HomeMy WebLinkAboutC501 - SWPPP NOTESSTORM WATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION SITES
ALL EROSION CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE INDIANA HANDBOOK FOR EROSION
CONTROL IN DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION, INDIANA DEPARTMENT OF
NATURAL RESOURCES. NO LAND CLEARING OR GRADING SHALL BEGIN UNTIL ALL REQUIRED EROSION CONTROL
MEASURES HAVE BEEN INSTALLED.
THE CONTRACTOR SHALL STRICTLY ADHERE TO THE STORM WATER POLLUTION PREVENTION PUN DURING
CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL CONTROL WASTE. GARBAGE, DEBRIS, WASTEWATER, AND
OTHER SUBSTANCES ON THE SITE IN SUCH A WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE
BY THE ACTION OF WINDS, STORM WATER RUNOFF, OR OTHER FORCES. PROPER DISPOSAL OR MANAGEMENT
OF ALL WASTES AND UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE OF THE WASTE OR MATERIAL,
IS REQUIRED.
THIS EROSION CONTROL PLAN SHALL BE IMPLEMENTED ON ALL DISTURBED AREAS WITHIN THE CONSTRUCTION
SITE. ALL MEASURES INVOLVING EROSION CONTROL PRACTICES SHALL BE INSTALLED UNDER THE GUIDANCE OF
QUALIFIED PERSONNEL EXPERIENCED IN EROSION CONTROL AND FOLLOWING THE PLANS AND SPECIFICATIONS
INCLUDED HEREIN. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE GENERAL CONTRACTOR
SHALL TAKE ALL NECESSARY PRECAUTONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE.
1. 14 DIGIT WATERSHED HYDROLOGIC UNIT CODE
05120201090030
2. NAME OF ALL RECEIVING WATERS IF THE DISCHARGE IS TO A MUNICIPAL SEPARATE STORM SEWER, IDENTIFY
THE ULTIMATE RECEIVING WATER
THE ULTIMATE RECEMNG WATER IS AN TO AN UNNAMED TRIBUTARY OF LITTLE COOL CREEK.
3. ESTIMATE OF PEAK DISCHARGE FOR POST CONSTRUCTION CONDITIONS (10-YEAR).
PRE -CONSTRUCTION 10-YEN DISCHARGE: 20.96 CPS
P05T-CONSTRUCTION 10-YEAR DISCHARGE: 31.25 CM
4. LOCATIONS OF SPECIFIC POINTS WHERE STORMWATER DISCHARGE WILL LEAVE THE SITE.
STORMWATER DRAINAGE FROM THE SITE WILL BE CONVEYED BY A COMBINATON OF PROPOSED AND EXITING
STORM SEWER TO A MODIFIED EXISTING DRY DETENTION POND AND PROPOSED UNDERGROUND DETENTION
ON THE EAST SIDE OF THE SITE. THE ULTIMATE RECEIVING WATER IS AN TO AN UNNAMED TRIBUFARY
OF LITTLE COOL CREEK.
5. LOCATIONS WHERE STORMWATER MAY BE DIRECTLY DISCHARGED INTO GROUNDWATER, SUCH AS ABANDONED
WELLS OR SINKHOLES.
THERE ARE NO LOCATIONS ON SITE WHERE SURFACE WATER MAY BE DISCHARGED INTO GROUND WATER.
6. SOILS MAP OF THE PREDOMINANT SOIL TYPES INCLUDING:
SOIL INFORMATION FROM THE HAMILTON COUNTY SOIL SURVEY IS ON SHEET C500. THE SITE HAS CROSBY
SILT LOAM AND BROOKSTON SILTY CLAY. CROSBY SILT LOAM IS A HYDROLOGIC GROUP C SOIL WITH
VERY LOW CHANCE OF FLOODING OR PONDING. BROOKSTON SILTY CUY IS A HYDROLOGICAL GROUP B
SOIL WIN A VERY LOW CHANCE OF FLOODING BUT WITH FREQUENT PONDING.
THE SUITABILITY OF THE SOIL FOR SMALL COMMERCIAL BUILDINGS IS VERY LIMITED. THE ON -SITE SOIL
WILL BE TREATED AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER IF THE CONDITIONS ARE UNSUITABLE
FOR THE PROPOSED BUILDING. THE FOUNDATIONS OF THE BUILDING WILL BE DESIGNED BY THE
STRUCTURAL ENGINEER TO ACCOMMODATE THE BEARING CAPACITY OF THE SOILS. REMEDIAL TREATMENTS
MAY INCLUDE THE REMOVAL OF THE UNSUITABLE SOIL AND BACKFILUNG WITH ENGINEERED MATERIAL.
THE SUITABILITY OF THE SOIL FOR ROADS AND STREETS IS VERY UMITED. THE ON -SITE SOIL WILL BE
TREATED AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER IF THE CONDITIONS ARE UNSUITABLE FOR
THE PROPOSED PAVEMENT. REMEDIAL TREATMENTS MAY INCLUDE THE REMOVAL OF THE UNSUITABLE SOIL
AND BACKPILLING WITH ENGINEERED MATERIAL, INSTALLATION OF GEOFABRIC UNDER THE PAVEMENT, AND/OR
THE INSTALLATION OF UNDERDRAINS BENEATH THE PAVEMENT.
Mld��a3131bI.`�]�S31X:NEI�$7191fi1i�'LPL:Ta�7S�3dML11ae�;71131:I��P.FiI1Re5Q77Gi�B�.
-CONSTRUCTION WASTE MATERIAL
-CONSTRUCTION MATERIAL STORAGE AREA
-FUEL STORAGE AREAS
-LEAKING CONSTRUCTION VEHICLES AND EQUIPMENT
-SOIL TRACKING OFPSIM FROM VEHICLES AND EQUIPMENT
-EXPOSED SOILS AND DUST
-SANITARY WASTE FROM TEMPORARY FACILITIES
-COMMON UTTER
8. TEMPORARY AND PERMANENT STORMWATER OUAUTY MEASURES:
STATE AND FEDERAL WATER QUALITY PERMITS
NO STATE OR FEDERAL WATER QUALITY PERMITS ARE REQUIRED FOR THIS PROJECT. THE GENERAL
CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL ORDINANCES THAT APPLY.
