Loading...
HomeMy WebLinkAboutLT-001 - GENERAL NOTES, LEGENDS AND ABBREVIATIONSGENERAL NOTES LEGENDS DRAWING INDEX SYMBOL I LIGHTING LIGHTING 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE FOLLOWING 10. LABOUR FOR THE INSTALLATION OF MATERIALS AND EQUIPMENT PROVIDED UNDER THE ELECTRICAL CURRENT CODES/NATI O FIRE PROTECTION ASSOCIATION, INTERNATIONAL CONSERVATION SCOPE OF WORK SHALL BE PERFORMED IN A NEATAND FIRST CLASS WORKMANSHIP LIKE SHEET ® fi00mmX1200mm (2'X4')LIGHTING FUTURE AL ELECTRICAL TIONS AND T ORDINANCES, REGULATIONS CODE, NATIONAL ELECTRICAL CODE AND ALL LOCAL CODE ORDINANCES, REGULATIONS AND THE AUTHORITY MANNER ER SHALL BE IN EWITH MANNEE AND QUALIFIED OF NUMBER SHEET NAME REVISION CURRENT REVISION HAVING JURISDICTION. AND ALLTRADE REQUIREMENTS DRAWINGS, CODED THE SPECIFIC REQUIREMENTS OF THE CONTRACT DRAWINGS, AND ALL CODES, ORDINANCES OF STATUES, SPECIFIC OF ORDINANCES STATUES, 600mmX6OOmnn LIGHTING FIXTURE DATE DESCRIPTION ETC. APPLICABLE. ® (2'X2') LT-001 GENERAL NOTES, LEGENDS AND ABBREVIATIONS 2019.03.04 ISSUED FOR PERMIT 2. ALL ELECTRICAL WORK PROVIDED FOR THIS PROJECT SHALL COMPLY WITH THE FOLLOWING CRITERIA: 11. ALL MOUNTING HEIGHTS INDICATED ARE MEASURED FROM FINISHED FLOOR UNLESS OTHERWISE NOTED. m 300mmX1200mm 1'X4' LIGHTING FIXTURE ( ) � STRIP LT-002A LIGHTING FIXTURE SCHEDULE-1 2019.03.04 ISSUED FOR PERMIT A) TRADE SIZE CONDUIT SMALLER THAN 1/2 INCH SHALL NOT BE USED. 12. PROVIDE TEMPORARY LIGHTING, POWER, AND WIRING SYSTEMS FOR USE OF ALL TRADES, ADEQUATE FOR a DOWN LIGHT LT-002B LIGHTING FIXTURE SCHEDULE-2 2019.03.04 ISSUED FOR PERMIT ENTIRE NEEDS OF THE PROJECT. 44 WALL WASHER LT-103 LIGHTING CONTROL SCHEDULE 2019.03.04 ISSUED FOR PERMIT B) CONDUIT ABOVE GRADE AND NOT EXPOSED TO WEATHER SHALL BE PVC, ENTB MC. CHANDILIER/PENDANT 13. PROVIDE LIGHT FIXTURES AS SELECTED BY ARCHITECT, OR AS SPECIFIED. 0 LT-10 LIGHTING DETAILS-1 2019.03.04 ISSUED FOR PERMIT C) CONDUIT BELOW GRADE AND PENETRATIONS AT GRADE SHALL BE SCHEDULE 40 PVC EXCEPT TURNS. 14. PROVIDE ALL WIRING DEVICES. WIRING DEVICES LT-102 LIGHTING DETAILS-2 2019.03.04 ISSUED FOR PERMIT D) CONDUIT ABOVE GRADE AND EXPOSED TO WEATHER SHALL BE SCHEDULE 80 PVC. 15, IDENTIFY CLEARLY ON A TYPE WRITTEN FORM ALL CIRCUITS AND EQUIPMENT TO CORRESPOND WITH THE LT-200A SITE LIGHTING PLAN 2019.03.04 ISSUED FOR PERMIT LT-200B SITE PHOTOMETRIC PLAN 2019.03.04 ISSUED FOR