Loading...
HomeMy WebLinkAboutA11.3a Pass Thru Portal Details"nommonnii ;_ BUILT-UP BEAM/BOX COLUMN MATRIX - STRUCTURAL STUDS Z 461 FROM ROAD SPAN OF BEAM BEAM: REQUIRED DOUBLE STUD CANT 3 5/B' E92rnrn7, 18 �'N PARAMUS NJ 07652 U UP TO [3 48mm7 VOL b' [I52rrrrl] OF, IB GA STUD GA TRACK, TOP 0 BTM ` rc T973.253.9393 BEAM: DOUBLE STUD PER TABLE �< WWW.SARGARCH.COM 10-1 TO 15-0 DEL B' [249mm7 OF, IS GA STUD a TO mm] COLOM` DOUBLE 3-5/B' [92mm7 DP, 20 GA. STUDS AND 3 5/8 I5 -I TO 20 0 5 DEL p' f264mrn] W iG GA STUD r TO DBL 12' C305mn1 DU, 16 GA STUD OP, 20 GA. TRACK EACH SIDE E6121mm17 C762Omwn7 WEB I4EA SETINFFENERS AT #B PAN HEAD SCREWS ®12" [305mm] O.C. SA `3@��PSGJ 25'-I' TO 30'-O' DBL 14' [356mm1 DP, 14 GA STUD -� 17645mm7 TO C9144mm] W WEB 14 AT ¢ . ¢ o•• EACH > s TATE OF i zm FOR SPANS OVER W-O' [9I44mm] SEE DESIGN FROM STRUCTURAL ENGINEER - :;M1'D16N�L • * i' BEAM TO BE SUPPORTED ON COLUMN AT EA. END. SECURE BEAM TO COLUMN USING 3' W X 12' L [86xrrn x 305rrwn7, - - -. IB GA. PL. EA. SIDE, ATTACH W (4) PAN HEAD SCREWS TO BOTH BEAM AND COLUMN. ATTACH COLUMN TO BASE TRACK W/ 4 #B PAN HEAD SCREWS AND ATTACH TRACK TO CONC. FUR W 4 SA6' [Wm] CONC. SCREWS /I#RIIItlt80` _____________ /^______ I NOTES: C ++i 1 VERIFY INSTALLATION OF a1.3 _ ' _ FRAME AND SHELVING I I WITH LSDNC PM J,REFER TO RCP L I ALL CUT PLANK EDGES YE .o CEILINT_ K I SHOULD BE PAINTED PER An.9" J FINISH SCHEDULE 3/4" EI°1rrr11 WOOD 4'-7 3/B' C1407mml 1 -�\ PLANKING OVER 5/8' REFER TO RCP Nplp I.--_ F.R.T. I 4'-1 3/4' I B.O. CEILING / �\ Z O 07 PLTNO OVER CI264mm] 5/8° [Ibmm] GYP. BD. METAL STUD FRAMING I • /4 Cot) we / / O Cool I WER METAL STUD SF-90 LAYOUTjll LAYOUT FRAMING V // n I I y,IC-91 Re Uj I (PLANKS) (PLANKS) I U O a __B'-6" C2591mm] A.F.f r SI - B.O. PASS -THRUM O m1.a f FOCAL HEADER SHOWN O 14ATC44ED TO E INSTALLED BJACENT LOOSE 52 PIECES Z BPRIORASE - MIS .( •pAm Eli o _- 7'-0 [2134mm] A.F.F. LINE OF BACK B.O. OPENINGL 0 0 U U O 7 I OF FRAME AND SINK ATTACH PANEL TO METAL ANGLE WITH 2 #8 SCREW AT EACH STUD 16" O ( PANECENTLTOALIGN WITH 07 O 3/4' aleI'-0 _ _ 7'=B" 37mm] A,F __�pp,,JJ,, LIQUID NAILS 'HEAVY DUTY CONSTRUCTION + + I C40Wm�7 O.C.) CENTERLINE FOCAL 13/4'L C44rrrn] X #12 HEADER, IN FRONT - O Z [Ignrn7 B.O. CEILIAG, ADHESIVE (W-W/9D3)' APPLY PER MANUFACTURER'S ' PAINT ANGLE AT CEILIFX. PT-91 STEEL SCREW, TYP OF 3, ( VIEW ELEVATION VIEW EACH STANDARD ) Y N RECOMMENDATION + - , _.,._.. T-8' C2337mm3 A.F.F.