Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
E-304 - PANEL SCHEDULE-IV
VOLTAGE:120/208 •Y'^c MOUNTING:WALL MOUNTED TYPE:LOAD CENTRE LOAD DESCRIPTION ROOM 401 PNL'C' ROOM 403 PNL'D' ROOM 405 PNL'H' ROOM 407 PNL'H' ROOM 409 PNL'H' ROOM 411 PNL'H' 4th FLOOR COORIDOR RCPT PANEL'4GA' MAIN BUS (A) 400 NEUTRAL(%) 100% MAINS (A) 400 AIC (A) 22,00 PHASE R Y B TRIP POLE WIRE CONDUIT (INCH) CRT NO. CKT NO. CONDUIT (INCH) WIRE TRIP POLE PHASE R Y B 8110 8110 80/2P 4 11/4 11/4 4 70/2P 6430 6430 3 4 mmIIIIIIIIII6430 6430 70/2P 4 11/4 11/4 4 70/2P 6430 7 8 6430 6430 6430 60/2P fi 1 9 10 11/4 4 70/2p 6430 6430 11 12 6430 1 1 60/2P 6 1 13 14 11/4 4 70/2P 6430 6430 15 lfi 6430 6430 6430 60/2P 6 1 17 18 11/4 4 70/2p 6430 19 20 6430 6430 6430 60/2P 6 1 21 22 11/4 4 70/2P 6430 6430 23 24 720 360 540 20/1P 20/1P 1 20/1P 12 12 12 3/4 3/4 3/4 25 27 29 26 28 30 3/4 3/4 3/4 12 12 12 20/1P 20/1P 20/1P(GFCI) 540 540 1000 31 33 32 34 35 36 37 38 LOAD FACTOR( LOAD (DEMAND LOAD GUEST ROOMS: LIGHTING 1.25 NEC ARTICLE RCPT 2700 2700 220.44 NEC ARTICLE NO TOTAL GUEST ROOM LOAD IN VA 157680 67802 240.42 NEC ARTICLE NO ARTICIAL COOKTOP LOAD 96000 41280 240.83B MISC LOAD 1000 TOTALLOADINVA 257380 111782 TOTAL LOAD IN AMPERE 714 310 TAKING 20% SPARE CAPACITY IN AMP 372 11111a1192 ZZTuFOiI]JryO ROOM 404 PNL'D' ROOM 406 PNL'D' ROOM 408 PNL'D' ROOM 410 PNL'D' ROOM 412 PNL'D' 4th FLOOR COORIDOR RCPT AS PER N EC 410.8 GFCI RECEPTACLE SHALL BE ON READILY ACCESIIBLE LOCATION IF NOT CONTRACTOR SHALL PROVIDE GFCI EAKER IN PANEL. PROVIDE GFCI TYPE RECEPTACLE AT KITCHEN COUNTER AND SHALL BE READILY ACESSIBLE LOCATION. IF Al CEPTACLE COMING BEHIND EQUIPMENT PROVEDE GFCI PROTECTION IN BREAKER AS PER CODE. SERVICE:3 PHASE,4WIRE PANEL'SGA' MAIN BUS (A)! 400 VOLTAGE:120/208 NEUTRAL( 100% MOUNTING:WALL MOUNTED MAINS (A) 400 TYPE:LOAD CENTRE AIC (A) 180000 LOAD DESCRIPTION PHASE R I Y B TRIP POLE WIRE CONDUIT (INCH) CKTNO. CKTNO. CONDUIT (INCH) WIRE TRIP POLE PHASE LOAD DESCRIPTION R Y B ROOM 501 PNL'C' 8110 80/2P 4 1114 2 11/4 4 70/2P 6430 mm ROOM 502 PNL'D' 8110 3 6430 ROOM 503 PNL'D' 6430 70/2P 4 11/4 11/4 4 70/2P 6430 ROOM 504 PNL'D' 6430 7 8 6430 ROOM 505 PNL'H' 6430 60/2P 6 1 9 10 11/4 4 70/2p 6430 ROOM 506 PNL'D' 6430 11 12 6430 ROOM 507 PNL'H' 6430 60/2P 6 1 13 14 11/4 4 70/2P 6430 ROOM 508 PNL'D' 6430 15 16 6430 ROOM 509 PNL'H' 6430 60/2P 6 1 17 18 11/4 4 70/2p 6430 ROOM 510 PNL'D' 6430 Nii 19 1 20 6430 ROOM 511 PNL'H' 6430 60/2P 1 6 1 21 22 11/4 4 70/2p 6430 ROOM 512 PNL'D' 6430 23 24 1 6430 Sth FLOOR COORIDOR RCPT 720 20/1P 12 3/4 25 26 3/4 12 20/1P 540 Sth FLOOR COORIDOR RCPT 5th FLOOR ELECTRICAL ROOM RCPT 360 20/1P 12 3/4 27 28 3/4 12 20/1P 540 Sth FLOOR HOUSEKEEPING RCPT Sth FLOOR STORAGE RCPT 540 20/1P 12 3/4 29 30 3/4 12 20/1P(GFCI) 1000 5th FLOOR ICE DISPENSER RCPT