Loading...
HomeMy WebLinkAboutM01.01 Mech Notes & SchedulesGENERAL NOTES ALL NOTES INCLUDED HEREIN ARE MADE PART OF EACH AND ALL MECHANICAL, ELECTRICAL AND PLUMBING SECTIONS OF WORK. 1. REFER TO LANDLORD'S SPECIFICATIONS AND TENANT DESIGN CRITERIA FOR NECESSARY INFORMATION AND COORDINATION WITH OTHER TRADES. 2. THE ABBREVIATION LSDBC WHEREVER IT APPEARS IN THE DRAWINGS, SHALL REFER TO "LRRANDS DESIGN AND CONSTRUCTION", ANY REFERENCE TO TENANT, BRAND SPECIFIC (VICTORIA'S SECRET, ETC.) OR FURNISHED BY ANY OF THE ABOVE REFERS TO LSDAC. 3. ANY DISCREPANCY BETWEEN LSDAC DRAWINGS AND TENANT CRITERIA, LSD4C DRAWINGS SHALL TAKE PRECEDENCE. 4. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT ALL INSTALLED ITEMS AND LOCATIONS ARE NOT EXACTLY PLACED AND ARE NOT TO BE SCALED. 5. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELATED PERMITS AND INSPECTION FEES. 6. BEFORE COMMENCING ANY WORK, CONTRACTORS SHALL REVIEW THE LATEST NATIONAL, STATE AND LOCAL CODE REQUIREMENTS INCLUDING LANDLORD CRITERIA AND PERFORM THE WORK IN STRICT ACCORDANCE WITH THESE. IN CASE OF CONFLICT THE STRICTER REQUIREMENTS WILL PREVAIL. 7. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR AT CHANGE ORDERS DUE TO CONTRACTOR'S FAILURE TO VISIT THE JORSITE AND/OR PREDETERMINE ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS BID. A. CONTACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO SUBMITTING A RID. FOR THE PURPOSE OF SURVEYING EXISTING CONDITIONS, WHICH MAY AFFECT THE WORK TO BE DONE UNDER THIS SECTION, ANY DISCREPANCIES SHALL BE IMMEDIATELY REPORTED TO THE GENERAL CONTRACTOR, LSDAC OR THE LANDLORD'S FIELD REPRESENTATIVE FOR CLARIFICATION. B AFTER BID, ANY QUESTIONS RELATING TO SPECIFIC M, E, OR P ISSUES ARE TO BE DIRECTED AS RFI'S THROUGH THE LSDBC PROJECT MANAGER. C. SHOULD THE SPACE RAVE BEEN INACCESSIBLE FOR INSPECTION CONTRACTOR MUST INDICATE SO ON HIS BID. S. THE GENERAL CONTRACTOR'S FIRE SPRINKLER SUBCONTRACTOR SHALL DESIGN AND INSTALL TIRE SPRINKLER SYSTEM CONFORMING TO LANDLORD'S CRITERIA, TENANT'S REQUIREMENTS AND PER LOCAL CODES AND NFPA STANDARDS 9. THE CONTRACTOR, WITHIN FIFTEEN (15) DAYS OF THE AWARD OF THE CONTRACT, SHALL SUBMIT TO THE OWNER, SIX (6) COPIES OF A COMPLETE LIST OF MATERIALS AND EQUIPMENT PROPOSED FOR THE JOB INCLUDING ALL DATA, PART NUMBERS, RATING CAPACITY, SIZE, DIMENSIONS, ELECTRICAL DATA, GRADE, MANUFACTURER, AND ANY OTHER DESCRIPTIVE DATA FOR ALL EQUIPMENT OR SYSTEMS THAT DEVIATE FROM SPECIFIED ITEMS. ANY DELAYS OR COSTS DUE TO THESE DEVIATIONS, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. to. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF ALL UNUSED OR ABANDONED MATERIALS AND EQUIPMENT, AND ITS REMOVAL OFF THE LANDLORDS PREMISES. 