Loading...
HomeMy WebLinkAboutP03.01 Plmb & Fire Prot DetailsON BRANCH LINE GREATER HOT OR THAN 20 FEET LONG, PUCE COLD ANOTHER ARRESTER IN THE WATER MIDDLE, EACH IS SIZED FOR SUPPLY WALL THE FIXTURE UNITS - �� ARRESTER WITHIN SIX FEET OF FIXTURE SERVED SINGLE FI%WRE MULTIPLE FIXTURES PDI SIZE FIXTURE UNIT LOAD AA 1-3 A 4-11 B 12-32 C 33-60 D 61-113 E 114-154 F 155-330 FIXTURE UNIT TABULATION FIXTURE COLD HOT VALVE WATER CLOSET 10 - TANK WATER CLOSET 5 - URINAL 5 - LAVATORY 1.5 1.5 SINK 2 2 MOP BASIN 3 3 SHOWER/BATHTUB 2 3 DRINKING FOUNTAIN RECIRCULATING HOT WATER TO WATER HEATER VACUUM i1 STRAP -ON AQUASTAT SET 5 BREAKER BY PC DEGREES LOWER THAN HEATER TEMPERATURE 11 STRAINER RECIRCULATION PUMP nw Y4" DOMESTIC COLD WATER FROM WATER SERVICE `\\ CHECK VALVE WALL 'JL" HOT WATER SUPPLY -II" COLD WATER SUPPLY VENT PIPING HOT S COLD WATER OUTLET IN WALL NP SINK P-TRAP U INSULATE PIPING ELEC. CONDUIT AND J-BOX (REFER TO FINISHED FLOOR ELEC. DRAWINGS) NQTE INSULATE EXPOSED PIPING BELOW SINK PER ACCESSIBILITY REQUIREMENTS. DEMONSTRATION SINK DETAIL N.2DPD3ITTSo�oEMo , H FLOOR SLAB PC TO PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF, PRECISION PLUMBING PRODUCTS, WATTS OR APPROVED EQUIVALENT WITH PISTON AND 0-RING N" COLD WATER TO WATER HDI€: CONSTRUCTION, HAVING PIN DUN-201, /1010 OR ANSI /A11226.1M HEATER SEE WATER HEATER DETAIL ALL FLOOR PENETRATIONS MUST BE SLEEVED AND UQUID TIGHT. CERTIFICATION. SIZE AND INSTALL POI ALL PER fill STANDARD OR NOTE: MANUFACTURER'S INSTRUCTION. THE TABLES ABOVE ARE BASED ON THE SIOUX INSULATE ALL PIPING IN ACCORDANCE WITH SPECIFICATIONS. PIPING ARRANGEMENT SHOWN IS SCHEMATIC. CHIEF PRODUCT UNE. IF PRESSURE IS IN EXCESS OF 65 PSIG THEN UPSIZE THE ADJUST TO SUIT FIELD CONDITIONS. MAKE PIPE SAME SIZE AS PUMP FITTING. FOLLOW MANUFACTURER'S ARRESTER BY ONE (EXAMPLE: AN 'A' ARRESTER WOULD BECOME A 'B' ARRESTER.) INSTRUCTIONS FOR INSTALLATION PROCEDURE. VERIFY PROPER OPERANON WHEN INSTALLED. WATER HAMMER ARRESTERS NTS R HOT WATER RECIRC. PUMP DETAIL NTS L P FLOOR PENETRATION DETAIL OOD-PO301-R00-WNAI 110 4 08/11/15 TYPICAL SPRINKLER iTO SANITARY SEWER SYSTEM HEAD LOCATION FOR COPPER T-BAR CEILING 2 0 PRESSURIZED 1/2" HOT WATER SUPPLY (BEHIND) PUMP DISCHARGE VENT 0 COLD WATER SUPPLY PROVIDE DRAIN PUMP BASIN SOLENOID VALVE (NI ON BALL VALVE AND SOLENOID VALVE IN LIE COLD AND HOT WATER ONES OF GRAVITY DRAIN UNDER BY PLUMBING 1/2" TO 3/B" REDUCER ALTERNATE BID. COORDINATE POWER WITH ELECTRICAL REFER TO PLUMBING FlXNRE WALL SCHEDULE-BBW. LOW VOLTAGE11RINGU c BY ELECTRICAHOT 3 COLD WATER OUTLET - SINK TRAP PRIMER WITH INTEGRAL VACUUM BREAKER r YPICAL A 48"X24" CEILING TILE INSULATE PIPING a 1-0" TYPICAL SPRINKLER HEAD LOCATION FOR 1�_0"�J[. PROVIDE COUPLING T-BAR CEILING -- CHECK VALVEFLOAT P-TRAP MOUNTSACCESS PANEL. CAULK WITH FLEXIBLE FILLER NON-COMBUSTIBLE UL LISTED FIRE STOPPING PIPE D umPr..'