A. SCOPE OF WORK
I. PROVIDE A COMPLETE AND OPERABLE FIRE PROTECTION SYSTEM AS IT APPLIES TO THE DEMISED PREMISE.
2. WHERE APPLICABLE, THE CONTRACTOR SHALL CONTRACT THIS WORK WITH A LANDLORD APPROVED FIRE PROTECTION CONTRACTOR, ALL MATERIALS
AND EQUIPMENT UNDER THIS SECTION SHALL BE NEW AND LISTED BY UNDERWRITERS LABORATORIES/OF CANADA, INC. FOR FIRE PROTECTION
SYSTEM INSTALLATION.
3.THE FIRE PROTECTION SYSTEM SHALL BE AS FOLLOWS:
o.NEW WET SPRINKLER FIRE PROTECTION SYSTEM FOR ALL AREAS OF THE RETAIL SPACE, PORTIONS THAT ARE UNHEATED OR EXPOSED TO
FREEZING TEMPERATURES SHALL BE PROVIDED WITH AN AUTOMATIC DRY PIPE SYSTEM COMPLYING WITH NFPA/NFPAC 13.
b.COVERAGE SHALL BE IN ACCORDANCE WITH EXISTING CONDITIONS, NFPA/NFPAC 13, LOCAL CODES, LANDLORD'S CRITERIA, MALL INSURANCE AND
LSD&C'S STANDARDS AND SHALL INCLUDE:
(1) ALL PIPE TAPS, RISERS, LATERALS, BRANCHES, VALVES, HANGERS, ALARMS, SPRINKLER HEADS AND ALL COMPONENTS REQUIRED.
(2) PROVIDE PROFESSIONALLY DESIGNED AND SEALED DRAWINGS, HYDRAUUC CALCULATIONS, SUBMITTALS AND APPROVALS AS NEEDED
INCLUDING ANY SEALS, PERMITS, FEES, AND CHARGES.
c.FIRE EXTINGUISHERS SHALL BE PROVIDED. REFER TO INSTALLATION SECTION OF THIS SPECIFICATION.
4.EXAMINE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DOCUMENTS TO PROPERLY SEQUENCE, COORDINATE, AND INTEGRATE THE
VARIOUS ELEMENTS OF THE FIRE PROTECTION SYSTEM WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS.
5.01ONTRACTOR SHALL USE APPROVED INDUSTRY FIRE SPRINKLER STANDARDS FOR REUSING EXISTING FIRE SPRINKLER BRANCHES AND SUBMIT
CALCULATIONS TO THE LSD&C'S PROJECT MANAGER UPON REQUEST OR REWORK SYSTEM TO THE LSD&C PROJECT MANAGER'S SATISFACTION.
6.RELOCATION OF EXISTING MAINS, LATERALS, BRANCHES AND RISERS TO FACILITATE STORE DESIGN CRITERIA SHALL BE INCLUDED AS PART OF THIS
WORK.
LO" ORIAWMOM ARID COMMON
1. IN ACCORDANCE WITH THE PREVAILING STANDARDS, BUT NO LESS THAN THAT REQUIRED BY NFPA/ NFPAC 13, THIS FIRE PROTECTION CONTRACTOR
SHALL PREPARE COMPLETE CALCULATIONS AND SHOP DRAWINGS. SO (6) COPIES SHALL BE SUBMITTED TO THE GENERAL CONTRACTOR AND
ADDITIONAL SETS AS REQUIRED TO THE PROPER CODE AUTHORITIES FOR APPROVAL (NO WORK SHALL BEGIN UNTIL ALL APPROVALS HAVE BEEN
RECEIVED).
2.00PY OF THE LETTER OF APPROVAL FROM THE LANDLORD'S INSURANCE RATING BUREAU SHALL BE FORWARDED TO THE LANDLORD'S AGENT AND
TO THE ISDQC PROJECT MANAGER.
a.REQUIREMENTS IF PROJECT IS A SIMON MALL A MINIMUM OF FIVE SETS OF SHOP DRAWINGS ALONG WITH HYDRAULIC CALCULATIONS (IF
APPLICABLE) SHALL BE SUBMITTED TO GLOBAL RISK CONSULTANTS FOR APPROVAL HYDRAUUC CALCULATIONS SHALL BE SUBMITTED
REGARDLESS OF THE SCOPE OF WORK INVOLVED.
b. REQUIREMENTS IF PROJECT IS A SIMON MALL FIVE SETS OF MATERIAL BROCHURES SHALL ALSO BE SUBMITTED TO GRC FOR REVIEW.