11. OWNER RESERVES THE RIGHT TO HAVE CONSTRUCTION REVIEWED BY AN OUTSIDE CONSULTANT PRIOR TO ACCEPTANCE OF THE PROJECT. 12. EACH CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP RELATED TO HIS WORK FOR A MINIMUM PERIOD OF ONE YEAR FROM THE DATE WHICH THE OWNER ACCEPTS THE PROJECT. THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER OR TENANT SHALL CORRECT AT DEFECTS IN MATERIALS OR WORKMANSHIP DURING THIS GUARANTEE PERIOD. 13. EACH CONTRACTOR SHALL BE RESPONSIBLE AND ENSURE A CLEAN INSTALLATION ESPECIALLY IN EXPOSED CEILING AREAS. THE FINAL APPROVAL OF THIS WORK WILL BE ISSUED BY LI PROJECT MANAGER. 14. PROVIDE ONE SETS OF "AS -BUILT" DRAWINGS INTO PLAN TUBE AND ONE BOUND SETS OF ALL OPERATIONS MANUALS, DIAGRAMS, SERVICE CONTRACTS AND GUARANTEES IN BINDER TO STORE MANAGER. A REPORT PREPARED IN ACCORDANCE WITH MECHANICAL SPECIFICATIONS BY AN INDEPENDENT AIR BALANCE CONTRACTOR, HIRED BY GC, MUST BE INCLUDED IN THE CLOSE-OUT PACKAGE. HVAC GENERAL NOTES 1. THEE PLANS MAY BE USED FOR CONSTRUCTION ONLY AFTER APPROVAL IS OBTAINED FROM THE BUILDING DEPARTMENT MECHANICAL PLAN CHECK DIVISION AND THAT DIVISION'S STAMPED APPROVAL AND AUTHORIZED SIGNATURE APPEAR ON THE PLANS. 2. COORDINATE ALL WORK WITH ALL TRADES INCLUDED BUT NOT UNITED TO ELECTRICAL, PLUMBING, TIRE PROTECTION AND STRUCTURAL CONTACTORS. INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS PIPE, DUCT, ETC. IS TO COME IN CONTACT WITH ANY EQUIPMENT. 3. REFER TO ARCHITECTURAL DRAWINGS FOR DEMOLITION WORK. 4. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT TIIITURE LOCATION. 5. CONTRACTOR SHALL PROVIDE CUT SHEETS TO LSDAC FOR ALL EQUIPMENT AND DEVICES FURNISHED BY THE CONTRACTOR THAT DEVIATE FROM SPECIFIED ITEM FOR REVIEW AND APPROVAL PRIOR TO THE PURCHASE OF ANY SUCH EQUIPMENT OR DEVICES. 6. HVAC CONTRACTOR IS RESPONSIBLE TO INQUIRE WITH THE LANDLORD'S REPRESENTATIVE ON ANY SMOKE EVACUATION SYSTEM IN USE AT THE MALL AT THE TIME OF THE BID. IF THE SAID SYSTEM IS NOT ADEQUATELY DESCRIBED ON THE DRAWINGS, THE MECHANICAL CONTRACTOR IS RESPONSIBLE TO INFORM THE GENERAL CONTRACTOR AND INCLUDE THE COST AS A SEPARATE LINE REM IN THE BID. NO ADDITIONAL MONEYS SHALL BE AWARDED FOR TIE-IN REQUIREMENTS TO A LANDLORD'S SMOKE EVACUATION SYSTEM THAT IS IN EXISTENCE AT THE TIME OF THE BID, WITHOUT HAVING IDENTIFIED A SEPARATE LINE ITEM FOR THE SMOKE EVACUATION SYSTEM AT THE TIME OF THE BID. 7. ACCESS TO ALL COMPONENTS AND EQUIPMENT MUST BE PROVIDED TO MEET CODE AND SERVICE/MAINTENANCE EASE. B. PRIOR TO CONTRACTORHANICAL CONFIRM TUP OF HVAC UPOWER LISTED MANUFACTURER REPRESENTATIVES THAT CORRECT FOR EQUIPMENT EQUIPME THASS BEEN PROVIDED TO LSD@C PROVIDED RVC UNITS AND HASBEENON FOR A MINIMUM OF 24 HOURS. LSDAC RESERVES THE