Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LT-201 - 1ST FLOOR LIGHTING PLAN
— - 481 _ EM: 18 I )Z t R-i R vm(ll;� EM;24 \ o PA-114 .12 CORR. i, :14 OR j'LA: MAS � I ,.WL i � I:r PA-204 EM: A\ Rd T `J/ -T \ CY O R 13 \ H ' 19 15 \ I 5 EM: 16 R-1 R-1 R-1 R-1 - � BULE-13 R1 q 139 i ER �I\nI 1 IR-1 R-1 %01 e4 11 EM:48 - - - �T© 1 8 — 2 R-4 R-4 Z 7 - — 4 R--� 2a R-1 -'r R- �� R 4— R 4 -3 Z'10 BREAKFAST / 3 R-1 S EM: 47 R-4 R-1 R-1 R I 3 Z:6 1 -3 R"4 I Z: 9 i — R"4 \ R 1 / I 1 R 1 8 EM: 46 f O R-1 -1 / \ I -3 ZJ R-4 Z. 5 R-f \ 3 d 2 �1 \ R-1 R-1 R-1 _R-1_ R-1 R-1 3R-1 ll 1R-1 FIT oil S ■rK ■■■■■■■■tyy�l �III��■■III�II'■■■IIII'll1l1■■IY��Yri -• a If Iff KET EM •I - — ---- °LIB B� o BI,I �a1lBllaa.. ��'3 1� —i -•I �I�iiiillll�iP�=== _, 1 Ee .1 LIB" II� IIN iL_J r9 I I . OR 003SF� 1 ® �I 'LA it OPINIONS11 III as M:8 j srm�srTe ea.e eR ii■�r�i�I ��� Q I -. u■I�II`�+"I O �II Iu��� ���4,. _ ��a■■■■ III M Icy Icy Ill®� ►II ., nil i��n1 .� Iii �■Ili■�i■■■�ii` ' ,�I oil INEEMEN �a°� �lil�l � � I■��ri■�■ ■■I�`■�■.■■■� 1 � III �■■®r��■ �� �� ■■■�M■■■EA■! _ _ LiL� FFFF��EE jam � �I iZ:' iil�..6 ELECTRICAL =II■1 mmo ��� ROOM —�—IaJ _ R-3 R-3 R-3 R-3 I I A;27 1 3.1 7R� a R \ 10 11 12 13 14 15 GENERAL ELECTRICAL NOTES 1. ELECTRICAL CONTRACTOR SHALL PROVIDE ELECTRICAL ROUTE INCLUDING FEEDER HOTEL RUN TO MSB. 2. ELECTRICAL CONTRACTOR SHALL BALANCE CURRENT IN ALL PANELS; MODIFY AND/OR ADJUST CIRCUITS AS REQUIRED. 3. VERIFY WALL SCONCE HEIGHT WITH ARCHITECT/OWNER PRIOR TO ROUGH -IN OR INSTALLATION. 4. ALL INTERIOR LIGHTS SHALL BE CONTROLLED FROM PANEL UNLESS CONTROLLED BY LOCAL SW ITCHESISENSORS, DIMMER OR KEYED SWITCHES. 5. ELECTRICAL CONTRACTOR SHALL VERIFY ALL DOOR SWINGS BEFORE INSTALLING LIGHT SWITCHES. ALL LIGHT SWITCHES ARE TO BE INSTALLED ON STRIKE SIDE OF DOOR UNLESS SPECIFICALLY NOTED OTHERWISE. 6. LOBBY AREA LIGHTING CONTROLS NOT TO BE ACCESSIBLE BY GUESTS. ]. COORDINATE LIGHTING FIXTURE LOCATIONS WITH MECHANICAL AND PLUMBING EQUIPMENT TO AVOID INTERFERENCES. 8. ELECTRICAL CONTRACTORTO COORDINATE WITH CONTROLS MANUFACTURER FOR EXACT INSTALLATION AND WIRING DETAILS. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR CONTROLS COMPATIBILITY WITH ALL COMPONENTS PURCHASED ON SITE. ANY SUBSITITUTIONS MADE NEED TO BE VERIFIED BY THE ELECTRICAL CONTRACTOR PRIOR TO PURCHASE TO BE COMPATIBLE WITH SYSTEM. 9. CONTRACTOR SHALL PROVIDE POOL STORAGE, ENGINEERING ROOM, ELECTRICAL ROOM & MECH AREA LIGHTS WITH PROTECTIVE LENS COVER. LIGHTING CONTROL NOTES 1. ELECTRICAL CONTRACTOR SHALL PROVIDE CONTROLS AS SPECIFIED BELOW: a. AREAS ENCLOSED BY WALLS OR FLOOR TO CEILING PARTITIONS SHALL HAVE AT LEAST ONE MANUAL CONTROL FOR THAT PARTICULAR AREA. b. CONTRACTOR SHALL ELIMINATE MANUAL CONTROLS IN AREAS INCLUDING SECURITY, EMERGENCY, CORRIDORS AND STAIRWAYS. c. CONTRACTOR SHALL MAKE SURE THAT AREAS REQUIRING MANUAL CONTROL SHALLALSO ALLOW OCCUPANTTO REDUCE THE CONNECTED LIGHTING LOAD UNIFORMLY BYAT LEAST 50 PERCENT. d. CONTRACTOR SHALL MAKE SURE LIGHTING REDUCTION CONTROLS SHOULD NOT BE PROVIDED IN AREAS LIKE CORRIDORS, EQUIPMENT ROOMS, STOREROOMS, RESTROOMS, PUBLIC LOBBIES, ELECTRICAL OR MECHANICAL ROOMS. 