HomeMy WebLinkAboutC4.1.SWPP Details07/17/2019
PERMANENT SEEDING DATES
TEMPORARY SEEDING DATES
LAWNS AND HIGH MAINTENANCE AREAS
STEEP BANKS AND CUTS
SEED TOLERANCE CHART
LEVEL AND SLOPING, OPEN AREAS
SEED TOLERANCE
TEMPORARY SEEDINGS
SEEDING DETAIL
TEMPORARY CONSTRUCTION ENTRANCE
FERTILIZER NOTE
SILT FENCE CONSTRUCTION
JOINT DETAIL
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
SILT FENCE MAINTENANCE REQUIREMENTS:
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
EROSION CONTROL SCHEDULE
MAINTENANCEEROSION CONTROL MEASURE INSTALLATION SEQUENCE
ROCK CHECK DAM MAINTENANCE REQUIREMENTS:
EROSION BLANKET INSATLLATION
PROJECT NUMBER
DRAWING NUMBER
SHEET OF
SCALE:
DATE:
DWN BY:
CHKD. BY:CIVIL SITE GROUP, INC.GROUP, INC.PROF
E
SS
ION A L E NG INEERIND
IA NA
PE10910647
STATE OF
-oNREGIS TER
E
DBR IA N S CR
O
SSVIOC.001
C4.1LEXINGTON, KY 40509100 VALVOLINE WAYVALVOLINE INSTANT OIL CHANGESTORMWATER POLLUTION PREVENTION DETAILSVALVOLINE INSTANT OIL CHANGE9835 MICHIGAN ROAD - LOT '1A' of NORTH AUGUSTACARMEL, INDIANA 46032REVISION RECORD
1
1
2
2
3
3
4
4
A A
B B
C C
D D
SHEET 1 OF 1
DWG NOSIZE
SCALE
REV
TYPICAL RECTANGULAR INLET FILTER COMBINATION INLET
FILTER FOR CURB HOODS
TYPICAL ROUND INLET FILTER STAINLESS STEEL ROUND INLET FILTERS for
NYLOPLAST CASTINGS
CATCH-ITS SPECIFIED W/ FX or FX-S BAGS
IPP Flexstorm SpecificationsC A