Loading...
HomeMy WebLinkAboutC002 - GENERAL NOTESEARTHWORK -GENERAL DETERMINATION OF SITE EARTHWORK EXCAVATION AND EMBANKMENT QUANTITIES SHALL BE IN ACCORDANCE WITH THE FOLLOWING CRITERIA: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUITABILITY OF SOILS TO BE USED AS EMBANKMENTS FOR PARKING LOTS, BUILDING PADS, ETC. STOCKPILING OF TOP SOIL AND/OR EXCESS MATERIAL FOR THESE IMPROVEMENTS OR OFFSITE HAULING OF TOPSOIL/SUITABLE MATERIAL, ETC. SHALL BE COORDINATED WITH THE OWNER. APPROPRIATE MEANS FOR SEDIMENTATION CONTROL OF THE ONSITE STOCKPILES SHALL BE PROVIDED AS A MATTER OF GENERAL PRACTICE IN ACCORDANCE WITH THE REQUIRED STANDARDS REFERENCED AS A PART OF THE SEDIMENT AND EROSION DETAILS. IT IS THE CONTRACTORS RESPONSIBILITY TO ASSURE THAT A SUFFICIENT AMOUNT OF TOPSOIL REMAINS SO THAT ANY LANDSCAPING AND LANDSCAPE MOUNDING CAN BE COMPLETED. SURFACE GRADING TOLERANCE FOR HARD SURFACE AREAS (PARKING LOTS, ROADWAYS, DRIVES, CURBS, ETC.) SHALL NOT DEVIATE MORE THAN 0.1' AT PROPOSED SUBGRADE SURFACE. LANDSCAPE GRADING TOLERANCE SHALL NOT DEVIATE MORE THAN 0.3' FROM PROPOSED SURFACE ELEVATION. GENERAL SITE EARTHWORK OPERATIONS (PREPARATION OF PAVEMENT SUBGRADES, ETC.) ALONG WITH REQUIREMENT STANDARDS (COMPACTION, PROOF ROLLING, ETC.) SHALL BE IN ACCORDANCE WITH THE SOILS REPORT. COPIES OF THE SOILS REPORT SHOULD BE OBTAINED FROM THE OWNER OR OWNER'S REPRESENTATIVE. ALL EARTHWORK OPERATIONS SHALL BE OBSERVED AND TESTED BY THE SITE SOILS ENGINEER EMPLOYED AND PAID FOR BY THE OWNER. ADDITIONALLY, ALL FINAL GRADES SHALL BE FIELD CHECKED BY AN AGENT OF THE OWNER UPON COMPLETION OF CONTRACTOR'S OPERATIONS TO DETERMINE IF THE SITE HAS BEEN CONSTRUCTED TO THE GRADES INDICATED. TEMPORARY AND/OR PERMANENT SEEDING WITHIN THE DESIGNATED WORK LIMITS SHALL BE PERFORMED AT THE DIRECTION OF THE OWNER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. REQUIREMENTS FOR SEEDING MIX, RATE OF APPLICATION, ETC. SHALL AS SHOWN ON THE LANDSCAPE PLAN. EARTHWORK -SPECIFICATIONS PART 1 - PRODUCTS 1.1 SOIL MATERIALS A. GENERAL: PROVIDE BORROW SOIL MATERIALS WHEN SUFFICIENT SATISFACTORY SOIL MATERIALS ARE NOT AVAILABLE FROM EXCAVATIONS. B. SATISFACTORY SOILS: ASTM D 2487 SOIL CLASSIFICATION GROUPS GW, GP, GM, SW, SP, AND SM, OR A COMBINATION OF THESE GROUPS; FREE OF ROCK OR GRAVEL LARGER THAN 3 INCHES IN ANY DIMENSION, DEBRIS, WASTE, FROZEN MATERIALS, VEGETATION, AND OTHER DELETERIOUS MATTER. C. UNSATISFACTORY SOILS: SOIL CLASSIFICATION GROUPS GC, SC, CL, ML, OL, CH, Mitt, OH, AND PT ACCORDING TO ASTM D 2487, OR A COMBINATION OF THESE GROUPS. 