Loading...
HomeMy WebLinkAboutP02.01 Plmb Fire Spk HeadOI CONNECT (N) 4" SANITARY SEWER BELOW SLAB TO (E) SANITARY SEWER LINE. (FIELD VERIFY EXACT SIZE AND LOCATION - MIN. 411) 2O CONNECT (N) 1" COLD WATER TO (E) COLD WATER UNE. (FIELD VERIFY EXACT SIZE AND LOCATION - MIN. in) O3 P.O.C. OF (N) VENT TO (E) VENT LINE. (FIELD VERIFY EXACT SIZE AND LOCATION - MIN. 2") ® . O NNFERM. VERIFY LOCATION. MOUNT 48" © . 0 OB I" CONDENSATE DRAIN FROM EQUIPMENT TO DISCHARGE AT MOP SINK. REFER TO DETAILS J & K ON SHEET P03.1. Oq NO PIPING SHALL BE ROUTED OVER ELECTRICAL GEAR. ANY EXISTING PIPING LESS THAN 6'-0" ABOVE SHALL BE RELOCATED. ANY PIPING ABOVE 6'-0" SHALL BE PROVIDED WITH A DRIP PAN. M-Engineering 750 Brooksedge Btvd. Westerville, Ohio 43081 phone: 614.839.4639 tax: 614.839.2222 www.neengineenng us.cnm MAY 3 1 2019 SPRINKLER HEADS SHOWN FOR REFERENCE, STYLE, FINISH, SUGGESTED LOCATION AND QUANTITY ONLY. Z FILED UNDER SEPARATE PERMIT. O A'9 a Cl) M n GC TO PROVIDE WRITTEN REPORT TO LSD&C PM ON CONDITION OF (— a LA EXISTING SEWER TIE-IN REGARDING SLOPE AND FLOW. U p GC SHALL PROVIDE COVERS ON ALL FLOOR DRAINS • SCOPE WITH CAMERA PRIOR TO CONNECTION L DURING CONSTRUCTION TO PREVENT DEBRIS IN PIPES. DOTNOT CONNECT WITHOUT ESD&C PM AUTHORIZATION IF SPECS O (0 N P U ii PLUMBING AND FIRE SPRINKLER HEAD NT$ D Z Ll PLAN KEYNOTES Iv11AI L) v o W T O ,Z,n 3 F' V Y Inn V cn a a Lu g0 C) Lu E w .10 O N 0) tn H F 3 ' °S 3� 3v B�2g 94 2 §`.so. 3N RRInIam oat =m �aa at €=say n III EC EB EAR n� a--& 2 .e3 ED Q P x aW� a a z RA s=tea=`s ,eM 24 z�Ta� N � m E4 O d Y t n O d ,-M Vl�a w VI r O Y a O O� O r O <1nf W i �• a (W:1 Q J N W � M O O N M ) Q00 O O C3 J W DO J W wW 4m m Z Q M Q T Cc HLU a11• O 2 I-g'^oz SO z FM L) W J } a W a M W a ad Jv�a 0WIn In wn RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel DATE: 07/16/19 SPRINKLER HEAD PLAN VALVE IN"UEU OF GRAVITY DRAIN UNDER ALTERNATE BID. REFER TO DETAIL K ON SHEET P03.01 AND PLUMBING FIXTURE SCHEDULE-BBW ON SHEET POIDI. COORDINATE POWER WITH ELECTRICAL VERIFY ALL FIELD CONDITIONS - • •, BID REVISIONS: REQUIRED By DATE DATE ISSUED: 05/31 /2019 DESIGNED BY: - XXX DRAWN BY: XXX CHECKED BY: XXX PLUMBING AND FIRE SPRINKLER HEAD PLAN DRAWING NUMBER: 1/4" 1'-0" A P02RT01