PERMIT PLANS AND PANEL SCHEDULE AND ATTACH INSIDE THE PERTAINING PANEL. E) WIRE SIZE SMALLER THAN#12 Awg. LT-201 1ST FLOOR LIGHTING PLAN 2019.03.04 ISSUED FOR PERMIT i6. ALL EQUIPMENTS AND MATERIALS SHALL BE GUARANTEED FOR ONE YEAR AFTER THE DATE OF ACCEPTANCE �� CIRCUIT BREAKER LT-202 2ND FLOOR LIGHTING PLAN 2019.03.04 ISSUED FOR PERMIT F) BRANCH CIRCUIT WIRING PROVIDED BY THE ELECTRICAL CONTRACTOR SHALL BE COPPER; BY OWNER. ♦♦ FEEDER SERVICE WIRING SHALL BE ALUMINUM. Y 125V OR 277V AC SINGLE POLE 20 AMP SWITCH ROCKER TYPE MOUNTED ( ) AT 48'AFF ON CENTER, UNO. LT-203 3RD FLOOR LIGHTING PLAN 2019.03.04 ISSUED FOR PERMIT G) CONDUCTORS T TY NONMETALLIC SHEATHED CABLE IS LIMITED TO THE 60 17. AT COMPLETION OF JOB THE ELECTRICAL CONTRACTOR SHALL GIVE THE OWNER AN AS -BUILT SET OF LT-204 4TH FLOOR LIGHTING PLAN 2019.03.04 ISSUED FOR PERMIT A ALL OTHER CONDUCTORS SHALL DEGRE RACTO SHALL REFER NEC TABLE REPRODUCIBLE DRAWINGS SHOWING THE EXACT ELECTRICAL INSTALLATION, WRITTEN MAINTENANCE ��4 277V AC 3-WAV ORNTER, 20 AMP SWITCH (ROCKER TYPE) 125VMOU LT-205 5TH FLOOR LIGHTING PLAN 2019.03.04 ISSUED FOR PERMIT MINIMUM TEMP DEGREES C. (), HAVE MINIMUM TEMPERATURE RATING OF 75 DEGREES C. (TYPE THWN OR TYPE THHN), 98% INSTRUCTIONS AND SCHEDULE OF ROUTINE MAINTENANCE AS WELL AS ANY OTHER CLOSE OUT ITEMS T MOUNTEDAT 48" AFF ON CENTER, UNO. COPPER OR ALUMINUM. REQUIRED BY THE CONTRACT DOCUMENTS. LT-206 EXTERIOR ELEVATIONS-1 2019.03.04 ISSUED FOR PERMIT LT-207 EXTERIOR ELEVATIONS-2 2019.03.04 ISSUED FOR PERMIT 125V OR 277V AC 20 AMP DIMMER SWITCH MOUNTED AT 48" AFFON CENTER, H) WHERE POSSIBLE, EXCEPT AS SHOWN OTHERWISE ON THE DRAWINGS,ALL CONDUIT SHALL BE RUN 18. BEFORE BIDDING THE JOB THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH UNO. LT-208 TYPICAL UNIT LIGHTING PLAN-1 2019.03.04 ISSUED FOR PERMIT CONCEALED BELOW GRADE,WITHIN WALLS OR ABOVE CEILING. ANY EXISTING CONDITIONS. 125V OR 277V AC 20 AMP KEYED SWITCH MOUNTED AT 48"AFF ON LT-209 TYPICAL UNIT LIGHTING PLAN-2 2019.03.04 ISSUED FOR PERMIT I) CONDUCTORS #12AWG AND SMALLER SHALL BE SOLID. CONDUCTOR IO#AWG AND LARGER 19. ALL ELECTRICAL SWITCHES,CONTROLS,ETC. IN ALL AREAS ARE TO BE AT A.D.A. ACCESSIBILITY CODE CENTER,UNO. LT-210 TYPICAL UNIT LIGHTING PLAN-3 ISSUED FOR PERMIT SHALL BE STRANDED. CONDUCTOR #12 AWG MAY BE SOLID OR STRANDED, EXCEPT THAT ONLY # COMPLAINT HEIGHT. 