BROCHURES SHALL BE UNITED TO NEW SPRINKLER HEADS, FLEXIBLE DROPS AND VALVES. PLANS SHALL INDICATE THE TYPE OF PIPING BEING
UTILIZED WITH THE GAUGE INDICATED.
3. LISTED BELOW ARE MINIMUM REQUIREMENTS FOR SPRINKLER SYSTEM DESIGN AND INSTALLATION. SYSTEM SHALL BE HYDRAULICALLY DESIGNED:
a. ORDINARY HAZARD, GROUP 2: PROVIDE A 0.20 GPM/SF PER 1,500 SQUARE FEET DENSITY WITH IWF RATED 1/2" ORIFICE SPRINKLER HEADS
OR FOLLOW NFPA/NFPAC DENSITY/AREA CURVE FOR DENSITY COVERAGE. PROVIDE A MAXIMUM COVERAGE OF 130 SQUARE FEET PER HEAD.
(1) REQUIREMENTS IF PROJECT IS A SIMON MALL MINIMUM SPACING SHALL BE 70 SQUARE FEET PER HEAD AND SPACING SHOULD NOT
EXCEED 100 SF FOR DENSITIES OVER 0.25 GPM/SF.
(2) REQUIREMENTS IF PROJECT IS A SIMON MALL: FM GLOBAL REQUIRED DENSITY WILL BE 0.15 GPM/SF OVER THE MOST HYDRAULICALLY
REMOTE 2500 SF USING AR ORIFICE, 165 DEGREE RATED HEADS. HEAD SPACING SHOULD NOT EXCEED 130SF. OPTIMUM SPRINKLER
OPERATING AREA SHOULD BE 300SF UNLESS SPECIFIC APPROVAL IS GIVEN OTHERWISE FOR SPECIAL OCCUPANCIES. THE MOST REMOTE AREA
SHOULD HAVE THE DIMENSIONS PARALLEL TO THE BRANCH LINE OF AT LEAST 1.4 TIMES THE SOUARE-FOOT OF THE AREA. THE DENSITY
DESIGN SHOULD CONFORM TO THE MOST STRINGENT FM GLOBAL OR NFPA/NFPAC 13, ORDINARY HAZARD GROUP TWO OCCUPANCY FOR
RETAIL/COMMON/OFFICE AND MECHANICAL EQUIPMENT AREAS.
Is. MAXIMUM HEAD SPACING: 15 FT.
c. SPRINKLERS SHALL BE TESTED FOR A MINIMUM OF 2 HOURS AT 200 PSI.
d. DESIGN CALCULATIONS OF INSIDE PIPE SHALL USE F--100 FOR DRY AND C=120 FOR WET SYSTEMS.
C. SPRINKLER MEADS
1. ALL SPRINKLER HEADS SHALL BE NEW (EXISTING HEADS IN EXISTING LSD&C STORES ARE NOT TO BE REPLACED UNLESS NOTED OTHERWISE), U.L
AND F.M. LISTED AND APPROVED AUTOMATIC SPRAY TYPE AS MANUFACTURED BY AUTOMATIC SPRINKLER, GRINNELL, RELIABLE, OR VIKING.
2. ALL SPRINKLER HEADS SHALL BE RATED AS FOLLOWS OR AS REQUIRED BY LOCAL CODES:
a. STORAGE AREAS OR MEZZANINES: 2007-2257.
b. SALES AREA 150E-170'F OR 20PF-225'F AS NOTED ON PUNS.
3. MANUFACTURER FOR ALL SPRINKLER HEADS SHALL BE AS FOLLOWS:
o. SALES AREA: BASE BID SHALL INCLUDE HEADS MANUFACTURED BY RELIABLE WITH ALTERNATE BIDS BASED ON VIKING MICROFAST AND MIRAGE
VK SERIES OR GRINNELL MODEL F972 AND SHALL BE APPROVED BY THE LSD&C PROJECT MANAGER PRIOR TO ORDERING AND INSTALLATION.
E. NON -SALES AREA ROUGH BRASS FINISH AS MANUFACTURED BY AUTOMATIC SPRINKLER, STAR, RELIABLE, GRINNELL OR VIKING SPRINKLER
COMPANY ONLY.
