Mr. Mark Monroe
Mr. Terry Jones
CARMEL DEPARTMENT OF
COMMUNITY SERVICES
One Civic Square
Carmel, IN 46032
RE: Carmel Clay Public Library
Docket Nos. V-21-97, V-22-97, & UV-20-97
Dear Mark and Terry:
Enclosed please find a recorded copy of the Commitment by the Carmel Clay Public
Library to the Cannel Clay Board of Zoning Appeals which we have received. If you have any
questions regarding the enclosed, please do not hesitate to contact me.
Sincerely,
CAMPBELL KYLE PROFFITT
William E. Wendling, Jr.
WEW/mlh
Encl.
C:\W E W\LIB RARY\M ONROE4.W PD276-4
650 East Carmel Drive Suite 400 Carmel,Indiana 46032 (317)846-6514 FAX(317)843-8097
e
CAMPBELL KYLE PROFFITT
ATTORNEYS AT LAW
JOHN M.KYLE FRANK S.CAMPBELL
JOHN D.PROFFITT (1880-1964)
ROBERT F.CAMPBELL
JEFFREY S.NICKLOY FRANK W.CAMPBELL
DEBORAH L.FARMER (1916-1991)
WILLIAM E.WENDLING,JR. May19, 1997
ANNE HENSLEY POINDEXTER
ANDREW M.BARKER
TODD L.RUETZ
MELISSA A.CLARK
MATTHEV iL( ark Monroe
Mr. Terry Jones
CARMEL DEPARTMENT OF
COMMUNITY SERVICES
One Civic Square
Carmel,IN 46032
RE: Carmel Clay Public Library
Dear Mark and Terry:
Enclosed please find copies of letters we received from the City of Carmel, Department
of Engineering dated May 1, and April 24, 1997. As you can see,both letters recommend to the
Board of Public Works that they approve both the sewer and water availability for the new
Carmel Public Library as well as the curb cuts requested on 4th Avenue SE.
On May 7, 1997, I attended the Board of Public Works and Safety meeting and both of
these requests were unanomously approved.
For your information the Carmel Clay Library is also scheduled to be on the
May 21, 1997,Board of Public Works and Safety agenda in regard to the sidewalk issue for the
west side of 4th Avenue SE. Specifically, an extension of the sidewalk up to the driveway of
Marilyn Thomas as well as addressing the issue of whether the sidewalks on both sides of 4th
Avenue SE need to be set further back from the curb then what has previously been submitted. I
will inform the Department of Community Services of the outcome of that meeting.
If you have any questions regarding the above please do not hesitate to contact me.
Sincerely,
CAMPBE KYLE PROFFIT
William E. Wendling, Jr.
WEW/mlh
Encl. 4.0,8 OF
C:\WEW\LIBRARY\MONROE4.WPD276-4 do a"* :0
�C ;
etY
650 East Carmel Drive Suite 400 Carmel,Indiana 46032 (317)846-6514 FAX(317)843-8097
t NAY-02-1997 11:46 FRUM I U y1=i4S1=10' . H.b2/bS
CT
of CqR�
it of Carmel
DEPARTMENT OF ENGINEERLNG
•
liApril 24, 1997
oard,of Public Works and Safety
One Civic Square
!Carmel, IN 46032.
pear Board Members:
11 recommend the Board approve sewer and water availability for the New Carmel Public Library
las follows:
CARMEN,RUBLIC LIBRARY
Sewer: 7.17 E.D.U.s as per Sewer Ordinance S-58. Not to exceed an average daily flow of 2,151
gallons.
k�
aier. 7.17 E.D.U.s as per Water Ordinance A-66/A-77. Not to exceed an average daily flow of
2,151 gallons.
pie above availability was based upon the existing library average usage of 0.563 gallons per
;square foot x the proposed 114,602 square foot library which equals 64,520 gallons per month
!divided by 1.0 E.D.U. (9,000 gallons per month) equals 7.17 E.D.U.s.
Construction or development of this project must begin within twelve (12)months or said
approval expires and the developer or builder must reapply to the Board.
Sincerely,
7?7Lt
M. Boyle, P.E.
City Engineer
MKB/rbh
Enclosure
J:\DOC\AVAIL97\LIBRARY
illY-ud-1yy'/ 11:4'/ HKUf'1 i u yN4.66U (
`0 of eA;Z
1.1
Carmel
A
.. Lai
•
` ', NCity sf
't," / DEPARTMENT OF ENGINEERING
May 1, 1997
Board of Public Works and Safety
One Civic Square
Carmel, IN 46032
Dear Board Members:
William E. Wendling, Jr., of Campbell Kyle Proffitt and representing the Carmel Clay Public
Library, has requested to be on the Board of Public Works and Safety agenda for approval of curb
cuts on 4th Avenue SE.
1 The proposed site plan for the library includes one entrance on the east side of 4th Avenue SE
into the library parking lot(adjacent to the library building) and one entrance into the parking lot
! directly across the street from the building (on the west side of 4th Avenue SE),
The entrance into the separate parking lot is located at the south edge of the lot and at a distance
of approximately 215'from the centerline of Main Street. The remainder parcel south of this lot is
being utilized for detention purP9ses. The main entrance into the library is located even further
south(approx. 450) and should not pose any problems as it relates to the intersection and
ingress/egress from the site. This office does not have any problems with the proposed locations.
Therefore, I recommend the Board approve this request for two (2) curb cuts along 4th Avenue
SE for the proposed Cannel Clay Public Library.
Sincerely,
-)44 te
M. Kate Boyle, P.E.
City Engineer
MKB/mkb
TOTAL P.03
05/01/87 11:28 .Hill, W. 51Icu -444 4ALCmCL r'. Suva
I`fiamiiltOn County SOS . .• Water Conservation District
925 Division Street—Noblesville,IN_ .i•4.2744--Ph. (317) 773-1406—Fax(317)776-1101
Drainage, Erosion and Sediment Control Plan
T'eelmiCal,Revi.ew and Commeat
- - -
Project natae: C -Reviewed by Zi,Aiy 50 U1Y
Suluuitiiby. Cast... Czar L gegr C'laael7 rOMt m1 Er.1GNEE?f14JG
• .3sae, D+=Pnu( 3 LAID, 5o. loss
XJNO:AtJmFt'irL3, 'NJ 'L2(8
• Phone:( ) Phan:(3/7 ) B7! --006' {
Ma=riew pmct duxc, Site visit(Dale: ! I )- Plan review: (Date: Si !30 177 )
coati m `��` A„c S.E. — -
Legal deeeait Sl�c. 30
Toow.nship:` 1i Rain '1 E• Cavil Township- C LA
Sad Stnvey Map Sheet Di tubed acv:s_ 2.