TEMPORARY STORMWATER QUALITY MEASURES
STABILIZED CONSTRUCTION ENTRANCE
REFER TO SHEET C100 AND C500 FOR LOCATION OF THE STABILIZED CONSTRUCTION ENTRANCE.
STABILIZED CONSTRUCTION ENTRANCE DETAILS AND SPECIFICATIONS ARE ON SHEET C502.
SILT FENCE
SILT FENCE WILL BE PLACE AROUND THE PERIMETER OF THE SITE, AS SHOWN ON SHEET C100 AND C500,
TO HELP PREVENT RUNOFF SEDIMENTS FROM LEAVING THE SITE. REFER TO SHEET C502 FOR DEVILS.
SHEET FLOW
SEEDING AND MULCHING WILL PROTECT SHEET FLOW AREAS ON SITE. TEMPORARY AND PERMANENT
SPECIFICATIONS CAN BE LOCATED ON SHEET C502 AND L101. REFER TO SHEET C500 FOR AREAS OF
APPLICATION. EROSION CONTROL BLANKETS WILL BE INSTALLED IN AREAS WHERE STEEP SLOPES ARE
PRESENT AND WITHIN THE BOTTOM OF THE BIOSWALE AREA TO PREVENT EROSION AND SEDIMENT FROM
LEAVING THE SITE. REFER TO C500 FOR LOCATIONS FOR EROSION CONTROL BLANKETS AND C503 FOR
DETAILS.
CONCENTRATED FLOWS
A ROCK CHECK DAM WILL BE TEMPORARILY LOCATED
IN THE SWALE
ON
THE NORTH OF THE SITE,
UNTIL THE SWALES REMOVAL. THE ROCK CHECK DAM
LOCATION CAN
BE
SEEN ON SHEET C100 AND THE
DUAL ON SHEET C503.
STORMWATER INI ET PROTECTION
INLET PROTECTION WILL BE INSTALLED ON ALL INLETS ONSITE AND WITHIN THE RIGHT-OF-WAY THAT
RECEIVE RUNOFF FROM CONSTRUCTION ACTIVITIES. INLET PROTECTION LOCATIONS CAN BE SEEN ON C100
AND C500. REFER TO SHEETS C502 AND C503 FOR DETAILS. BELOW GRATE INLET PROTECTION IS
REQUIRED FOR ALL INLETS WITHIN THE RIGHT-OF-WAY.
STORMWATER OUTLET
RIP RAP WILL
PROTECTION
BE PROVIDED AT THE OUTLET OF ALL
STORM SEWER PIPE
OUTLETS AND CURB TURNOUT
LOCATIONS, AS
WELL AS THE EMERGENCY OVERFLOW
OF THE DETENTION
POND. REFER TO SHEET CX)1
FOR LOCATION
AND C503 FOR DETAILS.
SEDIMENT BASIN
THE DRY DETENTION BASIN WILL BE USED AS A TEMPORARY SEDIMENT BASIN DURING CONSTRUCTION TO
PREVENT SEDIMENT RUNOFF FROM LEAVING THE SITE. DIVERSION OF STORMWATER TO THE BASIN MAY BE
REQUIRED UNTIL PERMANENT STORM STRUCTURES ARE PUCED. A RISER PIPE AND SKIMMER WILL BE USED
AT THE DRY BASINS OUTLET TO CONTROL THE STORMWATER RUNOFF FROM THE SITE. LOCATIONS FOR THE
RISER PIPE AND SKIMMER CAN BE SEEN ON SHEET C100 AND C501. RISER PIPE DETAILS ARE LOCATED
ON SHEET C503.
MONITORING AND MAINTENANCE GUIDELINES FOR TEMPORARY STORMWATER QUALITY MEASURES
SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY SEVEN (])
DAYS AND WITHIN 24 HOURS OF A RAINFALL EXCEEDING 0.5 INCHES DURING A 24-HOUR PERIOD OR
MORE FREQUENTLY IF REQUIRED BY GOVERNING NPDES GENERAL PERMIT. ALL MAINTENANCE REQUIRED BY
INSPECTION SHALL COMMENCE WITHIN 24 HOURS AND BE COMPLETED WITHIN 48 HOURS OF REPORT.
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DEEMED NECESSARY BY
ON SITE INSPECTION.
INSPECTIONS SHALL BE CONDUCTED AND A WRITTEN REPORT SHALL BE PREPARED BY A DESIGNATED AND
QUALIFIED PERSON WHO IS FAMILIAR WITH THE USEPA NDPES STORMWATER GENERAL PERMIT, THE SWPPP,
AND THE PROJECT.
INSPECTION REPORTS SHALL BE STATE THE SCOPE OF THE INSPECTION, NAME(S) OF QUALIFIED
PERSONNEL WHO PERFORMED THE INSPECTION, THE DATE OF THE INSPECTION, OBSERVATIONS REUTING TO
THE IMPLEMENTATION OF THE SWPPP, AND ACTIONS TAKEN IN REGARDS TO INCIDENTS OF NONCOMPLIANCE
DURING THE INSPECTION.
UPON COMPLETION OF THE PROJECT, AS -BUILT DRAWINGS ALONG WITH A COPY OF THE MAINTENANCE
REPORT SHALL BE SUBMITTED TO THE HAMILTON COUNTY DRAINAGE BOARD. THE HAMILTON COUNTY
DRAINAGE BOARD SHALL NOT APPROVE FUTURE IMPROVEMENTS ON THE SITE UNTIL AS -BUILT DRAWINGS
ARE SUBMITTED. THE CONTRACTOR SHALL KEEP A COPY OF Al__. THE INSPECTION REPORTS ON SITE AND
PERMANENTLY FOR A PERIOD OF 2 YEARS AFTER CONSTRUCTION. REPORTS CAN BE REQUESTED BY THE
LOCAL SOIL AND WATER CONSERVATION DISTRICT.