CALL SALES AREA SPRINKLER HEADS INCLUDING TRIM AND COVER SHALL HAVE FACTORY APPLIED FINISH. REFER TO FIRE SPRINKLER HEAD PLAN
FOR FINISH REQUIREMENTS.
5.ALL SPRINKLER HEADS ON THE MALL SIDE OF TENANT'S STOREFRONT ENCLOSURE, IF ANY, SHALL MATCH LANDLORD'S TYPE.
LPMMNL FRTT[NQ% Be VALVES
1. SCHEDULE 40 BLACK STEEL: ASTM A-53 WELDED AND SEAMLESS, ANSI B-36-10-70 FOR WROUGHT STEEL PIPE.
2.CAST IRON OR MALLEABLE IRON SCREWED FITTINGS FOR PIPES 2 INCHES AND SMALLER, SCREWED OR CAST IRON FLANGED JOINTS FOR PIPES
LARGER THAN 2 INCHES. FITTING SHALL BE APPROVED FOR 175 PSI WORKING PRESSURE.
3.GALVANIZED OR BLACK MALLEABLE IRON WITH BRASS SEAT SCREWED UNIONS FOR PIPES 2 INCHES AND SMALLER.
4.VICTAULIC TYPE COUPLINGS ARE ACCEPTABLE WHERE APPROVED BY LOCAL CODE AND THE LANDLORD.
5.11EQUIREMENTS IF PROJECT IS A SIMON MALL APPROVED FM UGHTWALL PIPING WITH ROLL GROVES MAY BE USED IS SIZES LARGER THAN 2
INCHES, EXCEPT WHERE PIPE IS SUBJECT TO PHYSICAL DAMAGE.
6. REQUIREMENTS IF PROJECT IS A SIMON MALL- ALL HANGERS SHALL CONFORM TO FM GLOBAL GUIDEUNES, STRUCTURAL STEEL HEADERS SHALL BE
INSTALLED FOR SUPPORTING CROSS MAIN HANGERS WHERE THE MAIN IS NOT DIRECTLY BELOW A STRUCTURAL MEMBER.
7.REQUIREMENTS IF PROJECT IS A SIMON MALL: CAST IRON WALL PLATES SHALL BE PROVIDED ON EXPOSED PIPING WHERE PIPE PASSES THROUGH
WALLS, PARTITIONS, CEILINGS, ETC., SECURED BY SETSCREWS.
& REQUIREMENTS IF PROJECT IS A SIMON MAW VALVES SHALL BE FM GLOBAL APPROVED AND RATED 175 PSI MINIMUM.
LMMTAU ATMON
1.A FIRE PROTECTION SYSTEM TAP IS NORMALLY FURNISHED BY THE LANDLORD, VERIFY IN FIELD PRIOR TO BID.
a.WHENEVER AN EXISTING SPRINKLER SYSTEM IS BEING RENOVATED, THE INTEGRITY AND REUABIUTY OF THE EXISTING SYSTEM SHALL BE
MAINTAINED.
b. ORIGINAL SPRINKLER SHOP DRAWINGS SHALL BE ACQUIRED THROUGH THE MALL MANAGER/PROJECT MANAGER; HOWEVER, THE SPRINKLER
CONTRACTOR SHALL VERIFY THE EXISTING SPRINKLER SYSTEM IN THE FIELD AND SHALL COORDINATE WITH AND SHOW DISCREPANCIES BETWEEN
THE ORIGINAL SHOP DRAWINGS AND FIELD CONDITIONS IN THE RENOVATED SHOP DRAWINGS.
2.01STALLATION SHALL INCLUDE TESTING THE BUILDING SYSTEM PRIOR TO CONNECTING TO MALL SPRINKLER SYSTEM. TESTING SHALL BE APPROVED
BY THE FIRE DEPARTMENT AND LANDLORD REPRESENTATIVES. FINAL CONNECTION TO LANDLORD'S SPRINKLER MAIN WILL NOT BE MADE UNTIL THE
ENTIRE SYSTEM WITHIN THE DEMISE PREMISES IS TESTED AND READY FOR SERVICE.
& SPRINKLER HUD SPACING SHALL COMPLY WITH ORDINARY HAZARD, GROUP 2.
4.SYSTEM SHALL COMPLY WITH THE MOST STRINGENT OF THESE SPECIFICATIONS, THE LANDLORD'S DESIGN CRITERIA OR LOCAL CODES WITH PIPE
SIZING BEING BASED ON NFPA/NFPAC ORDINARY HAZARD, GROUP 2 AND COMPLY WITH NFPA/NFPAC 13 LATEST EDITION.
