HomeMy WebLinkAboutP03.01 Plmb & Fire Prot DetailsON BRANCH LINE GREATER
HOT OR THAN 20 FEET LONG, PUCE
COLD ANOTHER ARRESTER IN THE
WATER MIDDLE, EACH IS SIZED FOR
SUPPLY WALL THE FIXTURE UNITS -
�� ARRESTER
WITHIN SIX
FEET OF
FIXTURE
SERVED
SINGLE FI%WRE MULTIPLE FIXTURES
PDI
SIZE
FIXTURE
UNIT LOAD
AA
1-3
A
4-11
B
12-32
C
33-60
D
61-113
E
114-154
F
155-330
FIXTURE UNIT TABULATION
FIXTURE
COLD
HOT
VALVE WATER CLOSET
10
-
TANK WATER CLOSET
5
-
URINAL
5
-
LAVATORY
1.5
1.5
SINK
2
2
MOP BASIN
3
3
SHOWER/BATHTUB
2
3
DRINKING FOUNTAIN
RECIRCULATING HOT
WATER TO WATER HEATER
VACUUM i1 STRAP -ON AQUASTAT SET 5
BREAKER BY PC DEGREES LOWER THAN
HEATER TEMPERATURE
11
STRAINER
RECIRCULATION PUMP
nw
Y4" DOMESTIC COLD
WATER FROM WATER SERVICE `\\
CHECK VALVE
WALL
'JL" HOT WATER SUPPLY
-II" COLD WATER SUPPLY
VENT PIPING HOT S COLD WATER OUTLET
IN WALL NP
SINK
P-TRAP
U
INSULATE PIPING
ELEC. CONDUIT AND
J-BOX (REFER TO FINISHED FLOOR
ELEC. DRAWINGS)
NQTE INSULATE EXPOSED PIPING BELOW SINK PER ACCESSIBILITY REQUIREMENTS.
DEMONSTRATION SINK DETAIL N.2DPD3ITTSo�oEMo , H
FLOOR SLAB
PC TO PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF, PRECISION
PLUMBING PRODUCTS, WATTS OR APPROVED EQUIVALENT WITH PISTON AND 0-RING N" COLD WATER TO WATER
HDI€:
CONSTRUCTION, HAVING PIN DUN-201, /1010 OR ANSI /A11226.1M HEATER SEE WATER HEATER DETAIL ALL FLOOR PENETRATIONS MUST BE SLEEVED AND UQUID TIGHT.
CERTIFICATION. SIZE AND INSTALL
POI
ALL PER fill STANDARD OR NOTE:
MANUFACTURER'S INSTRUCTION. THE TABLES ABOVE ARE BASED ON THE SIOUX INSULATE ALL PIPING IN ACCORDANCE WITH SPECIFICATIONS. PIPING ARRANGEMENT SHOWN IS SCHEMATIC.
CHIEF PRODUCT UNE. IF PRESSURE IS IN EXCESS OF 65 PSIG THEN UPSIZE THE ADJUST TO SUIT FIELD CONDITIONS. MAKE PIPE SAME SIZE AS PUMP FITTING. FOLLOW MANUFACTURER'S
ARRESTER BY ONE (EXAMPLE: AN 'A' ARRESTER WOULD BECOME A 'B' ARRESTER.) INSTRUCTIONS FOR INSTALLATION PROCEDURE. VERIFY PROPER OPERANON WHEN INSTALLED.
WATER HAMMER ARRESTERS NTS R HOT WATER RECIRC. PUMP DETAIL NTS L P FLOOR PENETRATION DETAIL
OOD-PO301-R00-WNAI
110
4
08/11/15
TYPICAL SPRINKLER
iTO SANITARY SEWER SYSTEM
HEAD LOCATION FOR
COPPER
T-BAR CEILING
2 0
PRESSURIZED
1/2" HOT WATER SUPPLY (BEHIND)
PUMP DISCHARGE
VENT
0
COLD WATER SUPPLY
PROVIDE DRAIN PUMP BASIN
SOLENOID VALVE (NI ON
BALL VALVE
AND SOLENOID VALVE IN LIE
COLD AND HOT WATER ONES
OF GRAVITY DRAIN UNDER
BY PLUMBING
1/2" TO 3/B" REDUCER
ALTERNATE BID. COORDINATE
POWER WITH ELECTRICAL
REFER TO PLUMBING FlXNRE
WALL
SCHEDULE-BBW.
LOW VOLTAGE11RINGU
c
BY ELECTRICAHOT
3 COLD WATER OUTLET
-
SINK
TRAP PRIMER WITH
INTEGRAL VACUUM BREAKER
r YPICAL
A
48"X24" CEILING TILE
INSULATE PIPING
a
1-0"
TYPICAL SPRINKLER
HEAD LOCATION FOR
1�_0"�J[.
