Loading...
HomeMy WebLinkAboutC503 - SWPPP DETAILSPVC VENT 2'-0" or T-On at center F. Subject to compliance with all regulations Disclaimer: of State and Local Codes The information presented herein is general design information only. For specific applications, City of Camel consult an independent professional for further design guidance. H: 00-77 8 D: n.com 00-772-2 40 Drawn on: 5-4-17 1'-0" MIT _ Geotextile L►A 1'-0' 2 #5 or #8 Stone NOTES: O Riprap ditch check dams shall be spaced such that the top of the downstream check dam is at the same elevation as the toe of the adjacent upstream check dam. A" 01 Revetment Matadi IdOn Compacted #5 or #8 Stone / rle .t1 !mporfry Temporary r�Geoldextile N16.r ��4•�.�_.11 �� t:� 1.Flow 3'-0' T Dam - 12' Min. � q• EdsBnu Ground I INDIANA DEPARTMENT OF TRANSPORTATION I TEMPORARY CHECK DAM REVETMENT RIPRAP SEPTEMBER 2012 r #B Stone STANDARD DRAMNG NO. E 205-TECD-01 `. ,V„ /s/Rjchar6L. Nan Cleave 09104112 No. k^= SLIPERV150111, RenuwAY sraso DATE ' 9750 er ' STATE OF /s/'Mark1. wili 09104112 AI E0V`� CHIEF ENGINEER DATE DATE: 07/22/19 SLOPE INSTALLATION DETAIL 1. Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2. Begin at the top of the slope by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12" (30cm) of RECIPE extended beyond the up -slope portion of the trench. Anchor the RECPs with a raw of staples/stakes approximately 12" (30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Applyseecto the composed soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12"(30cm) apart across the width of the RECPs. 3. Roll the RECIPE (A) down or (B) horizontally across the slope. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to sail surface by placing stapes/stakes in appropriate locations as shown in the staple pattern guide. 4. The edges of parallel RECPs must be stapled with approximately 2" - 5" (5-12.5cm) overlap depending on the RECPs type. 5. Consecutive RECPs spliced down the slope must be end over end (Shingle style)with an approximate 3"(7.5cm) overlap. Staple through overlapped area, approximately 12"(30cm) apart across entire RECPs width. In loose sail conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the RECP's. FLOAT WC VENT PIPE % WATER ENTRY UNIT END VIEW SCHEDULE 40 WC PIPE (BARREL OR ARM) FLOAT FLEXIBLE HOSE L = 1.4 X DEPTH 1 /t TO THE OVERFLOW J MNMY UNGTH APPLES ➢UL11 SIDE VIEW (NO SCALE) NOTE: PROPOSED SKIMMER SHALL BE A FAIRCLOTH SKIMMER OR EQUIVALENT SKIMMER SPECIFICATIONS SKIMMER DIAMETER SIZE (INCHES) SKIMMER ORIFICE DIAMETER (INCHES) SKIMMER LENGTH (FEET) TEMPORARY SEDIMENT BASIN PIPE DEWATERING CONTROL SYSTEM NOT TO SCALE TYPICAL CURB BOX INLET FILTER TOP VIEW TEMPORARY SEDIMENT CONTROL RISER PIPE DETAIL NOT TO SCALE WATER ENTRY UNIT WITH TRASH SCREEN IBn1:{111Ryaylg E 40 WC PIPE OR ARM) FLEXIBLE HOSE 2" /�LIFf HANDLES 11 GAUGE STEEL EA / \ FSUSPENSION SYSTEM DC RRABP \-STAINLESS STEEL MAGNETIC CLAMPING BAND )OWNS 9—DI v MCDI APPAPH P GEOTEXTILE FILTER FABRIC. TYPICAL RECTANGULAR TYPICAL ROUND INLET FILTER INLET FILTER NOTE 1. CONTRACTOR TO USE BELOW GRATE INLET PROTECTION WITHIN THE RIGHT—OF—WAY. 2. BELOW GRATE INLET PROTECTION IS TO BE FLEXSTORM CATCH —IT INLET PROTECTION OR EQUIVALENT. INSTALLATION: 1. REMOVE STORM SEWER GRATE. 2. PLACE THE INLET PROTECTION ONTO LOAD BEARING LIP OF CASTING OR CONCRETE STRUCTURE. 3. REPLACE STORM SEWER GRATE. MAINTENANCE: 1. INSPECT DAILY. 2. REMOVE AND DISPOSE OF ACCUMULATED SEDIMENT AND DEBRIS AFTER EACH STORM EVENT. 3. REMOVE INLET PROTECTING WHEN DRAINAGE AREA HAS BEEN STABILIZED. BELOW GRATE INLET PROTECTION NOT TO SCALE CD Z_ U) LU K F_ 0 Z �O 0 �/•�0 VJ J_ N x m c�c G O U H Tp 2 N U) J psi i1 N C503