Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P02.01 Plmb Fire Spk Head
OI CONNECT (N) 4" SANITARY SEWER BELOW SLAB TO (E) SANITARY SEWER LINE. (FIELD VERIFY EXACT SIZE AND LOCATION - MIN. 411) 2O CONNECT (N) 1" COLD WATER TO (E) COLD WATER UNE. (FIELD VERIFY EXACT SIZE AND LOCATION - MIN. in) O3 P.O.C. OF (N) VENT TO (E) VENT LINE. (FIELD VERIFY EXACT SIZE AND LOCATION - MIN. 2") ® . O NNFERM. VERIFY LOCATION. MOUNT 48" © . 0 OB I" CONDENSATE DRAIN FROM EQUIPMENT TO DISCHARGE AT MOP SINK. REFER TO DETAILS J & K ON SHEET P03.1. Oq NO PIPING SHALL BE ROUTED OVER ELECTRICAL GEAR. ANY EXISTING PIPING LESS THAN 6'-0" ABOVE SHALL BE RELOCATED. ANY PIPING ABOVE 6'-0" SHALL BE PROVIDED WITH A DRIP PAN. M-Engineering 750 Brooksedge Btvd. Westerville, Ohio 43081 phone: 614.839.4639 tax: 614.839.2222 www.neengineenng us.cnm MAY 3 1 2019 SPRINKLER HEADS SHOWN FOR REFERENCE, STYLE, FINISH, SUGGESTED LOCATION AND QUANTITY ONLY. Z FILED UNDER SEPARATE PERMIT. O A'9 a Cl) M n GC TO PROVIDE WRITTEN REPORT TO LSD&C PM ON CONDITION OF (— a LA EXISTING SEWER TIE-IN REGARDING SLOPE AND FLOW. U p GC SHALL PROVIDE COVERS ON ALL FLOOR DRAINS • SCOPE WITH CAMERA PRIOR TO CONNECTION L DURING CONSTRUCTION TO PREVENT DEBRIS IN PIPES. DOTNOT CONNECT WITHOUT ESD&C PM AUTHORIZATION IF SPECS O (0 N P U ii PLUMBING AND FIRE SPRINKLER HEAD NT$ D Z Ll PLAN KEYNOTES Iv11AI L) v o W T O ,Z,n 3 F' V Y Inn V cn a a Lu g0 C) Lu E w .10 O N 0) tn H F 3 ' °S 3� 3v B�2g 94 2 §`.so. 3N RRInIam oat =m �aa at €=say n III EC EB EAR n� a--& 2 .e3 ED Q P x aW� a a z RA s=tea=`s ,eM 24 z�Ta� N � m E4 O d Y t n O d ,-M Vl�a w VI r O Y a O O� O r O <1nf W i �• a (W:1 Q J N W � M O O N M ) Q00 O O C3 J W DO J W wW 4m m Z Q M Q T Cc HLU a11• O 2 I-g'^oz SO z FM L) W J } a W a M W a ad Jv�a 0WIn In wn RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel DATE: 07/16/19 SPRINKLER HEAD PLAN VALVE IN"UEU OF GRAVITY DRAIN UNDER ALTERNATE BID. REFER TO DETAIL K ON SHEET P03.01 AND PLUMBING FIXTURE SCHEDULE-BBW ON SHEET POIDI. COORDINATE POWER WITH ELECTRICAL VERIFY ALL FIELD CONDITIONS - • •, BID REVISIONS: REQUIRED By DATE DATE ISSUED: 05/31 /2019 DESIGNED BY: - XXX DRAWN BY: XXX CHECKED BY: XXX PLUMBING AND FIRE SPRINKLER HEAD PLAN DRAWING NUMBER: 1/4" 1'-0" A P02RT01