HomeMy WebLinkAboutLT-001 - GENERAL NOTES, LEGENDS AND ABBREVIATIONSGENERAL NOTES
LEGENDS
DRAWING INDEX
SYMBOL
I
LIGHTING
LIGHTING
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE FOLLOWING
10. LABOUR FOR THE INSTALLATION OF MATERIALS AND EQUIPMENT PROVIDED UNDER THE ELECTRICAL
CURRENT
CODES/NATI O FIRE PROTECTION ASSOCIATION, INTERNATIONAL CONSERVATION
SCOPE OF WORK SHALL BE PERFORMED IN A NEATAND FIRST CLASS WORKMANSHIP LIKE
SHEET
®
fi00mmX1200mm (2'X4')LIGHTING FUTURE
AL ELECTRICAL TIONS AND T
ORDINANCES, REGULATIONS
CODE, NATIONAL ELECTRICAL CODE AND ALL LOCAL CODE ORDINANCES, REGULATIONS AND THE AUTHORITY
MANNER ER SHALL BE IN EWITH
MANNEE AND QUALIFIED OF
NUMBER
SHEET NAME
REVISION
CURRENT REVISION
HAVING JURISDICTION.
AND ALLTRADE
REQUIREMENTS DRAWINGS, CODED
THE SPECIFIC REQUIREMENTS OF THE CONTRACT DRAWINGS, AND ALL CODES, ORDINANCES OF STATUES,
SPECIFIC OF ORDINANCES STATUES,
600mmX6OOmnn LIGHTING FIXTURE
DATE
DESCRIPTION
ETC. APPLICABLE.
®
(2'X2')
LT-001
GENERAL NOTES, LEGENDS AND
ABBREVIATIONS
2019.03.04
ISSUED FOR PERMIT
2. ALL ELECTRICAL WORK PROVIDED FOR THIS PROJECT SHALL COMPLY WITH THE FOLLOWING CRITERIA:
11. ALL MOUNTING HEIGHTS INDICATED ARE MEASURED FROM FINISHED FLOOR UNLESS OTHERWISE NOTED.
m
300mmX1200mm 1'X4' LIGHTING FIXTURE
( )
�
STRIP
LT-002A
LIGHTING FIXTURE SCHEDULE-1
2019.03.04
ISSUED FOR PERMIT
A) TRADE SIZE CONDUIT SMALLER THAN 1/2 INCH SHALL NOT BE USED.
12. PROVIDE TEMPORARY LIGHTING, POWER, AND WIRING SYSTEMS FOR USE OF ALL TRADES, ADEQUATE FOR
a
DOWN LIGHT
LT-002B
LIGHTING FIXTURE SCHEDULE-2
2019.03.04
ISSUED FOR PERMIT
ENTIRE NEEDS OF THE PROJECT.
44
WALL WASHER
LT-103
LIGHTING CONTROL SCHEDULE
2019.03.04
ISSUED FOR PERMIT
B) CONDUIT ABOVE GRADE AND NOT EXPOSED TO WEATHER SHALL BE PVC, ENTB MC.
CHANDILIER/PENDANT
13. PROVIDE LIGHT FIXTURES AS SELECTED BY ARCHITECT, OR AS SPECIFIED.
0
LT-10
LIGHTING DETAILS-1
2019.03.04
ISSUED FOR PERMIT
C) CONDUIT BELOW GRADE AND PENETRATIONS AT GRADE SHALL BE SCHEDULE 40 PVC EXCEPT TURNS.
14. PROVIDE ALL WIRING DEVICES.
WIRING DEVICES
LT-102
LIGHTING DETAILS-2
2019.03.04
ISSUED FOR PERMIT
D) CONDUIT ABOVE GRADE AND EXPOSED TO WEATHER SHALL BE SCHEDULE 80 PVC.
15, IDENTIFY CLEARLY ON A TYPE WRITTEN FORM ALL CIRCUITS AND EQUIPMENT TO CORRESPOND WITH THE
LT-200A
SITE LIGHTING PLAN
2019.03.04
ISSUED FOR PERMIT
LT-200B
SITE PHOTOMETRIC PLAN
2019.03.04
ISSUED FOR PERMIT
PLANS AND PANEL SCHEDULE AND ATTACH INSIDE THE PERTAINING PANEL.
