HomeMy WebLinkAboutA-503 - WINDOW SCHEDULEWINDOW SCHEDULE
TYPE
MARK
LOCATION
ELEV.
TYPE
WIDTH
HEIGHT
HEAD
HEIGHT
SILL
HEIGHT
FRAME
MATERIAL
GLASS TYPE
DESCRIPTION
1 ST
FLOOR
W1
ELEVATOR LOBBY
A
81.099
7'
— 4 3/411
7' —
4
3/411
0"
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W3
HOUSEKEEPING
C
51.099
6'
— 2 1/411
7' —
4
3/411
1' — 2 1/2"
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W5
LAUNDRY/POOL EQUIP
E
51.099
2' — 2"
5'
—
2"
31. 0"
ALUMINUM LOUVERS
LOUVERS
2ND
FLOOR
W1
ELEVATOR LOBBY
A
81.011
71.4
3/4"
7' —
7
7/8"
3 1/811
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W2
GUESTROOMS
B
5'
— 0"
6'
— 1 1/411
6' —
1
1/411
0"
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W3
HOUSEKEEPING
C
5'
— 0"
6'
— 2 1/411
T—
7
7/8"
1' — 5 5/811
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W4
CORRIDOR
D
4'
— 7"
6'
— 2 1/411
6'
— 1111
8 3/411
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
3RD
FLOOR
W1
ELEVATOR LOBBY
A
81.011
7'
— 4 3/411
T—
7
7/8"
3 1/811
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W2
GUESTROOMS
B
5'
— 0"
6'
— 1 1/411
6' —
1
1/411
loll
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W3
HOUSEKEEPING
C
5'
— 0"
6'
— 2 1/411
T—
7
7/8"
1'— 5 5/8"
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W4
CORRIDOR
D
4'
— 7"
6'
— 2 1/411
6'
— 1111
8 3/411
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
4TH
FLOOR
W1
ELEVATOR LOBBY
A
81.011
7'
— 4 3/411
T—
7
7/8"
3 1/8"
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W2
GUESTROOMS
B
5'
— 0"
6'
— 1 1/41'
6' —
1
1/41'
0"
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W3
HOUSEKEEPING
C
5'
— 0"
6'
— 2 1/411
T—
7
7/8"
1'— 5 5/811
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W4
CORRIDOR
D
al
7"
6'
— 2 1/41'
6'
— 11"
8 3/4"
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
5TH
FLOOR
W1
ELEVATOR LOBBY
A
81.019
7'
— 4 3/41'
T—
7
7/8"
3 1/8"
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W2
GUESTROOMS
B
5'
— 0"
6'
— 1 114"
6' —
1
1/41'
0"
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W3
HOUSEKEEPING
C
5'
— 0"
6'
— 2 1/41'
T—
7
7/8"
Ill— 5 5/811
CLEAR ANODIZED,
ALUMINUM
MULLION
CLEAR TEMPERED
W4
CORRIDOR
D
al
7"
6'
— 2 1/4"
6'
— 11"
8 3/4"
CLEAR
ANODIZED,
ALUMINUM
MULLION
CLEAR
TEMPERED
* 4 (Y 4 0' X
I�
1 W1 3/4" -
- 1'-0"
WATER -RESISTIVE
BARRIER COATING
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
�NtY�l�o>�WA�
x
DATE: 07/22/19
STEP 01
APPLY DIAGONAL
STRIP OF
FLASHING MESH &
FLASHING AT
CORNERS -SEE
NOTES I&3
STEP 82
2 W2 3/4" -
- 1'-0"
SHALL EXTEND TO INTERIOR FACE OF OPENING.
L AND JAMB DETAILS FOR FLASHING INTEGRATION.
NDOW HEAD & 4" TO 6" BELOW BOTTOM EDGE OF NAILING FLANGE.
DUTER EDGES OF JAMB FLASHING.
)MPLETE GUEST ROOM MOCK UP TO INCLUDE EXTERIOR WINDOW FOR OWNER/ARCHITECT APPROVAL.
T-0,
5--0"
STEP #4
STEP 05
INSTALL APPROVED SEALANT BEHIND WINDOW FLANGES (JAMB & HEAD ONLY)
INSTALL WINDOW IN OPENING
INSTALL FASTENERS AT APPROVED SPACING INTO NAILING FLANGES
T
J CHANNE
a
e
L 4 7
STEP 06
J CHANNEL IS NAILED TO THE WINDOW
HEADER AND TRIMMERS AFTER THE
WINDOW FRAME IS SET. DRYWALL
SLIPS INTO THESE CHANNELS.