125VOR27N WALL OCCUPANCY SENSOR MOUNTED AT 48"AFF ON LT-211 DIMMER RISER DIAGRAM %O29.23.04 2019.03.04 ISSUED FOR PERMIT 12 AWG SOLID OR ONLY#12 AWG STRANDED SHALL BE USED. 20. CIRCUIT NUMBERS SHOWN ON THE DRAWINGS ARE FOR REFERENCE ONLY. BALANCE LOADS AMONG CENTER, UNO. J) MOUNTING HEIGHT OF WALL MOUNTED CONTROLS AND RECEPTACLES SHALL FOLLOW THE GIVEN PHASES IN NEW PANEL BOARDS TO WITHIN 10 % OF EACH OTHER. DIAGRAM BELOW, UNLESS COMPARABLE CONTROLS OR OUTLETS (THAT PERFORM THE SAME 24V OCCUPANCY SENSOR CEILING MOUNTED, UNO. FUNCTIONS) ARE PROVIDED WITHIN THE SAME AREA AND ARE ACCESSIBLE. 21. FEEDER CONDUCTORS SHALL BE SIZED BY ENGINEER. 125V OR 27N AC 20 AMP TIMER SWITCH MOUNTED AT 48" AFF ON CENTER, UNO. 22. AT COMPLETION OF WORK, CONTRACTOR SHALL CLEAN UP AND REMOVE ALL DEBRIS AND MATERIALS NOT INSTALLED IN WORK, LEAVING PREMISES CLEAN. �D GUEST ROOM DOORBELL DISCONNECT SWITCH MOUNTED 48"AFF WALL MOUNTEDOCCUPANCV 23. THE FRANCHISE BRAND STANDARD DESIGN DOCUMENT SHALL BE CONSIDER AS AN INTEGRAL PART OF = ELECTRICAL DIMMER PANEL BOARD SENSOR CONSTRUCTION DOCUMENTS. ALL CONTRACTOR SHALL ENSURE THEY OBTAIN,READ AND FAMILIARIZE THEMSELVES WITH THE BRAND STANDARD DOCUMENT BEFORE BIDDING AND ALSO THROUGHOUT THE CEILING MOUNTED WALL SCONCE CONSTRUCTION STAGE. IF THERE ARE ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND OCCUPANCY EXIT LIGHT FRANCHISE BRAND STANDARDS, THE CONTRACTOR SHALL ISSUE AN RFI TO THE AOR AND EOR. SENSOR EMERGENCY LIGHT 24. ELECTRICAL CONTRACTOR TCOORDINATE WITH CONTROLS MANUFACTURER FOR EXACT INSTALLATION AND WIRING DETAILS. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR CONTROLS COMPATIBILITY WITH ALL COMPONENTS PURCHASED ON SITE. ANY SUBSITITUTIONS MADE NEED TO BE VERIFIED BY THE ELECTRICAL OS CONTRACTOR PRIOR TO PURCHASE TO BE COMPATIBLEWITH SYSTEM. 25. THE WORK SHALL BE COORDINATED WITH THE ARCHITECTURAL DOCUMENTS FOR THE EXACT LOCATION OF GENERAL LIGHTING CONTROL ABBREVIATIONS LIGHT FIXTURES, EQUIPMENT, DEVICES, ETC. TO ASSURE PROPER PLACEMENT OF SAID DEVICES AND QUIPMENT. SWITCHES SHALL BE PLACED ON LATCH SIDE OF ALL DOOR OPENINGS. WHERE A CONFLICT EXISTS A BETWEEN ANY TWO DOCUMENTS, NOTIFY THE ARCHITECT PRIOR TO ANY INSTALLATION FOR RESOLUTION. COMMON AREA: AMP CEILING MOUNTED EXIT SIGNAGE AFF ABOVE FINISHED FLOOR 26. REFER TO ARCHITECTURAL AND INTERIOR DESIGN REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF ALL 1. LIGHTING