E) WIRE SIZE SMALLER THAN#12 Awg.
LT-201
1ST FLOOR LIGHTING PLAN
2019.03.04
ISSUED FOR PERMIT
i6. ALL EQUIPMENTS AND MATERIALS SHALL BE GUARANTEED FOR ONE YEAR AFTER THE DATE OF ACCEPTANCE
��
CIRCUIT BREAKER
LT-202
2ND FLOOR LIGHTING PLAN
2019.03.04
ISSUED FOR PERMIT
F) BRANCH CIRCUIT WIRING PROVIDED BY THE ELECTRICAL CONTRACTOR SHALL BE COPPER;
BY OWNER.
♦♦
FEEDER SERVICE WIRING SHALL BE ALUMINUM.
Y
125V OR 277V AC SINGLE POLE 20 AMP SWITCH ROCKER TYPE MOUNTED
( )
AT 48'AFF ON CENTER, UNO.
LT-203
3RD FLOOR LIGHTING PLAN
2019.03.04
ISSUED FOR PERMIT
G) CONDUCTORS
T TY NONMETALLIC SHEATHED CABLE IS LIMITED TO THE 60
17. AT COMPLETION OF JOB THE ELECTRICAL CONTRACTOR SHALL GIVE THE OWNER AN AS -BUILT SET OF
LT-204
4TH FLOOR LIGHTING PLAN
2019.03.04
ISSUED FOR PERMIT
A ALL OTHER CONDUCTORS SHALL
DEGRE RACTO SHALL REFER NEC TABLE
REPRODUCIBLE DRAWINGS SHOWING THE EXACT ELECTRICAL INSTALLATION, WRITTEN MAINTENANCE
��4
277V AC 3-WAV ORNTER, 20 AMP SWITCH (ROCKER TYPE)
125VMOU
LT-205
5TH FLOOR LIGHTING PLAN
2019.03.04
ISSUED FOR PERMIT
MINIMUM TEMP DEGREES C. (),
HAVE MINIMUM TEMPERATURE RATING OF 75 DEGREES C. (TYPE THWN OR TYPE THHN), 98%
INSTRUCTIONS AND SCHEDULE OF ROUTINE MAINTENANCE AS WELL AS ANY OTHER CLOSE OUT ITEMS
T
MOUNTEDAT 48" AFF ON CENTER, UNO.
COPPER OR ALUMINUM.
REQUIRED BY THE CONTRACT DOCUMENTS.
LT-206
EXTERIOR ELEVATIONS-1
2019.03.04
ISSUED FOR PERMIT
LT-207
EXTERIOR ELEVATIONS-2
2019.03.04
ISSUED FOR PERMIT
125V OR 277V AC 20 AMP DIMMER SWITCH MOUNTED AT 48" AFFON CENTER,
H) WHERE POSSIBLE, EXCEPT AS SHOWN OTHERWISE ON THE DRAWINGS,ALL CONDUIT SHALL BE RUN
18. BEFORE BIDDING THE JOB THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH
UNO.
LT-208
TYPICAL UNIT LIGHTING PLAN-1
2019.03.04
ISSUED FOR PERMIT
CONCEALED BELOW GRADE,WITHIN WALLS OR ABOVE CEILING.
ANY EXISTING CONDITIONS.
125V OR 277V AC 20 AMP KEYED SWITCH MOUNTED AT 48"AFF ON
LT-209
TYPICAL UNIT LIGHTING PLAN-2
2019.03.04
ISSUED FOR PERMIT
I) CONDUCTORS #12AWG AND SMALLER SHALL BE SOLID. CONDUCTOR IO#AWG AND LARGER
19. ALL ELECTRICAL SWITCHES,CONTROLS,ETC. IN ALL AREAS ARE TO BE AT A.D.A. ACCESSIBILITY CODE
CENTER,UNO.
LT-210
TYPICAL UNIT LIGHTING PLAN-3
ISSUED FOR PERMIT
SHALL BE STRANDED. CONDUCTOR #12 AWG MAY BE SOLID OR STRANDED, EXCEPT THAT ONLY #
COMPLAINT HEIGHT.