RIOT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND SPECIFICATIONS. SHOULD THE OWNER FIND CORRECTIVE WORK TO BE NECESSARY, HE WILL NOTIFY CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO BE NECESSARY, THE COST OF REINSPETDNS WILL BE BORNE BY THE CONTRACTOR. THE MECHANICAL CONTRACTOR WILL THEN ENSURE THAT THE EQUIPMENT IS POWERED FOR A MINIMUM OF 24 IRS BEFORE START-UP. 9. IF WORK IS REQUIRED BY LSDAC IN ORDER TO IMPROVE, CHANGE OR CORRECT AIR CONDITIONING OPERATIONAL CONDITIONS DUE TO: PART MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE STORE, CONTRACTOR SHALL BE SESSIONS DIRECTED BY LSDAC TO ADDRESS THIS WORK IN A TIMELY WANNER. IF IT BECOMES EVIDENT THAT THE CONTRACTOR CANNOT ACCOMPLISH THE TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE THE OWNER NAY, AT HIS DISCRETION, ABBREVIATIONS -MECHANICAL TAKE OVER SUCH WORK AND BACK CHARGE THE CONTACTOR FOR AT CORRECTIVE WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE, WORKMANSHIP AND/OR ADHERENCE TO PLANS AABC AMERICAN AND SPECIFICATIONS AIR BALANCE COUNCIL AFF ABOVE FINISH FLOOR 10. UPON COMPLETION OF THE WORK, CONTRACTOR SYSTEMS) AND MAKE ANY ADJUSTMENTS OR SHALL VERIFY THE PROPER WORKING ORDER OF T AS REQUIRED. AHD AIR HANDLING UNIT APD AIR PRESSURE DROP ASHRAE AMERICREFRIGERATING 11. PROVIDE FILTER CHANGES THROUGHOUT CONSTRUCTION AS REQUIRED FOR MONTHLY ONCE STARTED, PRIOR 70 TEST AND RALANCE, PONY )EQUIPMENT N AIHEATING, CONDITIONING CONDITIONING ENGINEERS ENGINEERS AND LASTLY, PRIOR TO MERCHANDISING. OHR DUCTWORK THAT BECOMES SOILED DUE TO A LACK OF FILTER CHANGES, AS DETERMINED SOLELY BY THE LSDRC PROJECT MANAGER, SHALL BE CORRECTED ON BEHALF OF THE CONTRACTOR AND CHANGES BILLED TO THE CONTRACTOR. ODD BACK DAFT DAMPERS BHP BRAKE HORSEPOWER 12. NOTES TO EQUIPMENT SCHEDULES USE THE WORDS "FURNISH" AND "PROVIDE". WHERE THE WORD "FURNISH" IS USED, SOME FIELD BLDG BUILDING Boo B0TTT0MOFDUCT INSTALLATION IS REQUIRED BY THE CONTRACTOR. WHERE THE WORD "PROVIDE" IS USED, NO FIELD INSTALLATION IS REQUIRED AS THE DEVICES OR ACCESSORIES BOP BOTTOM OF PIPE ARE FURNISHED AND INSTALLED BY THE MANUFACTURER AS PART OF THE EQUIPMENT WHEN SHIPPED. BTUH BRITISH THERMAL UNIT PER HOUR 13. UNLESS OTHERWISE SPECIFIED, CONTACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE THE HEATING, VENTILATING AND AIR CONDITIONING WORK CM CAPACITY IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS AS OUTLINED HEREIN. SEE CD RESPONSIBILITY SCHEDULE ON SHEET M04.01. CEILING DIFFUSER OR CONDENSATE DRAIN CFM 14. MECHANICAL CONTRACTOR SHALL FIELD MEASURE EXISTING ROOF CURB(5) FOR CURB ADAPTE1% WHERE APPLICABLE, AND SHALL SUPPLY CHWR CUBIC FEET PER MINUTE CHILLED WATER RETURN DA DIMENSIONS TO LSC HVAC SUPPLIER PRIOR