM PANEL J SECTION THRU ENTRY DOORS A ..�. 07/19/10 us-�oa Loa eecr 09.27.n 42"088NMP.MCT o9. I7