125VOR27N WALL OCCUPANCY SENSOR MOUNTED AT 48"AFF ON
LT-211
DIMMER RISER DIAGRAM
%O29.23.04
2019.03.04
ISSUED FOR PERMIT
12 AWG SOLID OR ONLY#12 AWG STRANDED SHALL BE USED.
20. CIRCUIT NUMBERS SHOWN ON THE DRAWINGS ARE FOR REFERENCE ONLY. BALANCE LOADS AMONG
CENTER, UNO.
J) MOUNTING HEIGHT OF WALL MOUNTED CONTROLS AND RECEPTACLES SHALL FOLLOW THE GIVEN
PHASES IN NEW PANEL BOARDS TO WITHIN 10 % OF EACH OTHER.
DIAGRAM BELOW, UNLESS COMPARABLE CONTROLS OR OUTLETS (THAT PERFORM THE SAME
24V OCCUPANCY SENSOR CEILING MOUNTED, UNO.
FUNCTIONS) ARE PROVIDED WITHIN THE SAME AREA AND ARE ACCESSIBLE.
21. FEEDER CONDUCTORS SHALL BE SIZED BY ENGINEER.
125V OR 27N AC 20 AMP TIMER SWITCH MOUNTED AT 48" AFF ON CENTER, UNO.
22. AT COMPLETION OF WORK, CONTRACTOR SHALL CLEAN UP AND REMOVE ALL DEBRIS AND MATERIALS
NOT INSTALLED IN WORK, LEAVING PREMISES CLEAN.
�D
GUEST ROOM DOORBELL DISCONNECT SWITCH MOUNTED 48"AFF
WALL MOUNTEDOCCUPANCV
23. THE FRANCHISE BRAND STANDARD DESIGN DOCUMENT SHALL BE CONSIDER AS AN INTEGRAL PART OF
=
ELECTRICAL DIMMER PANEL BOARD
SENSOR
CONSTRUCTION DOCUMENTS. ALL CONTRACTOR SHALL ENSURE THEY OBTAIN,READ AND FAMILIARIZE
THEMSELVES WITH THE BRAND STANDARD DOCUMENT BEFORE BIDDING AND ALSO THROUGHOUT THE
CEILING MOUNTED WALL SCONCE
CONSTRUCTION STAGE. IF THERE ARE ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND
OCCUPANCY EXIT LIGHT
FRANCHISE BRAND STANDARDS, THE CONTRACTOR SHALL ISSUE AN RFI TO THE AOR AND EOR.
SENSOR
EMERGENCY LIGHT
24.
ELECTRICAL CONTRACTOR TCOORDINATE WITH CONTROLS MANUFACTURER FOR EXACT INSTALLATION AND
WIRING DETAILS. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR CONTROLS COMPATIBILITY WITH ALL
COMPONENTS PURCHASED ON SITE. ANY SUBSITITUTIONS MADE NEED TO BE VERIFIED BY THE ELECTRICAL
OS
CONTRACTOR PRIOR TO PURCHASE TO BE COMPATIBLEWITH SYSTEM.
25. THE WORK SHALL BE COORDINATED WITH THE ARCHITECTURAL DOCUMENTS FOR THE EXACT LOCATION OF
GENERAL LIGHTING CONTROL
ABBREVIATIONS
LIGHT FIXTURES, EQUIPMENT, DEVICES, ETC. TO ASSURE PROPER PLACEMENT OF SAID DEVICES AND
QUIPMENT. SWITCHES SHALL BE PLACED ON LATCH SIDE OF ALL DOOR OPENINGS. WHERE A CONFLICT EXISTS
A
BETWEEN ANY TWO DOCUMENTS, NOTIFY THE ARCHITECT PRIOR TO ANY INSTALLATION FOR RESOLUTION.
COMMON AREA:
AMP
CEILING MOUNTED EXIT SIGNAGE
AFF
ABOVE FINISHED FLOOR
26. REFER TO ARCHITECTURAL AND INTERIOR DESIGN REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF ALL
1. LIGHTING PANEL FOR HLA. HUB
ADA
ACT
AUTOMA
DIMMER/TOGGLE SWITCH
LIGHTING FIXTURES SHOWN.