Subject to compliance with all regulations
Of State and Local Codes
City of Camel
�N�1��31QwW�DDA�
DATE: 07/22/19
EROSION CONTROL MONITORING & MAINTENANCE GUIDELINES
STORM EVENT IS DEFINED AS PRECIPITATION ACCUMUJATION EQUAL TO OR GREATER THAN 0.5 INCHES OF RAINFALL
EROSION CONTROL MEASURE
MONITORING & MAINTENANCE
TEMPORARY CONSTRUCTION
INSPECT WEEKLY, AFTER STORM EVENTS, AND AFTER HEAVY USE; RESHAPE
ENTRANCE
PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL; TOP DRESS WITH
CLEAN STONE AS NEEDED; IF THE MAJORITY OF MUD OR DIRT IS NOT
REMOVED FROM EXITING TRAFFIC, TEMPORARY WATER SERVICE OR STORAGE
TANKS WIN HOSES SHALL BE PROVIDED AT THE CONSTRUCTION EXIT
POINT, AND VEHICLE TIRES SHALL BE WASHED BEFORE EXITING ON PUBLIC
ROADS. SILT FROM THIS WASHING OPERATION SHALL BE INTERCEPTED AND
TRAPPED BEFORE WASHED WATER IS ALLOWED TO BE DISCHARGED OFFSITE;
REMOVE ALL MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBUC
ROADS IMMEDIATELY; PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT
CLEARED OF ACCUMULATED SEDIMENT. BULK CLEARING OF ACCUMULATED
SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WIN WATER. CLEARED
SEDIMENT SHALL BE RETURNED TO THE POINT OF LIKELY ORIGIN OR
OTHER SUITABLE LOCATION.
SILT FENCE
INSPECT AFTER STORM EVENTS; REPAIR ANY AREAS OF DECOMPOSITION OR
DAMAGE TO FENCE MATERIAL; REMOVE SEDIMENT AT DEPTH OF ONE HALF
FENCE HEIGHT AT LOWEST POINT OR IF FABRIC BULGES; AVOID
UNDERMINING DURING CLEANOUT.
TEMPORARY DIVERSIONS
INSPECT WEEKLY AND AFTER EACH STORM EVENT; REMOVE SEDIMENT FROM
CHANNEL AND REINFORCE RIDGE AS NEEDED: REPAIR OUTLET DAMAGE
IMMEDIATELY; WHEN WORK AREA IS STABILIZED REMOVE RIDGE, FILL
CHANNEL. REMOVE TEMPORARY SLOPE DRAINS, AND STABIUZE ALL
DISTURBED AREAS.
TEMPORARY SEDIMENT TRAP
INSPECT AFTER STORM EVENTS: REMOVE SEDIMENT AT ONE HALF DESIGN
DEPTH; CHECK SKIMMER AND STANDPIPE FOR IF CLOGS; REPLACE
DISPLACED RIP RAP.
TEMPORARY SEEDING
INSPECT PERIODICALLY TO VERIFY ADEQUATE ESTABLISHMENT OF
VEGETATIVE STANDS; RESEED AND MULCH AS NEEDED; INSPECT AFTER
STORM EVENTS AND REPAIR EROSION DAMAGE; TOP DRESS FALL SEEDED
WHEAT OR RYE SEEDINGS WITH 50 LBS/AC OF NITROGEN IN FEBRUARY
OR MARCH IF NITROGEN DEFICIENCY IS APPARENT; WATER AS NEEDED.
EROSION CONTROL BLANKET
INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH STORM
EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED PORTION OF
BU NKET. ADD SOIL RESEED, RELAY AND STAPLE BLANKET; INSPECT
PERIODICALLY AFTER VEGETATON IS ESTABLISHED.
INLET PROTECTION
INSPECT AFTER STORM EVENTS AND MAKE NEEDED REPAIRS IMMEDIATELY;
REMOVE ACCUMULATED SEDIMENT WHILE AVOIDING DAMAGING OR
UNDERCUTTING THE FABRIC.
PERMANENT STORMWATER QUALITY MEASURES
SEEDING AND MUNCHING
SEEDING AND MULCHING WILL CREATE VEGETATION TO PROTECT AREAS ON SITE AREAS FROM EROSION,
SEDIMENT RUNOFF, AND DUST FROM BARE SOILS. TEMPORARY AND PERMANENT SPECIFICATIONS CAN BE
LOCATED ON SHEET C502 AND L101. REFER TO SHEET C500 FOR AREAS OF APPLICATION.
RAIN GARDENS
TWO RAIN GARDENS WILL BE LOCATED AROUND THE STORM INLETS WITHIN PARKING AREA ISLANDS. THE
RAIN GARDENS ARE DESIGNED TO PROMOTE INFILTRATION INTO THE SOIL, REDUCE SEDIMENT RUNOFF, AND
REDUCE STORMWATER RUNOFF VOLUME. LOCATIONS OF RAIN GARDENS ARE SHOWN ON SHEET C500. REFER
TO SHEET C502 FOR DETAILS.
ROSWBLE
A LOW FLOW BIOSWALE IS LOCATED WITHIN THE DRY DETENTION BASIN ON THE EAST SIDE OF HE SITE
THE BIOSWALE IS DESIGNED FOR SLOW SHALLOW FLOW TO ALLOW POLLUTANTS TO SETTLE OUT AND TO
PROMOTE INFILTRATION. LOCATION OF BIOSWALE IS SHOWN ON SHEET C500. REFER TO SHEET C300 FOR
DETAILS.
AOUA-SWIRL
AN AQUASWIRL AS-0 IS LOCATED ON THE SOUTHEAST SIDE OF THE PARKING AREA. THE AQUASWIRL
TAKES STORM WATER RUNOFF FROM THE PROPOSED BUILDING BUILDING AND PARKING AREA AND HELPS
REMOVE SEDIMENT FROM THE STORMWATER RUNOFF. LOCATION OF AQUA -SWIRL IS SHOWN ON SHEET
C500. REFER i0 SHEET C402 FOR DETAILS.