PROVIDE COUPLING
T-BAR CEILING
--
CHECK VALVEFLOAT
P-TRAP
MOUNTSACCESS
PANEL.
CAULK WITH FLEXIBLE FILLER
NON-COMBUSTIBLE UL LISTED FIRE STOPPING
PIPE D umPr..'-_ —
WEMSULATED . EFL SYSTEM WL ff
JIM INSULATED - UL SYSTEM NIL SD80 s 7 Y i qa ❑g€ o
N: nYEQh€
Mffffffff &g€o$g
6 somas yNt
s s a', gNK
NOTE: WEU+ 5LW.LLAS
3 qg
INSTALLATION TO FOLLOW UL SYSTEM WL 1001 OR e b P; �H 9 11
WL 5039 AND BE A UL TESTED ASSEMBLY. a `S E IN, ?£4 g
ytE,'B: EBB g° f.
s
NITS PIP THRU FIRE WALL NTS p �I an .e
09/03/ NETRATION DETAIL 1ADOD-PO301-000-PPEN _^ ^
CeEo�:
N-z Pie
on aW� d?ajY„
WATER PIPE HANGER I REFER TO HOT WATER €g@S� b�' sag^� V
SUPPLY r NEXT TO PIPE I RECIRC. PUMP DETAIL L Fee " MM Q c s
"�' ON THIS SHEET -'
TO W.H. TEE HW�� w F p e 5a
r�cw I ,F I 9'f TO FIXTURESIN PIP, w
UNION BY PC (TYP) N M rn
GATE/BALL _ I I WATER HEATER, SEE e9 o I
VALVE BY I PLUMBING FIXTURE SCH. O Y to CD
DOMESTIC COLD WATER LINE IN PLUMBING CHASE OR UNDER I
PC (ttP) I I FOR ADDITIONAL INFO. a P M
FIXTURE. MAKE BRANCH TO TRAP PRIMER OFF TOP OF THIS PIPE o1l I i (F N On a
- TRAP PRIMER IN CHASE OR UNDER FIXTURE. INSTALL PRIMER MINIMUM CHECK 11 I I REFER TO STRUCTURAL N
SIX INCHES ABOVE FLOOD RIM OF FIXTURE BEING SERVED VALVE BY BUTYL I DRAWINGS FOR SEISMIC
PC (TYP) DIAPHRAGM I SUPPORT REQUIREMENTS PROVIDE DISTRIBUTION UNITS WHERE MORE THAN ONE TRAP IS ROM[.. ----J �' T A P RELIEF VALVE i
SERVED BY A PRIMER W BY PC T
PRIMER MAY BE LOCATED ABOVE CEILING WHERE ACCESSIBLE. IF RUN -" COPPER PIPE Two: N
LOCATED IN A CHASE OR WALL, PROVIDE A HINGED, LOCKABLE, TO MOP SINK
PRIME COATED ACCESS DOOR IN AN ACCESSIBLE BUT INCONSPICUOUS PLACE AIR CHARGING VALVE FILL O Y tip
TANK WITH AIR PRESSURE. DAILY. DRIP PAN BY PC
THEN OPEN VALVE I~O LL z
e W
CONCRETE FLOOR x O W
ROOFING M
(FLASHING,
LANDLORD
INCREASER WHERE
REQUIRED
TURN DOWN
INTO STACK
THRU ROOF DETAIL
3M
RATED WALL 1
1" FIBERGLASS INSULATION
THRU WALL ONLY
(E) OR (N) PIPE -�
SPACE
VENT STACK
ROOFING MATERIAL
ROOF CONSTRUCTION
CONSTRUCTION
11-1/2"_ 'IP
DOD-P0801-D00-P
IqF
4k0�
M-Engineering
750 Brooksetlge Blvd.
WesheMlle, Ohio 43081
phone: 6/4.839.4639
/ex: 614.839=
wivvv.menginsenng.us.c
A,.f
WF
i ?',
MAY 3
1 019
�\
Z
O
O
UJ\
O
c')0
N
M
M
n
I--
It
N
U
oa
PIP
�
ov
a
z
?E
LL
O^yy
U
O
W
T
3
O
I
,Z,n
V
Y
L.