CHECK WITH ELECTRICAL PLAN FOR PROPER PANEL LOCATIONS
ATS
(DISABILITIES
AUTOMATIC
TIC TRANSFER SWITCH
PROJECT MASTER LIGHT TURE T LL LIGHTING
27. REFFIXTURES
2. CONTROL CHECK:
CRT
CLG
CIRCUIT
CEILING
NOTEEMERGENCY
UNSWITCHED NIGHOR T
FIX
LIGHT FIXTURES,
S UNSWITCHED NIGHT LIGHT FIXTURES, UNLESS NOTED OTHERWISE.
FIXTURES SHOWN SHALL OPERATE UNLESS
EM
EMERGENCY
INSERT
RI TLIGHT
WHERE REQUIRED BY LOCAL AUTHORITY, PROVIDE 24 HOUR POWER TO ALL EGRESS AND EXIT LIGHT
A. SERVICECORRIDORS:ONTROL TCH OCAL PANELWHENEVERNINIMUM
FIXTURES.
B. LOBBY: DIMMER CONTROL PROGRAM INGMUST OF
OW MINIMUM OL THREESETTINGS
GENERATOR
CARD
BYPASS
C. RESTAURANTS/MEETING ROOMS/ BOARDROOMS: DIMMER CONTROL WITH LOCAL BYPASS
OOM& BOARDROOMS DI
JB
JB
JUNCTION BOX
FOR
SWITCHING.
LTG
LIGHTING
72• POWER
LIGHTING NOTES
D. GENERAL INTERIOR LIGHTING SWITCH LOCALLY
LTS
LIGHTS
E. STAIRWAYAND EXIT LIGHTS: SWITCH FROM PANEL, OCCUPANCY SENSOR CONTROL
MICE
MAIN CIRCUIT BREAKER
F. GUEST CORRIDORS: SWITCH AT PANEL LOCATED IN ELECTRICAL CLOSET, LIGHTING WOULD BE
50 % DIM
N
NEUTRAL
KEYED SWITCH
48"
1. REFER TO ENLARGE POWER PLAN SHEET FOR PANEL LOCATIONS.
G. DAYLIGHT SENSOR, DIMMING WITH TWO MODES, ALTERNATE LOOPING WHICHEVER USEFUL
NEC
NATIONAL ELECTRICAL CODE
H. INDOOR POOLS SHALL HAVE KEYED REMOTE OR OCCUPANCY SENDOR LIGHT SWITCHES.
NF
NON FUSED
2. REFER TYPICAL GUESTROOM PLAN FOR DETAILED ROOM LAYOUT, REFER TO FULL FLOOR POWER AND
I. FITNESS ROOMS SHALL HAVE KEYED REMOTE OR OCCUPANCY SENSORS LIGHT SWITCHES.
NFPA
NATIONAL FIRE PROTECTION ASSOCIATION
LIGHTING PLANS FOR EXACT CIRCUITING INFORMATION.
J. PUBLIC AREAS: CONTROL FROM BACK -OF -HOUSE AREAS
NL
NIGHT LIGHT (UNSWITCHED CKT.) POLE
PH
PHASE
3. PROVIDE 3#12-1/1 BETWEEN CORRESPONDING 3-WAY/4-WAV SWITCHES.
3. EXTERIOR LIGHTING:
PNL
PANEL
CHECK THE EXTERIOR LIGHITNGS AT THE EVERY EGRESS DOORS.
PI
POWER
4. COORDINATE EXACT LOCATION OF COVE LIGHTING WITH ARCHITECTURALAND LIGHTING DESIGN DRAWINGS.
SW
SWITCH
5. EXITSIGNS:
UG
UNDERGROUND
5. COORDINATE EXACT LOCATION OF TABLE AND HEADBOARD LIGHTING WITH ARCHITECTURAL DRAWINGS.
VERIFY 100 FEET MAXIMUM DISTANCE BETWEEN EXITS SIGNS IN CORRIDORS.
V
VOLT
W
WATTS
6. PROVIDE DIMMING CONTROLS FOR WELCOME DESK AND LOBBV,HANGOUT,MARKET AREAS,COFFEE HOUSE PUB
6. STAIRWAYS :
BAR AND SITTING AREAS, MEETING ROOM AREA.