DETENTION POND
A DRY DETENTION POND AND CONTECH PERFORATED CMP UNDERGROUND DETENTION SYSTEM ARE LOCATED
ON THE EAST S1DE OF THE SITE. THESE PRE CONNECTED TO PILL UP IN UNISON, WITH OUTFLOW
RESTRICTED BY AN ORIFICE TO LIMIT THE PEAK DISCHARGE OF STORMWATER FROM THE SITE. THE
LOCATION OF THE DETENTION POND AND UNDERGROUND SYSTEM ARE SHOWN ON SHEET CMO. REFER
SHEET C400, C401, C403, C404 AND C405 FOR DETAILS.
MONITORING AND MAINTENANCE GUIDELINES FOR PERMANENT STORMWATER QUALITY MEASURES
MAINTANENCE REQUIREMENTS FOR THE DRY DETENTION POND, UNDERGROUND DETENTION SYSTEM
AQUA -SWIRL RAIN GARDENS, AND BIOSWALE WILL REMAIN IN PLACE AFTER CONSTRUCTION HAS
COMPLETED.
POST CONSTRUCTION MAINTENANCE REQUIREMENTS FOR THE DRY DETENTION POND. UNDERGROUN
DETENTION SYSTEM, AQUA -SWIRL, RAIN GARDENS, AND BIOSWALE ARE TO INCLUDE PERIODIC INSPECTIONS
AS NEEDED OR AT A MINIMUM Of EVERY SIX MONTHS. SEDIMENT SHOULD BE PROPERLY DISPOSED OF OFF
SITE IN COMPLIANCE WITH ALL APPLICABLE LAWS. AREAS THAT SHOW SIGNS OF EROSION SHOULD BE
STABILIZED WITH SEEDING OR EROSION CONTROL BLANKETS IF NECESSARY. FOR COMPLETE AND DETAILED
INSPECTION AND MAINTENANCE PROCEDURES REFER TO THE SITE SPECIFIC OPERATION AND MAINTENANCE
MANUAL
9. GENERAL CONSTRUCTION SEQUENCE
L SCHEDULE A PRE CONSTRUCTION MEETING WITH THE CITY OF CARMEL ENGINEERING OFFICE AT LEAS
48 HOURS PRIOR TO LAND DISTURBING ACTMTIES.
2. INSTALL STABILIZED CONSTRUCT ENTRANCE.
3. POST THE I AT THE ENTRANCE OF THE S1TE
4. INSTALL PERIMETER SILT FENCE. ADD PROTECTION MEASURES TO THE EXISTING INLETS.
5. INSTALL STAGING AREA, FUELING FACILITIES, MATERIAL STORAGE, STAGING AREA, AND CONCRETE
WASHOUT.
IIIIIIIII<:I<I(.y�aFYXa91]�a1a�}YBISIT.I�:i W[Na/_11iIX!IlQY\YEiX�IIIIX.I�:IcyIJF�Y:[�I^.I.<tl:FY:14at4UL1�
]. PERFORM CLEARING, GRUBBING, DEMOLITION AND TOPSOIL REMOVAL AS REQUIRED. CLEARING AND
GRUBBING SHALL BE DONE ONLY IN AREAS WHERE EARTHWORK WILL BE PERFORMED AND ONLY
AREAS WHERE CONSTRUCTION IS PUNNED TO COMMENCE WITHIN 14 DAYS AFTER CLEARING AND
GRUBBING.
B. BEGIN SITE FINAL GRADING.
9. DISTURBED AREAS OF THE SITE WHERE CONSTRUCTION ACTMTY HAS CEASED FOR MORE THAN 14
DAYS SHALL BE TEMPORARILY SEEDED AND WATERED.
10. INSTALL STORM SEWERS, UNDERGROUND DETENTION SYSTEM, AND UTUTES. PROVIDE INLET
PROTECTION IMMEDIATELY.
11. MOVE RISER PIPE AND SKIMMER TO LOCATION SHOWN ON SHEET C500, TO CREATE TEMPORARY
SEDIMENT BASIN. FINAL GRADE POND AND BIOSWALE. PROVIDE SEEDING AND EROSION CONTROL
BLANKETS TO SLOPES.
12. SEED THE PERIMETER OF THE SITE.
13. START BUILDING CONSTRUCTION.
14. FINALIZE PAVEMENT SUBGRADE PREPARATION.
15. WHEN APPLICABLE, INSTALL BASE MATERIAL AS REQUIRED FOR PAVEMENT.
16. REMOVE TEMPORARY CONSTRUCTION ENTRANCE ONLY PRIOR TO PAVEMENT CONSTRUCTION IN THESE
AREAS (THESE AREAS ARE TO BE PAVED UST).
17. COMPLETE UTILITY INSTALLATION, CURBING, PAVING, AND BUILDING CONSTRUCTION.
18. FINALIZE STABILIZATION AND LANDSCAPING OF THE RAN GARDENS.
19. CARRY OUT FINAL GRADING, SEEDING. LANDSCAPE PIATJNG. AND STABIUZATON OF ALL REMAINING
DISTURBED ARM.
20, REMOVE ALL EROSION AND SEDIMENT CONTROL PRACTICES WHEN AREAS HAVE A UNIFORM GRASS
COVER. CLEAN AREAS WHERE SEDIMENT HAS ACCUMULATED AND DISPOSE OF PROPERLY.
10. LOCATION OF PROPOSED SOIL STOCKPILES, BORROW, AND/OR DISPOSAL AREAS
EXCESS SOIL MALL BE IMMEDIATELY STOCKPILED AND SEEDED AND/OR REMOVED FROM THE
CONSTRUCTION SITE IN ACCORDANCE WITH ALL APPLICABLE LAWS.