712 rraMin r-P1417551S Jow.usNl.FORI IE'B Fl}HLEME4IISOP3.XdC-1SS-7.DIEFRIENCIESARBNO7221 -
ICI VIE'[TEC A!LMENIS'aritHSCHIECMIs7 1WEET3 Z086An atrinzp T+'►.3az'IBP.mixrci d Alsxmlll.SOrnsz ZULL PLF1$E
SHffi@ TOBT2ENZTER v.sv-,:r...r..» (*-retlx21tfi 1V17ZESNLOEIZOO1?L?'APFR�AI.WHEN
YZNAEX T5D- 21ETO 0.407101 8 ET. •r r.-.P.FntLGCL.SLOE I=CUL PERMS l ferILLYBE$.52/Tn b lV
Pt4a® tffi MIS Plio :
YES.713:6PIdRdfla=2718lE OF3Z7,Td• 7
./� No,7 ,pldNl cis soiriersoUIIaareasoF rAcam-,€7
Are the following on the pI2
a.+TA..deestg rater_An item is not applicable to this project)
-I YES NO PROW-er. FQRMA ZON
IA a/ Project location map in adequate IWO to show the site relationship to
other areas m the cowry
lB „ .` Narrative dekcaring the nature and purpose of the project and the
cri13StEflthOn. mr)udimg start and comple on.dates for each
land .may
IC c/" 7Lococcat Location plan.Tand
�o�r exist ng roads,utilities, structures,
ID V �and oru t I I c locaIio1
All plans must show appropriate legends, s4aies,and North arrow
I YES NO TOPOGR ,PmC AND GENERAL SITE FEATURES
2A ,/^ Icy .it.a tferinte,existing Vegetation.
2E fisting -.+' proposed co otns at an interval appropriate to ireif-
draInage p.a awn
2C Nana 4 Deli the 100 year ffloodpinms,floodway fringes,and floodways
2D Identify lanialuse of adjacent areas
2E .. Location aril name of all lakes,streams, channels,ditches,
wetlands, and otter water courses on and adjacent to the site
Show the entire upstream watershed and ad,.acent.areas within 500 feet of property lines
Paso
tt a oa/au% •
1 -
h/U1/!i f li:La nan. %.v. ona,v -,-,-, ti.tilk r'. •Ei vu.,
Project- GAerc C L._,p_i L ,_ar ,e►-e
... i____ YES NO St71IiIl� t?l 'i7f3i� __ : .. .
3A d nafthe types;ineir;dingmap, .
am. - .
IF MA=SOWIEI' .CII'S VIE:rz.:(•r ,r.u/r. GQr EMIRATE OF
h
4A. r/j Location
wt.-leave
,�.,o�.fspec c pars where. d�cbatge I
Seaver 1r=r y r -yamr.. ,7y,
411 ' an ►r- I•1=:: - ,if&stha ige is�
�.:it. sewer,�+o. naLac of the.
- 1aI operator a3ad the rdtimatc receiving r
4C if Notation. the rir,',`�l. of e1 I ar as-where
/` .�3 y :tfn:.
4D Y Ucation of'ate ssystemstf1C�U din culverts,
Ste storm. ,t l f'LS„and$&ales)
4E __— f.,' CoIuctioa dells of outlet pmtoetion.below srnrat _
water wets
rYES NO LAM)D�ATG A+C IVTI� S •
arras;with a •• . ve v tatie cover will be
5B ,, 1,0041 of:4= stockxles ar d or barrow areas
- . YBS NO EROSION Alb SHI331 CONTROL MEASORES
CIA 5e.4 Ca ! Schuh& WliAlt_i each measure Elbe leme od •
6B _ s and for each .
.. - measure
6C ✓ Laca on,&mayon s,and
4-011.. .r..n�A al
0
i M4.in. Setrirakit..ii . s
6D ._ _ ,-«",.:1u1 anilVirdrire for temporary seeding, with
areas to bc ae d`edclearly d (inducring seed
mimes,ferniu4s,EMS andnmIdt rates)
6E k! Imago;dimairions,construction depik,and
6F „r specifications of all temporary
Location,d ons;ova 440%and
6G ,/f pof T}p morsaies
and c[r�a;�for storm infer protection
6"H ✓` Specifications arid details for a stable camoructian
e
61 r S'imdcations R, erosian and sit control.an
individual .U: . r= lots
AEL PEACI100121CUVEDIN7$EPl&C-AS-BET.Z RECOMMIDEO RussCOMMENTS,SHOULDBEEVAL 3AS
TO T73E FFil S LLTlYBYL r'a_I r »t IMMVIDMIL.MIOISTROCTOEMPJZo z 1 Qt+d'LLD imi Q IFli1 FR.
r •Ps0 f'4'1TE :Tetr CaCOLCUOIV1UlYBEYE 70FM:O iirdl.�drdEMOStON4i'87
SEDMENI"CONTIEOLMEASOZEIL
YES NO PERMANENT VEGErATNE STABILIZATION
TA ✓'' Schedule why each disturbed Bret will be stabilized.