ROOF AREA RCPT 720 20/1P 12 3/4 31 32 SPACE SPACE 33 34 SPACE SPACE 35 36 SPACE SPACE 37 38 SPACE SPACE 39 40 SPACE SPACE 41 42 SPACE SUBTOTALVA 28840 27760 26260 26260 26260 2672C SUBTOTALVA 28840 127760 126260 55100 54020 52980 TOTALVA: 162100 LOAD CONNECTED LOAD DEMANDFACTOR DEMAND LOAD NOTE: 1)ASPER NEC 510.8 GFCI RECEPTACLE SHALL BE ON READILY ACCESIIBLE LOCATION IF NOT CONTRACTOR SHALL PROVIDE GFCI BREAKER IN PAN EL. PROVIDE GFCI TYPE RECEPTACLE AT KITCHEN COUNTER AND SHALL BE READILY ACESSIBLE LOCATION. IF ANY GFCI RECEPTACLE COMING BEHIND EQUIPMENT PROVEDE GFCI PROTECTION IN BREAKER AS PER CODE. GUEST ROOMS: LIGHTING 1.25 RCPT 3420 NECARTICLE 220.44 3420 TOTAL GUEST ROOM LOAD IN VA 157680 NEC ARTICLE NO 250.42 67802 ARTIFICIAL COOKTOP LOAD 96000 NEC ARTICLE NO 250.83B 41280 M ISC LOAD 1000 1 1000 TOTAL LOAD IN VA 258100 113502 TOTAL LOAD I N AMPERE 716 315 TAKING 20% SPARE CAPACITY IN AMP 378 RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel ((�� �vm�3tlDnrklDAaL x DATE: 07/22/19 SERVICEA PHASE,4WIRE PANEL'4GB' MAIN BUS (A) 400 VOLTAGE:120/208 NEUTRAL(%) 100% MOUNTING:WALL MOUNTED MAINS (A) 350 TYPE:LOAD CENTRE All (A) 18,000 LOAD DESCRIPTION PHASE TRIP POLE WIRE CONDUIT (INCH) CKTNO. CNT NO. CONDUIT (INCH) WIRE TRIP POLE PRASE LOAD DESCRIPTION R Y B R V B ROOM 413 PNL'H' 6430 60/2P 6 1 11/4 4 70/2P 6430 ROOM 416 PNL'D' 6430 3 4 6430 ROOM 415 PNL'D' ROOM 417 PNL'D' 6430 70/2P 4 11/4 6 11/4 4 70/2P 6430 643o 6430 ROOM 418 PNL'D' ROOM 420 PNL'D' 6430 5 6430 70/2P 4 11/4 9 10 11/4 q 7012p 6430 11 12 6430 ROOM 419 PNL'D' 6430 70/2P 4 11/4 13 14 11/4 4 70/2p 6430 ROOM 422 PNL'D' 6430 15 16 6430 ROOM 421 PNL'C' 8110 8130 SO/2P 4 11/4 17 18 11/4 4 70/2p 6430 ROOM 424 PNL'D' 19 20 6430 4TH FLOOR CORRIDOR LTG 340 15/1P 12 3/4 1 21 22 1 3/4 12 1 15/1P 340 4TH FLOOR CORRIDOR LTG 4TH FLOOR ELEV. LOBBY LTG 70 1 15/11) 1 12 3/4 23 24 3/4 12 1 15/IP 60 4TH FLOOR ELEV. LOBBY LTG 4TH FLOOR HSKG/IDF/ELECT. LTG 100 15/1P 12 3/4 25 26 3/4 12 15/I1P 50 4TH FLOOR STORAGE LTG SPACE SPACE 27 28 SPACE 29 30 SPACE SPACE 31 32 SPACE SPACE SPACE 33 34 SPACE p 35 36 SPACE SPACE 37 38 SPACE SPACE SPACE 39 40 SPACE 41 1 42 SPACE SUBTOTAL VA 27500 19630 21040 25770 19630 19350 SUBTOTALVA 27500 19630 21040 53270 39260 40390 TOTAL VA: 132920 LOAD CONNECTED LOAD DEMAND FACTOR DEMAND LOAD NOTE: 1)ASPER NEC410.8 GFCI RECEPTACLE SHALL BE ON READILY ACCESIIBLE LOCATION IF NOT CONTRACTOR SHALL PROVIDE GFCI BREAKER IN PANEL. PROVIDE GFCI TYPE RECEPTACLE AT KITCHEN COUNTER AND SHALL BE READILY ACESSIBLE LOCATION. IF ANY GFCI RECEPTACLE COMING BEHIND EQUIPMENT PROVEDE GFCI PROTECTION IN BREAKERAS PERCODE. GUEST ROOMS: LIGHTING 960 1.25 1200 RCPT NECARTICLE 220.44 TOTAL GUEST ROOM LOAD IN VA 131960 NEC ARTICLE NO 420.42 56743 ARTIFICIAL COOKTOP LOAD 80000 NEC