1. UNSATISFACTORY SOILS ALSO INCLUDE SATISFACTORY SOILS NOT MAINTAINED WITHIN 2 PERCENT OF OPTIMUM MOISTURE CONTENT AT TIME OF COMPACTION. D. SUBBASE MATERIAL: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR CRUSHED GRAVEL, CRUSHED STONE, AND NATURAL OR CRUSHED SAND; ASTM D 2940; WITH AT LEAST 90 PERCENT PASSING A 1-1/2-INCH SIEVE AND NOT MORE THAN 12 PERCENT PASSING A NO. 200 SIEVE. E. BASE COURSE: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR CRUSHED GRAVEL, CRUSHED STONE, AND NATURAL OR CRUSHED SAND; ASTM D 2940; WITH AT LEAST 95 PERCENT PASSING A 1-1/2-INCH SIEVE AND NOT MORE THAN 8 PERCENT PASSING A NO. 200 SIEVE. F. ENGINEERED FILL: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR CRUSHED GRAVEL, CRUSHED STONE, AND NATURAL OR CRUSHED SAND; ASTM D 2940; WITH AT LEAST 90 PERCENT PASSING A 1-1/2-INCH SIEVE AND NOT MORE THAN 12 PERCENT PASSING A NO. 200 SIEVE. G. BEDDING COURSE: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR CRUSHED GRAVEL, CRUSHED STONE, AND NATURAL OR CRUSHED SAND; ASTM D 2940; EXCEPT WITH 100 PERCENT PASSING A 1-INCH SIEVE AND NOT MORE THAN 8 PERCENT PASSING A NO. 200 SIEVE. H. DRAINAGE COURSE: NARROWLY GRADED MIXTURE OF WASHED, CRUSHED STONE, OR CRUSHED OR UNCRUSHED GRAVEL; ASTM D 448; COARSE -AGGREGATE GRADING SIZE 57; WITH 100 PERCENT PASSING A 1-1/2-INCH SIEVE AND 0 TO 5 PERCENT PASSING A NO. 8 SIEVE. PART 2 - EXECUTION RELEASED FOR CONSTRUCTION Subject to compliance with all regulations TES, SIDEWALKS, of State and Local Codes ILITIES FROM DAMAGE City at Camel -ERAL MOVEMENT, ) OTHER HAZARDS w�dOaA�SL_ ERATIONS. DATE: 07/22/19 B. PROTECT AND MAINTAIN EROSION AND SEDIMENTATION CONTROLS DURING EARTHWORK OPERATIONS. 2.2 EXCAVATION A. UNCLASSIFIED EXCAVATION: EXCAVATE TO SUBGRADE ELEVATIONS REGARDLESS OF THE CHARACTER OF SURFACE AND SUBSURFACE CONDITIONS ENCOUNTERED, UNCLASSIFIED EXCAVATED MATERIALS MAY INCLUDE ROCK, SOIL MATERIALS, AND OBSTRUCTIONS. NO CHANGES IN THE CONTRACT SUM OR THE CONTRACT TIME WILL BE AUTHORIZED FOR ROCK EXCAVATION OR REMOVAL OF OBSTRUCTIONS. 1. IF EXCAVATED MATERIALS INTENDED FOR FILL AND BACKFILL INCLUDE UNSATISFACTORY SOIL MATERIALS AND ROCK, REPLACE WITH SATISFACTORY SOIL MATERIALS. 2.3 EXCAVATION FOR STRUCTURES A. EXCAVATE TO INDICATED ELEVATIONS AND DIMENSIONS WITHIN A TOLERANCE OF PLUS OR MINUS 1 INCH. IF APPLICABLE, EXTEND EXCAVATIONS A SUFFICIENT DISTANCE FROM STRUCTURES FOR PLACING AND REMOVING CONCRETE FORM WORK, FOR INSTALLING SERVICES AND OTHER CONSTRUCTION, AND FOR INSPECTIONS. B. EXCAVATIONS FOR FOOTINGS AND FOUNDATIONS: DO NOT DISTURB BOTTOM OF EXCAVATION. EXCAVATE BY HAND TO FINAL GRADE JUST BEFORE PLACING CONCRETE REINFORCEMENT. TRIM BOTTOMS TO REQUIRED LINES AND GRADES TO LEAVE SOLID BASE TO RECEIVE OTHER WORK. 2.4 EXCAVATION FOR WALKS AND PAVEMENTS A. EXCAVATE SURFACES UNDER WALKS AND PAVEMENTS TO INDICATED LINES, CROSS SECTIONS, ELEVATIONS, AND SUBGRADES. 