Loading...
HomeMy WebLinkAboutFP-001 - GENERAL NOTES AND LEGENDSBACKFLOWP ASSEMBLY GENERAL NOTES DRAWING INDEX VALVE 1 SHUT-OFF VALVE #1 RESILIENT SEATED GATE VALVE WITH HANDWHEEL OPERATOR FIRE PROTECTION sr cocK#1 sEENOTES#a&#a SHUT-OFF VALVE #1 RESILENrSEATED 01. THE SPRINKLER CONTRACTOR SHALL PROVIDE COMPLETE HYDRAUUC SEE NOTE #5 GATE VALVE WITH HANDWHEEL CALCULATIONS, PPE SIZING, P PE MATERIAL WITH LAV-our DWG'S& OPERATOR SEE NOTES #3&#4 CONSTRUCTION LAYOUTOWG'S. SHEET SHEET NAME CURRENT CURRENT REVISION NUMBER REVISION DATE DESCRIPTION WALL 02 ALL SPRINKLER HEADS SERVING, ELECTRIC, TELEPHONE, SWITCHGEARB CHECK VALVE#2 OUTSIDE WALL FP-001 GENERAL NOTES AND LEGENDS 2019.03.04 ISSUED FOR PERMIT ELEVATOR MACHINE ROOMS SHALL BE PROVIDED BY SHUT-OFF VALVES W/TAMPER CHECK VALVE#1 FP-101 1ST FLOOR FIRE SPECIFICATION PLAN 2019.03.04 ISSUED FOR PERMIT SWITCHES. FP-102 2ND FLOOR FIRE SPECIFICATION PLAN 2019.03.04 ISSUED FOR PERMIT OUTSIDE WALL z DUCTILE IRON OR TYPE OR L 1Z"MIN. CHECK VALVE#1 COPPER OR MIN. OF 5' FP-103 3RD FLOOR FIRE SPECIFICATION PLAN 2019.03.04 ISSUED FOR PERMIT m, THE FIRE PROTECTION SYSTEM DESIGN, INSTALLATION AND MATERIALS SHALL BE INAS AND THE BUILDING CODE ON EACH END OF ASSEMBLY D OF FP-105 4TH FLOOR FIRE SPECIFICATION PLAN 2019.03.04 ISSUED FOR PERMIT FP-105 STH FLOOR FIRE SPECIFICATION PLAN 2019.03.04 ISSUED FOR PERMIT BLEMOST AND FIRE CODES WELL AS ANY APPLICABLE STATE STATUTES. DFIRE ODES WELL AS SATE STATUTES � FLOW SEE NOTE #] o ® FLOW � � LEGEND 04. SPRINKLER SYSTEM TO BE INSTALLED BY STATE CERTIFIED FIRE PROTECTION SYMBOL DESCRIPTION CONTRACTOR. 6" MIN. SEE NOTE #8 / SPRINKLER HEAD 05. CONTRACTOR SHALL COORDINATE WITH STRUCTURE, CEILING GRID AND ELEVATION, GRAN RELIEF VALVE OUTLET SHUT-OFFVALVE#1 TEST DRAIN AND OTHER MECHANICAL AND ELECTRICAL SERVICES BEFORE FABRICATING AND COCK#1 w INSTALLING SPRINKLER HEADS & PIPING. MAKE OFFSETS IN PIPING AS REQUIRED PER FLOW SWITCH z z FIELD CONDITIONS. MAINTAIN 6" CLEARANCE BETWEEN PIPING AND 1 AND 2 HOUR ntt f LOWEST o. RATED WALLS INCLUDING CORRIDOR WALLS. V V VALVE RELIEF VALVE OUTLET � SHUT-OFF VALVE#2 a FLOOR n� FIRE DEPARTMENT CONNECTION rva SEE TABLE IN SPECIFICATIONS BE DOMESTIC L LISTEURE R FIRE OG. ALL VALVESPROTECTION FIRE ALARM