Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
E-308 - PANEL SCHEDULE-VIII
SERVICE:3 PHASE,4-WIRE VOLTAGE:120/208 MOUNTING:FLOOR MOUNTED PANELWSB' MAIN BUS (A) 2500 NEUTRAL 100% MAINS (A) 2500 TVPE:LOAD CENTRE AIC (A) 65,000 LOAD DESCRIPTION PHASE R V TRIP POLE Is TRIP WIRE CONDUIT CKT NO. CKT NO. CONDUIT WIRE TRIP POLE PHASE LOAD DESCRIPTION V Is SPACE 1 2 SPACE 3 4 S 6 EM KP 29319 286155 300/3P (3#500+1#500N+1#2G)AL (3#1+1#1N+1#6G)AL 3 2 7 8 2 1/2 2 (3#3/0+1#3/ON+1#4G)AL (3#1+1#1N+1#6G)AL 150/3P 100/3P 11840 SEP LP 30404 9 10 20860 11 13 12 14 6360 10960 12759 100/3P 9795 12543 15 16 7960 17 18 9600 PP 5160 100/3P (3#1+1#1N+1#6G)AL 2 19 20 2 1/2 2(3#250+1#250N)+(1#1G)AL 400/3P 50684 MP 4790 4840 21 22 41399 23 24 47423 EP 11958 200/3P (3#250+1#250N+1#4G)AL 2 1/2 25 26 2 (3#1+1#1N+1#6G)AL 300/3P 2130 SP 11238 9887 27 28 2570 29 30 2210 2GA 3GA 54380 400/3P 5280 400/3P 52800 2(3#250+1#2S0N)+(1#1G)AL 2 1/2 31 32 2 1/2 2(344/0+1#4/ON)+(1#1G)AL 350/3P 53450 2GB 3GB 54020 33 34 39540 335 36 40390 54290 2(3#2S0+1#2S0N)+(1#1G)AL 2 1/2 37 38 2 1/2 2(3#4/0+1#4/ON)+(1#1G)AL 350/3P 53450 53930 39 40 39440 41 42 40390 4GA 54380 400/3P 2(3#250+1#250N)+(1#1G)AL 2 1/2 43 44 2 1/2 2(3#4/0+1#4/ON)+(1#1G)AL 350/31) 53270 4GB 54020 52980 45 46 39260 47 48 40390 SGA 55100 54020 52980 400/3P 2(3#250+1#250N)+(1#1G)AL 2 1/2 49 50 2 1/2 2(3#4/0+1#4/ON)+(1#1G)AL 350/313 53270 SGB 51 52 39260 53 54 40390 HPA & HLA 020 14950 150/3P (3#3/0+1#3/ON+1#4G)AL 2 1/2 55 56 SPACE F 57 7 58 13500 1 59 1 60 SPACE 61 62 SPACE 63 64 65 66 SPACE 67 68 SPACE 69 70 71 72 SUBTOTALVA 289366 289915 278197 1 284454 230289 231753 SUBTOTALVA TOTAL VA: 289366 289925 1 278297 573819 52020E 1 509950 1603973 LOAD GUEST ROOM LOAD TOTAL GUEST ROOM LOAD IN VA CONNECTED LOAD DEMAND FACTOR NEC ARTICLE NO 220.42 DEMAND LOAD NOTE: I)CONTRACTOR SHALL CONSTRUCTION. 2)CONTRACTOR SHALL SELECT ACCORDINGLY. 3)CONTRACTOR SHALL CONSTRUTION. CHECK CHECK PROVIDE BREAKERSIZESAS SHORT CIRCUIT SELECTIVE PER PANEL SCHEDULE AND CALCULATION AND VERIFY COORDINATION REPORT OF ELEVATORS VERIFY IF ISTHERE BREAKER AIC RATING FOR ENGINEERS ANY CORRECTION AS PER AFC REVIEW. BEFORE PRIORTO CALCULATION AND BEFORE PRIOR TO TOTAL GUEST ROOM HVAC LOAD IN VA NEC ARTICLE NO 220.83B TOTAL GUEST