PANEL FOR HLA. HUB ADA ACT AUTOMA DIMMER/TOGGLE SWITCH LIGHTING FIXTURES SHOWN. CHECK WITH ELECTRICAL PLAN FOR PROPER PANEL LOCATIONS ATS (DISABILITIES AUTOMATIC TIC TRANSFER SWITCH PROJECT MASTER LIGHT TURE T LL LIGHTING 27. REFFIXTURES 2. CONTROL CHECK: CRT CLG CIRCUIT CEILING NOTEEMERGENCY UNSWITCHED NIGHOR T FIX LIGHT FIXTURES, S UNSWITCHED NIGHT LIGHT FIXTURES, UNLESS NOTED OTHERWISE. FIXTURES SHOWN SHALL OPERATE UNLESS EM EMERGENCY INSERT RI TLIGHT WHERE REQUIRED BY LOCAL AUTHORITY, PROVIDE 24 HOUR POWER TO ALL EGRESS AND EXIT LIGHT A. SERVICECORRIDORS:ONTROL TCH OCAL PANELWHENEVERNINIMUM FIXTURES. B. LOBBY: DIMMER CONTROL PROGRAM INGMUST OF OW MINIMUM OL THREESETTINGS GENERATOR CARD BYPASS C. RESTAURANTS/MEETING ROOMS/ BOARDROOMS: DIMMER CONTROL WITH LOCAL BYPASS OOM& BOARDROOMS DI JB JB JUNCTION BOX FOR SWITCHING. LTG LIGHTING 72• POWER LIGHTING NOTES D. GENERAL INTERIOR LIGHTING SWITCH LOCALLY LTS LIGHTS E. STAIRWAYAND EXIT LIGHTS: SWITCH FROM PANEL, OCCUPANCY SENSOR CONTROL MICE MAIN CIRCUIT BREAKER F. GUEST CORRIDORS: SWITCH AT PANEL LOCATED IN ELECTRICAL CLOSET, LIGHTING WOULD BE 50 % DIM N NEUTRAL KEYED SWITCH 48" 1. REFER TO ENLARGE POWER PLAN SHEET FOR PANEL LOCATIONS. G. DAYLIGHT SENSOR, DIMMING WITH TWO MODES, ALTERNATE LOOPING WHICHEVER USEFUL NEC NATIONAL ELECTRICAL CODE H. INDOOR POOLS SHALL HAVE KEYED REMOTE OR OCCUPANCY SENDOR LIGHT SWITCHES. NF NON FUSED 2. REFER TYPICAL GUESTROOM PLAN FOR DETAILED ROOM LAYOUT, REFER TO FULL FLOOR POWER AND I. FITNESS ROOMS SHALL HAVE KEYED REMOTE OR OCCUPANCY SENSORS LIGHT SWITCHES. NFPA NATIONAL FIRE PROTECTION ASSOCIATION LIGHTING PLANS FOR EXACT CIRCUITING INFORMATION. J. PUBLIC AREAS: CONTROL FROM BACK -OF -HOUSE AREAS NL NIGHT LIGHT (UNSWITCHED CKT.) POLE PH PHASE 3. PROVIDE 3#12-1/1 BETWEEN CORRESPONDING 3-WAY/4-WAV SWITCHES. 3. EXTERIOR LIGHTING: PNL PANEL CHECK THE EXTERIOR LIGHITNGS AT THE EVERY EGRESS DOORS. PI POWER 4. COORDINATE EXACT LOCATION OF COVE LIGHTING WITH ARCHITECTURALAND LIGHTING DESIGN DRAWINGS. SW SWITCH 5. EXITSIGNS: UG UNDERGROUND 5. COORDINATE EXACT LOCATION OF TABLE AND HEADBOARD LIGHTING WITH ARCHITECTURAL DRAWINGS. VERIFY 100 FEET MAXIMUM DISTANCE BETWEEN EXITS SIGNS IN CORRIDORS. V VOLT W WATTS 6. PROVIDE DIMMING CONTROLS FOR WELCOME DESK AND LOBBV,HANGOUT,MARKET AREAS,COFFEE HOUSE PUB 6. STAIRWAYS : BAR AND SITTING AREAS, MEETING ROOM AREA. LIGHTS ARE NOT ALLOWED TO BE MANUALLY OPERATED AND MUST REMAIN ON WHEN THE SPACE IS OCCUPIED. 