7B 4.-"" Spe.cfcatioas fer parmiment seeirmg(mdnding seed
mixes,fertiliat I ,,and mulch rants)
I
11al Uli bl LL:L1 It(( IIILA. +..11. Prrbii ' Ir LLa. av •ra�•�••
•
COMMT CONTINUED
PROJECe. CilktiEL -C.LA'," LttsrAe
•
I, f 1c.. CPO I16N. cop Cr'n J g'7 f ealh $ 11.1±-12.Cra-Z e44-+ Q rot%s4-eve--"ke '-
- .s c p,e-K c ._ vim;71.1 C. 2 - C /i0e.c o T 2 c�or11t c 14e-
ch- &¢ k_volLs 0 71r. r- o r-i r
2 i��`rK5 18} YFj S A S B • 8 sLecslrl rt f I L e cs.se- F•
•
_
cc; e Jo .s /
erogp.!„r, Dar ar' &,r,7
ale —
CAMPBELL KYLE PROFFITT
ATTORNEYS AT LAW
JOHN M.KYLE FRANK S.CAMPBELL
JOHN D.PROI F111 (1880-1964)
ROBERT F CAMPBELL
JEFFREY S.NICKLOY FRANK W.CAMPBELL
DEBORAH L.FARMER (1916-1991)
WILLIAM E.WENDLING,JR.
ANNE HENSLEY POINDEXTER
ANDREW M.BARKER April 28, 1997
TODD L.RUETZ
MELISSA A.CLARK
MATTHEW S.LOVE
Mr. Mark Monroe
Mr. Terry Jones
Mr. Mike Hollibaugh
CARMEL DEPARTMENT OF
COMMUNITY SERVICES
One Civic Square
Cannel,IN 46032
RE: Cannel Clay Public Library
Dear Mark, Terry and Mike:
The purpose of this letter is to inform you that as of last Tuesday or Wednesday(April 22 or
23), Steve Robinson of Browning Day Mullins Dierdorf,Inc. responded to each of the TAC
committee members who expressed issues to address at the TAC meeting on April 16, 1997.
Attached hereto are Steve's notes concerning the same. He specifically responded to items 1, 2, 3,4,
5, 6, 8, 9, 10, and 14, all in the affirmative to the requests. For example,the water main will now be
located on the east side of the building,as opposed to the west, in compliance with the request by the
Utilities Department.
No response was required for items 7 and 11. I have made arrangements to be on the agenda
for the May 7 Board of Public Works meeting to address the issues set forth in item 12.
In regard to item 13, it is my understanding that if the City Engineer wants to extend the
sidewalks on the west side of 4th Avenue, it will be done. As to item 16, we will do what we can,
but we are somewhat restricted due to the fact that we do not own the land to the east of the facility.
If you have any questions regarding this matter,please do not hesitate to contact me.
Sincerely,
CAMPBELL KYLE PROFFITT
William E. Wendling, Jr.
WEW/mlh
Encl. „gp
C:\WEW\LIBRARY\MONROE3.LTR276-4 t_y"•�+,
*CA,
' ILg
, ,r
,,xo
650 East Carmel Drive `Suite 400 Carmel,Indiana 46032 (317)846-6514 FAX(317)843-8097
APR-17-1997 11:31 BDMD INC. 317 634 5409 P.01i02
Alir
BROWNING DAY MULLINS DIERDORF INC MEMO
ARCHITECTURE PLANNING LANDSCAPE ARCHITECTURE
To: Terry Quilman/CEA - 876-0114
Steve Maynard/CEA - 876-0114
Gene Margason/Rotz - 293-1282
Phil Kuntz/Paul I. Cripe - 841-4798
Bill Wendling/Campbell, Kyle & Profit - 843-8097
John Fuchs/Carmel Clay Library - 571-4285
Barry Petit/MS&R - 612-342-2216
Dave Hall/GDI - 921-7687
Jeff Bolinger/BDMD
From: Steve Robinson
Re: Items to Complete or Revise based on TAC Meeting Comments
Project: Cannel Clay Public Library
Project No./File No.: 9647/01.40.0
Date: April 17,1997
It is important that revised sets of drawings go back to the various TAC members before the April
28th BZA meeting. Please make these revisions and send revised plots, where applicable, to me by
Tuesday, April 22, 1997.
ACTION ITEM
CEA/Rotz 1. Face the Siamese connection and the hydrant to the south, per Stan
Puckett.
MS&R 2. Continue to show the Knox Box on the plans.
CEA 3. Study water main on east side of building instead of west. If it can fit
there, put it there. If it cannot fit there, call Paul Arnone A_S.A.P_ and
determine an acceptable location.
Rotz 4. Get information on approved back-flow devices from Paul Arnone.
As far as I can tell, this is a Construction Document issue, not
something that needs to be on the BZA plans.
CEA 5. Revise sanitary so that it runs to the south manhole in a new PVC
pipe. Connection into manhole structure can be at the location of the
current clay pipe, which should be moved. There is no pipe between
the north and south manholes on 4th Avenue.
Browning Day Mullins Dierdorf Inc
334 North Senate Avenue
Indianapolis, Indiana 46204
(317) 635-5030
(317) 634-5409 Fax
APR-17-1997 11:31 BDMD INC. 317 634 5409 P.02/02
Carmel Clay Public Library
Issues about TAC Meeting Comments
BDMD Project No. 9647
Page 2
CEA 6. Prepare a plan for Paul Arnone that does not show the trees.
7. Mike Hollibaugh, Landscape Architect, said he had no comments.
CEA 8_ John South said an erosion control plan is needed. He must not have
looked at the one we have in our package. CEA verify that this is
final.
BDMD Landscape 9. Clarify on plan that curved line over the detention basin is the line of
the prairie grass seeding.
Rotz 10. Contact gas company representative Mary Schultz.
11. Dick Hill of Engineering said Kate Boyle is still in the process of
reviewing the plans. She will send comments this week.
CK&P 12, Dick Hill says Board of Public-Works issues are:
1. Sewer and water.
2. Commercial curb cut.
3_ Sidewalks inside of right-of-way. He said "normally" the
sidewalks are one foot back from the right-of-way, or they
must receive Board of public works approval. Ours along 4th
Avenue are in the right-of-way.
Campbell, Kyle & Profit identify review process, drawings needed,
etc.
CEA 13. Dick Hill said Kate Boyle is still considering a request for an extension
of the sidewalk on the west side of 4th Avenue, down to where it
would reach Mrs. Thomas's new driveway. If this is indeed
requested, CEA should study it relative to drainage.
CEA 14. Make the right-of-way lines bolder and note them more clearly.
CCPL 15. Dick frill said connection fees will apply. It appears acreage fees will
not apply.