2. ELECTRICAL CONTRACTOR TO MAKE SURE THAT OCCUPANCY SENSORS SHALL BE INSTALLED IN EMPLOYEE BREAK ROOMS, LAUNDRY, FOOD PREP, STORAGE ROOMS AND AREAS THAT ARE 300 BIDET OR LESS ENCLOSED BY FLOOR TO CEILING PARTITIONS. 3. AUTOMATIC CONTROL DEVICES SHALL BE INSTALLED TO AUTOMATICALLY TURN OFF LIGHTS WITHIN 30 MINUTES OF ALL OCCUPANTS LEAVING THE SPACE AND SHALL BE EITHER MANUAL ON OR SHALL BE CONTROLLED TO AUTOMATICALLY TURN THE LIGHTING ON TO NOT MORE THAN 50 PERCENT POWER. a. FULL AUTOMATIC SHALL BE PERMITTED TO CONTROL LIGHTING IN PUBLIC CORRIDORS, STAIRWAYS, RESTROOMS, PRIMARY BUILDING ENTRANCES AND LOBBIES, AND AREAS OPERATING ON MANUAL CONTROL 4. DISPLAY AND ACCENT LIGHT SHALL BE CONTROLLED BY DEDICATED CONTROL INDEPENDENT OF OTHER LIGHTS IN ROOM. 6. LIGHTS USED FOR DISPLAY PURPOSES SHALL BE CONTROLLED BYA DEDICATED CONTROL INDEPENDENT OF OTHER CONTROLS WITHIN THE ROOM, 6. SLEEPING UNITS AND GUEST SUITS SHALL HAVE MASTER CONTROL DEVICE AT MAIN ENTRANCE OF THE ROOM CONTROLLING ALL PERMANENTLY INSTALLED LUMINARIES AND SWITCHED RECEPTACLES. 7 SUPPLEMENT TASK LIGHTS INCLUDING LIGHTS UNDER -SHELF AND UNDER -CABINETS SHALL HAVE CONTROL DEVICE INTEGRATED TO LUMINARIES RELEASED FOR CONSTRUCTION 'L DEVICE. I CODE EXTERIOR LIGHTING NOT DESIGNATED FOR DUSKTO-DAWN OPERATION SHALL BE Subject to compliance allh all regulations IOTO SENSOR AND A TIME SWITCH, OR AN ASTRONOMICAL TIME SWITCH. LIGHTING DESIGNATED of State and local Codes ITROLLED BY AN ASTRONOMICAL TIME SWITCH OR PHOTO SENSOR. ALL TIME SWITCHES SHALL BE IF TIME SETTING DURING LOSS OF POWER FOR A PERIOD OF AT LEAST 10 HOURS. City of Camel DIAGRAM ON SHEET LT-211 FOR DIMMER DETAILS. x DATE: 07/22/19 I\ R-3 R-3 — 4-3 -3 1 i� / EM: 20 fi � 2 R-3 R-3 R-3 R-3 1ST FLOOR LIGHTING PLAN U1/8 111= 11.011 T, ROOM I I I I I I i6 17 18 100 19 20 21 LT-201 KEYNOTES ® Text 1 LIGHTS ARE WIRED TOAN OCCUPANCY SENSOR WITH 30-MINUTE DELAY. A MINIMUM LIGHT LEVEL OF TWO FOOT-CANDLES/20 LUX IS MAINTAINED WHEN THE ROOM IS UNOCCUPIED. 2 CONTRACTOR SHALL CONNECT EMERGENCY LIGHTING THROUGH EM PANEL POWER BY GENERATOR AND WILL POWER THE LUMINAIRE FOR A MINIMUM DURATION OF 90 MINS FROM THE TIME SUPPLY POWER IS LOST AS PER IBC CODE, SECTION 1006 AND NFPA 101 LIFE SAFETY CODE, SECTION 7.9. DASHED LINE REPRESENT EMERGENCY LOOPING AND CIRCUITING. 3 ALL LIGHTING FIXTURES SHALL BE AS PER BRAND STANDARDS. 4 CONTRACTOR SHALL PROVIDE KEYED SWITCH TO CONTROL LIGHTING OF FITNESS ROOM AND INDOOR POOL. 5 CONTRACTOR SHALL CONNECT ALL EXTERIOR LIGHTING THROUGH EM PANEL POWERED BY GENERATOR AND ALSO PROVIDE PHOTOSENSOR TO CONTROL LIGHTS. 