ASSEMBLY FOR MINIMUM DRAN SIZES FOR CHECK VALVE #2 PLAN VIEW A PSI WORKING PRESSURE PROVIDE SERVICE RATEDFOR 175 PSI WORKING PROTECTION SERVICE AND RATED FOR m RP INDOOR INSTALLATIONS ELEVATION VIEW LISTEDTEDAPPR TAMPER ES ONTROL VI LOCATIONS. PROVIDE SPRINKLER VALVE ASSEMBLY NOT TO SCALE NOT TO SCALE APPROVED FLOWVED STITCHES WHERE U.L. LISTED/ FM APPROVED FLOW SWITCHES, WHERE SHOWN, AT CONTROL VALVE LOCATIONS. ® PUMP NOTES. 1. INDOOR INSTALLATION SHALL ONLY BE PERMITTED IN CASES WHERE ADEQUATE SPACE FOR THE BACKFLOW PREVENTION ASSEMBLY IS NOT AVAILABLE OUTSIDE. 07. SPRINKLER H FADS SHALL BE LISTED AS INDICATED IN SCHEDULE AND RATED FOR 175 o FIRE DEPARTMENT CONNECTION OWNER WILL REVIEW ON A CASE BY CASE BASIS. PSI WORKING PRESSURE. PROVIDE HEAD GUARDS ON UPRIGHT AND PENDANT 2. REDUCED PRESSURE ASSEMBLIES (RPA). SPRINKLER HEADS LOCATED IN ELEVATOR SHAFTS, MECHANICAL SHAFTS, 3. APPROVED EPA INCLUDES SHUT-OFF VALVES. ELECTRICAL, TELEPHONE, MECHANICAL AND MACHINE ROOMS. CONTRACTOR SHALL 4. FIRE LINE INSTALLATIONS SHALL HAVE OUTSIDE STEM AND YOKE "OWNERS" HANDWHEEL OPERATORS. IF SERVING FIRE SPRINKLERS, TAMPER SWITCHES ARE PROVIDE TH E OWNER WITH A COPY OF NFPA 25. REQUIRED. ABBREVIATIONS 5. TEST COCK#1 SHALL BE UPSTREAM OF SHUT-OFF VALVE#1 AND IS PART OF THE APPROVED ASSEMBLV. C6. CONTRACTOR SHALL PROVIDE FLUSHING CONNECTIONS WHERE SHOWN ON PLANS. 6. ASSEMBLIES SHALL BE INSTALLED UPRIGHT AND IN THE HORIZONTAL POSITION UNLESS OTHERWISE APPROVED. PROVIDE A DRAIN CONNECTION FOR ALL TRAPPED SECTION OF PIPING. ]. PIPE MATERIAL AND FITTINGS SHALL BE A9 SPECIFIED STANDARDS & SPECIFICATIONS. SVA SPRINKLER VALVE ASSEMBLY 8. SUPPORT FOR ASSEMBLY SHALL BE DESIGNED BY GENERAL CONTRACTOR. IT IS RECOMMENDED 3"-10" RP BE SUPPORTED AT CENTER. THE SU PPORT SHALL NOT 09. INSPECTORS TEST, DRAIN AND SHUT-OFF VALVES SHALL BE LOCATED AT MAXIMUM OF BLOCK RELIEF VALVE OR DRAIN PORT. T-0"AFF FAA FIRE ALARM ASSEMBLY 9. AN AIR GAP DRAIN IS RECOMMENDED TO REDUCE SPLASHING OF MINOR DISCHARGES FROM THE RELIEF VALVE DRAIN PORT. 10.ALL LOCATIONS FOR SPA'S RECUT RE OWNER APPROVAL. 