Loading...
HomeMy WebLinkAboutGN000.21900 Golf Road, Suite 300Schaumburg, Illinois 60173Midwest Zone Office........................... PLAN NAME SHEET PRODUCTION MANAGER DATE / DESCRIPTION NPC PLAN NUMBERLAWSON PLAN ID GARAGE HANDING REV # NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS INITIAL RELEASE DATE:CURRENT RELEASE DATE: (c) Copyright Pulte Home Corporation - 2019 SUZETTE SCHUETTE06/07/2013 GARAGE RIGHT Croix 1993.301 LOT 12 06/26/2019 PLOTTED: June 26, 2019 / Rajeev Kumar / 1993-CROIX-CZ-BAS2-COVR.DWG CZ 0.2Croix General NotesIndiana DivisionLot 12\A1;{\LGENERAL REQUIREMENTS\P}\P\pxi-2,l2,t2;1. WORK PERFORMED SHALL COMPLY WITH THE FOLLOWING:\P\pi-3,l5,tz;1.1. THESE GENERAL NOTES UNLESS OTHERWISE NOTED ON PLANS OR IN SPECIFICATIONS\P1.2. APPLICABLE NATIONAL CODES (IRC, NEC, IECC ETC.) LATEST ADOPTED EDITION WITH LOCAL AMMENDMENTS\P1.3. ALL APPLICABLE LOCAL AND STATE CODES, ORDINANCES AND REGULATIONS\P1.4. IN AREAS WHERE THE DRAWINGS SPECIFICATIONS OR SCOPES OF WORK DO NOT ADDRESS METHODOLOGY, THE CONTRACTOR SHALL BE BOUND TO PERFORM IN STRICT COMPLIANCE WIITH MANUFACTURER'S SPECIFICATIONS AND/OR RECOMMENDATIONS\P\pi-2,l2,t2;2. ON-SITE VERIFICATIONS OF ALL DIMENSIONS AND CONDITIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUBCONTRACTORS. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALE.\P3. THE GENERAL NOTES AND TYPICAL DETAILS APPLY THROUGHOUT THE PROJECT UNLESS OTHERWISE NOTED OR SHOWN.\P4. DISCREPANCIES:\P\pi-3,l5,tz;4.1. THE CONTRACTOR SHALL COMPARE AND COORDINATE ALL DRAWINGS \P4.2. WHEN IN THE OPINION OF THE CONTRACTOR, A DISCREPANCY EXISTS, THE CONTRACTOR SHALL PROMPTLY REPORT IT FOR PROPER RESOLUTION BEFORE PROCEEDING WITH THE WORK.\P\pi-2,l2,t2;5. OMISSIONS:\P\pi-3,l5,tz;5.1. IN THE EVENT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE DRAWINGS, THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR NOTED\P5.2. WHERE NO SIMILAR FEATURE OR CONDITION EXISTS THE CONTRACTOR SHALL PROMPTLY REPORT IT FOR PROPER RESOLUTION BEFORE PROCEEDING WITH THE WORK.\P\pi-2,l2,t2;6. ALL WORK IS TO BE PERFORMED IN A PROFESSIONAL MANNER AND IN ACCORDANCE WITH STANDARD PRACTICE AND CONSISTENT WITH MANUFACTURER'S AND SUPPLIER'S RECOMMENDED INSTALLATION PROCEEDURES.\P7. DIMENSIONING:\P\pi-3,l5,tz;7.1. ALL DIMENSIONS SHALL BE READ OR CALCULATED - NOT SCALED\P7.2. ALL DIMENSIONS ARE TO FACE OF STUD OR FACE OF SHEATHING UNLESS NOTED OTHERWISE\P7.3. ALL DRAWINGS ARE AT A SCALE OF {\H0.7x;\S1#4;}" = 1'-0" UNLESS NOTED OTHERWISE\P7.4. ALL DIMENSIONS AT WINDOWS ARE TO THE CENTERLINE OF THE OPENING.\P\pi-2,l2,t2;8. BEFORE SUBMITTING PROPOSALS, BIDDERS SHALL CAREFULLY EXAMINE THE DRAWINGS, INSPECT THE SITE AND ACQUAINT THEMSELVES WITH ALL GOVERNING CODES, ORDINANCES, REGULATIONS, LAWS, ETC. AND OTHERWISE FAMILIARIZE THEMSELVES WITH ALL MATTERS WHICH MAY AFFECT PERFORMANCE AND COMPLETION OF THE WORK. THE ACT OF SUBMITTING A PROPOSAL SHALL BE CONSIDERED AS MEANING THAT THE BIDDER HAS COMPLIED WITH ALL REQUIREMENTS OF THESE GENERAL NOTES AND SPECIFICATIONS AND THEREFORE NO CONCESSION WILL BE GRANTED BECAUSE OF ANY CLAIM OF MISUNDERSTANDING OR LACK OF INFORMATION.GENERAL NOTES