11. TEMPORARY AND PERMANENT SURFACE STABILIZATION METHODS APPROPRIATE FOR EACH SEASON
THE UNITS OF SEEDING AND MULCHING ARE ASSUMED TO BE 5'-0' OUTSIDE THE WORK LIMITS. ALL
AREAS NOT DESIGNATED TO BE SEEDED SHALL REMAIN UNDER NATURAL GROUND COVER. THOSE AREAS
DISTURBED OUTSIDE THE SEEDING LIMITS SHALL BE SEEDED AND MULCHED AT THE CONTRACTOR'S
EXPENSE.
TEMPORARY SEEDING: ANY AREA WHICH WILL BE LEFT DORMANT (UNDISTURBED) FOR MORE THAN 21
DAYS SHALL BE SEEDED WITHIN ] DAYS OF TERMINATED WORK. DISTURBED AREAS WITHIN 50 FEET OF A
STREAM, FIRST ORDER OR URGER, SHALL BE STABILIZED WITHIN 2 DAYS OF INACTMW. TEMPORARY
SEEDING CONSISTS OF SEEDBED PREPARATION AND APPLICATION OF SEED, FERTILIZER, AND WATER. SOIL
TEST IS RECOMMENDED TO DETERMINE PROPER APPLICATION RATE OF FERTILIZER AND IF UME IS
NECESSARY.
WINTERIZATION OF ANY DISTURBED AREA THAT IS NOT GOING TO BE WORKED FOR 21 DAYS OR MORE
MUST BE SEEDED AND MULCHED BY NOVEMBER 1 OR MUST HAVE DORMANT SEEDING OR MULCH COVER
APPLIED BETWEEN NOVEMBER 1 AND MARCH 1.
FERTILIZER 12-12-12
8 LB 1000 SQ. ET.
STRAW MULCH
I2 TONS ACRE
WATER
I300 G 1000 S0. FT.
TEMPORARY SEEDING
SEEDING DATES
SPECIES
LB./1000 So
R.
PER ACRE
MARCH 1 TO
NOVEMBER 1
PERENNIAL RYEGRASS
TALL FESCUE
ANNUAL RYEGRASS
1
1
1
40 L.B.
40 LB.
40 I.B.
NOV. 1 TO SPRING SEEDING
USE MULCH ONLY, SODDING PRACTICES
OR DORMANT SEEDING
NOTE OTHER APPROVED
SEED SPECIES MAY BE SUBSTITUTED.
PERMANENT SEEDING: ANY AREA THAT IS AT FINAL GRADE SHALL BE SEEDED WITHIN ] DAYS OF
TERMINATED WORK. PERMANENT SEEDING CONSISTS OF SEEDBED PREPARATION AND APPLICATION OF SEED,
FERTILIZER, AND WATER. SOIL TEST IS RECOMMENDED TO DETERMINE PROPER APPLICATION RATE OF
FERTILIZER AND IF LIME IS NECESSARY. IDEAL CONDITIONS FOR PERMANENT SEEDING IS MARCH 1-MAY 31
AND AUGUST 1-SEPTEMBER 30.
PERMANENT SEEDING
SEEDING RATE
SEED MIX
NOTES
LB/ACRE
LB/1000 SOFT.
GENERAL USE
CREEPING RED FESCUE
20-40
/2-1
DOMESTIC RYEGRASS
10-20
1/4-1/2
KENTUCKY BLUEGRASS
10-20
1/4-1/2
TALL FESCUE
and)1
DWARF FESCUE
40
1
12. EROSION AND SEDIMENT CONTROL SPECIFICATIONS FOR INDIVIDUAL BUILDING LOTS
THE SITE IS DIVIDED INTO TWO LOTS, AN EASTERN AND A WESTERN. THE EASTERN LOT CONTAINS AN
EXISTING VFW BUILDING AND DETENTION POND. THE WESTERN LOT WILL COMPRISE OF A NEW HOTEL
BUILDING. PROPOSED SITE IMPROVEMENTS FOR BOTH LOTS ARE SHOWN ON THE SITE PUN.
DESCRIPTION OF POLLUTANTS AND THEIR SOURCES ASSOCIATED WITH THE PROPOSED LAND USE:
THE PROPOSED LAND USE OF BOTH LOTS IS COMMERCIAL. POLLUTANTS NORMALLY EXPECTED FROM THIS
LAND USE ARE:
PASSENGER VEHICLES AND DELIVERY VEHICLES
TYPES OF POLLUTANTS: OIL, GASOLINE. DIESEL FUEL, HYDROCARBONS RELATED TO VEHICULAR USE,
LUBRICANTS, GREASE, ANTIFREEZE, WINDSHIELD WIPER FLUID, BRAKE FLUID, RUBBER, GLASS, METAL
FRAGMENTS, PLASTIC FRAGMENTS, GRIT, DEICING MATERIAL
COMMERCIAL BUILDING
TYPES OF POLLUTANTS: CLEANING SOLUTIONS/SOLVENTS, HVAC LEAKS, ROOF GRIT, ROOF AGGREGATE OR
RUBBER FRAGMENTS
PARKING LOTS
TYPES OF POLLUTANTS: ANY POLLUTANT ASSOCIATED WITH VEHICULAR USE, ASPHALT GRIT, BITUMINOUS
COMPOUNDS, DEICING MATERIALS, PAINT PARTICLES, CONCRETE FRAGMENTS, ELEVATED WATER
TEMPERATURES
DUMPSTER
TYPES OF POLLUTANTS: CLEANING SOLUTIONS/SOLVENTS, COMMON UTTER, FOOD PRODUCTS, BACTERIA
LAWN AND LANDSCAPING
TYPES OF POLLUTANTS: FERTILIZER, SOILS, ORGANIC MATERIAL
13. MATERIAL HANDLING, STORAGE, AND SPILL PREVENTION PUN
SOLID WASTE DISPOSAL:
NO SOLID MATERIAL, INCLUDING BUILDING MATERIALS, IS PERMITTED TO BE DISCHARGED TO SURFACE
WATERS OR BURIED ON SITE. ALL SOLID WASTE MATERIALS, INCLUDING DISPOSABLE MATERIALS INCIDENTAL
TO THE CONSTRUCTION ACTIVITY, MUST BE COLLECTED IN CONTAINERS OR CLOSED DUMPSTER'S. THE
COLLECTION CONTAINERS MUST BE EMPTIED PERIODICALLY AND THE COLLECTED MATERIAL HAULED TO A
UNDPILL PERMITTED BY THE STATE AND/OR APPROPRIATE LOCAL MUNICIPALITY TO ACCEPT THE WASTE
FOR DISPOSAL A SUPERVISOR SHOULD BE DESIGNATED IN WRITING TO OVERSEE, ENFORCE, AND
INSTRUCT CONSTRUCTION WORKERS ON PROPER SOLID WASTE PROCEDURES.