7. PROJECTION SCREEN WITH CONTROL SWITCH. INSTALL SCREEN CONTROL SWITCH INCLUDED WITH PROJECTOR AS SHOWN. EXTEND AND CONNECT TO LOCAL 120V RECEPTACLE CIRCUIT AND PROVIDE POWER 7. GUESTROOM/BATHROOM: TO LIGHTS IN MARKET MILLWORK. COORDINATE EXACT DETAILS WITH ARCHITECTURAL AND INTERIOR DESIGN PROVIDE SEPARATE WALL SWITCH FOR EXHAUST FAN. AN OCCUPANCY/MOTION SENSOR CONTROLLED DRAWINGS. EXHAUST FAN IS NOT ALLOWED. ILLUMINATED ROCKER SWITCH -PROVIDE A WALL SWITCH IMMEDIATELY ADJACENT TO ENTRANCE OF BATHROOM. 8. REFER TO ARCHITECTURAL AND LIGHTING DESIGN DRAWING REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF ALL LIGHTING FIXTURES SHOWN. B. OFFICES: 3. CONTRACTOR SHALL: ALL OFFICE LIGHTING MUST BE LOCALLY SWITCHED. A) OBTAIN AND PAY ALL INSURANCE, FEES, PERMITS, ASSOCIATION DUES, ROYALTIES, AND TAXES OF 9. REFER TO PROJECT MASTER LIGHT FIXTURE SCHEDULE FOR LIGHT DETAIL. WHATEVER WHICH TO THE WORK. 9 ECHANICAL ROOMS: 10. ALL EMERGENCY LIGHTING FIXTURES SHOWN SHALL OPERATE AS UNSWITCHED NIGHT LIGHT FIXTURES, LIGHT SWITCH FOR THE ROOM MUST BE IMMEDIATELY ADJACENT TO THE ENTRY DOOR. SPECTINATURE EESSHALL B) PAY ALL INSPECTION FEES AS REQUIRED BY LAW OR ORDINANCE. REQUIRED UNLESS NOTED OTHERWISE. WHERE REQUIRED BY LOCAL AUTHORITY, PROVIDE 24 HOUR POWER TO ALL C) HOLD THE OWNER HARMLESS FROM ANY DAMAGE AND EXPENSE ARISING FROM ANY VIOLATION OF THE EGRESS AND EXIT LIGHT FIXTURES 10. LIGHT REDUCTION CONTROLS: LAWS, RULES, OR ORDINANCES. 11. PROVIDE 1 HOUR FIRE RATED LIGHT FIXTURE ENCLOSURES FOR ALL LIGHT FIXTURES IN THE GUESTROOM SPACES REQUIRED TO HAVE ON CONTROLS SHALL HAVE MANUAL CONTROL THAT D) PROVIDE MATERIALS THAT ARE NEW AND FREE OF DEFECTS AND ILL LISTED FOR THE INTENDED APPLICATION. CORRIDORS AND GUESTROOM ELEVATOR LOBBIES. PROVIDE ESAFELITER FIRE RATED RECESSED REDUCE THE I ALLOWS THE OCCUPANT TO REDUCE THE CONNECTED LIGHTING LOAD IN A UNIFORM IN ELEVATOR LOBBY. PROVIDE RE RATED ENCLOSURE FOR DOWNILIGHTSFIRE RATED RECESSED ENCLOSURE BE ACHIEVED ILLUMINATION PATTERN BY AT LEAST 50 PERCENT. LIGHTING REDUCTION SHALL BE ACHIEVED BY ONE SHALL E) TAKE MEASUREMENTS AND MAKE LAYOUTS AS REQUIRED FOR PROPER INSTALLATION AND COMPLETION FOR ALL OTHER LIGHT FIXTURES MENTIONED ABOVE. COORDINATE DIMENSIONS OF ALL SAFELITE FIRE FIXTURES ATE DAME OF THE FOLLOWING OR ANOTHER APPROVED METHOD: OF WORK IF THE ELECTRICAL DRAWINGS ARE NOT TO BE SCALED WHERE SPECIFIC DETAILS AND RATED ENCLOSURES WITH CORRESPONDING LIGHT FIXTURES. DIMENSIONS FOR ELECTRICAL WORK ARE NOT SHOWN IN DRAWINGS. A. CONTROLLING ALL LAMPS OR LUMINAIRES. F) INSPECT SITE FOR FIELD VERIFICATION OF ALL ASPECTS OF THE PROJECT PRIOR TO BIDDING. 