LIGHTS ARE NOT ALLOWED TO BE MANUALLY OPERATED AND MUST REMAIN ON WHEN THE SPACE IS
OCCUPIED.
7. PROJECTION SCREEN WITH CONTROL SWITCH. INSTALL SCREEN CONTROL SWITCH INCLUDED WITH
PROJECTOR AS SHOWN. EXTEND AND CONNECT TO LOCAL 120V RECEPTACLE CIRCUIT AND PROVIDE POWER
7. GUESTROOM/BATHROOM:
TO LIGHTS IN MARKET MILLWORK. COORDINATE EXACT DETAILS WITH ARCHITECTURAL AND INTERIOR DESIGN
PROVIDE SEPARATE WALL SWITCH FOR EXHAUST FAN. AN OCCUPANCY/MOTION SENSOR CONTROLLED
DRAWINGS.
EXHAUST FAN IS NOT ALLOWED. ILLUMINATED ROCKER SWITCH -PROVIDE A WALL SWITCH IMMEDIATELY
ADJACENT TO ENTRANCE OF BATHROOM.
8. REFER TO ARCHITECTURAL AND LIGHTING DESIGN DRAWING REFLECTED CEILING PLANS FOR EXACT LOCATIONS
OF ALL LIGHTING FIXTURES SHOWN.
B. OFFICES:
3. CONTRACTOR SHALL:
ALL OFFICE LIGHTING MUST BE LOCALLY SWITCHED.
A) OBTAIN AND PAY ALL INSURANCE, FEES, PERMITS, ASSOCIATION DUES, ROYALTIES, AND TAXES OF
9. REFER TO PROJECT MASTER LIGHT FIXTURE SCHEDULE FOR LIGHT DETAIL.
WHATEVER WHICH TO THE WORK.
9 ECHANICAL ROOMS:
10. ALL EMERGENCY LIGHTING FIXTURES SHOWN SHALL OPERATE AS UNSWITCHED NIGHT LIGHT FIXTURES,
LIGHT SWITCH FOR THE ROOM MUST BE IMMEDIATELY ADJACENT TO THE ENTRY DOOR.
SPECTINATURE
EESSHALL
B) PAY ALL INSPECTION FEES AS REQUIRED BY LAW OR ORDINANCE.
REQUIRED
UNLESS NOTED OTHERWISE. WHERE REQUIRED BY LOCAL AUTHORITY, PROVIDE 24 HOUR POWER TO ALL
C) HOLD THE OWNER HARMLESS FROM ANY DAMAGE AND EXPENSE ARISING FROM ANY VIOLATION OF THE
EGRESS AND EXIT LIGHT FIXTURES
10. LIGHT REDUCTION CONTROLS:
LAWS, RULES, OR ORDINANCES.
11. PROVIDE 1 HOUR FIRE RATED LIGHT FIXTURE ENCLOSURES FOR ALL LIGHT FIXTURES IN THE GUESTROOM
SPACES REQUIRED TO HAVE ON CONTROLS SHALL HAVE MANUAL CONTROL THAT
D) PROVIDE MATERIALS THAT ARE NEW AND FREE OF DEFECTS AND ILL LISTED FOR THE INTENDED APPLICATION.
CORRIDORS AND GUESTROOM ELEVATOR LOBBIES. PROVIDE ESAFELITER FIRE RATED RECESSED
REDUCE THE I
ALLOWS THE OCCUPANT TO REDUCE THE CONNECTED LIGHTING LOAD IN A UNIFORM
IN ELEVATOR LOBBY. PROVIDE RE RATED
ENCLOSURE FOR DOWNILIGHTSFIRE RATED RECESSED ENCLOSURE
BE ACHIEVED
ILLUMINATION PATTERN BY AT LEAST 50 PERCENT. LIGHTING REDUCTION SHALL BE ACHIEVED BY ONE
SHALL
E) TAKE MEASUREMENTS AND MAKE LAYOUTS AS REQUIRED FOR PROPER INSTALLATION AND COMPLETION
FOR ALL OTHER LIGHT FIXTURES MENTIONED ABOVE. COORDINATE DIMENSIONS OF ALL SAFELITE FIRE
FIXTURES ATE DAME
OF THE FOLLOWING OR ANOTHER APPROVED METHOD:
OF WORK IF THE ELECTRICAL DRAWINGS ARE NOT TO BE SCALED WHERE SPECIFIC DETAILS AND
RATED ENCLOSURES WITH CORRESPONDING LIGHT FIXTURES.