10. ALL SPRINKLER HEADS SHALL BE CENTERED AND PRESENTED IN ANEATAND F.P.C. FIRE PROTECTION CONTRACTOR 11.NO TAPS, BRANCHES, PHIS OR OTHER ACCESSORIES ARE PERMITTED ON THE PIPING BETWEEN THE BRA & METER . BALANCED CEILING PATTERN. FP CONTRACTOR TO COORDINATE WITH ARCHITECT 12. BACKFLOW PREVENTION AND METERING SHALL MEET LOCAL WATER PURVEYOR REQUIREMENTS INCLUDING MAXIMUM ALLOWABLE PRESSURE DROP. AND INTERIOR DESIGNER FDC FIRE DEPARTMENT CONNECTION BACKFLOW PREVENTER DETAIL NOT TO SCALE 11. PIPING TO BE BLACK STEEL IN AIR CONDITIONED SPACES, PIPING IN NON -AR U.L. UNDERWRITERS LABORATORY INC. CONDITIONED SPACE SHALL BE BLACK STEEL SCHEDULE 40 (PAINTED) WITH AN ALTERNATE FOR GALVANIZED SCHEDULE 40. GROOVED FITTINGS ARE NOT ALLOWED WHERE PRESSURE EXCEEDS 175 PSI. WALL PLATE REFER ARCH ITECTU HAL WALL 12. SP RI N KLER H EADS TO BE MO DEL GBR BE RI ES SP RI N KLER WHITE P LATED BE M I- (TYPICAL) DRAWINGS FOR EXTERIOR PLATE REFER RECESSED TYPE FOR SIDE WALL, AND FOR CEILING LOCATIONS, BRASS UPRIGHT FOR WALL TYPE (TYPICAL) ARCHITECTURAL EXPOSED LOCATIONS, RECESSED TYPE FOR FIRST FLOOR LOBBY AREAS. TEFLON DRAWINGS FOR FINISHED HEADS TO BE USED IN NON -AIR CONDITIONED AREAS. PIPE TAP FOR EXTERIOR WALL TYPE PIPE TAP FOR BALL BALL DRIP 13. CONTRACTOR SHALL INSTALL A SPRINKLER HEAD IN LINEN/LAUNDRY CHUTES ON TOP DRIP VALVE FIRE VALVE AND ALTERNATE FLOOR. DEPARTMENT CONNECTION FIRE 14. SPRINKLER SUBCONTRACTOR TO PROVIDE ALL REQUIRED STANDPIPES AND FIRE DEPARTMENT HOSE VALVES, FLOW AND TAMPER SWITCHES, PRESSURE REDUCING VALVES AT ALL CONNECTION FLOORS, SIAMESE CONNECTIONS, INSPECTOR TEST STATIONS, SPARE SPRINKLER HORIZONTAL MOUNTED HEAD CABINET. ALL NECESSARY DRANS AND SIGNAGE. BALL DRIP VALVE ro a 15. FIRE PUMP AND CONTROLLER SHALL BE SIZED ACCORDING TO HYDRAULIC O v CALCULATIONS AND FLOW TEST. IF FIRE PUMP IS REQUIRED, FP CONTRACTOR SHALL HORIZONTAL O SUBMIT FIRE PUMP SHOP DRAWINGS TO FOR FOR REVIEW. ALL ASSOCIATED m MOUNTED BALL DRIP ACCESSORIES INCLUDING JOCKEY PUMP AND CONTROLLER, PUMP BYPASS, AND EXISTING GRADE VALVE NECESSARY VALVING SHALL MEET LOCAL CODES AND NFPA STANDARDS. PROVIDE EXISTING GRADE REMOTE ANNUNCIATOR AT FIRE COMMAND ROOM AND REMOTE ALARM AT SECURITY ��, DESK 2" GRAIN PIPE 16. ALL EXPOSED FIRE ALARM PIECES (STROBES, SPEAKERS, PULL STATIONS) TO BE WHITE TO OUTSIDE 2" DRAIN PIPE IN COLOR WHERE POSSIBLE FP CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO OUTSIDE AND INTERIOR DESIGNER, 1]. FIRE CONTRACTOR MUST PROVIDE LANDLORD AND TENANT WITH A COPY OF NFPA 25. NOTE 18. FP SUBCONTRACTOR SHALL CONNECTTO SITE UTILITY SOURCE AND PROVIDE ALTERNATIVE FOR POST INDICATOR VALVE (PTV). SUCTION SIDE PIPING SHALL BE 1.FIRE DEPARTMENT CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH THE NFPA DUCTILE IRON. STANDARD APPLICABLE TO THE SYSTEM DESIGN AND SHALL COMPLY WITH SECTIONS 912.2 THROUGH 912.6. 19. SPRINKLER HEAD INSTALLATION SHOULD BE PLACED SO HEADS ARE LOCATED AT SIDE 2. PLEASE REFER TO SHEET FP 101 SHEET FOR THE FIRE DEPARTMENT CONNECTION. SPACE OR PIPED ABOVE MAIN LINE TO PREVENT SEDIMENT FROM CLOGGING THE &FIRE DEPARTMENT LOCATION AND CONNECTIONS SHALL BE APPROVED BY FIRE CHIEF OF THE HEADS. JURISDICTION HAVING APPROVAL AUTHORITY. 20. HIGH HEAT HEADS WHERE REQUIRED. 21. FIRE PUMP AND PIPING DESIGNED FOR RECYCLING DURING EXERCISE CYCLE. FIRE DEPARTMENT CONNECTION DETAIL 2 NOT TO SCALE 22. THE STRUCTURAL ENGINEER SHALL INCLUDE THE LOAD FOR THE SPRINKLER SYSTEM AND OTHER FIRE PROTECTION COMPONENTS INTO THE DESIGN OF THE STRUCTURE. REFER TO STRUCTURAL DRAWINGS. BULK FEED MAIN TO 23. ALL FIRE PROTECTION SYSTEMS AND MATERIAL TO COMPLY WITH HILTON BRAND SPRINKLER SYSTEM STANDARDS FOR FIRE PROTECTION AND LIFE SAFETY WATER MOTOR GONG SIZED BY HYDRAULIC 24. EACH FLOOR SHOULD BE DESIGNED AS A SEPARATE ZONE. A/S CALCULATIONS 25. SEE ARCH DRAWINGS FOR EXTINGUISHER CABINET LOCATION. RETARD CHAMBER 26. RECESSED SPRINKLER HEADS SHALL BE USED IN ALL PUBLIC AREAS WITH FLOW SWITCH SPARE SPRINKLER HEAD INCLUDING REST ROOMS. CABINET MTD. ON WALL. GRV'D CHECK VALVE GLOBE UMC CONTROL VA. ASSEMBLY 27. THE FP DRAWINGS INCLUDED IN THIS DESIGN DRAWING SET ARE SPECIFICATIONS ONLY. (1) DRAIN AND TEST CHECK VALVE ALARM CHECK VALVE GRV'D BUTTERFLVVA. (2)FLOW SWITCH 2B. THE FIRE PROTECTION SYSTEM NEEDSTO BE DESIGNED BY PROFESSIONAL WITH BALL DRIP ASSEMBLY w/TRIM W/TAMPER SWICTH (3) PRESSURE GAUGE ENGINEERS IN THE STATE THAT TH E PROJECTS LOCATED IN. N) SI NGS ON BODY 29. THE DESIGN DRAWINGS MUST BE SIGNED AND SEALED BY THIS PEANDTHEV NEED F.D. SIAMESE \ X TO BE SUBMITTED TO BASE 4 FOR REVIEW. CONNECTION -VERIFY LOCATION WITH CIVIL BACKFLOW m " PREVENTION DEVICE m _ $ 30. CONTRACTOR