6 CONTRACTOR SHALL PROVIDE EXIT LIGHTWITH MIN 2 HRRATTERY PACK TYPE AND AS PER NFPA LIFE SAFETY CODE REQUIRMENT. CONTRACTOR SHALL USE CIRCUIT FOR GROUND FLOOR EXIT LIGHTS. CONTRACTOR SHALL ALSO CONNECT WITH NEAREST NON SWITCHING LEG OF CIRCUITAND MAKE SURE THAT LIGHTING SHALL REMAIN ON IN ALL CONDITION. 7 STAIR LIGHTS ARE WIRED TO AN OCCUPANCY SENSOR WITH 30-MINUTE DELAY. A MINIMUM LIGHT LEVEL OF TWO FOOT-CANDLES/20 LUX IS MAINTAINED WHEN THE ROOM IS UNOCCUPIED. 8 CONTRACTOR SHALL PROVIDE WALL MOUNTED LOWER EXIT SIGNAGE AS PER IBC 1011.2 BOTTOM OF SIGNAGE SHALL BE IN BETWEEN 10" TO 12'AFF. SIGNAGE SHALL BE FLUSH MOUNTED AND EDGE OF THE SIGNAGE SHOULD BE 4" AWAY FROM THE DOOR LATCH.CONTRACTOR SHALL USE CIRCUIT FOR LOWER LEVEL EXIT LIGHTS. CONTRACTOR SHALLALSO CONNECT WITH NEAREST NON SWITCHING LEG OF CIRCUIT AND MAKE SURE THAT LIGHTING SHALL REMAIN ON IN ALL CONDITION. 9 BASE4 HAS PROVIDED DIMMER WIRING AND SCHEDULE FOR REFERENCE ONLY. CONTRACTOR SHALL COORDINATE WITH DIMMER VENDOR AND PROVIDE CONNECTION FOR DIMMER PANEL AND LIGHTING ACCORDINGLY. 10 OVERRIDE SWITCH FOR OCCUPANCY SENSOR. ELECTRICAL CONTRACTOR TO COORDINATE WITH CONTROLS MANUFACTURER FOR EXACT INSTALLATION AND WIRING DETAILS. ELECTRICAL CONTRACTOR TO VERIFY CONTROLS COMPATIBILITY BETWEEN ALL LIGHTING CONTROL SYSTEM COMPONENTS 11 CONTRACTOR SHALL PROVIDE LOW VOLTAGE UNDERWATER LIGHT AND WIRE AS PER NEC ARTICLE. POOL VENDOR IN COORDINATION WITH CONTRACTOR SHALL INSTALL TRANSFORMER INSIDE POOL EQUIPMENT ROOM AND RUN LOW VOLTAGE CIRCUIT FROM TRANSFORMER TO POOL LIGHT. 12 CONTRACTOR SHALL PROVIDE WALL MOUNTED ELEVATOR PIT LIGHTING AND SWITCH. REFER THE POWER SHEET NO. E-207 FOR POWER DETAILS. 13 CONTRACTOR SHALL PROVIDE DAY LIGHT SENSOR TO CONTROL LIGHTING IN ALL DAYLIGHT ZONES SHALL BE CONTROLLED IN ACCORDANCE WITH THE REQUIREMENTS IN SECTION 130.1(d) AND DAYLIGHT ZONES ARE ARE SHOWN ON PLANS. 14 CONTRACTOR SHALL COORDINATE WITH ELEVATOR VENDOR FOR EXACT LOCATION AND WIRING DETAILS OF ELEVATOR SHAFT LIGHTS. 15 CONTRACTOR SHALL PROVIDE DIMMER SWITCH FOR MEETING ROOM TO DIM TO 50%WHEN UNOCCUPIED. THESE DIMMER SWITCH ARE NOT TIED TO CENTRAL DIMMING SYSTEM. Am BAS E'' BASE4 2901 CLINT MOORE ROAD, #114 BOCA RATON, FLORIDA 33496 888.901.8008 www.bafie-4.ccm RICARDO J. MUNIZ-GUILLET, AIA 5453 NW 106TH DR CORAL SPRINGS, FL 33076 MEP ENGINEER GARRY VERMAAS PhD, PE 2183 S BERRYS CHAPEL ROAD FRANKLIN, TN 37069 Seal: H W VF hil o.m Oc.x N 1 12 o ATE I OF �gBroNpL eN° DATE: 2o1ED3.oa Oil VERMAAS. PhD. PE Owner: t; THE WITNESS GROUP 600 ENTERPRISES DRIVE LEWIS CENTER,OH 513-623-9430 HOME©SUITES BY HILTON CARMEL, INDIANA PROTOTYPE VERSION-V2.2 2016 REVISION: MAY 2016 ISSUE NO. DELTA ISSUED DATE DESCRIPTION 1 LO 2019.03.04 ISSUED FOR PERMIT CURRENT ISSUE ISSUED FOR PERMIT CURRENT ISSUE DATE 2019.03.04 DRAWN BY MSM CHECKED BY GWV PROJECT NO, B4-134-1705 SHEET NAME 1ST FLOOR LIGHTING PLAN DRAWINGS NO. LT=201