}, --- _ ` DIAGONAL BRACE, SEE A/503.01 - 5F-90 5.0. GYP. BD. 5OFFITY FOR SIZE AND SPACING SF-91 1 s m EE ww"a PRE -ASSEMBLED PLANKING 91s9rwAr9-vL-m PANEL WITH RECE55ED STANDARDS FURNISHED BY INSTALLATIONEz PLYWOODTOMETAL FRAMING. Q D O INSTALL SEQUENCE: -' 2. SECURE RECESSED STANDARDS TO PLYWOOD SUBSTRATE AS _ II I. COUNTERTOP. ^ FOR DECOR ON VENDOR INSTALLED BY G.C. \^J SEE DETAIL N2/A10.9 FOR 2. INSTALL STANDARDS < 16 GAUGE METAL ANGLE BY G.C. -3 II/i6' [39Bmm1 7 TO SUPPORT FOCAL HEADER BACK WALL SEE A06.1 AND R/A11.3a NOTED BELOW AND AS SHOWN IN PLAN AND ELEVATION. 3. PLACE PRE -ASSEMBLED PLANKING PANEL OVER RECESSED �ii W c � J L FRAME ATTACHMENT DETAIL PRE -ASSEMBLED PLANKING PANEL TO BACK WALL. ROUGH OPENING PAINT ANGLE I ADA COMPLIANT 51W AND STANDARDS AND SECURE TO PLYWOOD. PREFERRED SCREW O _ RECESSED 3. SF-90 PLANKING AT BACK t 1 AGAINST BLACK WOOD PT-92 B' C20 REI VERTICAL FAUCETS LOCATIONS ARE AROUND PERIMETER OF PANEL AND BEHIND N N I n STANDARDS AND I SIDES OF NICHE (ABOVE TRIM PROVIDED BY BACKSPLASH DECOR LOCATIONS. L ADJUSTABLE COUNTER).VENDOR _ PRE -ASSEMBLED PLANKING PANEL FURNISHED BY VENDOR AND ~ ~ SHELVES 4. SF-91 PLANKING AT SIDES OF =. INSTANTANEOUS WATER 2'_IO" 1864mm1 A.F.F.A INSTALLED BY G.C. NICHE (BELOW COUNTER). / .. _ _ NEATER (WHEN T.O. COI/NTTERY �pq_ 1HIq 5. BACKSPIASH. b. FOCAL HEADER PANEL. ++ + APPLICABLE) INSTALLED 1 2'-5" C737mm]A,F,ELHOLD))��, AT OF WALL. B.O. COUNTERT - •' 13/4'L C44mm] X #12 STEEL SCREW, (TYP OF 3, EACH STANDARD) T.D. BACKSPLASH 7. 8' VERTICAL TRIM. 3 5/6' [92mm] 20 GA. BLOCKING BACKSIDE 3'-6" [1067mm3 &,F F -------- -'� B. BASE, INSIDE OF NICHE ONLY. + + AT 16' 14Mml O.C. SEE PLUMBING DRAWINGS SF-91 WINES B.D. FRAME .. 9. GRAPHIC FRAMES. W-6" C259Imm] A.F.FL DISCONNECT SWITCH BARN SIDE I"A�TMATa Pr-� K "'s ^ < < I 5/B [IErrwn] F.R.T. PLYWOOD SUBSTRATE TO BE PAINTED CONTINUOUS 3 5/8' B.O. PA53-THRU OWNER PROVIDED AND G.C.S F'T-91 'v [92mm7 20 GA. TRACK W/ i FOCAL HEADER PANEL WITH PRE ANEL BATH B BODY I WORKS SIDE INSTALLED REMOVABLE PLANKED N -v `w n y y s E V - - (2) #B SCREWS AT EACH ++ ++ ATTACHED 3/4' F.R.T. PLYWOOD PANEL ON BACK WALL FOR DRAIN PUMP AND INSTANTANEOUS 8_ B In Q g S c 5 3 9 2 a a B STUD BLOCKING ABOVE + + + OVER METAL STUD FRAMING SF-91 n ' [i WATER HEATER ACCESS, SHOWN m 'i o a II E z 2 ff " '�._.-a gg�I 3 5/8" [93nm1 20 GA. -\ B-92 ..