WHENEVER POSSIBLE, MINIMIZE THE USE OF HAZARDOUS MATERIALS AND GENERATION OF HAZARDOUS
WASTES. ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED IN THE MANNER SPECIFIED BY FEDERAL,
STATE, OR LOCAL REGULATIONS OR BY THE MANUFACTURER. USE CONTAINMENT BERMS IN FUELING AND
MAINTENANCE AREAS AND WHERE POTENTIAL FOR SPILLS IS HIGH. A SUPERVISOR SHOULD BE DESIGNATED
IN WRITING TO OVERSEE, ENFORCE AND INSTRUCT CONSTRUCTION WORKERS ON PROPER HAZARDOUS
WASTE PROCEDURES. THE LOCATION OF ANY HAZARDOUS WASTE STORAGE AREAS SHOULD BE INDICATED
ON THE STORMWATER POLLUTION PREVENTION PUN BY THE OPERATOR FOLLOWING ON -SITE LOCATION OF
THE FACILITY.
DUST CONTROL/OFF-SITE VEHICLE TRACKING:
DURING CONSTRUCTION, DUST ON SIZE SHALL BE MINIMIZED BY SPRAYING WATER ON DRY AREAS OF THE
SITE. THE USE OF OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION IS
PROHIBITED. SOIL ROUGHENING TO PRODUCE 6'i HEIGHT PERPENDICULAR TO PREVAILING WIND AND/OR
COVERING 30R MINIMUM OF THE SOIL SURFACE WITH NON -ERODIBLE MATERIAL MAY ALSO BE USED TO
MINIMIZE WIND EROSION. AFTER CONSTRUCTION, THE SITE SHOULD BE STABILIZED TO REDUCE DUST.
CONSTRUCTION TRAFFIC SHOULD ENTER AND EXIT THE SITE AT A CONSTRUCTION ENTRANCE WITH A ROCK
PAD OR EQUIVALENT DEVICE. THE PURPOSE OF THE ROCK PAD IS TO MINIMIZE THE AMOUNT OF SOIL
AND MUD THAT IS TRACKED ONTO EXISTING STREETS. IF SEDIMENT ESCAPES THE CONSTRUCTION SITE.
OFF -SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED AT A FREQUENCY SUFFICIENT TO MINIMIZE
OFPSITE IMPACTS.
BY ALL CONSTRUCTION PERSONNEL AND BE SERVICED REGULARLY. ALL EXPENSES ASSOCIATED WITH
PROVIDING SANITARY FACILITIES ARE THE RESPONSIBILITY OF THE CONTACTORS AND SUBCONTRACTORS.
THE LOCATION OF ANY SANITARY FACILITIES SHOULD BE INDICATED ON THE STORMWATER POLLUTION
PREVENTION PUN BY THE OPERATOR FOLLOWING ON -SITE LOCATION OF SAID FACILITIES.
WATER SOURCE:
WATER USED TO ESTABLISH AND MAINTAIN GRASS. TO CONTROL DUST, AND FOR OTHER CONSTRUCTION
PURPOSES MUST ORIGINATE FROM A PUBLIC WATER SUPPLY OR PRIVATE WELL APPROVED BY THE STATE
OR LOCAL HEALTH DEPARTMENT.
EQUIPMENT FUELING AND STORAGE AREAS:
EQUIPMENT FUELING, MAINTENANCE, AND CLEANING SHOULD ONLY BE COMPLETED IN PROTECTED AND
BERMED AREAS. LEAKING EQUIPMENT AND MAINTENANCE FLUIDS WILL BE COLLECTED AND NOT ALLOWED
TO DISCHARGE ONTO SOIL WHERE THEY MAY BE WASHED AWAY DURING A RAN EVENT. EQUIPMENT WASH
DOWN SHOULD TAKE PLACE WITHIN AN AREA SURROUNDED BY A BERM. THE USE OF DETERGENTS IS
PROHIBITED.
CONCRETE WASHOUT:
ALL CONCRETE TRUCKS WASTE MATERIAL SHALL BE COMPLETELY CONTAINED AND DISPOSED IN
ACCORDANCE WITH ALL LOCAL STATE, AND FEDERAL REGULATIONS. A PIT OR CONTAINER IS REQUIRED
WHEN CLEANING CONCRETE CHUTES.
HAZARDOUS MATERIAL STORAGE:
STORED IN THEIR ORIGINAL CONTAINERS (IF ORIGINAL CONTAINER IS NOT RESEAIFBLE, STORE THE
PRODUCTS IN CLEARLY LIBELED, WATERPROOF CONTAINERS). EXCEPT DURING APPLICATION, THE
CONTAINERS SHOULD BE KEPT IN TRUCKS OR IN BERMED AREAS WITHIN COVERED STORAGE FACILITIES.
RUNOFF CONTANING SUCH MATERIALS SHALL BE COLLECTED, REMOVED FROM THE SITE, AND DISPOSED
OF IN ACCORDANCE WITH THE FEDERAL, STATE, AND LOCAL REGULATIONS.
