Loading...
HomeMy WebLinkAboutSPP3 - Balcius (220 1st Avenue NE PG-3 (1)SITE PLAN R.L.S. # LS20500017 DATE: FOR: OLD TOWN DESIGN GROUP BY: JD HALL LAND SURVEYING, IVOSB 803 S. OHIO STREET SHERIDAN, INDIANA 46069 Ph: 317-696-3594 Fx: 317-758-5510 JOB NO: 19-009 SHEET 3 OF 3 LOT 27 D. WILKINSON ADDITION TO CARMEL, INDIANA 220 1ST AVE NE Concrete washout facilities should be inspected daily and after heavy rains to check for leaks, identify any plastic linings and sidewalls have been damaged by construction activities, and determine whether they have been filled to over 75 percent capacity. When the washout container is filled to over 75 percent of its capacity, the washwater should be vacuumed off or allowed to evaporate to avoid overflows. Then when the remaining cementitious solids have hardened, they should be removed and recycled. Damages to the container should be repaired promptly. Before heavy rains, the washout container's liquid level should be lowered or the container should be covered to avoid an overflow during the rain storm. -OR- APPROVED EQUIVALENT METHOD OF CONCRETE WASHOUT 07/17/19 Adam Schriner