-HATCHED M N.. m > - 5 -�=e N G= 'k z =1; ,B^ m ' STUD AT I6 [406mm] O.L. " T 8 C233_7mm] AF.F. `-g,0. -2'-p " 53ss l;se8 1300 5q $$$ I GYP BD.SOFFIT FI171S4 FLOOR - _ 3 3 3 L CIOOimm] AF7. "MC?ia sy=&� `e WBTDV-WS-V01 RECESSED LIGHT FIXTURE I _ _ _? -0 [2134mm] A.F.F. OF BACK G.C. TO ADD BASE TO FACE OF B.O. RECESSED STANDARD a w B z € € B o k N M 5/5' 11&1 TYPE 'X' GYP. BD. EQ. EQ. B.O. HEADER PANEL ACCESS NOT ��� 1 2' SCRIBE PANEL PANEL, TO BE ; 5 Il ";= = s a m OVER METAL STUD FRAMING PT-91 I PRE -ASSEMBLED PLANKING PANEL CONTINUOUS PIECE ACROSS ANGLED FOCAL ELEVATION BACK WALL ___ 2'-10' 1564mml A.F.F.J, B.D. PANELY n 2 a s ,Isg ;yy s ` o - 8 ` B k s � � i 3 ff i 6 I FURNISHED BY VENDOR INSTALLED BY - - " B 5 s FIAI51-I III OLO- eL C An.m I G.C., INSTALL OVER RECESSED STANDARDS SF-90' SEE A/All.3 'pj C l b f i e s III S I k s 6 �DBy= W e D 1 Is ELEVATION AT WIDE ANGLED 3/4" : 1'-0" RECESSED STANDARDS I ELEV. AT WIDE DEMO SINK W/ SHELVES 3/4" ° 1'-0" PASS-THRU DEMO SINK BACK PANEL 1 1/2" = 1'-0" i"1911 R ATTACHED TO PLYWOOD 1 FOR DECOR ON BACK WALL SEE AO6.I AND E0 EQ. R All.3a �rl r V v` v"'B S ., G a E 3 B DEMO SINK GRAPHICS 4RDArifAROOggBTL WITH 1 3 aL t44mm1 x 1 (WBTDV-BC-WS-V##) (WBDCT29-W-V##) 4sD-A11BA-ao143En ATTACHMENT DETAIL 421-A1+SA-GO1�EV N g � 1D27.17 M2 STEEL SCRBVS 1 5/8" C16mm] F.R.T. PLYWOOD ON Ga- 05.11: a 02.12.18 €=1 1`g gN=:=: >u`= E GFCI DUPLEX OUTLET IN 1 WALL, REFER TO POWER FOR OUTLET I zl--. BACK WALL ONLY, SUBSTRATEs�- TO BE PAINTED FT-91 RECESSED LIGHT FIXTURE ABOVE, WHITE BARN SIDE B2 RECESSED LIGHT FIXTURE ABOVE,`3 REFER TO ELECTRICAL DRAWING Aii ss REFER TO ELECTRICAL DRAWING „'< 1n9=a€§ k „:kk=Q ti 4y PLAN 4� 5 a 3 = 6 = _ �Ys P LOCATIONS I FILL PIN NAIL HOLES WITH WOW PUTTY ` / \ E0. -- �• / \ � Rom 2 `3_ = FOR STRUCTURAL I I'-3 II/Ib'8,62 7 TO MATCH pT-91 \ / \ / gNg a k S a a 4 E 5= R a -" D - ei:as 3 ATTACHMENT REFER TO j�g8nwn7 CI78mm7 \ EQ.rilED. / / \ / -s8-- S€. _a3 . -1 DETAILS JIWAll.3a I 7J EQ. EQ. PLANKING BEYOND SF_g0 I \ INSTANTANEOUS WATER I P I ® / -- -----------------------------_---___------- _ -- \ © O 0 1 Y o NEATER (WHEN APPLICABLE) I DEMO SINK SUPPORT STRUCTURE. / N SEE PLUMBING DRAWINGS - - - - REFER TO STRUCTURAL DRAWINGS \ / \ i m a SCREW LOCATION, TYP. 4 ( N FOR MORE INFORMATION \ a got V N CORNERS - SCREW HEADS I I A11.9 2'-101" C864mm] A.F.F. --- / / \ / \ '7� / \ZL TO BE PAINTED TO MATCH 1 T.O. COUATER ---- Fp / / PLANKING FINISH I _ b / / MIN. PROVIDE CLEARANCE AS LINE OF FLYWC\OD I CUTOUT BEYOND _ -_. -- - -- REQUIRED FOR ADA COMPLIANCE SHOWN DASHED BLACK INSULATED SINK TRAP, q^ N I REFER TO PLUMBING SHEETS. n' E �O v / O Y 3 / / / FILL PIN MAIL ILTTY TO MATCHES WITH WOOD I I �qag I \\ I I PREFINISHED BACK PANEL - SCRIBE n I II I '� '�' / / / \ \\DO / \\ O O aof AT TOP