16. Mark Monroe asked about building a walk to the adjacent
neighborhoods to the east. We responded with no commitment to this
because it would cross Church land, which we do not control.
Browning Day Mullins Dierdorf Inc
334 North Senate Avenue
Indianapolis, Indiana 46204
(317) 635-5030
(317) 634-5409 Fax
TOTAL P.02
Carmel Clay Schools
CLAY
BOARD OF EDUCATION L+`, �'�'yn ADMINISTRATION
President � Superintendent
BRUCE BREEDEN b.�/ R.STEPHEN TEGARDEN,Ph.D.
Vice Presidents /� Assistant Superintendent
PAUL BOLIN For Human Resources
Secretary •. �• JAMES F.BURRELL,Ed.S.
ANGELA CORLEY '�►EL.1NO,r Assistant Superintendent
Members For Business Affairs
STEPHEN A.BACKER ROGER McMICHAEL
TOM WILLIAMS Director of Curriculum
NANCYLEE C.BUCKLEY
Director of Information Services
SUE MOESCHL
April 28, 1997
Director of Curriculum
BARBARA UNDERWOOD,Ed.D.
Dear Board of Zoning Appeals:
The Carmel Clay Schools fully support the plans for construction of the new Cannel Clay Public Library as
presented by the library board. The relationship that exists between the schools and the public library has
proven time and again to be extremely beneficial for our children and professionals. Not only is our
relationship a positive one but it is unique as well. Very few school systems share a card catalog with their
public library that can be accessed within each school building. The public library staff and the teachers in
our system work together to prepare research opportunities for all of our students. Our schools cannot
possibly house all of the material necessary for total learning. The public library has always been there to
help, and we value that partnership. Needs have grown not just for our schools but for our community as a
whole. The plans presented by the library are essential to the continued quest for knowledge and service that
our community presently exhibits and requires in the future.
Currently, the library offers various summer programs for our children. In order to get even more students
involved additional space and resources are needed. We want our children to have every opportunity to gain
knowledge not only of information but in how to access that information. The plan presented by the library
board allows for that growth needed immediately and in the future.
The public library has continually supported the efforts our schools have made to provide opportunities for
children and their families. We hope that we have reciprocated by equally supporting the programs of the
public library. We feel very fortunate to have such a wonderful relationship with the public library as do the
patrons we serve. We applaud the degree to which the library board has assessed the needs and desires of the
total community and the manner in which they have solicited suggestions and input from all citizens.
Therefore, the Cannel Clay School Corporation fully supports, approves, and recommends the construction
of a new library facility at the corner of 4th Avenue and Main Street, and supports the bond financing
necessary to construct a new library facility that will meet and anticipate the needs of the community now and
in the future. If you have questions, or would like additional information, I would be more than happy to
talk with you at any time.
Sincerely,
R. Ste len Teg en, Superintendent
cc: Board of Education
EDUCATIONAL SERVICES CENTER•5201 E. 131 ST STREET•CARMEL, IN 46033•TELEPHONE(317)844-9961 •FAX(317)844-9965
APR -28-1997 15 30 HDMD 1 NC:. .51 f b34 +ray
•
BROWNING DAY MUWN$DIERDORF INC FAX
ARCHITECTURE PLANNING I ANDSCAPF ARCHITECTURE
To: Mr. Mark Monroe
Department of Community Services
Fax Number: 571-2426
Frorn: Steve Robinson
Re:
Project; Cannel Clay Public Library
Project No No.: 9647/01,10.1
Date: April 25,1997
No.of Pages: 4 including this sheet
If this transmission is incomplete or illegible, please contact the gender eye soon as possible at the number below.
For your review.
Browning Day Mullins Dierdorf Inc
334 North Senate Avenue
Indianapolis, Indiana 46204
t3171r 635-5030
(317) 634-5409 Fax
FIPR-213-1'±yY 15 t 51 .B1)111) 'NU. .]l( 0.34 .'+i r r.tie/YJ4
Browning Day Mullins Dierdorf Inc
Arthitectu re
Planning
Landscape Architecture
Apnl 28, 1997
Mr. Mark Monroe
Department of Community Services
One Civic Square
Cannel,IN 46032
Re: TAC Committee Review Items
Carmel Clay Public Library Project
BDMD No. 9647
Dear Mr. Monroe:
Attached hereto are the notes of items that the TAC Committee asked us to address.
We believe we can positively respond to all of the items they asked us to address_ In
revised drawings that we sent to you and other TAC members on April 23, 1997, we
indicate the revisions you requested such as relocation of the water line to the east
side of the building, revised routing of the sanitary sewer lines, and clarification of
several other items. We believe the drawings are now in compliance with the intent
of your wishes.
Sincerely,
BROWNING DAY MULLINS DJERDORF INC
Steven W_Robinson
Vice President
SWR/mmr
cc: Bill Wendling
James E. Browning
Daniel Alan Day
Craig W. Mullins
John M. Dierdorf
Jonathan R. Hess
Greg E.Jacoby
John E,()Meld
Steven W. Robinson
334 North Senate Avenue
Indianapolis, Indiana 46204
317,635.5030
FAX 317.634.5409
Ind:enepolis
HYK-�t5-177( 1J Jl t4U1'U 114L. - r oJ-, J-+JJ I .CI.,CV,
BROWNING DAY MULLINS DIERDORF INC MEMO
ARCHITECTURE PLANNING LANDSCAPE ARCHITECTURE
To: Terry Quilman/CEA -876-0114
Steve Maynard/CEA -.876-011.4
Gene Margason/Rotz-293-1282
Phil KuntzlPaul I. Cripe- 841-4798
Bill Wendling/Campbell, Kyle & Profit- 843-8097
John Fuchs/Carmel Clay Library-571-4285
Barry Petit/MS&R - 612-342-2216
Dave 1Ial IGDI- 921-7687
Jeff Bolinger/BDMD
From: Steve Robinson
Re: Items to Complete or Revise based on TAC Meeting Comments
Project: Cannel Clay Public Library
Project No./File No.: 9647101.40.0
Date: April 17,1997
ft is important that revised sets of drawings go back to the various TAC members before the April
28th BZA meeting. Please make these revisions and send revised plots,where applicable, to me by
Tuesday, April 22, 1997.