12. ROUTE LIGHTING HOMERUN SERVING EXTERIOR HOTEL SIGNS.THROUGH EXTERIOR TIME CLOCK FOR B. DUAL SWITCHING OF ALTERNATE ROWS OF LUMINAIRES, ALTERNATE LUMINAIRES OR ALTERNATE G) EXAMINE ALL DRAWINGS CAREFULLY PRIOR TO SUBMITTING ABID. CONTROL.COORDINATE EXACT REQUIREMENTS FOR EXTERIOR HOTEL SIGNS.AND LOCATION OF JBOX WITH LAMPS. ARCHITECTURAL DRAWINGS. H) BE REQUIRED TO FURNISH, INSTALLAND/OR CONNECT WITH APPROPRIATE SERVICES ALL ELECTRICAL C. SWITCHING THE MIDDLE LAMP LUMINAIRES INDEPENDENTLY OF THE OUTER LAMPS. ITEMS SHOWN ON ANY OF THE ARCHITECTURAL,PLUMBING, AIR CONDITIONING, SPRINKLER DRAWINGS 13. MASTER LIGHT SWITCH SHALL CONTROL ALL PERMANENTLY INSTALLED LUMINAIRES AND SWITCHED WITHOUT ADDITIONAL EXPENSE TO THE OWNER. RECEPTACLES IN THIS ROOM.PROVIDE LOW VOLTAGE MASTER LIGHT SWITCH THAT TIES TO BUILDING D. SWITCHING EACH LUMINAIRE OR EACH LAMP. MANAGEMENT SYSTEM (BMS). PROVIDE DOUBLE -GANG JBOX NEXT TO MASTER SWITCH FOR MASTER RELAY. 4. START WORK BY CONTRACTOR SHALL BE CONSIDERED AS ACCEPTANCE BY HIM ALL CLAIMS OR QUESTIONS COORDINATE EXACT CONTROL REQUIREMENTS WITH CONTROLS VENDOR. EXCEPTION: LIGHT REDUCTION CONTROLS ARE NOT REQUIRED IN DAYLIGHT ZONES WITH DAYLIGHT AS TO SUITABILITY WORK OTHERCLIGHTIGWORKONTRACTORS TO RE HIS THIS THEVE 14. EXTEND AND CONNECT TO POWERED WINDOW SHADES. COORDINATE EXACT REQUIREMENTS AND LOCATION RESPONSIVE CONTROLS. REPLACOTHER E TE CONTRACTOR SHALL AND THIS XP WHICH MAY CONTRACTOR SHALL REMOVE AND REPLACE AT HIS EXPENSE, ALL LIGHTING WORK WHICH MAV HAVE TO BE OF CONTROLS WITH ARCHITECTURAL DRAWINGS AND EQUIPMENT PROVIDED. REMOVED BECAUSE OF INTERFERENCE WITH OTHER TRADES 5. PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND TOOLS TO PERFORM ALL WORK NECESSARY FOR THE COMPLETE 15. CIRCUIT SHALL SERVE ALL LIGHTING IN THIS GUESTROOM. NO NON -LIGHTING LOADS TO BE SERVED BY THIS GUESTROOM: EXECUTION OF THE LIGHTING WORK AS SHOWN ON THE DRAWINGS. CIRCUIT. 