ARTICLE NO 420.84B 34400 MISC LOAD TOTAL LOAD IN VA 212920 TOTAL LOAD IN AMPERE 591 q308 TAKING 20% SPARE CAPACITY IN AMP SERVICE:5 PXASE,•S-WIRE PANEL'SGB' MAIN BUS (A) 400 VOLTAGE:120/208 NEUTRAL(%) 100% MOUNTING:WALL MOUNTED MAINS(A) 350 TYPE:LOAD CENTRE AIC A 18,000 LOAD DESCRIPTION PHASE R Y B TRIP POLE WIRE CONDUCT (INCH) CKT NO. CKT NO. CONDUIT (INCVI) WIRE TRIP POLE PHASE LOAD DESCRIPTION R Y B ROOM 513 PNL'H' 6430 6430 fi0/2P 6 1 11/4 4 70/2P 6430 ROOM 516 PNL'D' 3 4 6430 ROOM 515 PNL'D' 6430 70/2P 4 11/4 6 11/4 4 70/2P 6430 ROOM 518 PNL'D' 6430 5 6430 ROOM 517 PNL'D' 6430 70/2P 4 1114 9 10 1114 4 70/2P 6430 ROOM 520 PNL'D' 6430 11 12 6430 ROOM 519 PNL'D' 6430 70/2P 4 1114 13 14 1114 4 70/2P 6430 6430 ROOM 522 Pri 6430 15 16 ROOM 521 PNL'C' 8110 80/2P 4 1114 17 18 1114 4 70/2p 6430 ROOM 524 PNL'D' 8110 19 20 6430 5TH FLOOR CORRIDOR LTG 340 15/1P 12 3/4 21 22 3/4 12 15/1P 340 5TH FLOOR CORRIDOR LTG STH FLOOR ELEV. LOBBY LTG 70 15/1P 12 3/4 23 24 3/4 12 15/1P 60 STH FLOOR ELEV. LOBBY LTG STH FLOOR HSKG/IDF/ELECT. LTG 100 15/1P 12 3/4 25 26 3/4 12 15/1P 50 STH FLOOR STORAGE LTG SPACE 27 28 SPACE SPACE 29 30 SPACE SPACE 31 32 SPACE SPACE SPACE SPACE 33 34 SPACE 35 3fi SPACE SPACE 37 38 SPACE SPACE 39 40 SPACE SPACE 41 42 SUBTOTALVA 27500 19630 21040 157J0 19630 19350 SUBTOTALVA 27500 19630 21040 53270 39260 40390 TOTALVA: 1 132920 LOAD CONNECTED LOAD DEMAND FACTOR DEMAND LOAD NOTE: 1) AS PER NEC 510.8 GFCI RECEPTACLE SHALL BE ON READILY ACCESIIBLE LOCATION IF NOT CONTRACTOR SHALL PROVIDE GFCI BREAKER IN PANEL. PROVIDE GFCI TYPE RECEPTACLE AT KITCHEN COUNTER AND SHALL BE READILY ACESSIBLE LOCATION. PANY GFCI RECEPTACLE COMING BEHIND EQUIPMENT PROVEDE GFCI PROTECTION IN BREAKER AS PER CODE. GUEST ROOMS: LIGHTING 960 1.25 1200 RCPT NEC ARTICLE 220.44 TOTAL GUEST ROOM LOAD IN VA 131960 NEC ARTICLE NO 520.52 56743 ARTIFICIAL COOKTOP LOAD 80000 NEC ARTICLE NO 520.85B 34400 MISC LOAD TOTAL LOAD IN VA 212920 92343 TOTAL LOAD IN AMPERE 591 256 TAKING 20% SPARE CAPACITY IN AMP 308 PANEL'4GA' PANEL'il PANEL'5GA' PANEL'5GB' BAS E'' BASE4 2901 CLINT MOORE ROAD, #114 BOCA RATON, FLORIDA 33496 888.901.8008 wWw.base-4.00m RICARDO J. MUNIZ-GUILLET, AIA 5453 NW 106TH DR CORAL SPRINGS, FL 33076 MEP ENGINEER GARRY VERMAAS PhD, PE 2183 S BERRYS CHAPEL ROAD FRANKLIN, TN 37069 Seal: 1 W VF e' m N 1 12 o ATE OF �gBrONAI E�` DATE: M1e 0a 04 GARRY VERMAAe. PhD. PE Owner: THE WITNESS GROUP 600 ENTERPRISES DRIVE LEWIS CENTER,OH 513-623-9430 HOME©SUITES BY HILTON CARMEL, INDIANA PROTOTYPE VERSION-V2.2 2016 REVISION: MAY 2016 ISSUE NO.1 DELTA I ISSUED DATE I DESCRIPNON 1 EO 2019.03.04 ISSUED FOR PERMIT CURRENT ISSUE ISSUED FOR PERMIT CURRENT ISSUE DATE 2019.03.04 DRAWN BY SKJ CHECKED BY GWV PROJECT NO, B4-134-1705 SHEET NAME PANEL SCHEDULE -IV DRAWINGS NO. E=304