ACTION ITEM
CEA/Rotz 1. Face the Siamese connection and the hydrant to the south, per Stan
Puckett.
MS&R 2. Continue to show the Knox Box on the plans.
CEA 3. Study water main an east side of building instead of west If it can fit
there,put it there. If it cannot fit there,call Paul Arnone A.S.A.P. and
determine an acceptable location.
Rotz 4. Get information on approved back-flow devices from Paul Arnone.
As far as I can tell, this is a Construction Document issue, not
something that needs to be on the BZA plans.
CEA 5. Revise sanitary so that it runs to the south manhole in a new PVC
pipe. Connection into manhole structure can be at the location of the
current clay pipe, which should be moved. There is no pipe between
the north and south manholes on 4th Avenue_
Browning Day Mullins(Nerdorf Inc
334 North Senate Avenue
Indianapolis, Indiana 46204
1317) 635-5030
(317) 634-5409 Fax
Nrm-eo-1 J7! l J•J l YUI'IL L IYu. J 1 1 0J4 ..i'iKJ' r.YJ-F�YJ•+
Carmel Clay Public Library
Issues about TAC Meeting Comments
BDMD Project No, 9647
Page 2
CEA 6. Prepare a plan for Paul Arnonc that does not show the trees,
7, Mike Hollibaugh, Landscape Architect, said he had no comments,
CEA S. John South said an erosion control plan is needed. He must not have
seen the one we have in our package. CEA verify that this is final.
BDMD Landscape 9. Clarify on plan that curved fine over the detention basin is the line of
the prairie grass seeding.
Rotz 10. Contact gas company representative Mary Schultz.
l 1_ Dick Hill of Engineering said Kate Boyle is still in the process of
reviewing the plans. She will send comments this week.
CK&P 12_ Dick Hill says Board of Public-Works issues are:
1. Sewer and water.
2. Commercial curb cut.
3. Sidewalks inside of right-of-way_ lie said "normally" the
sidewalks are one foot back from the right-of-way, or they
must receive Board ofpublic works approval_ Ours along 4th
Avenue are in the right-of-way_
Campbell, Kyle & Profit identify review process, drawings needed,
etc.
CEA 13. Dick Hill said Kate Boyle is still considering a request for an extension
of the sidewalk on the west side a of 4th Avenue, down to where it
would reach Mrs. Thomas's new driveway. If this is indeed
requested, CEA should study it relative to drainage.
CEA 14. Make the right-of-way lines bolder and note them more clearly.
CCP", 15. Dick Dill said connection fees will apply. It appears acreage fees will
not apply.
16. Mark Monroe asked about building a walk to the adjacent
neighborhoods to the east. We responded with no commitment to this
because it would cross Church land,which we do not control.
Browning Day Mullins Dierdort Inc
334 North Senate Avenue
Indianapolis, Indiana 46204
Of71 NUR::
TOTAL_ F'.E�4
CAMPBELL KYLE PROFFITT
ATTORNEYS AT LAW
FRA s C..MM -
jOHN D_PRCi$11
RCazir'F C.ku7SFZL W.Cp.+tP9F
1=:°R NI EY S. CiL FRANK
LOY nr. .94s}
u.
DEBORAH L.FARMER
`7 TLLL!M E.WE•TDLLN ,IR.
ANNE HENSLEY DF TER
ANTAILEW RARTEA
TODD L RUETL
ISSA A.;LARK FMCS IrMIILE COVER SR7ET
!4 R:Ew S.LO`rf
Carmel Ofr:_ce 7'acsimi1e Number: (317) 843-8097
Noblesville Of_ .ce Facsimile *]vmnert (317) 776-3451 /ZF Jc�-7
Date
/ 1
(f1A
TO: f _
77
FROM: t 9:7.J t1 L\
(4)
Total number of including cover letter:
pages,
Snoutd you experience any problem in receipt of these pages, -zLlase contact
�` ititi �d as soon aS possible at (317) 846-0514
ADDITIONAL NQTE5
•
it
J L
Original will will not fellow via L'''_S. mail.
CONFIDENTZALITY NOT£CE: The materials enclosed with this facsimile transmission are
private and confidential and are the property of the sender. The information contained in the
material is privileged and is intended only for the use of the individal(s) or entity(les)
named above. If you are nor the intended recipient, be advised that any unauthorized
disclosure, copying, distribution or the raking of any action in reifar:ce on the contents of
this relecopied information is strictly prohibited. if you have recei".ied this facsimile
transmission in error, please immediately nortf reiepnone to orange for return. of the
forwarded documents to us.
650 Est Ctrrnd L•::,e Suite 4C0 Carmel,Indiana 4-032 317 i 346-5514 FAX(317)343-e097
Browning Day Mullins Dierdorf Inc
Architecture
Planning
Landscape Architecture
April 28, 1997
Mr. Mark Monroe
Department of Community Services
One Civic Square
Carmel, IN 46032
Re: TAC Committee Review Items
Carmel Clay Public Library Project
BDMD No. 9647
Dear Mr. Monroe:
Attached hereto are the notes of items that the TAC Committee asked us to address.
We believe we can positively respond to all of the items they asked us to address. In
revised drawings that we sent to you and other TAC members on April 23, 1997, we
indicate the revisions you requested such as relocation of the water line to the east
side of the building, revised routing of the sanitary sewer lines, and clarification of
several other items. We believe the drawings are now in compliance with the intent
of your wishes.
Sincerely,
BROWNING DAY MULLINS DIERDORF INC
,,,,i_:,,,,,t.,....,
Steven W. Robinson
Vice President
SWR/mmr
cc: Bill Wendling
James E. Browning
Daniel Alan Day
Craig W. Mullins
John M. Dierdorf
Jonathan R. Hess
Greg E. Jacoby
John E. Orfield
Steven W. Robinson
334 North Senate Avenue
Indianapolis, Indiana 46204
317.635.5030
FAX 317.634.5409
Indianapolis
Carmel Elementary School
CLAY
Principal 4,1' Secretary/Treasurer
Dr. WILLIAM A. YORK �', Mrs. PAT SCHOPP
Counselor 3' se%
Secretary
Mrs. DANIELLE SPAC' Mrs. ELAINE FROST
44EL,91
April 25, 1997
Honorable Members of the
Board of Zoning Appeals
Carmel City Hall
Civic Square
Carmel, IN 46032
Dear Members:
The purpose of this letter is to inform you that Mr. John Fuchs, Director of the Carmel
Clay Public Library, and members of his staff have had numerous discussions with several
of us associated with Carmel Elementary School regarding the proposed new library
building, now planned for construction at a location adjacent to our school property.