TO START or CONSTRUCTION. CHINS CHILLED WATER SUPPLY CO2 15. ALL HEATING VENTILATING AND AIR CONDITIONING EQUIPMENT SHALL BE CLEARLY IDENTIFIED WITH TENANPS NAME, SPACE NUMBER AND UNIT CONTR CARBON DIOXIDE CONTRACTOR DESIGNATION AND SHALL BE STENCILED IN 4" HIGH BUCK LETTERS. COP COEFFICIENT OF PERFORMANCE CAR 16. FURNISH AND INSTALL ALL NEW DUCTWORK INCLUDING INSTALLATION OF OWNER SUPPLIED ITEMS. CWS CONDENSER WATER RETURN CONDENSER WATER SUPPLY A. ALL MATERIAL SHALL BE NEW AND OF COMMERCIAL GRADE AND BEAR UNDERWRITER'S LABORATORY AND UNION LABELS WHERE SUCH DB DRY BULB, DECIBEL LABEUNG APPLIES. DEG DEGREE MA DIAMETER B. ALL PLENUMS SHALL BE FABRICATED FROM GALVANIZED SHEET METAL OF THE APPROPRIATE GAUGE AND BE INSULATED WITH A MINIMUM OF Dom' DRAWING I" THICK, 0.75 LB/CU.FT. DENSITY FIBERGLASS INSULATION WITH ALUMINUM FOIL BACKED VAPOR BARRIER. OX DIRECT EXPANSION C. WHERE DESIGNATED, BRANCHES FROM MAIN LOW VELOCITY TRUNK DUCTWORK SHALL BE FURNISHED WITH SPUTTERS, DAMPERS OR SIMILAR EA EXHAUSTAIR BALANCING DEVICES IN ACCORDANCE WITH THE STANDARDS OF SMACNA. EAG EXHAUST AIR GRILLE EAT ENTERING AIR TEMPERATURE EC D. ALL DUCTS FOR FINAL CONNECTION TO DIFFUSERS SHALL BE CLASS 1. UL LISTED (SL 181) FLEXIBLE AIR DUCT NOT TO EXCEED 4'-0" TRACT CONTRACTOR IN EER LENGTH (THERAFlEX, GLASREX, OR APPROVED EQUAL). E 0 EF ENERGY FFI AN Err E. RECTANGULAR SUPPLY AND RETURN AIR DUCTS - PLENUM OR DUCTED RETURN AIR SYSTEM: DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE EOD EFFICIENCY CLEAR DIMENSIONS. ALL RECTANGULAR DUCTWORK (SUPPLY AND RETURN) SHALL BE EXTERNALLY INSULATED PER SPECIFICATIONS. ELECTRICALLY OPERATED DAMPER ESP F. HANGER WIRES, DUCT STRAPS, FASTENING DEVICES, ETC. SHALL BE FASTENED TO THE STEEL JOISTS AND/OR BEAMS ABOVE. DO NOT ATTACH EWT AT SUCH ITEMS DIRECTLY EXTERNAL STATIC PRESSURE ENTERING WATER TEMPERATURE TO FLOOR SLABS, PIPING, OTHER DUCTWORK, ELECTRICAL CONDUITS OR THE ROOF DECK ABOVE. G. ADDITIONAL FIRE DAMPERS SHOULD BE INSTALLED AS REWIRED BY ANY APPLICABLE CODES AND/OR JURISDICTIONAL AUTHORITIES. F FAHRENHEIT FOU FAN COL UNIT 7. SEAL AROUND PIPES AND DUCTS PENETRATING FIRE SEPARATIONS WITH LISTED AND APPROVED FIRE SEAL MATERIAL ONLY LISTED AND FLA FULL LOAD AMPS APPROVED SEALANTS AND METHODS FOR THE SPECIFIC USE WILL BE PERMITTED. FLEX FLEXIBLE B. MECHANICAL CONTRACTOR SHALL INSTALL TEMPERATURE SENSORS AND AS SHOWN ON THE PLAN (VERIFY LOCAL CODES. IF PLAN LOCATION IS NOT ACCEPTABLE, IMMEDIATELY CONTACT ISDBC PROJECT MANAGER FOR DIRECTION.) L. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL FULLY PRESSURE CHECK AND CHARGE ALL REFRIGERANT SYSTEMS (IF REQUIRED). X THE CONTRACTOR SHALL ENGAGE THE SERVICES OF, AIR/WATER BALANCING COMPANY THAT IS PROVIDED BY LDSBC. THIS COMPANY SHALL PERFORM THE BALANCING OF AIR/WATER SYSTEMS) AND MAKE ANY REWIRED ADJUSTMENTS TO ENSURE PROPER WORKING ORDER. UPON COMPLEION, THE BALANCING COMPANY SHALL PROVIDE A COMPLETE SYSTEM REPORT. RELEASED FOR CONSTRUCTION Subject t0 compliance with all regulations of State and Local Codes City of Canned lj"10, DATE: 07/16/19 FPM FEETPERMINUTE OA OUTDOOR AM FPS FEET PER SECOND GAT OUTDOOR AIR TEMPERATURE FV FACE VELOCITY ORD OPPOSED BLADE DAMPER OD OUTSIDE DIMENSION OR DIAMETER GAL GALLONS OPNG OPENING GALV GALVANIZED GC GENERAL CONTACTOR P PUMP GPM GALLONS PER MINUTE Po PRESSURE DROP RBG PLUMBING HD HEAD PSI POUNDS PER SQUARE INCH HP HORSEPOWER HTR HEATER RA RETURN AIR HVAC HEATING VENTILATING AND AIR RG RETURN GRILLE CONDITIONING RH RELATIVE HUMIDITY HWR HOTWATERRETURN RPM REVOLUTIONS PER MINUTE HAS HOT WATER SUPPLY SA SUPPLYAIR ID INSIDE DIAMETER SENS SENSIBLE IN INCH SF SUPPLYFPN SACA SHEET METAL AND AIR CONDITIONING KW KILOWATT CONTRACTORS NATIONAL ASSOCIATION LL LANDLORD SP STATIC PRESSURE L LONG SO SQUARE IS POUND SOFT SQUARE FEET LD LINEARDIFFUSER SS STAINLESS STEEL IF LINEAR FEET LWF LEAVING WATER TEMPERATURE TEMP TEMPERATURE TSP TOTAL STATIC PRESSURE MAX MAXIMUM TSTAT THERMOSTAT MBH THOUSANDBIU PER HOUR TYP TYPICAL MCA MINIMUM CIRCUIT AMPACITY ECH MECHANICAL LAC UNDERCUT MFR MANUFACTURER UH UNIT HEATER MOCP MAXIMUM OVER CURRENT WN UNLESS OTHERWISE NOTED PROTECTION INTO MOUNTED VAV VARIABLE AIR VOLUME MIR MOTOR VENT VENTILATION, VENTILATOR VFD VARIABLE FREQUENCY DRIVE HERD NATIONAL ENVIRONMENTAL VTR VET THRU ROOF BALANCING BUREAU N.C. NORMALLY CLOSED W WATT N.I.C. NOTINCONTRAT AS WET BULB N.O. NORMALLY OPEN WG WATER GAUGE WA NOTAPPUCAIFE WPO WATER PRESSURE DROP WT WEIGHT TUTS MOTTO SCALE ® SUPPLY AIR DIFFUSER RETURN AIR GRILLE ® a ACCESS PANEL zEXHAUST AIR REGISTER s aR a UNEAR DIFFUSER ® S--SUPPLY, R=RETURN NEW DUCTWORK EXISTING DUCTWORK TO REMAIN EXISTING DUCPNORK TO BE REMOVED FLEXIBLE AIR DUCT 4'-0" MAX. MANUAL VOLUME DAMPER COMBINATION FIRE/SMOKE DAMPER -♦�AMm FIRE DAMPER AUTOMATIC ACKDRAFT DAMPER ELECTRONICALLY OPERATED DAMPER Uo UNDERCUT DOOR ® CARBON DIOXIDE SENSOR O HUMIDISTAT Q TEMPERATURE SENSOR Q THERMOSTAT RATURE/HUMIDITY SENSOR qXIDJTEMPE UCT SMOKE DE7ETOR IT OF CONNETION . NOTES I NTs OON-MOW1.JooNOTE _-N,,, ABBREVIATIONS AND SYMBOLS LEGEND AIR HANDLING UNIT SCHEDULE (SPLIT DX) MARK IAHU-RI 1 TRANS PACKAGE NUMBER1 812 MODEL UCCAAO8 AIR FLOW ICFMI 4000 CIA FLOW / MIN. OA FLOW ICIIII I 1000 425 EXT. BP. (IN W.C.) 0.8 DX COOLING COIL Ei'T "TDB 80.0 67.0 GROSS TOTAL BTU HR 118,930 GROSS SBTU HR g4 000 ELECTRIC HEAT HEAT INPUT WATTS 28,000 OUTPUT BTU NR 95,620 STAGES 2 ELECTRICAL VOLTS 0 HZ 460 3 PO MOTOR HP 3 MCA AMPS 48.53 MOCP AMPS 50 APPROX. WEIGHT ILES) 863 ACCESSORIES 1-8,10-11 NOTES 1 ACCESSORIES 1'e' INDICATES STANDARD; •O' INDICATES OPTIONAU: i. S-COMBINATION FAN CONTACTORAISCONNECT SWITCH (IN HEATER CONTROL CABINET WHERE APPLICABLE). 