-_ — WEMSULATED . EFL SYSTEM WL ff JIM INSULATED - UL SYSTEM NIL SD80 s 7 Y i qa ❑g€ o N: nYEQh€ Mffffffff &g€o$g 6 somas yNt s s a', gNK NOTE: WEU+ 5LW.LLAS 3 qg INSTALLATION TO FOLLOW UL SYSTEM WL 1001 OR e b P; �H 9 11 WL 5039 AND BE A UL TESTED ASSEMBLY. a `S E IN, ?£4 g ytE,'B: EBB g° f. s NITS PIP THRU FIRE WALL NTS p �I an .e 09/03/ NETRATION DETAIL 1ADOD-PO301-000-PPEN _^ ^ CeEo�: N-z Pie on aW� d?ajY„ WATER PIPE HANGER I REFER TO HOT WATER €g@S� b�' sag^� V SUPPLY r NEXT TO PIPE I RECIRC. PUMP DETAIL L Fee " MM Q c s "�' ON THIS SHEET -' TO W.H. TEE HW�� w F p e 5a r�cw I ,F I 9'f TO FIXTURESIN PIP, w UNION BY PC (TYP) N M rn GATE/BALL _ I I WATER HEATER, SEE e9 o I VALVE BY I PLUMBING FIXTURE SCH. O Y to CD DOMESTIC COLD WATER LINE IN PLUMBING CHASE OR UNDER I PC (ttP) I I FOR ADDITIONAL INFO. a P M FIXTURE. MAKE BRANCH TO TRAP PRIMER OFF TOP OF THIS PIPE o1l I i (F N On a - TRAP PRIMER IN CHASE OR UNDER FIXTURE. INSTALL PRIMER MINIMUM CHECK 11 I I REFER TO STRUCTURAL N SIX INCHES ABOVE FLOOD RIM OF FIXTURE BEING SERVED VALVE BY BUTYL I DRAWINGS FOR SEISMIC PC (TYP) DIAPHRAGM I SUPPORT REQUIREMENTS PROVIDE DISTRIBUTION UNITS WHERE MORE THAN ONE TRAP IS ROM[.. ----J �' T A P RELIEF VALVE i SERVED BY A PRIMER W BY PC T PRIMER MAY BE LOCATED ABOVE CEILING WHERE ACCESSIBLE. IF RUN -" COPPER PIPE Two: N LOCATED IN A CHASE OR WALL, PROVIDE A HINGED, LOCKABLE, TO MOP SINK PRIME COATED ACCESS DOOR IN AN ACCESSIBLE BUT INCONSPICUOUS PLACE AIR CHARGING VALVE FILL O Y tip TANK WITH AIR PRESSURE. DAILY. DRIP PAN BY PC THEN OPEN VALVE I~O LL z e W CONCRETE FLOOR x O W ROOFING M (FLASHING, LANDLORD INCREASER WHERE REQUIRED TURN DOWN INTO STACK THRU ROOF DETAIL 3M RATED WALL 1 1" FIBERGLASS INSULATION THRU WALL ONLY (E) OR (N) PIPE -� SPACE VENT STACK ROOFING MATERIAL ROOF CONSTRUCTION CONSTRUCTION 11-1/2"_ 'IP DOD-P0801-D00-P IqF 4k0� M-Engineering 750 Brooksetlge Blvd. WesheMlle, Ohio 43081 phone: 6/4.839.4639 /ex: 614.839= wivvv.menginsenng.us.c A,.f WF i ?', MAY 3 1 019 �\ Z O O UJ\ O c')0 N M M n I-- It N U oa PIP � ov a z ?E LL O^yy U O W T 3 O I ,Z,n V Y L. WLLJ a w �i E N Ex J L N N OCUP Cn F H- SPARE CAP ACCESS ELEC. CONDUIT AND J-BO% (REFER TO TYPE "K" SOFT COPPER TUBE BELOW WELDED STEEL EXPANSION O TANK WITH POLYPROPYLENE UNING a GC TO SUPPLY AND FLOOR SLAB WITHOUT JOINTS. SLOPE e x W INSTALL METAL GRIP ff�ELLC. DRAWINGS) JFLOOR DRAIN OR FLOOR SINK f. TOWARD FLOOR DRAIN TRAP. PROVIDE '_ < w PAN BENEATH PUMP CONNECT TO GFCI OUTLET BY ELECTRICAL ELASTOMERIC INSULATION FROM TRAP P-TRAP WITH TRAP PRIMER CONNECTION