TO FOLLOW THE NFPA STANDARD FOR FIRE PROTECTION REQUIREMENTS. ASSEMBLY W/TAMPER < 1-1/2" 2"MAIN DRAIN SWITCHES ON SHUT- SCH7 TO 31. ALL AND SPECIFICATIONS FIRE PROTECTION OFFVALVES. SYSTEM SAKEPERFORMANCE IS SHEET COMPONENTS ARE PROVIDED IN THE NOTES ON THIS SHEET. COMPONENTS LF xrx"2g ,^N � � 32. CONTRACTOR SHALL ENSURE SPRINKLER SYSTEM BE ZONED AT EVERY FLOOR WITH FINISHED FLOOR REF.) TO ON SITE POST _ a ..a�. INSPECTOR'S TEST STATION WITH SIGHT GLASS AT EVERY HORIZINTAL SPRINKLER ai ZONE WITH A CONTROL VALVE AND TAMPER SWITCH, WATERFLOWSWITCH, TYPE F.D. SIAMESE BRIDLE ROD (TYP.) �0 b w PRESSURE GAUGE, AND DRAIN AND TEST ASSEMBLVREQUIRED BY NFPA I3 CONN. SEE SITE z H x UTILITY PLANS FOR p Z 33. FIRE CONTRACTOR SHALL ENSURE TO PROVIDE CORROSION RESISTANT CONTINUATION F CONCRETE THRUST w LL¢ H W SPRINKLER HEADS IN POOL ROOMS, POOL EQUIPMENT ROOMS, AND POOL \ BLOCK(TYP.) STORAGE ROOMS. �F F 34. SHALLENSURE TO PROVIDE FIRE SPRINKLER IN LINENCHUTE AS PERCONTRACTOR AS PER NFPA I3, NFPA 82. 82 FIRE LINE SUPPLY. SEE SITE UTILITY FOR 2" SCR, 40 STEEL CONTINUATION PIPE SUPPORT 35. CONTRACTOR SHALL INSTALL A REMOTE INSPECTORS TEST FOR THE WET RELEASED FOR CONSTRUCTION B PONSE SPRINKLER HEAD To AVOID FIRE UTOMATIC SPRINKLER SYSTEM RISER DETAIL WET SYSTEM ,1 YPICAL ZONE CONTROL ASSEMBLY Subject to compliance with all regulations 3 `* OT TO SCALE OTTO SCALE of State and local Codes City of Camel ((�� Avon G'Uoi nD1�L i AID a DATE: 07/22/19 Am BAS E4 BASE4 2901 CLINT MOORE ROAD, #114 BOCA RATON, FLORIDA 33496 888.901.8008 www.base-4.00m RICARDO J. MUNIZ-GUILLET, AIA 5453 NW 106TH DR CORAL SPRINGS, FL 33076 MEP ENGINEER GARRY VERMAAS PhD, PE 2183 S BERRYS CHAPEL ROAD FRANKLIN, TN 37069 Seal: 1 W VF QP��'\si EHh� e' %p m IN 1 12 9'. 2 AE W 90 ''OFW '0 ':YO I PNP 2 �gBrONAL ��` DATE: 20180304 OARRY VERII PhD. PE OwnerIn 4 THE WITNESS GROUP 600 ENTERPRISES DRIVE LEWIS CENTER,OH 513-623-9430 HOME©SUITES BY HILTON CARMEL, INDIANA PROTOTYPE VERSION-V2.22016 REVISION: MAY 2016 ISSUE NO.1 DELTA I ISSUED DATE I DESCRIPTION 1 FPO 2019.03.04 ISSUED FOR PERMIT CURRENT ISSUE ISSUED FOR PERMIT CURRENT ISSUE DATE 2019.03.04 DRAWN BY SPB CHECKED BY GWV PROJECT NO, 134-134-1705 SHEET NAME GENERAL NOTES AND LEGENDS DRAWINGS NO. FP=001