Loading...
HomeMy WebLinkAboutGN - Balcius ROW (1)RIGHT-OF-WAY PERMIT APPROVED PERMIT NUMBER: 0(0 z '� TODAY'S DATE: 06/06/2019 ESTIMATED DATE OF WORK: 06/08/2019 APPLICANT (Person doing the work) Elevation Excavation Inc. COMPANY: Elevation Excavation Inc. ADDRESS: 300 East Main Street, Suite E, Carmel IN 46032 PHONE: (765) 247-8828 EMAIL PERMIT TO: zach.spitz. eei@gmail, com CUSTOMER: Old Town Design Group ADDRESS: 1132 South Rangeline Road PHONE: 317-816-3151, 317-605-8796 (ADDRESS OF PROJECT: 220 1 st Avenue NE, Carmel, IN 46032 DESCRIPTION OF WORK (check all that apply) ROAD BORE El DRIVEWAY REPLACEMENT 7 CONSTRUCTION ENTRANCE ❑ LANE CLOSURE 0 STREET CUT M ROAD CLOSURE OTHER ED DESCRIPTION: Demolition of existing sanitary sewer utility. installation of new drivewav entrance TYPE OF SURFACE CUT (if applicable): Street (asphalt) and sideawak (concrete) *NOTE: OPEN CUTS IN PAVEMENT REQUIRE BOARD OF PUBLIC WORKS (BPW) APPROVAL* USE OF HEAVY EQUIPMENT YES of NO 8 DRAWING ATTACHED YES ,/ NO *NOTE: ON REVERSE SIDE OF THIS PERMIT, PROVIDE NAMES AND CONTACTS OF ALL SUB -CONTRACTORS INVOLVED SURETY BOND. Please see Item #1 of the Right -of -Way Conditions. BONDING COMPANY: Selective Insurance BONDING NUMBER: B 1097582 EXPIRATION DATE: 03/18/2020 As applicant pxjhis Right -of --Way Permit, t understand and agree to al/ of the specifications and conditions listed on the attached sheet. Zach Spitz (Applicant' Signature (Print Name) PERMIT GRANTED BY: DATE ISSUED: 17 (City Official) COMMENTS: REPAIR WORK INSPECTED AND APPROVED I have inspected the repair of the above right-of-way and find it to be completely satisfactory. (City Inspector) (Date Released) g Dept. CIly b - EL J:\ rs I3i::\i�:\liu. N-Lw(m June 10, 2019 Board of Public Works and Safety One Civic Square Carmel, Indiana 46032 RE: LANE RESTRICTIONS, OPEN PAVEMENT CUT- 2201" AVE NE Dear Board Members: Mr. Zach Spitz with Elevation Excavation, Inc. is requesting approval for lane restrictions and open pa for the installation of utilities and driveway to serve a new residence at 220 1s' Ave NE (exhibit attacF utility tap will take place on the west side of the road and requires a lane restriction and sidewalk clo approximately 6 hours. A separate sidewalk cut will take place to facilitate the installation of a new d will last approximately 3 days. The Department of Engineering recommends that the Board approve the requested lane restriction, and open pavement cut conditioned upon the following requirements: • The project's contractor shall comply with the provisions of Carmel City Code 6-227(a)(1), 6- 6-227(b). • Petitioner agrees to post proper lane restriction signage during the duration of the work. Tr maintained at all times during the restrictions. • Any damage to the existing improvements within the City of Carmel right of way shall be res satisfaction of the City when work is completed. • The petitioner agrees to work with the Department of Engineering on the establishment of for the walkway prior to the closure. Signage identifying the sidewalk/pathway closure and shall be posted prior to the closure and a sign, measuring at least 18" x 12", shall be posted of the closure reading "SIDEWALK CLOSED". • Emergency access to adjoining properties of the work site shall remain in place at all times. to adjoining property owners shall be made 48 hours prior to commencement of work activi • Any open pavement cuts remaining open during overnight non -working hours shall be cover steel plate, anchored and secured in place. • Construction in dedicated City Right -of -Way shall be restored in compliance with all City cod standards. Sincerely, 7 Jeremy Kashman, P.E. City Engineer S:\shared\NEW SHARED DRIVE\BPW\2019\STREET CLOSURES & CUTS\ELEVATION EXCAVATION -LANE RESTRICTION & CUT-22( I)rrvnat�r ur ti]ca\tr_Ri�c, c)�r GNu Siu NRt:. C:�xatrt IN -16032 Oto-i 31-.i 1? i o F\\ W.i-1.2139 F.m m. i,,,g 1 'l'llll h•� Ill .,_ EZEVAT/ONEXCAVARON 13280u/h Range Zine Road Caa»% IN46032 3>7, I"149 Fax.'317-846,0217 Caleb Warner City of Carmel I Jefferson Square Carmel IN. 46032 6/6/ 19 Dear Caleb, Please place us on the agenda for the Board of Public Works and Safety in regards to a proposed street and sidewalk cut and frill road and sidewalk closure at 220 1" Avenue NE. The work is to be performed for Old Town Development and is for the installation of City sanitary sewer and water utilities to the proposed construction. The removal and installation of a new tee/service line will require a lane closure (approx. 4-6 hours). The sidewalk cut is for installation of a new driveway and will need to be closed for approx. 2-3 days for concrete apron completion. I have included a layout of the proposed work and a traffic control plan for the road closure for reference. Thanks Zack Spitz Elevation Excavation Inc. ItI 2 v 3 0 n 0 v