ROOMS LOAD IN VA(GR- PNL) 11S8740 NEC ARTICLE NO 220.84 266510 TOTALARTIFICIAL COOKTOP LOAD IN VA 704000 NEC ARTICLE NO 220.84 161920 PUBLIC AND BON AREA LOAD LIGHTING (INTERIOR) 20030 1.25 25038 LIGHTING (EXTERIOR) 1940 1.25 2425 RCPT 20A 38880 NECARTICLE 220.44 24440 RCPT 3GA-100A NECARTICLE 220.44 HVAC NEC ARTICLE NO 220.82 HVAC COOLI NG 85695 1 HVAC HEATING 103SS9 1 103SS9 BOOSTER FAN 65 1 65 EXHAUSTLOAD 879 1 879 AHU S242 1 S241.6 MOTOR NEC ARTICLE 430.24 BOOSTER PUMP 8970 1 8970 CP PUMP 910 1 910 POOLWATER HEATER 1800 1 1800 ELEVATORS-1 15852 1 15852 ELEVATORS-2 12609 1 12609 POOL FILTER PUMP 4050 1 4050 SUMPPUMP 2782 1 2782 KITCHEN LOAD 34557 0.65 22462 2S% LARGEST MOTOR 15852 0.25 3963 LAUNDRY LOAD 22300 1 1 1 22300 CHARGING STATIONS LOAD 40000 1 1 40000 MISC LOAD 44614 1 44614 TOTAL LOAD IN VA 1603973 770389 TOTALLOAD IN AMPERE 4452 2138 TAKING 15%SPARE CAPACITY IN AMP 2459 TRANSFORMER CALCULATION FIRE PUMP 1 0 TOTAL LOAD IN VA 1603973 770389 TOTAL LOAD IN KVA 1604 770 DESIGN MARGIN@15% 1845 886 TRANSFORMER SIZE (KVA) moo RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Camel ((�� �vm�ltlDnrklDAaL x DATE: 07/22/19 MECH. EQUIPMENT FLA MCA MOCP VOLTAGE PHASE LOAD CIRCUITNO. AHU-1 2.8 4 15 208 1 582.4 HEATER-1 - 20 30 208 1 4800 AHU-1+HEATER-1 29 30 208 1 5382.4 MP:1,3 AHU-2 7.6 10 15 208 1 1580.8 HEATER-2A 40 - 208 1 9600 HEATER-2B - 40 50 208 1 9600 AHU-2+HEATER-2A - 50 60 208 1 1.1181 MP:5,7 AHU-3 6 8 15 208 1 1248 HEATER-3 - 40 60 208 1 9600 AHU-3+HEATER-3 58 60 208 1 10848 MP:9,11 AHU-0 2.8 4 15 208 1 582.4 HEATER-4 - 1 20 30 208 1 4800 AHU-0+HEATER-4 - 29 30 208 1 5382.4 MP:13,15 AHU-5 6 8 15 208 1 1248 HEATER-5 20 35 208 1 4800 AHU-S+HEATER-S 33 35 208 1 6048 MP:17,19 CU-1 10.4 13 20 208 1 2163.2 MP:2,4 CU-2 25.6 32 50 208 1 5324.8 MP:618 CU-3 19.2 24 40 208 1 3993.E MP:10,12 CU4 13.6 17 25 208 1 2828.8 MP:14,16 CU-5 19.2 24 40 208 1 3993.6 MP:18,20 FCU-1 1.16 1.45 15 208 1 241 MP:21,23 FCU-2 1.16 1.45 15 208 1 241 MP:25,27 ODU-1 8.8 11 30 208 1 1830.4 MP:22,24 ODU-2 8.8 11 30 208 1 1830.4 MP:26,28 CCU-I+DS-1 9.6 12 30 208 1 1996.8 MP:33,35 CCU-2+DS-2 9.6 12 30 208 1 1996.8 MP:34,36 CCU-3+DS-3 16 20 30 208 1 3328 MP:29,31 71.2 88 90 208 3 25650 MP:37,39,41 48.6 60 208 3 17508 MP:38,40,42U [DHCU 2.6 4 15 208 3 937 MP:43,45,47MP:55,57/MP:59,61 23 - 30 208 1 4800 MP:56,58/MP:60,62 UH 21.1 - 30 208 3 7600 MP:50,52,54 ERV-1 74 92.5 110 208 3 1266591 EM:32,34,36 ERV-2 178.64 198.3 1 125 208 3 1283311 EM:33,35,37 TRANSFORMER SECONDARY SHORT CIRCUIT CURRENT CALCULATION I F.L=(KVA X 1000)/(EL. L X1.732) F=(1.732 X L X IS.C)/(C X n X ELL) IF.L=(1000 X 1000)/(208'1.732) F=(1.732 X 100 X79302.3903 )/(230l8X9X 208) IF.L=2775.722 AMP F = 0.318 1 KVA- RATING OF TRANSFORMER EEACTOR EL.L=VOLTAGE OF CIRCUIT 4 L=LENGTH OF CONDUCTOR IN FEET I F.-=TRANSFORMER FULL LOAD CURRENT IS.C= TRANSFORMER SECONDRY FAULT CURRENT C= CONSTANT n=NO. OF CONDUCTOR PER PHASE M=100/%Z M=100/3.5 EL.L=VOLTAGE OF CIRCUIT z M=28.5] M=1/1+F M=MULTIPLIER M=1/1+0.318 %Z=TRANSFORMER IMPEDENCE s 0.758 IS.0 SYM. RMS= IS.0 X M S.C=IF.L X M IS.C=2775.722 X 28.57 AMP IS.0 SYM. RMS=79302.39 X 0.7S8 IS.0 SYM. RMS= 60111.21 AMP IS.C=79302.3903 AMP 3 AFC RATING OF 65 KA IS.C= TRANSFORMER SECONDARY FAULT CURRENT EMERGENCY GENERATOR SIZING CALCULATION LOAD CONNECTED LOAD DEMAND FACTOR DEMAND LOAD LIGHTING 6740 AS PER NEC ARTICLE 220.42 6740 RCPT 6300 AS PER NEC ARTICLE 220.44 6300 HVAC BOOSTER FAN 65 1 65 HVAC COOLING S4989 1 S4989 EXHAUSTFAN 879 1 879 MOTOR AS PER NEC ARTICLE 430.24 ELEVATOR 28461 1 15852 SUMPPUMP 2782 1 2782 LARGEST MOTOR 15852 0.25 3963 MISC. LOAD 21204 1 21204 TOTAL LOAD IN VA 237272 222774 237 223 DESIGN MARGINII IN KVA 241 GENERATOR SRE IN KW (P.F-0.8) 15OKW NOTE: 1."BASE4 HAS CONNECTED BOTH ELEVATOR WITH EMERGENCY GENERATOR BUT THE DEMAND LAOD CONSIDER FOR ONE. CONTRACTOR TO PROVIDE SWITCH GEAR ACCORDINGLY. 2.CONTRACTOR SHALL MAKE PROVISION AND PROVIDE SYSTEM SO THAT BOTH ELEVATOR COME DOWN AT GROUND FLOOR AND AFTER THAT ONE ELEVATOR WILL RUN ON EMERGENCY FOR FIRE FIGHTERS OPERATION. CONTRACTOR SHALL FIELD VERIFY AND CO-ORDINATE WITH GENERATOR VENDOR TO VERIFY SIZE." LOADS IN STEP-1 LIGHTING RECEPTACLE EXHUAST FAN MISC. LOAD ELEVATOR-1: 20 HP (Soft start with Ramp) SUMP PUMP -1-1 HP (Across the Line) ERV-1 &ERV-2 STARTING LOAD: 100.42KW / 135.45KVA RUNNING LOAD: 83.O8KW /99.99KVA GENERATOR SIZE: 15OKW SHORT CIRCUIT CALCULATION FEEDER DESIGNATION DISTANCE(FT.) IFL(AMP) M ISC(AMP) BREAKER MAINS AWG N C F MFACTOR ISC(M) All RATING (AMP) MSB 100 2776 28.57 79309 2500 3#500 9 23018 0.32 0.76 60138 65000 HPA & HLA 24 2776 28.57 79309 150 3#3/0 1 9243 1.71 0.37 29214 42000 KP 80 2776 28.57 79309 100 3#1 1 4699 11.24 0.08 6478 10000 MP 19 2776 28.57 79309 400 3#250 2 13236 0.47 0.68 53805 65000 PP 185 2776 28.57 79309 100 3#1 1 4699 26.00 0.04 2937 10000 LP 72 2776 28.57 79309 100 3#1 1 4699 10.12 0.09 7133 10000 SEP 30 2776 28.57 79309 150 3#3/0 1 9243 2.14 0.32 25230 42000 EM 30 2776 28.57 79309 300 3#5001 1 23018 0.86 0.54 42623 65000 EP 14 2776 28.57 79309 200 3#250 1 13236 0.70 0.59 46693 1 65000 SP 65 2776 28.57 79309 100 3#1 1 4699 9.14 0.10 7825 10000 2GA 112 2776 28.57 79309 400 3#250 2 13236 2.79 1 0.26 20903 22000 213B 112 2776 28.57 79309 350 3#4/0 2 11409 3.24 1 0.24 18698 22000 3GA 122 2776 28.57 79309 400 3#250 2 13236 3.04 0.25 19614 22000 3GB 122 2776 28.57 79309 350 3#4/0 2 11409 3.53 0.22 17504 18000 413A 132 2776 28.57 79309 400 3#250 2 13236 3.29 0.23 18474 22000 4GB 132 2776 28.57 79309 350 3#4/0 2 11409 3.82 0.21 16453 18000 SGA 142 2776 28.57 79309 400 3#250 2 13236 3.54 0.22 17459 18000 5GB 1 142 2776 1 28.57 1 79309 1 350 3#4/0 2 1 11409 4.11 0.20 15521 18000 ERV-1 152 2776 28.57 79309 110 3#2 1 6087 11.49 0.0E 4534 10000 ERV-2 182 2776 28.57 793. 125 3#1 1 7579 15.8E 0.0E 4704 30000 ELEVATOR-1 100 2776 28.57 79309 60 3#6 1 2433 27.14 0.04 2818 10000 ELEVATOR-2 100 2776 28.57 79309 60 1 3#6 1 1 2433 27.14 0.04 2818 10000 MSB MECH AIC SCHEDULE CALCULATION GENERATOR AIC CALCULATION BAS E'' BASE4 2901 CLINT MOORE ROAD, #114 BOCA RATON, FLORIDA 33496 888.901.8008 www.base-4.00m RICARDO J. MUNIZ-GUILLET, AIA 5453 NW 106TH DR CORAL SPRINGS, FL 33076 MEP ENGINEER GARRY VERMAAS PhD, PE 2183 S BERRYS CHAPEL ROAD FRANKLIN, TN 37069 Seal: 1 W VF QP �B'\ siEHh� O' %p m N 1 12 o ATE N OF �gBrONAI E�` DATE: M1903,04 GARRY VERMAAS. PhD. PE Owner: THE WITNESS GROUP 600 ENTERPRISES DRIVE LEWIS CENTER,OH 513-623-9430 HOME©SUITES BY HILTOH CARMEL, INDIANA PROTOTYPE VERSION-V2.2 2016 REVISION: MAY 2016 ISSUE NO.1 DELTA I ISSUED DATE I DESCRIPTION 1 EO 2019.03.04 ISSUED FOR PERMIT CURRENT ISSUE ISSUED FOR PERMIT CURRENT ISSUE DATE 2019.03.04 DRAWN BY SKJ CHECKED BY GWV PROJECT NO, B4-134-1705 SHEET NAME PANEL SCHEDULE-VIII DRAWINGS NO. E=308