Loading...
HomeMy WebLinkAbout19030126 State Release FULLELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA at http://www.in.gov/dhs/2650.htm. This on-line filing is through a secure site, you can use it to submit your project information, pay the fees and upload your project plans. Use Internet Browser to View this report, other browsers are not compatible to view this report Page 1/2 CONSTRUCTION DESIGN RELEASE State Form 41191 (R9/5-98) Report Printed on:March 27, 2019 Project number Release date 403780 01/10/19 Construction type Occupancy classification Scope of release I-A, V-A, SPK A-2, A-3, B, M, R-2 Type of release Project name Street address City County ARCH ELEC MECH PLUM STR Standard HOLLAND PLAYFAIR BUILDING 880 West Monon Green Blvd CARMEL HAMILTON To: Owner / Architect / Engineer PEDCOR DESIGN GROUP, LLC James Robert Stutzman AR00033126 355 City Center Drive Carmel IN 46032 Note :(A1A & A1B): In accordance with the affidavit sworn under penalties of perjury in the application for construction design release the plans and specifications filed in conjunction with this project shall comply with all of the applicable rules and laws of Fire Prevention and Building Safety Commission. Providing false information constitutes an act of perjury, which is a Class D felony punishable by a prison term and a fine up to $10,000. The plans, specifications and application submitted for the above referenced project have been reviewed for compliance with the applicable rules of the Fire Prevention and Building Safety Commission. The project is released for construction subject to, but not necessarily limited to, the conditions listed below. THIS IS NOT A BUILDING PERMIT. All required local permits and licenses must be obtained prior to beginning construction work. All construction work must be in full compliance with all applicable State rules. Any changes in the released plans and/or specifications must be filed with and released by this Office before any work is altered. This release may be suspended or revoked if it is determined to be issued in error, in violation of any rules of the Commission or if it is based on incorrect or insufficient information. This release shall expire by limitation, and become null and void, if the work authorized is not commenced within one (1) year from the above date. CONDITIONS: 14B A2 4G05 4G05A 4G0603AA2 14M0603 4G0603AE 4G0603AE1 This project has been reviewed under the 2014 Indiana Building Code. An elevator installation permit shall be obtained from the Elevator Safety Division in accordance with IESC (675 IAC 21-1-1). Please visit: http://www.in.gov/dhs/2374.htm NOTE: These buildings have been considered as separate and distinct buildings for the purpose of determining area limitations, continuity of firewalls, limitation of number of stories and type of construction in accordance with Section 510.2, IBC. All conditions set forth by the Indiana Fire Prevention and Building Safety Commission on variance submissions shall be considered part of the release documents and do not apply to future additions or alterations of this structure in accordance with 675 IAC l2-5. The Fire Prevention and Building Safety Commission has granted one or more variances which apply to this project. 18-11-20; 18-11-21 This project release is for the building shell only and does not include the finish of one or more tenant spaces. Tenant space finishes shall be filed as a new project or one or more partials in accordance with 675 IAC 12-6-6 and 675 IAC 12-6-15 before commencing work. This condition is only for the first floor of each building. Duct construction and installation shall be in accordance with the requirements of Section 603, IMC (675 IAC 18-1.6). Detailed plans and specifications of the fire suppression system shall be filed with the required application and appropriate fees in accordance with 675 IAC 12-6-3(a), 675 IAC 12-6-7(g)(17), and 675 IAC 13-1-8. (N.F.P.A. 13) Detailed plans and specifications of the fire suppression system shall be filed with the required application and appropriate fees in accordance with 675 IAC 12-6-3(a), 675 IAC 12-6-7(g)(17), and 675 IAC 13-1-25. (N.F.P.A. 13R) Indiana Department of Homeland Security DIVISION OF FIRE & BUILDING SAFETY PLAN REVIEW DIVISION 402 W. Washington St., Room E245 Indianapolis, IN 46204 Fax & e-mail: SUPPORT HOOSIER SAFETY Available At Your Local Licence Branch In accordance with Section 19 of the General Administrative Rules (675 IAC 12-6-19) a complete set of plans and specifications that conform exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a copy of the design release. 3177057980, jrs@pedcor.net ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA at http://www.in.gov/dhs/2650.htm. This on-line filing is through a secure site, you can use it to submit your project information, pay the fees and upload your project plans. Use Internet Browser to View this report, other browsers are not compatible to view this report Page 2/2 AREL Pursuant to 675 IAC 12-6-21, the issuance of a design release does not relieve the owner from required compliance with all applicable rules of the commission, even if noncompliant conditions appear in the plans and specifications that have been filed with the division. The owner is responsible for correcting any and all areas of noncompliance even if they are discovered subsequent to the issuing of this design release. Please be advised that if an administrative review of this action is desired, a written petition for review must be filed at the above address with the Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above - stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you choose to petition, and the before-mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not filed, this Order will be final, and you must comply with its requirements. Code review official Address (name,title of local official,street,city,state and ZIP code SEAN CALLAHAN JIM BLANCHARD ONE CIVIC SQUARE CARMEL,IN 46032 DEPT OF COMMUNITY SERVICE Fax & e-mail: 3175712499, jblanchard@carmel.in.gov Director, Division of Fire and Building Safety scallahan@dhs.in.gov