2.5 EXCAVATION FOR UTILITY TRENCHES A. EXCAVATE TRENCHES TO INDICATED GRADIENTS, LINES, DEPTHS, AND ELEVATIONS. B. EXCAVATE TRENCHES TO UNIFORM WIDTHS TO PROVIDE THE FOLLOWING CLEARANCE ON EACH SIDE OF PIPE OR CONDUIT. EXCAVATE TRENCH WALLS VERTICALLY FROM TRENCH BOTTOM TO 12 INCHES HIGHER THAN TOP OF PIPE OR CONDUIT, UNLESS OTHERWISE INDICATED. C. CLEARANCE: 12 INCHES EACH SIDE OF PIPE OR CONDUIT. D. TRENCH BOTTOMS: EXCAVATE AND SHAPE TRENCH BOTTOMS TO PROVIDE UNIFORM BEARING AND SUPPORT OF PIPES AND CONDUIT. SHAPE SUBGRADE 0 PROVIDE CONTINUOUS SUPPORT FOR BELLS, JOINTS, AND BARRELS OF PIPES AND FOR JOINTS, FITTINGS, AND BODIES OF CONDUITS. REMOVE PROJECTING STONES AND SHARP OBJECTS ALONG TRENCH SUBGRADE. 1. EXCAVATE TRENCHES 6 INCHES DEEPER THAN ELEVATION REQUIRED IN ROCK OR OTHER UNYIELDING BEARING MATERIAL, 4 INCHES DEEPER ELSEWHERE, TO ALLOW FOR BEDDING COURSE. 2.6 SUBGRADE INSPECTION A. PROOF -ROLL SUBGRADE BELOW THE BUILDING SLABS AND PAVEMENTS WITH HEAVY PNEUMATIC -TIRED EQUIPMENT TO IDENTIFY SOFT POCKETS AND AREAS OF EXCESS YIELDING. DO NOT PROOF -ROLL WET OR SATURATED SUBGRADES. B. RECONSTRUCT SUBGRADES DAMAGED BY FREEZING TEMPERATURES, FROST, RAIN, ACCUMULATED WATER, OR CONSTRUCTION ACTIVITIES, AS DIRECTED BY ARCHITECT. WITHOUT ADDITIONAL COMPENSATION. 2.7 UNAUTHORIZED EXCAVATION A. FILL UNAUTHORIZED EXCAVATION UNDER FOUNDATIONS OR WALL FOOTINGS BY EXTENDING BOTTOM ELEVATION OF CONCRETE FOUNDATION OR FOOTING TO EXCAVATION BOTTOM, WITHOUT ALTERING TOP ELEVATION. COMPACTED SECTION 302 DENSE GRADED AGGREGATE OR LEAN CONCRETE FILL, WITH 28-DAY COMPRESSIVE STRENGTH OF 1500 PSI, MAY BE USED WHEN APPROVED BY ARCHITECT. A. FILL UNAUTHORIZED EXCAVATIONS UNDER OTHER CONSTRUCTION OR UTILITY PIPE AS DIRECTED BY ARCHITECT. 2.8 STORAGE OF SOIL MATERIALS A. STOCKPILE BORROW SOIL MATERIALS AND EXCAVATED SATISFACTORY SOIL MATERIALS WITHOUT INTERMIXING. PLACE, GRADE, AND SHAPE STOCKPILES TO DRAIN SURFACE WATER. COVER TO PREVENT WINDBLOWN DUST. 1. STOCKPILE SOIL MATERIALS AWAY FROM EDGE OF EXCAVATIONS. DO NOT STORE WITHIN DRIP LINE OF REMAINING TREES. 2.9 UTILITY TRENCH BACKFILL A. PLACE BACKFILL ON SUBGRADES FREE OF MUD, FROST, SNOW, OR ICE. B. PLACE AND COMPACT BEDDING COURSE ON TRENCH BOTTOMS AND WHERE INDICATED. SHAPE BEDDING COURSE TO PROVIDE CONTINUOUS SUPPORT FOR BELLS, JOINTS, AND BARRELS OF PIPES AND FOR JOINTS, FITTINGS, AND BODIES OF CONDUITS. C. BACKFILL TRENCHES EXCAVATED UNDER FOOTINGS AND WITHIN 18 INCHES OF BOTTOM OF FOOTINGS WITH SATISFACTORY SOIL; FILL WITH CONCRETE TO ELEVATION OF BOTTOM OF FOOTINGS. D. PROVIDE 4-INCH- THICK, CONCRETE -BASE SLAB SUPPORT FOR PIPING OR CONDUIT LESS THAN 18 INCHES BELOW SURFACE OF ROADWAYS. AFTER INSTALLING AND TESTING, COMPLETELY ENCASE PIPING OR CONDUIT IN A MINIMUM OF 4 INCHES OF CONCRETE BEFORE BACKFILLING OR PLACING ROADWAY SUBBASE. E. PLACE AND COMPACT INITIAL BACKFILL OF SATISFACTORY SOIL, FREE OF PARTICLES LARGER THAN 1 INCH IN ANY DIMENSION, TO A HEIGHT OF 12 INCHES OVER THE UTILITY PIPE OR CONDUIT. 