On April 18, 1997, Mr. Fuchs, one of his assistants and a member of the architectural firm
with which the CCPL Board has been working, made an excellent presentation to our
Parent Teacher Organization's Board of Directors. At the meeting, Mr. Fuchs, et. al.,
used models, artistic renditions and other media to explain the building proposals to the
assembled audience, comprised of parents, teachers and other community members.
I am pleased to report that based upon the presentations, press releases and numerous
conversations with Mr. Fuchs and others, the Carmel Elementary School community
endorses the proposals of the CCPL Board of Directors regarding the new facility.
In the interest of children, I remain
Very truly yours,
WILLIAM A. ORK, Ed.D.,
Principal
ps
101 4th Ave., S. E. Carmel, IN 46032-2296 317-844-0168 FAX 317-571-4024
BROWNING DAY MULLINS DIERDORF INC TRANSMITTAL
ARCHITECTURE PLANNING LANDSCAPE ARCHITECTURE
To: Mark Monroe
Dept. Of Community Services
One Civic Square
Carmel IN 46032
From: Dean Rains
Project: Carmel Public Library
Project No./File No.: 9647/01.10.0
Date: 04.23.97
Item Quantity Description
1 1 TAC Review Set Revision
Browning Day Mullins Dierdorf Inc
334 North Senate Avenue
Indianapolis, Indiana 46204
(317) 635-5030
(317) 634-5409 Fax
RNk-21-1 k13:.5$ BUM INC. i1 r b34 .4T r.0l/IJ1
BROWNING DAY MULLINS DIERDORI`INC MEMO
O
ARCHITECTURE PLANNING LANDSCAPE ARCHITECTURE
To: Jerry Robinson-Fax: 776-5553
Phil Allgood -Fax: 263-6452
John South-Fax: 776-1101
Kate Boyle-Fax: 571-2439
Stan Puckett-Fax: 571-2615
Mark Monroe-Fax: 571-2426
Paul Arnone-F'ax: 571-2653
Brian Houghton-Fax: 219-484-7210
From: Steve Robinson
Re: Tac Submission Revisions
Project: Carmel Clay Public Library
Project No./File 9647/01.40.0
No.:
Date: April 21, 1997
-
Thank you for your comments during the recent TAC meeting. We are
working on the revisions you have suggested and hope to have all revised
drawings in your hands on Wednesday,April 23, 1997.
cc: Bill Wendling
John Fuchs
Steve Osborne
.Gene Margason
•
Browning Day Mullins Dierdorf Inc
334 North Senate Avenue
Indianapolis, Indiana 46204
(317) 035-5030
A:19647 CCL\TEAMEM4.4 1317) 634-5409 Fox
TOTRL P.01
AIiirBROWNING DAY MULLINS DIERDORF INC M E M 0
ARCHITECTURE PLANNING LANDSCAPE ARCHITECTURE
To: Terry Quihnan/CEA - 876-0114
Steve Maynard/CEA - 876-0114
Gene Margason/Rotz - 293-1282
Phil Kuntz/Paul I. Cripe - 841-4798
Bill Wendling/Campbell, Kyle & Profit - 843-8097
John Fuchs/Carmel Clay Library - 571-4285
Barry Petit/MS&R - 612-342-2216
Dave Hall/GDI - 921-7687
Jeff Bolinger/BDMD
From: Steve Robinson
Re: Items to Complete or Revise based on TAC Meeting Comments
Project: Carmel Clay Public Library
Project No./File No.: 9647/01.40.0
Date: April 17,1997
It is important that revised sets of drawings go back to the various TAC members before the April
28th BZA meeting. Please make these revisions and send revised plots, where applicable, to me by
Tuesday, April 22, 1997.
ACTION ITEM
CEA/Rotz 1. Face the Siamese connection and the hydrant to the south, per Stan
Puckett.
MS&R 2. Continue to show the Knox Box on the plans.
CEA 3. Study water main on east side of building instead of west. If it can fit
there, put it there. If it cannot fit there, call Paul Arnone A.S.A.P. and
determine an acceptable location.
Rotz 4. Get information on approved back-flow devices from Paul Arnone.
As far as I can tell, this is a Construction Document issue, not
something that needs to be on the BZA plans.
CEA 5. Revise sanitary so that it runs to the south manhole in a new PVC
pipe. Connection into manhole structure can be at the location of the
current clay pipe, which should be moved. There is no pipe between
the north and south manholes on 4th Avenue.
Browning Day Mullins Dierdorf Inc
334 North Senate Avenue
Indianapolis, Indiana 46204
(317) 635-5030
(317) 634-5409 Fax
Carmel Clay Public Library
Issues about TAC Meeting Comments
BDMD Project No. 9647
Page 2
CEA 6. Prepare a plan for Paul Arnone that does not show the trees.
7. Mike Hollibaugh, Landscape Architect, said he had no comments.
CEA 8. John South said an erosion control plan is needed. He must not have
seen the one we have in our package. CEA verify that this is final.
BDMD Landscape 9. Clarify on plan that curved line over the detention basin is the line of
the prairie grass seeding.
Rotz 10. Contact gas company representative Mary Schultz.
11. Dick Hill of Engineering said Kate Boyle is still in the process of
reviewing the plans. She will send comments this week.
CK&P 12. Dick Hill says Board of Public-Works issues are:
1. Sewer and water.
2. Commercial curb cut.
3. Sidewalks inside of right-of-way. He said "normally" the
sidewalks are one foot back from the right-of-way, or they
must receive Board of public works approval. Ours along 4th
Avenue are in the right-of-way.
Campbell, Kyle & Profit identify review process, drawings needed,
etc.