5.ALL SPRINKLER LINES SHALL BE CONCEALED AND MOUNTED AS HIGH AS IS PRACTICAL, AVOIDING INTERFERENCE WITH LIGHTS, DUCTS, PIPES,
STORAGE DECK, ETC.
& FIRE PROTECTION CONTRACTOR SHALL PREPARE COORDINATED SHOP DRAWINGS INDICATING THE LOCATIONS OF ALL SPRINKLER HEADS, SPRINKLER
LINES, LIGHTS, DIFFUSERS, GRILLES AND REGISTERS PRIOR TO INSTALLATION.
7.RELOCATE ALL MAINS AND BRANCHES INTERFERING WITH CEILING HEIGHTS, EQUIPMENT AND MAJOR COMPONENTS, INCLUSIVE OF ADJACENT
TENANTS AND MALL COMMON AREAS, REMOVE ALL UNUSED PIPING.
& FASTENING AND/OR SUSPENSION DEVICES MUST BE ATTACHED TO THE BUILDING STRUCTURE ONLY. SUPPORT SHALL BE FROM THE TOP OF ANY
BAR JOIST OR AS DIRECTED BY THE LANDLORD OR THE BUILDING STRUCTURAL ENGINEER.
9.FURNISH AND INSTALL A VALVED TEST CONNECTION IN AN ACCESSIBLE LOCATION FOR THE SPRINKLER SYSTEM AS REQUIRED OR REQUESTED BY
THE MALL, LOCAL INSPECTOR, OR INSURANCE CARRIER - COORDINATE LOCATION WITH THE LSD&C PROJECT MANAGER AND LOCAL FIRE
PROTECTION OFFICIAL TO ROUGH -IN.
10. WHEN COMPLETED, THE ENTIRE FIRE PROTECTION PIPING SYSTEM SHALL BE HYDROSTATICALLY TESTED AS REQUIRED BY THE RULES AND
REGULATIONS OF THE AUTHORITIES HAVING JURISDICTION. SYSTEM SHALL SHOW NO SIGNS OF LEAKAGE OR OTHER DEFECTS. THIS CONTRACTOR
SHALL BE RESPONSIBLE FOR DAMAGE TO THE WORK OF THE OTHER CONTRACTORS OR TO THE BUILDING, OR TO ITS CONTENTS, PEOPLE, ETC.,
EXPENSE. COMPLETELY FLUSH THE SYSTEM UNTIL DISCHARGE SHOWS NO DISCOLORATION.
11. PROPERLY COMPLETED AND SIGNED "SPRINKLER CONTRACTOR'S MATERIAL AND TEST CERTIFICATES SHALL BE FURNISHED TO THE LANDLORD,
AUTHORITIES HAVING JURISDICTION, TENANT'S ARCHITECT, INSURANCE REPRESENTATIVE, PROJECT OFFICE AND THE LSD&C PROJECT MANAGER.
t2. PROVIDE VALVED DRAIN WITH HOSE THREAD AT ALL LOW POINTS OR TRAPS IN SPRINKLER PIPING. IDENTIFY DRAIN VALVES IF ABOVE HARD
CEILINGS WITH A SUITABLE CEILING MARKER AND PROVIDE ARCHITECT APPROVED METHOD FOR ACCESS AS REQUIRED.
13. COORDINATE SPRINKLER WORK WITH FIRE/ALARM CONTRACTOR WHERE THERE ARE FLOW AND TAMPER SWITCHES AND ALARM REQUIREMENTS.
14. SPRINKLER SYSTEM SHALL BE INTERFACED WITH BUILDING FIRE/LIFE SAFETY AND SMOKE EXHAUST SYSTEM IF REQUIRED. REFER TO LANDLORD
TENANT CRITERIA AND REQUIREMENTS.
15. FURNISH AND INSTALL IOLB. TYPE "ABC" FIRE EXTINGUISHERS WITH CABINETS IF REQUIRED, AND AT LEAST A "4A-8OB:C" RATED EXTINGUISHER.
LOCATIONS ARE TO BE ESTABLISHED IN THE FIELD BY THE LSD&C PROJECT MANAGER AND THE LOCAL FIRE PROTECTION OFFICIAL MAXIMUM
TRAVEL DISTANCE BETWEEN EXTINGUISHERS SHALL BE 75 FEET OR LESS AS REQUIRED BY LOCAL CODES.