1. CAREFULLY COMPACT INITIAL BACKFILL UNDER PIPE HAUNCHES AND COMPACT EVENLY UP ON BOTH SIDES AND ALONG THE FULL LENGTH OF UTILITY PIPING OR CONDUIT TO AVOID DAMAGE OR DISPLACEMENT OF PIPING OR CONDUIT. COORDINATE BACKFILLING WITH UTILITIES TESTING. F. PLACE AND COMPACT FINAL BACKFILL OF SATISFACTORY SOIL TO FINAL SUBGRADE ELEVATION. G. INSTALL WARNING TAPE DIRECTLY ABOVE UTILITIES, 12 INCHES BELOW FINISHED GRADE, EXCEPT 6 INCHES BELOW SUBGRADE UNDER PAVEMENTS AND SLABS. 2.10SOIL FILL A. PLOW, SCARIFY, BENCH, OR BREAK UP SLOPED SURFACES STEEPER THAN 1 VERTICAL TO 4 HORIZONTAL SO FILL MATERIAL WILL BOND WITH EXISTING MATERIAL. B. PLACE AND COMPACT FILL MATERIAL IN LAYERS TO REQUIRED ELEVATIONS AS FOLLOWS: 1. UNDER GRASS AND PLANTED AREAS, USE SATISFACTORY SOIL MATERIAL. 2. UNDER WALKS AND PAVEMENTS, USE SATISFACTORY SOIL MATERIAL. 3. UNDER STEPS AND RAMPS, USE ENGINEERED FILL. 4. UNDER BUILDING SLABS, USE ENGINEERED FILL. 5. UNDER FOOTINGS AND FOUNDATIONS, USE ENGINEERED FILL. 2.11 SOIL MOISTURE CONTROL A. UNIFORMLY MOISTEN OR AERATE SUBGRADE AND EACH SUBSEQUENT FILL OR BACKFILL SOIL LAYER BEFORE COMPACTION TO WITHIN 2 PERCENT OF OPTIMUM MOISTURE CONTENT. 1. DO NOT PLACE BACKFILL OR FILL SOIL MATERIAL ON SURFACES THAT ARE MUDDY, FROZEN, OR CONTAIN FROST OR ICE. 2. REMOVE AND REPLACE, OR SCARIFY AND AIR DRY OTHERWISE SATISFACTORY SOIL MATERIAL THAT EXCEEDS OPTIMUM MOISTURE CONTENT BY 2 PERCENT AND 15 TOO WET TO COMPACT TO SPECIFIED DRY UNIT WEIGHT. 2.12 COMPACTION OF SOIL BACKFILLS AND FILLS A. PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT MORE THAN 9 INCHES IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HEAVY COMPACTION EQUIPMENT, AND NOT MORE THAN 4 INCHES IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND -OPERATED TAMPERS. B. PLACE BACKFILL AND FILL SOIL MATERIALS EVENLY ON ALL SIDES OF STRUCTURES TO REQUIRED ELEVATIONS, AND UNIFORMLY ALONG THE FULL LENGTH OF EACH STRUCTURE. C. COMPACT SOIL MATERIALS TO NOT LESS THAN THE FOLLOWING PERCENTAGES OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 1557: 1. UNDER STRUCTURES, BUILDING SLABS, STEPS, AND PAVEMENTS, SCARIFY AND RE -COMPACT TOP 12 INCHES OF EXISTING SUBGRADE AND EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 98 PERCENT. a. THE LIMITS FOR COMPACTION SHALL BE WITHIN A LINE TEN FEET OUTSIDE THE STRUCTURE OR PAVEMENT AND DOWN TO EXISTING A SLOPE OF TWO HORIZONTAL TO ONE VERTICAL. 3. UNDER WALKWAYS, SCARIFY AND REC-OMPACT TOP 6 INCHES BELOW SUBGRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 95 PERCENT. 4. UNDER LAWN OR UNPAVED AREAS, SCARIFY AND RECOMPACT TOP 6 INCHES BELOW SUBGRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 90 PERCENT. 5. FOR UTILITY TRENCHES, COMPACT EACH LAYER OF INITIAL AND FINAL BACKFILL SOIL MATERIAL AT 95 PERCENT. 2.13 GRADING A. GENERAL: UNIFORMLY GRADE AREAS TO A SMOOTH SURFACE, FREE OF IRREGULAR SURFACE CHANGES. COMPLY WITH COMPACTION REQUIREMENTS AND GRADE TO CROSS SECTIONS, LINES, AND ELEVATIONS INDICATED. B. SITE GRADING: SLOPE GRADES TO DIRECT WATER AWAY FROM BUILDINGS AND TO PREVENT PONDING. FINISH SUBGRADES TO REQUIRED ELEVATIONS WITHIN THE FOLLOWING TOLERANCES: 1. LAWN OR UNPAVED AREAS: PLUS OR MINUS 1 INCH. 2. WALKS: PLUS OR MINUS 1/2 INCH. 3. PAVEMENTS: PLUS OR MINUS 1/2 INCH. C. GRADING INSIDE BUILDING LINES: FINISH SUBGRADE TO A TOLERANCE OF 1/2 INCH WHEN TESTED WITH A 10-FOOT STRAIGHTEDGE. 