AS MAY BE REQUIRED BY FEDERAL, STATE OR LOCAL REGULATIONS, THE CONTRACTOR SHOULD HAVE A
HAZARDOUS MATERIALS MANAGEMENT PLAN AND/OR HAZARDOUS MATERIALS SPILL AND PREVENTION
PROGRAM IN PLACE. A SUPERVISOR SHOULD BE DESIGNATED IN WRITING TO OVERSEE, ENFORCE, AND
INSTRUCT CONSTRUCTION WORKERS ON PROPER HAZARDOUS MATERIALS STORAGE AND HANDLING
PROCEDURES. THE LOCATION OF ANY HAZARDOUS MATERIAL STORAGE AREAS SHOULD BE INDICATED ON
THE STORMWATER POLLUTION PREVENTION PUN BY THE OPERATOR FOLLOWING ON -SITE LOCATION OF
THE STORAGE AREAS.
MATERIAL HANDLING AND SPILL PREVENTION:
DISCHARGE OF HAZARDOUS SUBSTANCES OR OIL INTO STORMWATER IS SUBJECT TO REPORTING
REQUIREMENTS. IN THE EVENT OF A SPILL OF A HAZARDOUS SUBSTANCE. THE OPERATOR IS REQUIRED
THE POSSIBILITY OF FUTURE OCCURRENCES. EACH CONTRACTOR AND SUBCONTRACTOR IS RESPONSIBLE
FOR COMPLYING WITH THESE REPORTING REQUIREMENTS.
SPILL RESPONSE PLAN:
MINOR SPILLS
SMALL SPILLS THAT TYPICALLY INVOLVE OIL GASOLINE, PAINT, HYDRAULIC FLUID. ETC.. MINOR SPILLS CAN
BE CONTROLLED BY THE FIRST RESPONDER AT THE DISCOVERY OF THE SPILL BY CONTAINING THE SPILL
TO PREVENT MATERIAL FROM ENTERING STORM OR GROUND WATER. DO NOT FLUSH WITH WATER OR
BURY. AN ABSORBENT MATERIAL TO CLEAN-UP SPILL MATERIAL AND ANY SUBSEQUENTLY CONTAMINATED
SOIL AND DISPOSE OF PROPERLY.
SEMI -SIGNIFICANT SPILLS
SPILLS APPROXIMATELY TEN GALLONS OR LESS OF A POLLUTANT WITH NO CONTAMINATION OF GROUND
OR SURFACE WATERS. SEMI -SIGNIFICANT SPILLS CAN BE GENERALLY CONTROLLED BY THE FIRST
RESPONDER WITH HELP FROM OTHER SITE PERSONNEL. THIS RESPONSE MAY REQUIRE OTHER OPERATION
TO STOP TO MAKE SURE THE SPILL IS QUICKLY AND SAFELY ADDRESSED AT THE DISCOVERY OF THE
SPILL. RESPONDERS MUST CONTAIN SPILL TO PREVENT MATERIAL FROM ENTERING STORM OR GROUND z p v
WATER. DO NOT FLUSH WITH WATER OR w ti m
USE ABSORBENT MATERIAL TO CLEAN-UP SPILLS AND DISPOSE OF PROPERLY. SPILLS ON IMPERVIOUS m
SURFACES SHOULD BE CONTAINED WIN A DRY ABSORBENT. SPILLS ON CLAYEY SOILS SHOULD BE
CONTAINED BY CONSTRUCTING AN EARTHEN DIKE AND SHOULD BE DISPOSED OF AS SOON AS POSSIBLE w
TO PREVENT MIGRATION DEEPER INTO THE SOIL AND GROUNDWATER. DISPOSE OF CONTAMINATED SOILS Of
m O LL
ABSORBENTS PROPERLY. CONTACT 911 IF THIS SPILL COULD BE A SAFETY ISSUE. CONTACT SUPERVISORS
AND DESIGNATED INSPECTORS IMMEDIATELY. CONTAMINATED SOLIDS AND SUBSEQUENTLY CONTAMINATED
SOILS SHALL BE DISPOSED OF PROPERLY.
MAJOR OR HAZARDOUS SPILLS H i
MORE THAN TEN GALLONS, THERE IS THE POTENTIAL FOR DEATH, INJURY OR ILLNESS TO w
HUMANS OR ANIMALS OR HAS THE POTENTIAL FOR SURFACE OR GROUNDWATER POLLUTION. RESPONDERS
AND OPERATORS MUST CONTROL OR CONTAIN THE SPILL WITHOUT RISKING BODILY HARM. TEMPORARILY - -
PLUG STORM DRANS IF POSSIBLE TO PREVENT MIGRATION OF THE SPILL INTO THE STORMWATER SYSTEM. a
IMMEDIATELY CONTACT THE LOCAL FIRE DEPARTMENT AT 911 TO REPORT ANY HAZARD MATERIAL SPILL. F u
CONTACT SUPERVISORS AND DESIGNATED INSPECTORS IMMEDIATELY, OTHER COUNTY OR MUNICIPAL
OFFICIALS (CITY OF CARMEL ENGINEERING DEPARTMENT) RESPONSIBLE FOR STORM WATER FACILITIES ^
SHOULD BE CONTACTED AS WELL THE CONTRACTOR IS RESPONSIBLE FOR HAVING THESE CONTACT 2�^ LL10
NUMBERS AVAILABLE AT THE JOB SITE. A WRITTEN REPORT SHOULD BE SUBMITTED TO THE OWNER AS ;
SOON AS POSSIBLE. WITHIN 2 HOURS OF DISCOVERY, CONTACT THE DEPORTMENT OF ENVIRONMENTAL •�}
MANAGEMENT, OFFICE OF EMERGENCY RESPONSE (1-888-233-]]45). THE FOLLOWING INFORMATION
SHOULD BE NOTED FOR FUTURE REPORTS TO IDEM OR THE NOTIONAL RESPONSE CENTER: C tBC
-THE LOCATION OF THE SPILL C CIE