2. S-FACTORY PROVIDED IN MATT INSULATION. 3. S-FACTORY FURNISHED MIXING BOX WITH ACTUATOR AND 0-10 VOLT ADAPTER. 4. S-FACTORY FURNISHED INTERNAL VIBRATION ISOLATORS. 5. S-FACTORY FURNISHED FAN PROOVING SWITCH. S. S-FACTORY PROVIDED CONDENSATE PAN OVERFLOW SWITCH. 7. S-FACTORY FURNISHED THERMAL EXPANSION VALVE. B. S-FOUR ROW DX COIL. 9. 0-TWO ROW HDT WATER COIL to. O-FACTORY PROVIDED ELECTRIC HEATER WITH SINGLE POINT CONNECTION (REHEAT POSITION). 11. 0-FACTORY FURNISHED SECONDARY CONDENSATE PAN OVERFLOW SWITCH. 12. 0-FACTORY PROVIDED COASTAL EVAPORATOR COIL COATING. 13. S-FACTORY SUPPLIED/CONTRACTOR INSTALLED CONTROLLER ENCLOSURE. 14. S-FACTORY SUPPLIED/CONTRACTOR INSTALLED RETURN AIR TEMPERATURE SENSORS. 15. S-FACTORY SUPPLIED/CONTRACTOR INSTALLED RELAYS (FAN ENABLE, COOLING ENABLE, AND HEATING ENABLE). 16. S-FACTORY SUPPLIED/CONTRACTOR INSTALLED CURRENT SWITCHES (FAN STATUS, CGOUNG STATUS, AND HEATING STATUS NOTES: 1. REFER TO CONTROL WIRING SCHEMATICS FOR AT FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. " MINIMUM GA FLOW IS THE AREA COMPONENT OF THE MINIMUM VENTILATION RATE BASED ON ASHRAE STANDARD 62.1-2013 FOR RETAIL SALE SPACE (0.12 CFM SOFT, TABLE6-i. CONDENSING UNIT SCHEDULE MARK (CUI 1 TRANS PACKAGE NUMBER F2 MODEL / SEER BEER) I ITA120 1 12.7 AMBIENT WA TEMP (DEG F OBI gS TOTAL CAPACITY IBTUMRI 128930 PHYSICAL DATA NO. OF FANS 1 NO. OF COMP. 2 ELECTRICAL VOLTS B HZ 460 3 60 NCA AMPS 20.0 MOCP AMPS 25 APPROX. WEIGHT ALBS) 440 ACCESSORIES 1-6 ACCESSORIES I•S• INDICATES BTANDAR6, •O' INDICATES OPTIONAL): I. S-FACTORY FURNISHED TRANSFORMER FOR FIELD APPLIED CONTROLS. 2. S-PROVIDE DUAL COMPRESSORS WITH SEPARATE CIRCUITS FOR ALL UNITS 10 TONS A ABOVE. 3. S-FACTORY PROVIDED 5 MINUTE DELAY OFF TIMING ON COMPRESSOR RESTART. 4. S-FACTORY FURNISHED LOW AMBIENT CONTROL. S. S-FACTORY PROVIDED HIGH AND LOW PRESSURE SWITCHES. 6. S-FACTORY HAIL GUARD. 7. 0-FACTORY PROVIDED COASTAL CONDENSER COIL COATING. FAN TERMINAL UNIT SCHEDULE MARK IFPVAV-WI 1 TRANS PACKAGE NUMBER _ MODEL VSEFOS-0450 FAN SI2E 04SO INLET SIZE g MA MAXIMUM PRIMARY AIR FLOW ICFMI 650 MINIMUM AlR FLOW IMI 300 FAN PERFORMANCE MAXIMUM AIR FLOW CFM _1 11,550 EXTERNAL STATIC W.C. 0.25 FAN MOTOR HP 1 3 FAN MOTOR VOLTAGE 277 F160 ELECTRIC HEAT POWER INPUT WATTS 6,511 NEAT OUTPUT BTU HR 22.185 STAGES 2 ELECTRIC HEATER VOLTAGE 460 3 60 ELECTRICAL VOLTS 8 HZ MITES 460 3 80 4 FAN MOTOR AMPS VOLTS 0 Z. 277 1 ELECTRIC HEATER AMPS VOLTS 0 9.82 460 3 MCA AMPS 12.27 MOCP AMPS 15.00 APPROX. WEIGHT (LB8) 117 ACCESSORIES 1,24 NOTES ACCESSORIES 1' ININDICATES STANDARD; •O' INDICATES OPTIONAL): 1. S-FACTORY PROVIDED DISCONNECT SWITCH. 