DIMENSIONS FOR ELECTRICAL WORK ARE NOT SHOWN IN DRAWINGS.
A. CONTROLLING ALL LAMPS OR LUMINAIRES.
F) INSPECT SITE FOR FIELD VERIFICATION OF ALL ASPECTS OF THE PROJECT PRIOR TO BIDDING.
12. ROUTE LIGHTING HOMERUN SERVING EXTERIOR HOTEL SIGNS.THROUGH EXTERIOR TIME CLOCK FOR
B. DUAL SWITCHING OF ALTERNATE ROWS OF LUMINAIRES, ALTERNATE LUMINAIRES OR ALTERNATE
G) EXAMINE ALL DRAWINGS CAREFULLY PRIOR TO SUBMITTING ABID.
CONTROL.COORDINATE EXACT REQUIREMENTS FOR EXTERIOR HOTEL SIGNS.AND LOCATION OF JBOX WITH
LAMPS.
ARCHITECTURAL DRAWINGS.
H) BE REQUIRED TO FURNISH, INSTALLAND/OR CONNECT WITH APPROPRIATE SERVICES ALL ELECTRICAL
C. SWITCHING THE MIDDLE LAMP LUMINAIRES INDEPENDENTLY OF THE OUTER LAMPS.
ITEMS SHOWN ON ANY OF THE ARCHITECTURAL,PLUMBING, AIR CONDITIONING, SPRINKLER DRAWINGS
13. MASTER LIGHT SWITCH SHALL CONTROL ALL PERMANENTLY INSTALLED LUMINAIRES AND SWITCHED
WITHOUT ADDITIONAL EXPENSE TO THE OWNER.
RECEPTACLES IN THIS ROOM.PROVIDE LOW VOLTAGE MASTER LIGHT SWITCH THAT TIES TO BUILDING
D. SWITCHING EACH LUMINAIRE OR EACH LAMP.
MANAGEMENT SYSTEM (BMS). PROVIDE DOUBLE -GANG JBOX NEXT TO MASTER SWITCH FOR MASTER RELAY.
4. START WORK BY CONTRACTOR SHALL BE CONSIDERED AS ACCEPTANCE BY HIM ALL CLAIMS OR QUESTIONS
COORDINATE EXACT CONTROL REQUIREMENTS WITH CONTROLS VENDOR.
EXCEPTION: LIGHT REDUCTION CONTROLS ARE NOT REQUIRED IN DAYLIGHT ZONES WITH DAYLIGHT
AS TO SUITABILITY WORK OTHERCLIGHTIGWORKONTRACTORS TO RE HIS THIS
THEVE
14. EXTEND AND CONNECT TO POWERED WINDOW SHADES. COORDINATE EXACT REQUIREMENTS AND LOCATION
RESPONSIVE CONTROLS.
REPLACOTHER E TE
CONTRACTOR SHALL AND THIS XP WHICH MAY
CONTRACTOR SHALL REMOVE AND REPLACE AT HIS EXPENSE, ALL LIGHTING WORK WHICH MAV HAVE TO BE
OF CONTROLS WITH ARCHITECTURAL DRAWINGS AND EQUIPMENT PROVIDED.
REMOVED BECAUSE OF INTERFERENCE WITH OTHER TRADES
5. PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND TOOLS TO PERFORM ALL WORK NECESSARY FOR THE COMPLETE
15. CIRCUIT SHALL SERVE ALL LIGHTING IN THIS GUESTROOM. NO NON -LIGHTING LOADS TO BE SERVED BY THIS
GUESTROOM:
EXECUTION OF THE LIGHTING WORK AS SHOWN ON THE DRAWINGS.
CIRCUIT.