TO FIT y 3/4p InEnin] WOOD PLANKING OVER Ywa w / / / \ I I III 6" 11' [279mm] / \ \ a �O u' g III MAX MIN DID 5/8 [I6mm] E.R.T. PLYWOOD OVER a c0 4 I = I III Iq' MIN. FOR E METAL STUD FRAMING SF-91 / \ / \ \ A SF-q0, SEE M/AO4.1 A \ �� \ FOR PLANK DETAILS / / ULIFORNIA ---- FINISH FLOORL w M � n tg�� 1n 0 DO I'-4° [406mm] OWNER PROVIDED AND G.G. INSTALLED \ MIS LAYOUT LAYOUT BI AIC1.3 All.ae Al \ U CPENING REMOVABLE PLANKED PANEL FOR DRAIN PUMP \ FRONT POINT A119 / \ //// roRi _ AND INSTANTANEDUS WATER HEATER ACCESS \ C134TEREDPONNKPORTM \ 3o I'-6" [457mm] BATH S BODY WORKS SIDE REFER TO AI FOR LIGHT > W PANEL SECURE ACCESS PANEL W/ #10 X 2' [51mml SCREWS VARIES FIXTURE QUANTITY AND SPACING m J AT PLANKING REVEALS, TYR OF 4 LOCATIONS ll.I w I` 3 REFER TO A02.1 U LJ m SECTION AT DEMO SINK W/ SHELVES 1" = 1'-0" CEILING PLANKING @ WIDE ANGLED DEMO SINK PASS-THRU (REFLECTED CEILING PLAN) 3/4• ' 1'-0" 0� Mix N K B o (WBTDV-BC-WS-V##) (WBDCT29-W-V##) UD-A+uA-KG+-DETL (WBTDV-BC-WS-V## AND WBTDV-BF-W-V##1 14D ANeA BO&DETL a MIR �15� 06.14.18 � W T U 4'-9' ARC- THAN \CTE-. IF PASS-THRU SPAN IS LONSER 30' CONS�UIT WITH STRUCTURAL AND wDATE SZE O= FRArIN6 OUTLINE OF NOTES: FINI5HE5/TRIM ALL METAL STUDS B-13 y// WC-91 O fib• P y L761Lv1 nN.1NG 0 + o Z w g z w a o U C1448mm]JR.ENGINEER 6 1/2' /, -- ---' 9 /- " UNLESS 2 I!2' METAL STUDS ARE 3 5/6'1NOTED OTHERWISE. OTHERWD E. ai CA o ALL SUBSTRATE BELOW BLACK PLANKI m BQ '1 ', i U o ''' z Bob a [I65mm] 9 I/2" I'-7' i'-10' \ BOX COLUMN l REFER BUILT-UP BOX COLUMN, �. Yp BE PAINTED, TYP. O PT-92 ^ rmj ¢ J o N o DEMO SINK SUPPORT STRUCTURE. SEE MATRIx �� MATRIX, SEE MATRIX ON � "v V ` N U '�^ [241mm] 14B3mm7 [559mm1 9' 1�-4' REFER TO STRUCTURAL ON G/A11.3 y r=====____ STRUCTURAL DRAWINGS, FOR WATEG/AIIR INSTANTANEOUS WATER AIIA FACE OF SOFFIT „Z _ HEATER (WHEN ABOVE W� DRAWINGS FOR MORE - [229nm7 [406mm] INFORMATION DEMO SINK ; SUPPORT 1 STUD GAUGE, ETC. \\�. ALL DIMENSIONS _ = APPLICABLE) INSTALLED '� _ __ __ -_ -_ _ _ _ _ AT BACKSIDE OF WALL. aeouialo BY "BE wre 2 X 4 F.R.T. WOOD BLOCKING STRUCTURE, / / �'S, ARE TO METAL STUD FRAMING. SEE SEE PLUMBING DRAWINGS /- VERTICAL TRIM S• \ + ATTACHED TO METAL BLOCKING '/: TYP. REFER TO 3 / / 51RUCTURAL / DETAIL 'A' WATER HEATER \ � O ° "�?