Loading...
HomeMy WebLinkAboutMinutes TAC 04-16-97 I ► , purpose room. Variance needed for height of building. and setback. Drainage as proposed sheet drains to inlet. Curb line parallels the pole line. COMMENTS: - Carmel Fire Dept., Stan Puckett sent comment letter, no response; addition not being sprinklered, will be type 5 one-hour expiration with two hour Lire separation. Petitioner agrees to install knocksbox. - DOCS, Mike Hollibaugh regarding landscape plan. Landscaping along entry on parking lot edge—propose no landscaping along western line of Keystone; privacy fences along most of the north line, evergreens on east side. Ornamentals to be added to open areas, traditional shade trees and islands; no trees in right-of-way. - City Engineering, Kate Boyle reviewing drainage calcs; petitioner will need additional sewer & water connection—fee for additional. - County Soil & Water, John South only minor comments. - Carmel Utilities/Sewer, Matt Huddleston, concerns addressed.. - Carmel Utilities/Water, Paul Arnone says backflow device will be required. - Indiana Gas, Mary Shultz, petitioner to contact commercial rep. for gas - DOCS, Mark Monroe, Church willing to commit to install sidewalks on north side of 126th Street at future date. Landscaping is biggest issue. Input from neighbors to north? Petitioner has talked with some of the neighbors. CARMEL LIBRARY (UV/V) Petitioner seeks approval (Use Variance/Variances) to construct a library on 7.7 acres. The site is located at the southeast corner of 4th Avenue SE and 131st Street. The site is zoned R-2/Residence. Filed by Bill Wendling of Campbell Kyle and Proffitt. Bill Wendling: Application for Use Variance filed for construction of library on 4th Avenue and Main Street. Some property condemned to facilitate; west side of 4th Avenue will accommodate staff parking. Overview: Steve Robinson, Browning Day Muffins, Dierdorf and Jeff Bolinger. Also in attendance: John Fuchs, Carmel Clay Public Library; Terry Quillman and Steve Manor, Congdon Engineering; and Gene Margason, Rotz Engineers, Inc. Building to be two floors, 111,000 sq. ft., double entrance; building oriented to 4th Avenue; library currently leases 40 parking spaces from church. Some trees to be saved; landscaping to be added.. COMMENTS: - Carmel Fire Dept., Stan Puckett, Siamese to face south rather than north; knocksbox to be installed. - Carmel Utilities, Paul Arnone not happy with location of facilities—access to mechanical room a problem; backflow devices to be installed; access best on east side of building. - Cannel Utilities, Mart Huddleston: Ten inch sanitary sewer at 4th & Main to be abandoned; would prefer manhole on south end (8 inch) of property—can tap into existing. Utilities requests set of plans after revisions. - DOCS, Mike Hollibaugh, no comment on landscaping. c:\minutes\tac\197 apr - County Surveyor, Steve Cash no comment--Carmel's jurisdiction. - County Soil & Water, John South requests set of plans; project over five acres—petitioner to submit an erosion control plan and NOI letter. - Indiana Gas, Mary Shultz did not receive a set of plans; happy to serve petitioner. -City Engineering, Dick Hill, petitioner to appear before BPW for sewer & water availability; also commercial curb cut approval on 4th. Sidewalks adjacent to curb—should be one foot inside nght-of-way, any variation to go before BPW. Petitioner to extend sidewalk on west side of 4th Ave. Will look at connection fees and acreage charge—may not apply. - DOCS, Mark Monroe pedestrian access from neighborhood? would be coming across church property—if feasible, access easement would resolve; package agreement with church firm'? 2 yr. agreement. Re-use of building? Possibly community purpose—kept in hands of government, depends on use and access. CONSECO, BUILDING K (DP/ADLS) Petitioner seeks approval (Development Plan and Architectural Design, Lighting, Landscaping and Signage) to construct a 100,000 square feet office building within the existing complex. The site is located north of College Drive and east of Pennsylvania Street. The site is zoned M-3/Manufacturing and B-2/Business. Filed by Tim Tully of Woolpert. In attendance: Les Olds and Bob Olson, CSO Architects/Engineers; Tom Mills, Conseco Companies; Jim Tully of Woolpert. Project is combination office building, conference center on 55 acres, 100,000 square feet; addressed off College, two story, same material as existing. Overall appearance same. COMMENTS: - Carmel Fire Dept., Stan Puckett comment letter sent; would like to meet with petitioner regarding location of sprinkler Siamese hookup; petitioner agrees to install knocksbox. Letter designation of building is internal only. - County Surveyor, Steve Cash says indirect outlet request needed; drainage shed within Fertig drain. - County Soil & Water, John South says most all OK; two areas of concern: better construction schedule regarding erosion control; and maintenance requirements for erosion control practices with each of the practices. Otherwise, OK - Indiana Gas, Mary Shultz—building all electric - City Engineer, Dick Hill comments forthcoming on grading and drainage. Indpls. Water, Clay Regional Waste. No curb cuts on public streets—one on private drive.. - DOCS, Mark Monroe request application; zoning of property; confirmation of required parking--one space per 203 sq. it; tree preservation plan; dumpster detail; mechanical equipment to be screened. WEAVER INDUSTRIAL BUILDINGS, (LP) Petitioner seeks approval (Improvement Location Permit) to construct three buildings encompassing c:`minutes\tac\197 apr