2.14SUBBASE AND BASE COURSES A. PLACE BASE COURSE ON SUBGRADES FREE OF MUD, FROST, SNOW, OR ICE. B. ON PREPARED SUBGRADE, PLACE SUBBASE COURSE UNDER PAVEMENTS AND WALKS AS FOLLOWS: 1. SHAPE SUBBASE COURSE TO REQUIRED CROWN ELEVATIONS AND CROSS -SLOPE GRADES. 2. COMPACT SUBBASE COURSE AT OPTIMUM MOISTURE CONTENT TO REQUIRED GRADES, LINES, CROSS SECTIONS, AND THICKNESS TO NOT LESS THAN 95 PERCENT OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 1557. 2.15 DRAINAGE COURSE A. PLACE DRAINAGE COURSE ON SUBGRADES FREE OF MUD, FROST, SNOW, OR ICE. B. ON PREPARED SUBGRADE PLACE AND COMPACT DRAINAGE COURSE UNDER CAST -IN -PLACE CONCRETE SLABS -ON -GRADE AS FOLLOWS: 1. PLACE DRAINAGE COURSE THAT EXCEEDS 6 INCHES IN COMPACTED THICKNESS IN LAYERS OF EQUAL THICKNESS, WITH NO COMPACTED LAYER MORE THAN 6 INCHES THICK OR LESS THAN 3 INCHES THICK. 2. COMPACT EACH LAYER OF DRAINAGE COURSE TO REQUIRED CROSS SECTIONS AND THICKNESSES TO NOT LESS THAN 95 PERCENT OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 1557. 2.16 FIELD QUALITY CONTROL A. TESTING AGENCY: OWNER WILL ENGAGE A QUALIFIED GEOTECHNICAL ENGINEERING TESTING AGENCY TO PERFORM TESTS AND INSPECTIONS. B. ALLOW TESTING AGENCY TO INSPECT AND TEST SUBGRADES AND EACH FILL OR BACKFILL LAYER. PROCEED WITH SUBSEQUENT EARTH MOVING ONLY AFTER TEST RESULTS FOR PREVIOUSLY COMPLETED WORK COMPLY WITH REQUIREMENTS. C. FOOTING SUBGRADE: AT FOOTING SUBGRADES, AT LEAST ONE TEST OF EACH SOIL STRATUM WILL BE PERFORMED TO VERIFY DESIGN BEARING CAPACITIES. SUBSEQUENT VERIFICATION AND APPROVAL OF OTHER FOOTING SUBGRADES MAY BE BASED ON A VISUAL COMPARISON OF SUBGRADE WITH TESTED SUBGRADE WHEN APPROVED BY ARCHITECT. D. TESTING AGENCY WILL TEST COMPACTION OF SOILS IN PLACE ACCORDING TO ASTM D 1556, ASTM D 2167, ASTM D 2922, AND ASTM D 2937, AS APPLICABLE. TESTS WILL BE PERFORMED AT THE FOLLOWING LOCATIONS AND FREQUENCIES: 1. PAVED AND BUILDING SLAB AREAS: AT SUBGRADE AND AT EACH COMPACTED FILL AND BACKFILL LAYER, AT LEAST ONE TEST FOR EVERY 2000 SQ. FT. OR LESS OF PAVED AREA OR BUILDING SLAB, BUT IN NO CASE FEWER THAN THREE TESTS. 3. FOUNDATION WALL BACKFILL: AT EACH COMPACTED BACKFILL LAYER, AT LEAST ONE TEST FOR EVERY 100 FEET OR LESS OF WALL LENGTH, BUT NO FEWER THAN TWO TESTS. 4. TRENCH BACKFILL: AT EACH COMPACTED INITIAL AND FINAL BACKFILL LAYER, AT LEAST ONE TEST FOR EVERY 150 FEET OR LESS OF TRENCH LENGTH, BUT NO FEWER THAN TWO TESTS. E. WHEN TESTING AGENCY REPORTS THAT SUBGRADES, FILLS, OR BACKFILLS HAVE NOT ACHIEVED DEGREE OF COMPACTION SPECIFIED, SCARIFY AND MOISTEN OR AERATE, OR REMOVE AND REPLACE SOIL MATERIALS TO DEPTH REQUIRED; RE -COMPACT AND RETEST UNTIL SPECIFIED COMPACTION IS OBTAINED. 