�\ \ Mt PROVIDED BY � � �6a' WITH 3 L [76mm] X #12 WOOD TO STEEL /i / DRAWINGS FOR ry6. // FINISH DIMENSIONS DISCONNECT SWITCH �Tn ., � a Q2 -�+ / \ % Ans V?1DOR OVER � J \//� - - SCREW B b' O.C. 46,, MORE -cp J / AND ADDITIONAL VENDOR PROVIDED P R c 5/8' [I6mm] •' - STAGGERED, TYP. 3 SIDES •- -v INFORMATION // INFORMATION BASE AT BACK AND F.R.T. PLYWOOD J t I I I tO E11 1 I I SECURE F.R.T. PLYWOOD TO wZ e EEE ,� STUDS TO // •' SIDES BELOW P /, ,•c' AND BLOCKING / // J -F OVER METAL 1 E 1 1 WOOD BLOCKING W17H 11/2'L ? T ALIGN WITH �r -v `=' / // LINE OF BACKSP[ASH /� r�S'STUD FRAMING /� !/� _'.' 1 In m'J 1'-7 I/2 [38mrn1 X #B WOOD SCREW 0 in RECESSED u STANDARDS �k• // `' O / J AI BOT14 SIDES li. m > C415mml B' O.C. ,' // I a BUILT-UP J 12 \ y \ /// OF FOCAL / AT STANDARD OPENING 1 I' Tn I-9 7/W 1555mm] 11 1 - ORDER OF COUNTERTOP INSTALLATION: // HSEEEE MATRIX COLUMNI2 I/2' P METAL / �`r` TO BE F wT / $ UNDER -MOUNT SINK v WITH I W/ L�C44mm] uis Q� / .eC^ � n I.FED 1 DATE ISSUED: 05/31 /2019 _ - -- -- - -- ll I. INSTALL G.C. SUPPLIED TUBE STEEL °ARMS' �� ON G/All.3 STUDS bq" X 7R2 STEEL SCREW \ / n LINE OF COUNTERTOP. REFER TO Jll Al1.3 FOR \ y )`// j CUTOUT OPENING PER 12"' y / -�l - AREA OF F.R.T. I (REFER TO STRUCTURAL '� l __�__________ COUNTERTOP ATTACHMENT // SINK MANUFACTURER -- - pk DESIGNED BY. JH PHLAYWOODD SHOWN L DRAWINGS) - \ a C TEMPLATE BUILT-UP BOX 6.9 DRAWN BY: YL - EWE CUTOUT SINK / FAUCET COUNTERTOP 2. ATTACH 2 X 6 WOOD BLOCKING TO IN -WALL G.C. TO STOP THIS FRAMING ® i - --.-.� - ' -------- FACE OF SOFFIT Anse COLUMN, SEE I MATRIX ON G/AII.3a ABOVE SF-90 •' CHECKED BY: YL HOLES PER MANUFACTURER'S SHOWN DASHED METAL BLOCKING. B. ATTACH F.R.T. PLYWOOD 8'-2 1/2' A.F.F. �•� - - --- ------ 9UBe B-91 PA'urm rr-m WBC TEMPLATE AND INSTRUCTIONS TO AVOID CENTERLINE OF NESTED `--- - - - - J) 4'-4 1/211 TO WOOD BLOCKING. L SECURE/QLUE CONFLICT WITH METAL STUD BEAM AT wsealanneE LINE OF WOOD PLANKING PASS - T H R U RELEASED FOR CONSTRUCTION COUNTERTOP TO F.R.T. SOFFIT FINISHES SEE A02.1 2'-9 1/4' PASS-THRU SOFFIT w Bt FOUL HEADER ABOVE 34" [I9nm] WOOD PLANKING OVER SHOWN DA5NID 5F-91 [1333mm] FIN. DIM. C844mm] PLYWOOD PER VENDOR 7/16' 5/8" [Ibmm7 F.R.T. PLYWOOD OVER 18 [457mm] MIN. Ana PORTAL DETAILS Subject to compliance with all regula5ms Y IVgI q 1VgI INSTRUCTIONS. LAYp1T [I2mm] METAL STUD FRAMING SF-90 DRAWING NUMBER: d Sete and Local Codes C57mm] [57mm] POINT slsarwArs TO ss ral.rreP M-91 City of Camel y PLAN DETAIL @ WIDE SINK SUPPORT 1" = 1'-0" J WIDE ANGLED DEMO SINK FRAMING PLAN 3/4" a 1'-0" E PLAN AT WIDE ANGLED PASS-THRU DEMO 3/4" : 1'-0" A 07 WITH SHELVES (WBTDV-BC-WS-V##) 44G-A118A.IOX-DETL - WITH SHELVES (WBTDV-BC-WS-V##) 4sD A++sA Bos x*E SINK - W/ SHELVES (WBTDV-BC-WS-V##) 42D-A1+BAYMINS � 06.Iq.IB D2q.,B 0.24.18 viI IV/ IJ