1. HEARING IMPAIRED/ACCESSIBLE:
6. DRAWINGS ARE TO BE CONSIDERED DIAGRAMMATIC, NOT NECESSARILY SHOWING IN DETAIL OR TO SCALE ALL OF THE
PROVIDE A DOORBELL (HORN / STROBE) IN EACH ROOM (BATHROOM COMPARTMENT, LIVING ROOM AND
MINOR ITEMS, UNLESS SPECIFIC DIMENSIONS ARE SHOWN. THE STRUCTURAL, ARCHITECTURAL AND SITE CONDITIONS
BEDROOM), WITH AN ACCESSIBLE SHUT-OFF SWITCH LOCATED ADJACENT TO THE THERMOSTAT.
SHALL GOVERN THE EXACT LOCATIONS.THE CONTRACTOR SHALL FOLLOW DRAWINGS IN LAVING OUTWORK, CHECK
DRAWINGS OF ALLTRADES TOVERIFYSPACES IN WHICH WORKWILL BE INSTALLED AND MAINTAIN MAXIMUM HEAD
2. HEARING IMPAIRED/ACCESSIBLE:
ROOM, OR SPACES OR CONDITIONS ATALL POINTS. WHERE HEAD ROOM OR SPACES OR CONDITIONS APPEAR
SITE LIGHTING NOTES
ENSURE DOORBELL DISCONNECT SWITCH IS PROVIDEDAT HEARING IMPAIRED GUESTROOMS,
INADEQUATE, ARCHITECT/ENGINEER SHALL BE NOTIFIED BEFORE PROCEEDING WITH INSTALLATION. THIS
MOUNTED AT 46" AFF.SW ITCH TO ACTIVATE AUDIBLENISUAL UNIT MOUNTED AT 46" AFF IN HEARING
CONTRACTOR SHALL, WITHOUT EXTRA CHARGE, MAKE FIELD MODIFICATIONS IN LAYOUT AS NEEDED TO PREVENT
IMPAIRED AND ACCESSIBLE
CONFLICT WITH WORK OF VARIOUS TRADES OR FOR PROPER EXECUTION OF WORK. WHERE DISCREPANCIES OCCUR,
1. FLOOD LIGHTS. ADJUST & AIM LIGHTS TO GRAZE TEXTURED WALL SURFACE.
THE ARCHITECTURAL REFLECTED CEILING PLANS TAKE PRECEDENCE OVER THE ELECTRICAL LIGHTING FOR LOCATION
3. GUESTROOMS
AND ORIENTATION OF LIGHTING FIXTURES.
2. SITE LIGHTING POLES. INDICATE TO BE CENTERED ON PARKING STRIPES TO PROTECT FROM CAR OVERHANG
BATHROOM COMPARTMENT LIGHT AND FAN SHOULD BE ON SAME SWITCH, TO ENSURE FAN IS
DAMAGE.
ACTIVATED REGULARLY -WHICH WILL HELP MITIGATE DAMAGE FROM EXCESSIVE MOISTURE (OPTIONAL)
7. ALL DISCREPANCIES OF DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER IN WRITING
IN AMPLE TIME TO PERMIT REVISIONS PRIOR TO SUBMISSION OF BIDS. SUBMISSION OF A BID CONSTITUTES
3. LIGHT BOLLARDS @10'-0"ON CENTER. LOCATE IN GROUND 8" FROM EDGE OF SIDEWALK (CENTER TO EDGE).
4, CONTRACTOR SHALL ENSURE TO PROVIDE ONE MASTER SWITCH AT THE MAIN ENTRY DOOR THAT
ACCEPTANCE OF FIELD CONDITIONS AND ELECTRICAL DRAWINGS.
PROVIDE CONCRETE FOUNDATION W/ J-BOX PER MANUF. REQUIREMENTS.
CONTROLS ALL PERMANENTLY WIRED LUMINARIES AND SWITCHED RECEPTACLES, EXCEPT THOSE IN THE
BATHROOM AS PER 2010 INDIANA ENERGY CONSERVATION CODE BASED ON ASHRAE 90.1.2007.
8. PROVIDE MEANS TURNISH AND INSTALL COMPLETE AND READY FOR USE.
4. THESE SITE PLANS ARE REPRESENTATIVEOF THE MINIMUM DESIGN CRITERIA.CENTER PARKING LOT LIGHTING
9. DRAWINGS DO NOT NECESSARILY INDICATE THE ACTUAL ROUTES OF CONDUIT. WHERE INDICATED, THEY SHALL BE
POLES ON PARKING STRIPES TO PROTECT FROM CAR OVERHANG DAMAGE.