-THE TIME OF THE SPILL CIVIT 'E
-IDENTIFICATION OF THE SPILLED SUBSTANCE v�
-APPROXIMATE QUANTITY OF THE SUBSTANCE THAT HAS BEEN SPILLED OR MAY BE FURTHER
SPILLED co C
-THE DURATION AND SOURCE OF THE SPILL
-NAME AND LOCATION OF THE DAMAGED WATERS
-NAME OF SPILL RESPONSE ORGANIZATION ;
-WHAT MEASURES WERE TAKEN IN THE SPILL RESPONSE ;
-OTHER INFORMATION THAT MAY BE SIGNIFICANT
14. CONTACT INFORMATION FOR THE TRAINED INDIVIDUAL RESPONSIBLE FOR STORMWATER POLLUTION
PREVENTION FOR THE PROJECT SIZE
OWNE OPERAIDR CONTRACTOR
WITNESS CONSTRUCTION METER NPJEM CONSTRUCTION, LLC U
600THOMASEN LENNON MICHAEL Ni J
OFF ENTERPRISE DR, LEWIS CENTER, .9 O 43035 OFFICE:
LANTERN RD,7,0 SUITE 100, FISHERS. IN 46038
OFFICE: 614.495.8912 CELL: 513.623.9430 OFFICE: 31 ].5]].000] J
E-MAIL TOMA ENNONIGNEWIINESSGROURCOM E-MAIL M.NAJEM®METER-NAJEM.COM W 2
C K
O L O
of
STORM WATER POLLUTION PREVENTION PUN FOR POST -CONSTRUCTION: o Q
1. DESCRIPTION OF POLLUTANTS AND THEIR SOURCES ASSOCIATED WITH THE PROPOSED UND USE a U w
THE PROPOSED LAND USE OF BOTH LOTS IS COMMERCIAL. POLLUTANTS NORMALLY EXPECTED FROM THIS a GO w
UND USE ARE: Z m
PASSENGER VEHICLES AND DFUVERY VEHICLES
TYPES OF POLLUTANTS: OIL, GASOLINE, DIESEL FUEL, HYDROCARBONS RELATED TO VEHICULAR USE,
LUBRICANTS, GREASE, ANTIFREEZE, WINDSHIELD WIPER FLUID, BRAKE FLUID, RUBBER, GLASS, METAL
FRAGMENTS, PLASTIC FRAGMENTS, GRIT, DEICING MATERIAL
COMMERCIAL BUILDING
TYPES OF POLLUTANTS: CLEANING SOLUTIONS/SOLVENTS, HVAC LEAKS, ROOF GRIT, ROOF AGGREGATE OR
RUBBER FRAGMENTS
PARKING LOTS W
TYPES OF POLLUTANTS: ANY POLLUTANT ASSOCIATED WIN VEHICULAR USE, ASPHALT GRIT, BITUMINOUS 0
COMPOUNDS, DEICING MATERIALS, PAINT PARTICLES, CONCRETE FRAGMENTS, ELEVATED WATER Z V J
TEMPERATURES w
DUMPSTER
TYPES OF POLLUTANTS: CLEANING SOLUTIONS/SOLVENTS, COMMON UTTER, FOOD PRODUCTS, BACTERIA
LAWN AND LANDSCAPING
TYPES OF POLLUTANTS: FERTILIZER, SOILS, ORGANIC MATERIAL
2. POST -CONSTRUCTION STORMWATER QUALITY MEASURES:
0. LOCATION - REFER TO OVERALL DRAINAGE PLAN, SHEET C400
E. DIMENSIONS - REFER TO OVERALL DRAINAGE PUN, SHEET C400
C. SIZING CALCULATIONS - REFER TO THE DRAINAGE REPORT FOR THIS PROJECT
B. DETAILED SPECIFICATIONS -REFER TO THE DRAINAGE REPORT FOR THIS PROJECT
e. CONSTRUCTION DETAILS - REFER TO SHEETS C502 AND C503
3. SEQUENCE DESCRIBING STORMWATER QUALITY MEASURE IMPLEMENTATION:
THE EXISTING DRY DETENTION POND WITH BIOSWALE WILL BE MODIFIED AND THE UNDERGROUND
DETENTION SYSTEM WILL BE INSTALLED AT THE TIME OF GRADING OF THE SITE TO PROVIDE THE POND
OUTLET FOR THE SITE.
THE AQUA -SWIRL WILL BE INSTALLED ONTO THE EXISTING STORM SYSTEM ONCE OF THE EXISTING
PAVEMENT IS REMOVED FROM THE INSTALLATION ARE.
THE RAN GARDENS WILL BE INSTALLED DURING THE INSTALLATION OF THE CURBING AND LANDSCAPING
ONCE THE SITE WORK IS COMPLETE.
4. STORMWATER QUALITY MEASURES TO BE IMPLEMENTED TO PREVENT OR MINIMIZE ADVERSE IMPACTS TO
STREAM AND RIPARIAN HABITATS
RAN GMDFNS
THE RAIN GARDENS ARE DESIGNED TO PROMOTE INFILTRATION INTO THE SOIL. REDUCE SEDIMENT 1
AND REDUCE STORMWATER RUNOFF VOLUME.
BIOSWALE
THE BIOSWALE IS DESIGNED FOR SLOW SHALLOW FLOW TO ALLOW POLLUTANTS TO SETTLE OUT AND TO
PROMOTE INFILTRATION.
AQUASWIRL
THE AQUASWIRL TAKES STORMWATER RUNOFF FROM THE PROPOSED BUILDING BUILDING AND PARKING
AREA AND HELPS REMOVE SEDIMENT FROM THE STORMWATER RUNOFF.
THE DRY DETENTION POND AND CONTECH PERFORATED CMP UNDERGROUND DETENTION SYSTEM ARE
CONNECTED TO FILL UP IN UNISON, WIN OUTFLOW RESTRICTED BY AN ORIFICE TO UNIT THE PEAK
DISCHARGE OF STORMWATER FROM THE SITE.