2. S-FACTORY PROVIDED CONTROL TRANSFORMER. 3. 0-FILTER RACK AND FILTER. 4. S-FACTORY FURNISHED HEATING/0000NG CHANGEOVER SENSOR. NOTES: 1. REFER TO CONTROL MRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. EXHAUST AND VENTILATION FAN SCHEDULE MARK IEF44 i I MANUFACTURER FANTECH MODEL FC 6 TYPEINUNE FAN DRIVE TYPE DIRECT PERFORMANCE Now FlDW L6FM 220 EXT. STATIC IN W.C. 0.35 FAN 51 ilffill2,Sg2 ELECTRICAL VOLTS 0 HZ 120 i 80 FAN MOTOR WATTS 122 APPROX. WEIGHT (LBS) 15 SERVES RESTROOM ACCESSORIES 1 NOTES 43 ACCESSORIES 1•S' INDICATES STANDARD; "O" INDICATES OPTIONAL): 1. S-BACKDAFT DAMPER 2. S-DISCONNECT PLUG. 3. S-SPEED CONTROLLER. NOTES: 1. INTERLOCK WITH LIGHTS. 2. DISCONNECT SWITCH PROVIDED BY EC. GRILLE, REGISTER, AND DIFFUSER SCHEDULE MARK SDI SO-2 SD-3 SD-4 SDI MANUFACTURER TITUS TITUS TITUS TITUS TINS MODEL DARK TDC TUC 3m TWSA NECK SIZE (L•XW I SEE PLAN 9 )UT 8"P 9"%9 8 9 12 %8 SEE PLAN FRAME SIZE IL'XW 1 24 X24 12"%12 1Z X12 14 X10 26 X24" FRAME TYPE LAY -IN TYPE 3 G2 TYPE 3 A3 SURFACE LAY -IN FINISH* PRIMER PRIMER PRIMER TITUS 28 TITUS 26 NOISE CRITERIA LEVEL <30 <30 <30 <30 <30 ACCESSORIES 2,5 4,5 41 1 25 NOTES 1.3 1,3,4 3 1 MARK SD-6 SD-7 MANUFACTURER TITUS TITUS MODEL [NSA OMNI NECK 8RE (L"XW 1 S P S P FRAME SIZE IL•XW I 24 4 24 4 FRAME TYPE N N FINISH• T S 6 TI S 6 NOISE CRITERIA LEVEL <30 <30 ACCESSORIES 2 2 NOTES 1 1 MARK RG-1 RG-2 RG-3 RC-4 AG-5 MANUFACTURER TITUS TITUS TITUS TITUS TINS MODEL 355R1 355RL SOF 355RL 355RL NECK I SIZE IL•XW I 22 %10 %1 "%2 48•X18 'X1 FRAME SIZE IL•XW 1 24 %12 12 2 24 d 50 X20 24 2• FRAME TYPE LAY -IN N N SURFACE N FINISHw PRIMER T S 6 TI S 6 TITUS 26 TI S 6 NOISE CRITERIA LEVEL <30 <30 <30 <30 <30 ACCESSORIES 5 5 NOTES 2,3 2 2 2 MARK STAG-1 EAG-2 MANUFACTURER TITUS TITUS MODEL 355RL 355RL NECK SIZE IL•XW I X1 f0 X10it FRAME SIZE (L•XW 1 12 2 12 %12 FRAME TYPE N LAY -IN FINIBXw IM TITUS 26 NOISE CRITERIA LEVEL <SO <30 ACCESSORIES 1,5 7 NOTES 3,4 2A ACCESSORIES: 1. ODD -OPPOSED BLADE DAMPER. 2. LOD-LOCKING QUADRANT VOLUME DAMPER (PROVIDED BY MECHANICAL CONTRACTOR). SEE MECHANICAL SPECIFICATIONS SECTION 233300.D.1. 3. CFD-RUSKIN MODEL CFO OR CFDR FIRE DAMPER WITH VOLUME CONTROL. 4. YRD-YOUNG'S REGULATOR REMOTE DAMPER WITH CABLE CONTROL SYSTEM (MODEL 50201 (PROVIDED BY MECHANICAL CONTRACTOR). 5. TRM-RAPID MOUNT FRAME FOR GYPSUM CEILINGS. NOTES: 1. 4-WAY DIFFUSER (UNLESS 1-WAY, 2-1 OR 3-WAY AS INDICATED ON PLAN). 