CEA 13. Dick Hill said Kate Boyle is still considering a request for an extension
of the sidewalk on the west side of 4th Avenue, down to where it
would reach Mrs. Thomas's new driveway. If this is indeed
requested, CEA should study it relative to drainage.
CEA 14. Make the right-of-way lines bolder and note them more clearly.
CCPL 15. Dick Hill said connection fees will apply. It appears acreage fees will
not apply.
16. Mark Monroe asked about building a walk to the adjacent
neighborhoods to the east. We responded with no commitment to this
because it would cross Church land, which we do not control.
Browning Day Mullins Dierdorf Inc
334 North Senate Avenue
Indianapolis, Indiana 46204
(317) 635-5030
(317) 634-5409 Fax
Hrk-14-d I IHUN 19: I UUNIJUUN CNLrl1Yr.CJtINU 1NU rHR Nu. J1 101OU1 14 r, u,
OEM
CONGDON ENGINEERING ASSOCIATES, INC_
3500 DePauw Blvd.,Suite#1055
College Park Pyramids,Bldg.#1
Indianapolis,IN 46268
Phone:(317)816-0064
FAX:(317)876-0114
Date:April 14, 1997 From: Terry Quillman
CEA Project Number: 96-108 # of Pages: 1
Attn: Stan Pucket- Carmel Fire Department Fax: 571-261 5
Re: Carmel Library
Stan:
Enclosed is our plan showing the proposed water service, fire hydrant and siamese
connection per our discussion. I've also shown the approximate location of the
mechanical room and water riser inside the building and the location of the proposed
sanitary lateral.
cc, Paul Arnone 571 #er 2.661
Matthew Huddleston 571-4648
Terry Janes 571-2426
Steve Robinson 634-5409
Barry Petit 612/342-2216
Gene Margason 293-1282
PLEASE CALL THE NUMBER ABOVE IF THERE ARE ANY PROBLEMS DUWNU TRANSMISSION.
ORiGNYAL OF THIS TRANSMISSION MI.._WILL NOT X BE SENT SEPARATELY.
THIS MESSAGE IS INTENDED ONLY FOR THE USE OF THE INDIVIDUAL OR ENTITY TO WHICH IT IS ADDRESSED AND MAY
CONTAIN INFORMATION THAT IS PRIVILEGED OR CONFIDENTIAL. IF THE READER OF THIS MESSAGE IS NOT THE INTENDED
RECIPIENTOR THE EMPLOYEE OR AGENT RESPONSIBLE FOR DELNERiNG THE MESSAGE TO THE INTENDED RECIPIENT,YOU
ARE HEREBY NOTIFIED THAT ANY DISSEMINATION, DISTRIBUTION OR COPYING OF THIS COMMUNICATION IS STRICTLY
PROHIBITED. IF YOU HAVE RECEIVED THIS COMMUNICATION IN ERROR,PLEASE NOTIFY US IMMEDIATELY BY TELEPHONE,
AND RETURN THE ORIGINAL MESSAGE TO US AT THE ABOVE ADDRESS VIA THE U S.POSTAL SERVICE 1234SEED.FAX
iF
f ' 8.dumioc us T. r 1
f�i �U1 I.1� 11—�•. \ i I7 I 1 r+ 1
• }
, tea = of ° r id 8Sr 4th A!JINUt SOUTHEAST
,i I ;j t ,s'
,ta rs+. r r ika wMQ�Q�.Q11w i...�.=`==..r. 2:— Vag' row
- -- �..r- `
�. - •ram I <..+ti..i�.�r+.+�a� "� 1L� �i!a r �r.. -, c w.w.wfwr. - - wr rt. I I°-s"
Ism
�.{� -.--�f -•'_ - _ r —T— ` -n=rl7.R ^^S ti .ter �� �! - I -
,46..°, 1 ``�. } ' ''k. - :4: / : �R 9u rY �r ;� �`2� C�n i4, ra ,+r • �) � � i -18•SC'�
,,,,if ___ c2�•LJAJ. '�
± u-
% .."� ir } �.G EtA rB f t r':p.is4 , �k I r • la�.�� i tad s .� y- /�-� ~ n� � $ T ip jl, .
5h.t 5 �t .,' �r'� / l'�8���; ldiMng lint a JSS i,lf ♦,. [ i'L !t!
l '�o. 5• l� • -- q�7�llr!ii�fFOIL �. �� 1} '1- I 3
•
ay Nil I 1111110111,11.11111111111 f .,,,t ),.3".1.- j
_ �� A Z!' C
in 1 GWNEC7 i4
= 1111111Nalll 1 -1111111MEIMMIIIIMO - , L 11111. qpi AM' H
( ihr •ign•pi ,
\ 1101 10: 1 1
'= ; i , - I ' 1 $
t' f •
I :r
•
' 24' /' I f 1�,{�! .c'rlcastnt 1 i # i .{
trf t PROPOSED LIBRARY L-�_T" \.I II _I `\ ; !E
i IY,r.r+! '4„ �C�`t�)1S ff F. F. = 854.50 / ! }I?r'i[_ at
Z ! < t rt1 Nr .:3h. ?g ,�� I f 4.,eQnefl: i 5' --�-4�., .I i �{ ;
iif f.- -, I 1
•J Mares • •• • �.i 1.� 1 ' i I!�
IrECNxncu P.opu r r f ti !!.'.' 1`
r � _ / I-, ,;
,i,
i 3 Oil
1F.R"'SDK �J r'} L�- ,� 1 -.I•L-
N. ,,
11
•
FEN • ? ` `�.4. }^8� fi� .�j �.s . pT
.{'�Je? - �tr i 1c� I iI• I.
'1 .►a' #
ir, v mE.t " r---s- rrwF '� ' _
=" r ?C +5 a5 ' l,S r a r t t I ! i
tit + ti N. i c :& ^oJr. 9=?; -{ �t1:1 Ir-fie' f��r ;ti'� V �-- •-- 3 �:' I i
7� / I$ im Z9.:?6 - • 27' 9uid R (+ :l •t " `I� i
b _ cs�men r, �� ` ', ,r�, fix- ~_� •r �"•- � � J.4: _'" 1 =1
•
-- --- -- -�- 1� f - '
B•vz,, 1I1 �'(`� �o- 3. --— _ Jf 1 / ~ r•• - .1_�9 • '� �i
�iTY`.'1 4 t' .. t '8 .ram_ "�J.�-"'-�...._�. �..�r: �r.._� -_ r _._ �•.
a t
City
of CCarmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2600
Browning Day Mullins Dierdorf, Inc.