2.17 PROTECTION A. PROTECTING GRADED AREAS: PROTECT NEWLY GRADED AREAS FROM TRAFFIC, FREEZING, AND EROSION. KEEP FREE OF TRASH AND DEBRIS. B. REPAIR AND REESTABLISH GRADES TO SPECIFIED TOLERANCES WHERE COMPLETED OR PARTIALLY COMPLETED SURFACES BECOME ERODED, RUTTED, SETTLED, OR WHERE THEY LOSE COMPACTION DUE TO SUBSEQUENT CONSTRUCTION OPERATIONS OR WEATHER CONDITIONS. 1. SCARIFY OR REMOVE AND REPLACE SOIL MATERIAL TO DEPTH AS DIRECTED BY ARCHITECT; RESHAPE AND RECOMPACT. C. WHERE SETTLING OCCURS BEFORE PROJECT CORRECTION PERIOD ELAPSES, REMOVE FINISHED SURFACING, BACKFILL WITH ADDITIONAL SOIL MATERIAL, COMPACT, AND RECONSTRUCT SURFACING. 1. RESTORE APPEARANCE, QUALITY, AND CONDITION OF FINISHED SURFACING TO MATCH ADJACENT WORK, AND ELIMINATE EVIDENCE OF RESTORATION TO GREATEST EXTENT POSSIBLE. 2.18 DISPOSAL OF SURPLUS AND WASTE MATERIALS A. REMOVE SURPLUS SATISFACTORY SOIL AND WASTE MATERIALS, INCLUDING UNSATISFACTORY SOIL, TRASH, AND DEBRIS, AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. 1. REMOVE WASTE MATERIALS, INCLUDING UNSATISFACTORY SOIL, TRASH, AND DEBRIS, AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. NON -RUBBER TIRED VEHICLES NON -RUBBER TIRED VEHICLES SHALL NOT BE MOVED ON PUBLIC STREETS, EXISTING PRIVATE ROADWAYS OR PARKING LOTS. NO EXCEPTIONS SHALL BE GRANTED. WHERE POTENTIAL GRADE CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, THE CONTRACTOR WILL BE REQUIRED TO UNCOVER SUCH UTILITIES SUFFICIENTLY IN ADVANCE OF LAYING PIPE OR DUCT AND PROVIDE THE ENGINEER THE LOCATION AND ELEVATION OF SAID UTILITY SO THE ENGINEER CAN DETERMINE IF ANY ADJUSTMENTS ARE NECESSARY. THE NOTIFICATION OF AFFECTED UTILITY OWNERS IN ADVANCE OF CONSTRUCTION AND EXACT LOCATION AND PROTECTION OF UTILITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR. IF DAMAGE IS CAUSED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF THE SAME AND FOR ANY RESULTING CONTINGENT DAMAGE. PERMITS THE CONTRACTOR IS TO OBTAIN ALL NECESSARY PERMITS. AN ORIGINAL PERMIT WITH SIGNATURES SHALL BE KEPT ONSITE AT ALL TIMES. SITE VISIT THE CONTRACTOR SHALL PERFORM FIELD RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING SITE CONDITIONS AND THE POTENTIAL AFFECTS UPON THE WORK SCOPE. ANY PERFORMANCE OF ADDITIONAL SITE SUBSURFACE INVESTIGATIONS (TEST HOLES) SHALL BE COORDINATED IN ADVANCE WITH THE OWNER AS WARRANTED. EXCAVATED MATERIAL SHALL BE REPLACED IN A CONTROLLED MANNER TO MINIMIZE IMPACT ON FIELD EARTHWORK OPERATIONS. TRENCHES ALL TRENCHES THAT CROSS PAVEMENT OR WHERE THE FRONT FACE OF TRENCHES, PARALLELING THE PAVEMENT IS WITHIN 24" OF THE FACE OF CURB OR EDGE OF PAVEMENT SHALL BE BACKFILLED WITH COMPACTED GRANULAR MATERIAL AS PER SECTION 302. THE MATERIAL SHALL EXTEND LATERALLY 36" BEYOND FACE OF CURB OR EDGE OF PAVEMENT, OTHER AREAS OUTSIDE ABOVE REQUIREMENT SHALL BE COMPACTED AS PER SECTION 200. STORAGE OF EQUIPMENT