1. HEARING IMPAIRED/ACCESSIBLE: 6. DRAWINGS ARE TO BE CONSIDERED DIAGRAMMATIC, NOT NECESSARILY SHOWING IN DETAIL OR TO SCALE ALL OF THE PROVIDE A DOORBELL (HORN / STROBE) IN EACH ROOM (BATHROOM COMPARTMENT, LIVING ROOM AND MINOR ITEMS, UNLESS SPECIFIC DIMENSIONS ARE SHOWN. THE STRUCTURAL, ARCHITECTURAL AND SITE CONDITIONS BEDROOM), WITH AN ACCESSIBLE SHUT-OFF SWITCH LOCATED ADJACENT TO THE THERMOSTAT. SHALL GOVERN THE EXACT LOCATIONS.THE CONTRACTOR SHALL FOLLOW DRAWINGS IN LAVING OUTWORK, CHECK DRAWINGS OF ALLTRADES TOVERIFYSPACES IN WHICH WORKWILL BE INSTALLED AND MAINTAIN MAXIMUM HEAD 2. HEARING IMPAIRED/ACCESSIBLE: ROOM, OR SPACES OR CONDITIONS ATALL POINTS. WHERE HEAD ROOM OR SPACES OR CONDITIONS APPEAR SITE LIGHTING NOTES ENSURE DOORBELL DISCONNECT SWITCH IS PROVIDEDAT HEARING IMPAIRED GUESTROOMS, INADEQUATE, ARCHITECT/ENGINEER SHALL BE NOTIFIED BEFORE PROCEEDING WITH INSTALLATION. THIS MOUNTED AT 46" AFF.SW ITCH TO ACTIVATE AUDIBLENISUAL UNIT MOUNTED AT 46" AFF IN HEARING CONTRACTOR SHALL, WITHOUT EXTRA CHARGE, MAKE FIELD MODIFICATIONS IN LAYOUT AS NEEDED TO PREVENT IMPAIRED AND ACCESSIBLE CONFLICT WITH WORK OF VARIOUS TRADES OR FOR PROPER EXECUTION OF WORK. WHERE DISCREPANCIES OCCUR, 1. FLOOD LIGHTS. ADJUST & AIM LIGHTS TO GRAZE TEXTURED WALL SURFACE. THE ARCHITECTURAL REFLECTED CEILING PLANS TAKE PRECEDENCE OVER THE ELECTRICAL LIGHTING FOR LOCATION 3. GUESTROOMS AND ORIENTATION OF LIGHTING FIXTURES. 2. SITE LIGHTING POLES. INDICATE TO BE CENTERED ON PARKING STRIPES TO PROTECT FROM CAR OVERHANG BATHROOM COMPARTMENT LIGHT AND FAN SHOULD BE ON SAME SWITCH, TO ENSURE FAN IS DAMAGE. ACTIVATED REGULARLY -WHICH WILL HELP MITIGATE DAMAGE FROM EXCESSIVE MOISTURE (OPTIONAL) 7. ALL DISCREPANCIES OF DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER IN WRITING IN AMPLE TIME TO PERMIT REVISIONS PRIOR TO SUBMISSION OF BIDS. SUBMISSION OF A BID CONSTITUTES 3. LIGHT BOLLARDS @10'-0"ON CENTER. LOCATE IN GROUND 8" FROM EDGE OF SIDEWALK (CENTER TO EDGE). 4, CONTRACTOR SHALL ENSURE TO PROVIDE ONE MASTER SWITCH AT THE MAIN ENTRY DOOR THAT ACCEPTANCE OF FIELD CONDITIONS AND ELECTRICAL DRAWINGS. PROVIDE CONCRETE FOUNDATION W/ J-BOX PER MANUF. REQUIREMENTS. CONTROLS ALL PERMANENTLY WIRED LUMINARIES AND SWITCHED RECEPTACLES, EXCEPT THOSE IN THE BATHROOM AS PER 2010 INDIANA ENERGY CONSERVATION CODE BASED ON ASHRAE 90.1.2007. 