APPLYFLASHING
SYSTEM AT
JAMBS -SEE
NOTES I&3
STEP 07
GENERAL GLAZING NOTES
1. TEMPERED LOW-E GLASS WITH 2O-30h TINT
ON GUESTROOMS.
2. 1ST FLOOR CLEAR GLAZING
3. ALL OPERATING AND FIXED ALUMINUM
WINDOWS FACTORY GLAZING ONLY USE
QUAKER, WOJAN OR EQUIVALENT
4. ALL EXTERIOR AND INTERIOR WINDOWS ARE
FIXED TYPE WITH NO OPERABLE PANELS.
5. ALL INTERIOR GLAZING TO BE CLEAR.
6. ALL GLASS IN HAZARDOUS AREAS AND ALL
GLASS WITHIN 18" OF FLOOR AND/OR WITHIN A
24" ARC OF EITHER VERTICAL EDGE OF THE
DOOR JAMB IN A CLOSED POSITION SHALL BE
TEMPERED GLASS PER SECTION 2406.3 OF THE
I.B.C.
7. ALL EXTERIOR ALUMINUM FRAMES TO BE
THERMALLY BROKEN.
8. FINISHED PTAC LOUVERS TO MATCH WINDOW
FRAMES.
9. COORDINATE WINDOW SILL HEIGHTS WITH
REVEAL IN BUILDING ELEVATIONS.
10. ALL GLAZING SURROUNDED BY LAMINATE
COLORED PANELS AT ENTRY AREAS TO BE
PREFINISHED TO MATCH ADJACENT COLOR ON
EXTERIOR SIDE ONLY
PROJECT NOTES:
• ALL OPERABLE WINDOWS PROVIDED IN PUBLIC
GUEST ACCESSIBLE SPACES AND IN ACCESSIBLE
GUEST ROOM TYPES MUST MEET ALL
ACCESSIBILITY REQUIREMENTS PERTAINING TO
REACH RANGE, OPERATING CONTROLS AND
CLEAR FLOOR SPACE - HARDWARE AND WINDOW
OPERATION MUST BE NO GREATER THAN
WINDOWS MUST BE STANDARD ALUMINUM
STOREFRONT, THERMALLY BROKEN, WITH
CLEAR DUAL GLAZING WITH A FACTORY PAINTED
FINISH. LOUVERS FOR THRU-WALL Hi UNITS
MUST BE INTEGRATED WITH WINDOWS AND
PROVIDED BY WINDOW MANUFACTURER
GENERAL GUESTROOM
GLAZING NOTES
1. MIN STC 33 ON GUESTROOMS WINDOWS
2. MIN STC 41 IF HOTEL IS BY HIGHWAYOR
AIRPORT
3. "T" SAFETY GLAZING REQUIRED
WINDOWS-BAKED/POLYESTER PAINT/KYNAR
TYPE FINISH FRAME WITH CLEAR GLASS -DUAL
GLAZED THERMLLY BROKEN
{ID
'PLY FLASHING
'STEM AT HEAD -
:E NOTES 1, 3 & 4
STEP 08
BAS E4
BASE4
2901 CLINT MOORE ROAD, #114
BOCA RATON, FLORIDA 33496
888.901.8008 www.base-4.com
RICARDO J. MUNIZ-GULLIET, All
5453 NW 106TH DR
CORAL SPRINGS, FL 33076
Seal:
ip
17oo161
— OF
4``�.
' All ill T110
Owner:
f�
A=491
ra
THE WITNESS GROUP
60C ENTERPRISES DRIVE
LEWIS CEH
513.fi23.9430.9430
HOME
SUITES BY HILTON
CARMEL,INDIANA
PROTOTYPE VERSION42.2 2016
REVISION: MAY 2016
DECOR PACKAGE: TRIBECA
ISSUE
NO.
DELTA
I ISSUE DATE
DESCRIPTION
1
AO
12019.03.N
ISSUEDFORPERMIT
CURRENTISSUE
ISSUED FOR PERMIT
CURRENT ISSUE DATE
2019.03.04
DRAWN BY
NP
CHECKEDBY
NIL
PROJECTNO.
B4-134-1705
SHEET NAME
WINDOW
SCHEDULE
DRAWINGS NO.
A=503