HomeMy WebLinkAboutSPP3 - Balcius (220 1st Avenue NE PG-3 (1)SITE PLAN
R.L.S. # LS20500017 DATE:
FOR: OLD TOWN DESIGN GROUP
BY: JD HALL LAND SURVEYING, IVOSB
803 S. OHIO STREET
SHERIDAN, INDIANA 46069
Ph: 317-696-3594
Fx: 317-758-5510
JOB NO: 19-009 SHEET 3 OF 3
LOT 27 D. WILKINSON
ADDITION TO CARMEL, INDIANA
220 1ST AVE NE
Concrete washout facilities should be inspected daily and after heavy rains to check for leaks, identify any
plastic linings and sidewalls have been damaged by construction activities, and determine whether they have
been filled to over 75 percent capacity. When the washout container is filled to over 75 percent of its capacity,
the washwater should be vacuumed off or allowed to evaporate to avoid overflows. Then when the remaining
cementitious solids have hardened, they should be removed and recycled. Damages to the container should
be repaired promptly. Before heavy rains, the washout container's liquid level should be lowered or the
container should be covered to avoid an overflow during the rain storm.
-OR- APPROVED EQUIVALENT METHOD OF CONCRETE WASHOUT
07/17/19
Adam Schriner