SECTION 220000. PLUMBING
A. SCOPE OF WORK
1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR,
REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL WORK FOR THE PLUMBING SYSTEMS
AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE UMRED
TO THE FOLLOWING:
a. COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS.
b. COMPLETE COLD AND HOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION.
c. FIXTURES AND EQUIPMENT AS SCHEDULED.
d.COMPLETE NATURAL GAS OR PROPANE PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS).
e.CONDENSATE PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS).
L TESTS AND ADJUSTMENTS.
g.SUBMIT A COMPLETE SET OF REPRODUCIBLE AS-BUILTS.
2.BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND
SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE PLUMBING SYSTEM, MATERIALS, AND EQUIPMENT WITH
OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS.
3.ALL EXISTING WASTE LINES NEW OR OLD MUST UNDERGO A SEWER INTERIOR INSPECTION USING COLOR CLOSE CIRCUIT TELEVISION (CCTV) CAMERA
A MINIMUM OF 30 PAST LEASE LINE IN ALL DIRECTIONS, DOCUMENT INSPECTION ON DVD WITH AUDIO LOCATION AND DATE INFORMATION, DVD
TITLE INFORMATION AND CONTINUOUS TAPE COUNTER PROVIDE HAR COPY OF ALL INSPECTION LOGS. DO NOT COMMENCE WORK OF SANITARY TIE
IN PRIOR TO APPROVAL OF INSPECTION LOGS BY LDS&C PROJECT MANAGER. ANY BLOCKAGE WITHIN 30' PERIMETER MUST BE CLEARED. CAMERA
LENS MUST PROVIDE NOT LESS THAN 140 DEGREE VIEWING ANGLE WITH AUTOMATIC OR REMOTE FOCUS AND IRIS CONTROLS. POINTS OF
INTEREST MAY INCLUDE, BUT ARE NOT UNITED TO THE FOUDWING: DEFECTS, CRACKS, VOIDS, CONNECTIONS, ENCRUSTATIONS, MINERAL DEPOSITS,
DEPOSITS, DEBRIS, SEDIMENT, AND ANY LOCATION DETERMINED NOT TO BE CLEAN OR PART OF AN IMPROPER LINER INSTALLATION, AND ANY
DEFECTS IN LINER THAT INCLUDE BUT ARE NOT LIMITED TO BUMPS, FOLDS, TEARS, AND DIMPLES.
4. RELOCATION OF EXISTING WATER, GAS, WASTE, VENT, OR DRAINAGE LINES TO FACIUTATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID
PROPOSAL
LROtMVA IT AND OWALLATIMR
L REFER TO PLANS FOR SCHEDULES OF EQUIPMENT AND FIXTURES. AMERICAN STANDARD AND CRANE MAY BE CONSIDERED WITH APPROVAL FROM
LSD&C PROJECT MANAGER.
2. SANITARY PIPING
DRAINAGE PIPING SHALL BE UNIFORMLY PITCHED, 1/4" PER FOOT FOR PIPE SIZES 3" AND SMALLER, I/B" PER FOOT FOR PIPE SIZES 4" AND
LARGER, UNLESS OTHERWISE REQUIRED BY EXISTING CONDITIONS, OR INDICATED ON THE DRAWINGS.
b.INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES, WHEN APPLICABLE. INSULATION TO BE AS SPECIFIED FOR WATER
PIPING.
c.CONDENSATE PIPING SHALL BE TYPE 'L' DRAWN COPPER TUBE WITH 95-5 TIN -ANTIMONY SOLDERED JOINTS AND WROUGHT COPPER FITTINGS
WITH DIELECTRIC SEPARATION BETWEEN DISSIMILAR METALS.
& POTABLE WATER PIPING SHALL BE AS FOLLOWS:
a.BELOW GRADE: TYPE W. ANNEALED TYPE TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES AND SMALLER, BRAZE ALL JOINTS. (PROPRESS
FITTINGS ARE NOT PERMITTED)
b. ALL OTHER: TYPE 'L' DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95-5 TIN -ANTIMONY SOLDER.
4.PIPING OF DISSIMILAR METALS MUST BE DIELECTRICALLY SEPARATED.