WLLJ
a
w
�i
E
N
Ex
J
L
N
N
OCUP
Cn
F
H-
SPARE CAP ACCESS ELEC. CONDUIT AND J-BO% (REFER TO TYPE "K" SOFT COPPER TUBE BELOW WELDED STEEL EXPANSION O
TANK WITH POLYPROPYLENE UNING a
GC TO SUPPLY AND FLOOR SLAB WITHOUT JOINTS. SLOPE e x W
INSTALL METAL GRIP ff�ELLC. DRAWINGS) JFLOOR DRAIN OR FLOOR SINK
f. TOWARD FLOOR DRAIN TRAP. PROVIDE '_ < w
PAN BENEATH PUMP CONNECT TO GFCI OUTLET BY ELECTRICAL ELASTOMERIC INSULATION FROM TRAP P-TRAP WITH TRAP PRIMER CONNECTION d Al a
%TO ABOVE FLOOR SUB DRAIN VALVE BY PC
"I (MIN%. CAPACITY 3 HIGH LIMIT FLOAT SWITCH (li BY PLUMBING PLATFORM w `r 'n
PP BASIN FINISHED FLOOR TRAP PRIMER MAY BE LOCATED ABOVE CEILING WHERE ACCESSIBLE. GENERAL CONTRACTOR } 0 N
oZYPICAL 24"X24" CEI I G TILE EJECTOR PUMP WITH FLOAT SWITCH BY PLUMBING
c TYPICAL 48"X24" CEILING TILE (FAUX 24"X24"1
V
NOTE; INSULATE EXPOSED PIPING BELOW SINK PER ADA REQUIREMENTS.
FIRE SPRINKLER HEAD LOCATION DETAILS I" " � -0" P DEMONSTRATION SINK DETAIL NTS K TRAP PRIMER
}0 09/04/15
'DROP NIPPLE DROP NIPPLE
REDUCER REDUCER
SPRINKLER HEAD VENTED PERFORATED CAP
r SUSPENDED CEILING �r SUSPENDED CEILING CLFANOUT PWG
ESCUTCHEON
SPRINKLER HEAD
RECESSED
HEAD
DROP NIPPLE
REDUCER
SPRINKLER HEAD
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel (}
�VrtT�\DwsR),jpA�
ELATE: 07/16/19 'DETAILS
� REFER TO PLAN AND CONDENSATE DRAIN TO SLOPE
LEGEND FOR POP -OUT DOWN TO SANITARY RECEPTOR
CONCEALED COVER FINISH COLOR. WITH APPROVED AIR GAP
HEAD
UNION A FC, AND. OR WSHP
z
SLOPE
PNI
SPRINKLER HEAD
WATERTIGHT SECONDARY
"^ CLEANOUT DRIP PAN WITH WATER
DETECTION SENSOR BY
MECHCH CONTRACTOR
REDUCER TRAP FOR WATER SEAL (CONDENSATE SUSPENDED BELOW UNIT
DRAIN TRAP AS REQUIRED BY THE
EQUIPMENT OR APPLIANCE MANUFACTURER
DROP NIPPLE CEILING
UPRIGHT HEAD
02/ow N ] CONDENSATE DRAIN DETAIL
COD-P0301-N00-FNED 14/201
FINISHED FLOOR
CONCRETE SLAB
T
STRUCTURE AT
UPPER LEVEL
SEALANT
TO TENANT'S
SANITARY SEWER
2 FLOOR
CLEANOUT DETAILS
00D-P0301402-COND 09/03/201
r COVER
ADJUSTABLE
HOUSING
A
GRADE AT
LOWER LEVEL
1" SECONDARY DRAIN DRAINS TO
O W
:2
MOP SINK
O
m
NOM
>
INSULATE ALL PIPING IN ACCORDANCE WITH SPECIFICATIONS.
PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD
00
J
DO
J N
CONDITIONS. MAKE PIPE SAME SIZE AS TANK FITTINGS. FITTNGS COME FACTORY EQUIPPED WITH HEAT TRAPS IN NIPPLES. FOLLOW
W
111.1
3
MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION PROCEDURE.
VERIFY PROPER OPERATION WHEN INSTALLED.
V V
Q N
m
w TIP
1.O
in 1.030
-o
F
WATER HEATER DETAIL
B
o
�
c
��*�P
Oq/03/201
�-��H�-��
03/27/15
r
�
W
� ~ �
who
2
131 Y
F
U
0
^
ego=
z
L
r
Uw
�o
Ow
W
W U
WALL
z
/A/�
OI
J a� Q
o W o
CLEANOUT
a
W
(1 V1 U
N o
FINISHED FLOOR
WALL SEALANT
ACCESS COVER
WATERPROOF MEMBRANE
SHALL EXTENT INTO THE
DRAIN BOWL FLANGE. PC
SHALL CLAMP PAN WATER
TIGHT INTO DRAIN DOLLAR
NALL STRUCTURE AT
UPPER LEVEL
TO TRAP PRIMER
(SEE RISER DIAGRAMS)
1 wALL
NTS C
-HE C FLOOR DRAIN DETAIL
OOD-PO301-E00-FWCO 09/03/201
CONCRETE SLAB OR
FINISHED FLOOR
- GRADE AT LOWER LEVEL
TO TENANT'S
SANITARY SEWER
MIN. 4" DEEP SEAL TRAP
REVISIONS:
REDmwD BY: DATE
DATE ISSUED: 05/31 /2019
DESIGNED BY: JD
DRAWN BY: JD
CHECKED BY: BM
PLUMBING AND
FIRE PROTECTION
DETAILS
DRAWING NUMBER:
A P 0 c
/03/201