AND MATERIALS NO MATERIALS OR EQUIPMENT SHALL BE STORED WITHIN THE RIGHT-OF-WAY OR WITHIN ONE HUNDRED (100) FEET OF ANY INTERSECTING STREET OR DRIVEWAY. COMPLIANCE WITH THESE REQUIREMENTS ALONG WITH ADDITIONAL PROVISIONS OF THE CONTRACT SPECIFICATIONS SHALL NOT IN ANY WAY RELIEVE THE CONTRACTOR OF HIS LEGAL RESPONSIBILITIES OR LIABILITIES FOR THE SAFETY OF THE PUBLIC. THE CONTRACTOR SHALL INDICATE HIS INTENT WITH REGARD TO STORAGE AT THE PRE -CONSTRUCTION MEETING. '1112aOIIUIIi. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE ROUTING OF THE PROPOSED PRIVATE UTILITY SERVICES. THE ROUTING OF THE PROPOSED PRIVATE UTILITY SERVICES SHALL BE ADJUSTED IN THE FIELD AS NEEDED TO AVOID CONFLICTS WITH EXISTING UTILITIES AND EACH OTHER. CONTRACTOR SHALL COORDINATE THE FINAL LOCATIONS OF THE PRIVATE UTILITY SERVICE CONNECTION POINTS AT THE BUILDING PERIMETER WITH THE MOST CURRENT APPROVED BUILDING MECHANICAL SYSTEM DRAWINGS. THE ROUTING OF THE PRIVATE UTILITY SERVICES SHALL BE FIELD ADJUSTED AS NEEDED TO MEET THE PROPOSED CONNECTION POINTS. BUILDING/SITE UTILITY CONNECTIONS THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE ARCHITECT AND THE MECHANICAL ENGINEER FOR THE FINAL LOCATION OF UTILITY SERVICES INTO THE BUILDING AND ANY CONNECTIONS APPURTENANCES NECESSARY BETWEEN THE BUILDING AND SITE UTILITY SERVICES. ROOF DRAINS CONTRACTOR TO USE P.V.C. SEWER PIPE IN ACCORDANCE WITH ASTM D3034 AND WITH SECTION 701 WITH JOINTS PER ASTM D3212 FOR ROOF DRAIN PIPE. REFERENCE MECHANICAL, ELECTRICAL AND PLUMBING PLANS FOR SIZES OF ROOF DRAINS. ALL PIPE FITTINGS FOR THE ROOF DRAINS ARE TO BE INCLUDED IN THE UNIT PRICE BID FOR ITEM SPEC. ROOF DRAINS, COMPLETE; UP TO 5' FROM THE BUILDING. ALL BEDDING FOR ROOF DRAIN PIPE SHALL BE IN ACCORDANCE WITH SECTION 701. ROOF DRAINS SHALL BE INSTALLED PER THE SLOPE DESIGNATED IN THE PLANS. IF SLOPE IS NOT DESIGNATED ON THE PLANS ROOF DRAINS SHALL BE INSTALLED AT A 1.00% MINIMUM SLOPE. GRADING NOTES ALL EROSION AND SEDIMENTATION CONTROL PRACTICES ARE SUBJECT TO FIELD MODIFICATIONS AT THE DISCRETION OF THE CITY OF CARMEL, CITY ENGINEER, PROJECT ENGINEER AND/OR THE INDIANA DEPARTMENT OF ENVIRONMENTAL PROTECTION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING EARTHWORK CALCULATIONS AND INCLUDING THE NECESSARY IMPORTING OR EXPORTING OF SOIL IN THE BASE BID. ALL FILL PLACED FOR BUILDING PADS SHALL BE DONE SO IN ACCORDANCE WITH AND UNDER THE OBSERVATION OF A REGISTERED SOILS ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE TO EMPLOY THE SERVICES OF A REGISTERED SOILS ENGINEER TO INSURE THE SUBGRADE HAS BEEN COMPACTED IN ACCORDANCE WITH SECTION 200 AND THE RECOMMENDATIONS OF THE SOILS ENGINEER. BACKFILL OF UTILITY TRENCHES SHALL CONFORM TO THE SPECIFICATIONS, AS DELINEATED ON THE SEWER PROFILES. TEMPORARY SOIL EROSION AND SEDIMENT CONTROL EROSION AND SEDIMENT CONTROL MEASURES ARE REQUIRED AS A PART OF THIS PROJECT. EROSION