5.GENERALLY, SANITARY AND POTABLE WATER TAPS WILL BE PROVIDED BY THE LANDLORD. FIELD VERIFY EXACT CONNECTION POINTS PRIOR TO
SUBMFFTING BID. NOTIFY THE LSD&C PROJECT MANAGER, IF CONDITIONS ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN THE
SPECIFICATIONS. CONTRACTOR MUST VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE-IN AS FOLLOWS:
o.SCOPE SANITARY TO LEASE UNE, SNAKE AS REQUIRED AND REPORT ANY BLOCKAGES.
b.TEST WATER PRESSURE TO INSURE MINIMUM PSI MATCHES MOST DEMANDED BY EQUIPMENT SUPPLED.
6.INSULATE ALL HOT WATER, GOLD WATER AND CONDENSATE PIPING WITH I" THICK (K=0.23 0 750F) PIPE INSULATION WITH AN ALL SERVICE
JACKET. INSULATION AND JACKET TO MEET LOCAL CODES AND UL/ULC FUME SPREAD AND SMOKE DEVELOPED RATINGS. WHERE LOCAL CODE IS
MORE STRINGENT OR INSULATION VALUE OR FLAME AND SMOKE SPREAD COMPLY WITH LOCAL CODE.
TINSUUTE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH 1/2" ARMSTRONG "ARMAFLLX" PIPING INSULATION OR TRUEBRO MODEL
102W "HANDI LAV GUARD" INSULATION KIT.
&INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE
OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAY AND SEISMIC BRACING WHERE REQUIRED BY CODES.
9.STERIUZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES.
10. CLEANOUTS AND FLOOR DRAINS SHALL BE INSTALLED PER LOCAL CODES. WALL COVERS ARE TO BE STAINLESS STEEL AND FLOOR COVERS ARE
TO BE BRASS, UNLESS OTHERWISE SPECIFIED. PROVIDE FLOOR COVERS WITH INSET AREA FOR CARPETED LOCATIONS. ALL CLEANOUT LOCATIONS
SHALL BE APPROVED BY THE LSD&C PROJECT MANAGER.
11. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED, AND PLACED AT ALL PIPE PENETRATIONS AT WALLS, FLOORS AND CEILINGS IN
FINISHED AREAS.
12. LEAKAGE TESTS SHALL BE PER LOCAL CODES MINIMUM AS FOLLOWS:
o.TEST WATER PIPING AT 100 PSIG FOR SIX HOURS.
b. TEST DRAIN, WASTE, VENT PIPING BY A 10' WATER COLUMN FOR TWO HOURS.
13. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE LANDLORD'S CRITERIA. USE A LANDLORD APPROVED ROOFINC
CONTRACTOR, WHERE APPLICABLE.
14. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL UTILITIES REQUIREMENTS. IF APPLICABLE. REFER TO PLANS
TO DETERMINE IF WATER METER IS REQUIRED.
440
41-Engineering
750 Brooksedge Blvd.
WwA lle, Ohio 43081
phone: 614,839.4639
for. 614.839.2222
w ..rnengmeennigmwnl
A. P40ZB,..
MAY V1 2019
Z
0
1))
W
O
CO)
N
a
cQ
M
a
n
Uri
U
o70
�
�
o�
(�
x
\/`i
Z
?
L1
O
U
O
z
O
Z
T
3�
N
V
LL
J
L
0
m
a
Q
m
0
�
F
H
R
5s 7 5<€s
Vi
R 9 � _ biv _ v NN
ar.
K W�
a S E E €:ad5ti
asap s €.- eti
g
lB by* S i<- „W-Nk mBSN,,
G_ 3B`
"aa
Qas k1a2$g Pa6 5
€ 21y
" bon a IMN
FHM€ffU
<gg H.,xg HE
M- :Old. :at W ,- W.
a Y
� G3R ea
pg€$
H8F 37 €3
r N M O
O o
U o I
Y
N O
Ile
N
011 N
R
Cl)
r
O
/Yy/
li U
z
O o0
O 0
¢ a
6 l:J Q
>100 w o M
O
O N N
O aQ
Q U O
w
p o\O
J J N
Do J W
UU LL 3
Ci U M
06 Q a N
o KJ M o
a � F �1
a
Z U W a 0
�
U >E a
W Q a W W
& Jaya
a W C%�NU Ino�
REVISIONS:
RNJIRED BY: DA-E
DATE ISSUED: 05/31 /2019
DESIGNED BY: JD
DRAWN BY: JD
CHECKED BY: BM
PLUMBING AND
FIRE PROTECTION
SPECIFICATIONS
DRAWING NUMBER:
IJ 4 o , � 1
BITS
A