8. PROVIDE MEANS TURNISH AND INSTALL COMPLETE AND READY FOR USE. 4. THESE SITE PLANS ARE REPRESENTATIVEOF THE MINIMUM DESIGN CRITERIA.CENTER PARKING LOT LIGHTING 9. DRAWINGS DO NOT NECESSARILY INDICATE THE ACTUAL ROUTES OF CONDUIT. WHERE INDICATED, THEY SHALL BE POLES ON PARKING STRIPES TO PROTECT FROM CAR OVERHANG DAMAGE. EMERGENCY LIGHTING: FOLLOWED CLOSELY PROPER COORDINATION WITH THE WORK OF OTHER TRADES AND SPACES WILL PERMIT. CONDUIT R WHERERARUNTRUC NOT SHOWN ON THE RDINATEPOSSIBLE, CONDUITSUBJECT 5. SITEPLAINFOOTAGE CALCULATIONS ARE SHOWN AND MEET THE CITY AND BRAND 1. CONTRACTOR EMERGENCY ROR BATTERY POWER THE LLDRAWINGS, OTHER TRADES AND STRUCTURE. SIMPLIFY INSTALLATION WHERE OF BUT UBJE TWITHTHETO VAL OF REQUIRND EPRINT MENT. STANDARD REQUIREMENT. LUMINAIRE A MI IMUMD MINUTESFROM E SUPPLY POWER 90 SUPPLY POWER I LOST, PER NOTWIT IN THEE, OF TH DRAWINGS TO """' T'^T """ "^""' ""'^ ^T^"^T"""' ^'OSONS. IT IS NOT WITHIN THE SCOPE OF THE DRAWINGS TO SHOW ALL 1THE AND NFPA 101 LIFE SAFETY CODE SECTION NAL BUILDING 06AND LIFE S INTERNATIONAL BUILDING CODE SECTION ODE SECTION O PROVIDED " RELEASED FOR CONSTRUCTION VD OBSTRUCTIONS. THE DRAWINGS ARE NOT INTENDED TO BE SCALED 6. ROUTE LIGHTING HOMERUN THROUGH PHOTO/TIME CONTROL CENTER. PROVIDE PHOTO/TIME CONTROL CENTER RIA WITH LUMINAIRES ARE MOUNTED AT AN APPROPRIATE HEIGHT AND ILLUMINATE AN OPEN SPACE WITH NI S FOR DIMENSIONS. FOR EXTERIOR LIGHTS/SIGNAGE. MAJOR MAJOR OBSTRUCTION. B '•vs Subject to compliance with all regulations of State and Local Codes 2. MEANS OF EGRESS ILLUMINATION LEVELS FOR THE EXIT DISCHARGE SHALL BE PROVIDED SUCH THAT FAILURE OF ANY SINGLE LIGHTING UNIT SHALL NOT REDUCE THE ILLUMINATION LEVEL ON THAT LANDING City of Camel TO LESS THAN 1 FOOT CANDLE (11 LUX). iTDID a DATE: 07/22/19 BAS E4 BASE4 2901 CLINT MOORE ROAD, #114 BOCA RATON, FLORIDA 33496 888.901.8008 www.base-4.00m RICARDO J. MUNIZ-GUILLET, AIA 5453 NW 106TH DR CORAL SPRINGS, FL 33076 MEP ENGINEER GARRY VERMAAS PhD, PE 2183 S BERRYS CHAPEL ROAD FRANKLIN, TN 37069 Seal: H w VF QP��'\si EHh� e' %p m N 1 12 o ATE y OF roNAL DATE: 20180304 GAMY VER S. PhD. PE Owner: THE WITNESS GROUP 600 ENTERPRISES DRIVE LEWIS CENTER,OH 513-623-9430 SUITES BY HILTON HOMEN, CARMEL, INDIANA PROTOTYPE VERSION-V2.22016 REVISION: MAY 2016 ISSUE NO.1 DELTA I ISSUED DATE I DESCRIPTION 1 LO 2019.03.04 ISSUED FOR PERMIT CURRENTISSUE ISSUED FOR PERMIT CURRENT ISSUE DATE 2019.03.04 DRAWN BY MSM CHECKED BY GWV PROJECT NO 134-134-1705 SHEET NAME GENERAL NOTES, LEGENDS AND ABBREVIATIONS DRAWINGS NO. LT=0 01