2. INSTALL BLADES FACING THE BACK OF STORE, CABINET, OR WALL. 3. GC TO FIELD PAINT DIFFUSERS TO MATCH CEILING OR WALL WITH ENAMEL FINISH. d. MC SHALL PROVIDE SQUARE TO ROUND ADAPTOR. • FINISH REFERENCE: TITUS /26 IS WHITE: TITUS /84 IS BLACK AIR DEVICE SCHEDULE-BBW/WBC NATIONAL A TUTS 42N-MO1044807-BCHD I HVAC EQUIPMENT NOTED HAS BEEN PREPURCHASED BY L BRANDS STORE DESIGN A CONSTRUCTION. WITHIN THE FIRST WEEK OF CONSTRUCTION, THE GENERAL CONTRACTOR OR THEIR MECHANICAL SUBCONTRACTOR SHALL NOTIFY SUPPLIER VIA EMAIL. THE EMAIL SHALL STATE THE PHONE NUMBER, EMAIL ADDRESS AND DELIVERY ADDRESS OF THE CONTACT PERSON RESPONSIBLE FOR SCHEDULING AND RECEIVING THE HVAC EQUIPMENT AND ACCESSORIES EQUIPMENT AND ACCESSORIES ARE TO BE SHIPPED BY ANY SPECIAL SHIPPING INSTRUCTIONS REQUIRED OR REQUESTED. ALLOW A MINIMUM OF TWO WEEKS AFTER CONSTRUCTION STARTS FOR DEUVERY UNLESS SPECIAL ARRANGEMENTS ARE MADE PRIOR TO THE START OF CONSTRUCTION. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL SHIPPING COST INCURRED IF DELIVERY IS REQUIRED PRIOR TO THE STANDARD TWO WEEKS SCHEDULED. IF THIS INFORMATION IS NOT SENT TO NATIONAL ACCOUNT SUPPLIER, THEN THE EQUIPMENT AND ACCESSORIES WILL BE SHIPPED IN ACCORDANCE WITH THE PURCHASE ORDER DATE AND INSTRUCTIONS ISSUED BY LSDBC AND THE GENERAL CONTACTOR SHALL BE RESPONSIBLE FOR UNLOADING AND STORAGE OF EQUIPMENT UNTIL SUCH TIME AS REQUIRED FOR INSTALLATION ON PROJECT. IF OWNER'S REPRESENTATIVE IS PERFORMING START UP, THEN GC AND/OR MECHANICAL CONTRACTOR MUST COORDINATE WITH MANUFACTURER REP. 2 WEEKS PRIOR TO CONSTRUCTION END DATE. JODY SOWERS THANE TECHNICAL SUPPORT, PRIMARY ROLIAND SCOTT TONE TECHNICAL JOHN D'AGOSTINO SCOTT DAVIS EMAIL JSOWERSOTRANE.COM SUPPORT, SECONDARY EQUIPMENT SUPPORT PROJECT MANAGER AND PHONE NO: 866.415,2499 EMI ROLLAND.SCOTTOTRANE.COM EMAIL JOHN.DAGOSTINDOTRANEXOM PHONE NO: 866.415.2499 HVAC COMMISSIONING EMAIL SCOTT.DAVISOTANLCOM PHONE NO: 866.415.2499 PHONE NO: 866.4151499 �10 A1-Engineering 750 Brooksedge Blvd. WesfeMlle. Ohio 43081 phone: 614.839.4639 fax: 614,09.21 w Unengineerfng.us.LABm Z O CD W 0 C%J CV) Nil- Let U c� O � 0 rn fn x Z E Li -' C6 Uo O T 0 Low I�^T V Y T III in- N Q nINN ID LU E c J r. O ` CL D V) N F 3 IF tli�o NNW! ksE �ap3e -nD 3 e�[sq if Wig'^3 'e-14 '3=; SYg m5yay �i✓wdz- . 1,« €t � 6�ai� = i s �.T' � 0 e82� 1 �3 02 IF o4a4ag111a YBx S:q BeB ®E 1 �E 3e PIN r� N MO cal OY 00 "Iy d NM Id v_^v �A\ N VV T- r CO O /SNAC/ OTwww c�¢z ¢ e a Y W d�< JLOO W ^ M O O O N ONoJ W O O O \O J J L COJ W ULWT `m M Z Q N ifli ¢ cc f D ik z = LUr v Z W W ? r oF �JO 2 LIU <) W ~Mce U REVISIONS: ec01110 BY: DABS © rm^ M/1Va DATE ISSUED: 05/31 /2019 DESIGNED BY: ,ID DRAWN BY: JD CHECKED BY: BM MECHANICAL NOTES AND SCHEDULES TUTS NITS OON-M0101-J00-LGND 5/26/MECHANICAL EQUIPMENT SCHEDULES I - SESSION15 _. 1 OON-M0101-EO4-SCHD E ' NATIONAL ACCOUNTS INFORMATION DRAWING NUMBER: TUTS A 01201 OONaA0W1-A00-NOTE A, ,,. ,,.