AFF\PA/C\PALT\PARCH\PBSMT\PBLK\PBLKG\PBD\PBLDG\PCAB\PCPT\PCSMT\PCLG\PCIR\PCIRC\PCLR\PCOL\PCMU\PCONC\PCONST\PCONT\PCJ\PCF\PCY\PDET\PDIA\PDIM\PDW\PDR\PDH\PDS\PELEC\PELEV\PEQ\PEXH\PEXT\PFO\PFIN\PFPL\PFLR\PFD\PFLUOR\PFTG\PFND\PFUR\PGA\PGDO\PGFI\PGFI/WP\PGL\PGYP BD\PHDW\PHDR\PHVAC\PHGT\PHC\PHORIZ\PHB\PINSUL\PINT\PJT\PJST\PKIT\PLAV\PLT\PLNTL\PLVR\PMFR\PMAS\PMATL\PMAX\PMECH\PMC\PMTL\PMIN\PMIR\PMISC\PMOD\PMULL\PNTS\POC\POA\POH\POPT\PPB\PPNL\PPAR\PPED\PPL\PPVC\PPREFAB\PR\PREF\PREFR\PREINF\PRA\PREV\PRD\PRFG\PRM\PRO\PSCHED\PSECT\PSGD\PSHTH\PSHT\PSH\PSIM\PSL\PSC\PSPKR\PSPEC\PSQ\PSTD\PSTL\PSTOR.\PSTRUCT\PTEL\PTV\PTHR\PT&G\PTOC\PTOF\PTYP\PUNF\PUNO\PVERT\PWH\PWC\PWIN\PW/\PW/O\PWD\PWIABOVE FINISH FLOOR\PAIR CONDITIONING\PALTERNATE\PARCHITECT ARCHITECTURAL\PBASEMENT\PBLOCK\PBLOCKING\PBOARD\PBUILDING\PCABINET\PCARPET\PCASEMENT WINDOW\PCEILING\PCIRCLE\PCIRCUMFERENCE\PCLEAR CLEARANCE\PCOLUMN\PCONCRETE MASONRY UNIT\PCONCRETE\PCONSTRUCTION\PCONTINUOUS\PCONTROL OR CONSTRUCTION JOINT\PCUBIC FOOT\PCUBIC YARD\PDETAIL\PDIAMETER\PDIMENSION\PDISH WASHER\PDOOR\PDOUBLE HUNG\PDOWNSPOUT\PELECTRIC ELECTRICAL\PELEVATION\PEQUAL\PEXHAUST\PEXTERIOR\PFACE OF\PFINISH\PFIREPLACE\PFLOOR FLOORING\PFLOOR DRAIN\PFLUORESCENT\PFOOTING\PFOUNDATION\PFURR FURRED FURRING\PGAUGE\PGARAGE DOOR OPENER\PGROUND FAULT CIRCUIT\PGROUND FAULT CIRCUIT-WEATHER PROOF\PGLASS GLAZING\PGYPSUM WALLBOARD DRYWALL\PHARDWARE\PHEADER\PHEATING-VENTILATING-AIR CONDITIONING\PHEIGHT\PHOLLOW CORE\PHORIZONTAL\PHOSE BIBB\PINSULATE INSULATED INSULATION\PINTERIOR\PJOINT\PJOIST\PKITCHEN\PLAVATORY\PLIGHT\PLINTEL\PLOUVER\PMANUFACTURE MANUFACTURER\PMASONRY\PMATERIAL\PMAXIMUM\PMECHANICAL\PMEDICINE CABINET\PMETAL\PMINIMUM\PMIRROR\PMISCELLANEOUS\PMODULAR\PMULLION\PNOT TO SCALE\PON CENTER\POVERALL\POVERHEAD\POPTIONAL\PPUSH BUTTON\PPANEL\PPARTITION\PPEDESTAL\PPLATE\PPOLYVINYL CHLORIDE\PPREFABRICATE PREFABRICATED\PRISER\PREFERENCE\PREFRIGERATOR\PREINFORCE REINFORCED REINFORCING\PRETURN AIR\PREVISIONS REVISED\PROOF DRAIN\PROOFING\PROOM\PROUGH OPENING\PSCHEDULE\PSECTION\PSLIDING GLASS DOOR\PSHEATHING\PSHEET\PSHELF SHELVING SINGLE HUNG WINDOW\PSIMILAR\PSLIDING WINDOW\PSOLID CORE\PSPEAKER\PSPECIFICATIONS\PSQUARE\PSTANDARD\PSTEEL\PSTORAGE\PSTRUCTURAL\PTELEPHONE\PTELEVISION\PTHRESHOLD\PTONGUE AND GROOVED\PTOP OF CONCRETE\PTOP OF FOUNDATION\PTYPICAL\PUNFINISHED\PUNLESS NOTED OTHERWISE\PVERTICAL\PWATER HEATER\PWATER CLOSET\PWINDOW\PWITH\PWITHOUT\PWOOD\PWROUGHT IRONABBREVIATIONS SCHEDULE of AREAS BASE HOUSE - HEATED FIRST FLOOR 2460 TOTAL BASE HEATED 2460 BASE HOUSE - UNDER ROOF 2-CAR GARAGE 540 BASEMENT 2129 FRONT PORCH 104 TOTAL BASE UNDER ROOF 3000 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GATHERING ROOM 414.78 33.18 16.59 51.00 17.70 KITCHEN / CAFE 405.56 32.44 16.22 27.40 11.80 OWNER'S SUITE 274.58 21.97 10.98 51.00 17.70 OWNER'S BATH 106.39 8.51 4.26 ARTIF.MECH. TOILET ROOM 22.88 1.83 .92 ARTIF.MECH. BEDROOM 2 209.24 16.74 8.37 27.40 11.80 BATH 2 51.68 4.13 2.07 ARTIF.MECH. FLEX 168.81 13.50 6.75 27.40 11.80 ENTRY / LAUNDRY 87.07 6.97 3.48 ARTIF.MECH. POWDER 27.11 2.17 1.08 ARTIF.MECH. HVAC 41.34 3.31 1.65 ARTIF.MECH.{\Fsimplex|c0;\W0.7;ARTIF. = ARTIFICIAL LIGHT SUPPLIED\PMECH. = MECHANICAL VENTILATION SUPPLIED\PTHIS TABLE SHOWS CALCULATIONS FOR THE BASE HOUSE CONDITION} 07/22/19 Mike Sheeks