AND SEDIMENT CONTROL MEASURES RELATING TO THIS PROJECT DEVELOPMENT ARE INCLUDED AS A PART OF THIS IMPROVEMENT. THE EROSION AND SEDIMENTATION CONTROL REFLECTS A SCHEMATIC DIAGRAM OF THE INTENDED MEASURES FOR COMPLIANCE WITH THE REQUIRED STANDARDS. GENERAL PRACTICE AND/OR SITE FIELD CONDITIONS MAY WARRANT VARIATION IN THE PLACEMENT OR USE OF THE SPECIFIED CONTROLS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING NECESSARY AND ADEQUATE MEASURES FOR PROPER CONTROL OF EROSION AND SEDIMENT RUNOFF FROM THE SITE ALONG WITH PROPER MAINTENANCE AND INSPECTION IN COMPLIANCE WITH THE NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. LAND -DISTURBING ACTIVITIES MUST COMPLY WITH ALL PROVISIONS OF THE CITY & STATE DRAINAGE EROSION AND SEDIMENT CONTROL REGULATIONS. ALL LAND - DISTURBING ACTIVITIES SHALL BE SUBJECT TO INSPECTION AND SITE INVESTIGATION BY THE CITY OF CARMEL AND/OR THE INDIANA DEPARTMENT OF ENVIRONMENTAL PROTECTION. FAILURE TO COMPLY WITH THESE REGULATIONS IS SUBJECT TO LEGAL ENFORCEMENT ACTION. r > a o 0o C i� z�w> >>m�m a U N � z 0 m MILL! ti U H U O Q o w w Z U O O r d !L O U DUST CONTROL THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING DUST CONTROL MEASURES. DUST CONTROL OPERATIONS SHALL BE PERFORMED ON A PERIODIC BASIS AND/OR AS DIRECTED BY THE OWNER OR ENGINEER TO ALLEVIATE OR PREVENT THE DUST NUISANCE ORIGINATING WITHIN THE PROJECT WORK LIMITS. CALCIUM CHLORIDE ON AREAS TO BE SEEDED AND MULCHED WILL NOT BE PERMITTED. THE o COST FOR ALL DUST CONTROL MEASURES SHALL BE w INCLUDED IN THE PRICE BID FOR THE STORM SEWER a IMPROVEMENTS. a n a MISCELLANEOUS CONSTRUCTION NOTES THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCH MARKS, PROPERTY CORNERS, REFERENCE POINTS, STAKES AND OTHER SURVEY REFERENCE MONUMENTS OR MARKERS. IN CASES OF WILLFUL OR CARELESS DESTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORATIONS. RESETTING OF MARKERS SHALL BE PERFORMED BY AN INDIANA PROFESSIONAL SURVEYOR AS APPROVED BY THE CITY ENGINEER. Z U) RESTORATION AND CLEAN UP �E LJJ INCONVENIENCE TO THE ADJACENT PROPERTY OWNERS K AND TO THE TRAVELING PUBLIC SHALL BE KEPT TO AN 0 ZO ABSOLUTE MINIMUM. ALL WORK IS TO CONTINUE ON A Z UNIFORM BASIS AND ON SCHEDULE, PARTICULARLY THE 2 U) J RESTORATION AND CLEAN UP OF DISTURBED AREAS AFTER CONSTRUCTION. W m ALL FENCES, SIGNS, DRAINAGE STRUCTURES, VALVES, LANDSCAPING, ETC. REMOVED, DISTURBED OR DAMAGED Z DURING WORK WITHIN PUBLIC RIGHT-OF-WAYS, EASEMENT S O AREAS AND/OR UNDER THE PROJECT IMPROVEMENTS SHALL BE RESTORED TO THEIR ORIGINAL CONDITION BY H Cl) CONTRACTOR UNLESS OTHERWISE SPECIFIED. PAYMENT FOR SAME SHALL BE INCLUDED IN THE PRICE BID FOR SITE RESTORATION. CONVENIENCE FACILITIES THE CONTRACTOR SHALL FURNISH AND MAINTAIN SANITARY (n CONVENIENCE FACILITIES FOR THE WORKMEN AND W INSPECTORS FOR THE DURATION OF THE WORK. COST H- SHALL BE INCLUDED IN THE PRICE BID MOBILIZATION. O Z J a LU W Z W C002