Attn: Dean Rains
334 North Senate Avenue
Indianapolis, Indiana 46204
RE: CARMEL CLAY PUBLIC LIBRARY
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
Carmel Clay Public Library
and has approved the Plans subject to the following:
1 . The plans as submitted are so incomplete that I am unable to
do a complete review of this project. Please contact me to
to schedule a time for us to sit down and review the building
plans .
2 .
3 .
4 .
5 .
6 .
Date: April 8 , 1997 By:Stanley Puckett, Fire Marshal
Carmel Fire Department
Fire Prevention Saves Lives and Property
City
of CCarmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2600
Rotz Engineers, Inc.
Attn: Stanton Heimsath
2828 North High School Road
P.O. Box 24357
Indianapolis, Indiana 46224
RE: CARMEL CLAY PUBLIC LIBRARY
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
Carmel Clay Public Library
and has approved the Plans subject to the following:
1 . The plans as submitted are so incomplete that I am unable to
do a complete review of this project. Please contact me to
to schedule a time for us to sit down and review the building
plans .
2 .
3 .
4 .
5 .
6 .
Date: April 8, 1997 By:Stanley Puckett, Fire Marshal
Carmel Fire Department
Fire Prevention Saves Lives and Property
1\(\.(aArk_.
, ity ot
ar i et.
Carmel Clay Communications Center
31 19c AVENUE.
CARMEL.INDIANA 4iO32
31:f57t-2580
March 27, 1997
To Whom It May Concern:
w
This letter is
willirm the be 55 4th Ave SE Cazlnel,ess for the 1eIBiC46o32_Clay
Library. The
Respectfully,
(')/4°. at-1141-d
Lu Anna Stephens �'�G1
CAMPBELL KYLE PROFFITT
ATTORNEYS AT LAW
JOHN M.KYLE FRANK S.CAMPBELL
JOHN D.PROFFITT (1880-1964)
ROBERT F.CAMPBELL
JEFFREY S.NICKLOY FRANK W.CAMPBELL
DEBORAH L.FARMER (1916-1991)
WILLIAM E.WENDLING,JR.
ANNE HENSLEY POINDEXTER
ANDREW M.BARKER March 12, 1997
TODD L.RUETZ
MELISSA A.CLARK
MATTHEW S.LOVE
Mr. Mark Monroe
Mr. Terry Jones
CARMEL DEPARTMENT OF MAR 12 1997
COMMUNITY SERVICES DOCD
One Civic Square
Carmel, IN 46032
RE: Carmel Clay Public Library
Dear Mark and Terry:
Along with this letter you will find two full sized plans of the proposed Carmel Clay
Public Library for your review. In addition,you will also find two bound documents entitled,
"Cannel Clay Public Library TAC Submission."
In regard to the Cannel Clay Public Library TAC Submission documents, if after you
have reviewed them, you feel that they are sufficient and informative, we will make as many
copies of the same that you feel are necessary for all of the members of the Technical Advisory
Committee. Also, I anticipate that after you have had an opportunity to review the plans
submitted herewith you will contact me to either notify me of any deficiencies that need to be
corrected, or hopefully, indicate that you will assign a docket number as required for a Use
Variance and for the Developmental Standards Variances which we are requesting. At that time,
I will provide you with a check to satisfy the fees.
Also attached you will find two copies of the Use Variance Application and two copies of
the Developmental Standards Variance request. As I indicated to Mark during my telephone
conversation earlier this morning,we believe that there are three Developmental Standards
Variances that need to be addressed. What I have done is supplied you with three separate
Findings of Fact to accommodate each of those requests. As Mark and I earlier discussed, I am
not sure that we need a Developmental Standards Variance as it applies to a parking facility more
than 300 feet from the primary building. In the event that you believe that is unnecessary, we
can certainly eliminate that from our request. As I also indicated to Mark, it was a challenge to
come up with the affected property owners. The Auditor took each of the four parcels under
consideration and listed the property owners t re adjacent to and would be subject to zoning
notices. We have taken each of his certific, y; p those properties and
CENT !AL
Uc env
650 East Carmel Drive Suite 400 Carmel,Indiana 46032 (317)846-6514 FAX(317)843-8097
Mr. Mark Monroe
Mr. Terry Jones
March 12, 1997
Page Two
eliminated those that do not need to be noticed, and eliminated those that were repetitive, and we
have provided you with a summary of those property owners that need to be noticed regarding
the zoning variances. However, we did attach all of the Auditor's certified lists of property
owners affected by the variance requests.
Finally, I have enclosed a copy of the sign associated with this project. If you will recall,
this will be engraved into the stone facade of the building as it faces 4th Street. You can see how
we measured the signage from the print. If this is incorrect, please let me know at your earliest
possible convenience.
Thank you for your assistance in completing these applications. If you have any
questions regarding the information contained therein, or if you need additional information,
please do not hesitate to contact me. As I mentioned above, as soon as you are ready to provide
us with docket numbers, we will provide you with a check for the fees associated with the
requests.
Sincerely,
CAMPBELL KYLE PROFFITT
William E. Wendling, Jr.
WEW/mlh
Encl.
C:\WE W\LIBRARY\MONROE.LTR276-4
CAMPBELL KYLE PROPITI-1
ATTORNEYS AT LAW
03/11/97 11: 41 FAX 91 612 342 2216 M S & R _ .. Campbell Kyle Pr [0001.001
, 1480 ,
i
r.
1 .1 .:-.,
1 [ ,:
•
.
►�r 71 c1 1
0 t".."1 :' RI
_ _ ,
.g
I ,,
1 :=C1
....c
iii.3
N4 li Rp
..
1 i
i i:I=.
IV
A
....,4... . ....41 iF
\P,
N c ,
—nvv is -,,-,