EMERGENCY LIGHTING:
FOLLOWED CLOSELY PROPER COORDINATION WITH THE WORK OF OTHER TRADES AND SPACES WILL PERMIT.
CONDUIT R
WHERERARUNTRUC NOT SHOWN ON THE RDINATEPOSSIBLE,
CONDUITSUBJECT
5. SITEPLAINFOOTAGE CALCULATIONS ARE SHOWN AND MEET THE CITY AND BRAND
1. CONTRACTOR EMERGENCY ROR BATTERY POWER THE
LLDRAWINGS,
OTHER TRADES AND STRUCTURE. SIMPLIFY INSTALLATION WHERE OF
BUT UBJE TWITHTHETO VAL OF
REQUIRND EPRINT MENT.
STANDARD REQUIREMENT.
LUMINAIRE A MI IMUMD MINUTESFROM E SUPPLY POWER
90 SUPPLY POWER I LOST, PER
NOTWIT IN THEE,
OF TH DRAWINGS TO
"""' T'^T """ "^""' ""'^ ^T^"^T"""' ^'OSONS. IT IS NOT WITHIN THE SCOPE OF THE DRAWINGS TO SHOW ALL
1THE
AND NFPA 101 LIFE SAFETY CODE SECTION
NAL BUILDING 06AND LIFE S
INTERNATIONAL BUILDING CODE SECTION
ODE SECTION O PROVIDED
" RELEASED FOR CONSTRUCTION VD OBSTRUCTIONS. THE DRAWINGS ARE NOT INTENDED TO BE SCALED
6. ROUTE LIGHTING HOMERUN THROUGH PHOTO/TIME CONTROL CENTER. PROVIDE PHOTO/TIME CONTROL CENTER
RIA WITH
LUMINAIRES ARE MOUNTED AT AN APPROPRIATE HEIGHT AND ILLUMINATE AN OPEN SPACE WITH NI
S FOR DIMENSIONS.
FOR EXTERIOR LIGHTS/SIGNAGE.
MAJOR
MAJOR OBSTRUCTION.
B
'•vs Subject to compliance with all regulations
of State and Local Codes
2. MEANS OF EGRESS ILLUMINATION LEVELS FOR THE EXIT DISCHARGE SHALL BE PROVIDED SUCH THAT
FAILURE OF ANY SINGLE LIGHTING UNIT SHALL NOT REDUCE THE ILLUMINATION LEVEL ON THAT LANDING
City of Camel
TO LESS THAN 1 FOOT CANDLE (11 LUX).
iTDID
a
DATE:
07/22/19
BAS E4
BASE4
2901 CLINT MOORE ROAD, #114
BOCA RATON, FLORIDA 33496
888.901.8008 www.base-4.00m
RICARDO J. MUNIZ-GUILLET, AIA
5453 NW 106TH DR
CORAL SPRINGS, FL 33076
MEP ENGINEER
GARRY VERMAAS PhD, PE
2183 S BERRYS CHAPEL ROAD
FRANKLIN, TN 37069
Seal:
H w VF
QP��'\si EHh�
e'
%p m
N
1 12
o ATE y
OF
roNAL
DATE: 20180304
GAMY VER S. PhD. PE
Owner:
THE WITNESS GROUP
600 ENTERPRISES
DRIVE
LEWIS CENTER,OH
513-623-9430
SUITES BY HILTON
HOMEN,
CARMEL, INDIANA
PROTOTYPE VERSION-V2.22016
REVISION: MAY 2016
ISSUE NO.1
DELTA
I ISSUED DATE
I DESCRIPTION
1
LO
2019.03.04
ISSUED FOR
PERMIT
CURRENTISSUE
ISSUED FOR PERMIT
CURRENT ISSUE DATE
2019.03.04
DRAWN BY
MSM
CHECKED BY
GWV
PROJECT NO
134-134-1705
SHEET NAME
GENERAL NOTES,
LEGENDS AND
ABBREVIATIONS
DRAWINGS NO.
LT=0 01