d Al a %TO ABOVE FLOOR SUB DRAIN VALVE BY PC "I (MIN%. CAPACITY 3 HIGH LIMIT FLOAT SWITCH (li BY PLUMBING PLATFORM w `r 'n PP BASIN FINISHED FLOOR TRAP PRIMER MAY BE LOCATED ABOVE CEILING WHERE ACCESSIBLE. GENERAL CONTRACTOR } 0 N oZYPICAL 24"X24" CEI I G TILE EJECTOR PUMP WITH FLOAT SWITCH BY PLUMBING c TYPICAL 48"X24" CEILING TILE (FAUX 24"X24"1 V NOTE; INSULATE EXPOSED PIPING BELOW SINK PER ADA REQUIREMENTS. FIRE SPRINKLER HEAD LOCATION DETAILS I" " � -0" P DEMONSTRATION SINK DETAIL NTS K TRAP PRIMER }0 09/04/15 'DROP NIPPLE DROP NIPPLE REDUCER REDUCER SPRINKLER HEAD VENTED PERFORATED CAP r SUSPENDED CEILING �r SUSPENDED CEILING CLFANOUT PWG ESCUTCHEON SPRINKLER HEAD RECESSED HEAD DROP NIPPLE REDUCER SPRINKLER HEAD RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel (} �VrtT�\DwsR),jpA� ELATE: 07/16/19 'DETAILS � REFER TO PLAN AND CONDENSATE DRAIN TO SLOPE LEGEND FOR POP -OUT DOWN TO SANITARY RECEPTOR CONCEALED COVER FINISH COLOR. WITH APPROVED AIR GAP HEAD UNION A FC, AND. OR WSHP z SLOPE PNI­ SPRINKLER HEAD WATERTIGHT SECONDARY "^ CLEANOUT DRIP PAN WITH WATER DETECTION SENSOR BY MECHCH CONTRACTOR REDUCER TRAP FOR WATER SEAL (CONDENSATE SUSPENDED BELOW UNIT DRAIN TRAP AS REQUIRED BY THE EQUIPMENT OR APPLIANCE MANUFACTURER DROP NIPPLE CEILING UPRIGHT HEAD 02/ow N ] CONDENSATE DRAIN DETAIL COD-P0301-N00-FNED 14/201 FINISHED FLOOR CONCRETE SLAB T STRUCTURE AT UPPER LEVEL SEALANT TO TENANT'S SANITARY SEWER 2 FLOOR CLEANOUT DETAILS 00D-P0301402-COND 09/03/201 r COVER ADJUSTABLE HOUSING A GRADE AT LOWER LEVEL 1" SECONDARY DRAIN DRAINS TO O W :2 MOP SINK O m NOM > INSULATE ALL PIPING IN ACCORDANCE WITH SPECIFICATIONS. PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD 00 J DO J N CONDITIONS. MAKE PIPE SAME SIZE AS TANK FITTINGS. FITTNGS COME FACTORY EQUIPPED WITH HEAT TRAPS IN NIPPLES. FOLLOW W 111.1 3 MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION PROCEDURE. VERIFY PROPER OPERATION WHEN INSTALLED. V V Q N m w TIP 1.O in 1.030 -o F WATER HEATER DETAIL B o � c ��*�P Oq/03/201 �-��H�-�� 03/27/15 r � W � ~ � who 2 131 Y F U 0 ^ ego= z L r Uw �o Ow W W U WALL z /A/� OI J a� Q o W o CLEANOUT a W (1 V1 U N o FINISHED FLOOR WALL SEALANT ACCESS COVER WATERPROOF MEMBRANE SHALL EXTENT INTO THE DRAIN BOWL FLANGE. PC SHALL CLAMP PAN WATER TIGHT INTO DRAIN DOLLAR NALL STRUCTURE AT UPPER LEVEL TO TRAP PRIMER (SEE RISER DIAGRAMS) 1 wALL NTS C -HE C FLOOR DRAIN DETAIL OOD-PO301-E00-FWCO 09/03/201 CONCRETE SLAB OR FINISHED FLOOR - GRADE AT LOWER LEVEL TO TENANT'S SANITARY SEWER MIN. 4" DEEP SEAL TRAP REVISIONS: REDmwD BY: DATE DATE ISSUED: 05/31 /2019 DESIGNED BY: JD DRAWN BY: JD CHECKED BY: BM PLUMBING AND FIRE PROTECTION DETAILS DRAWING NUMBER: A P 0 c /03/201