Loading...
HomeMy WebLinkAboutP-101 - DETAILS-1BACK FLOW PREVENTER ASSEMBLY SHUT-OFF VALVE #1 RESILIENT SEATED TEST COCK#1 GATE VALVE WITH HANDWHEEL OPERA SEE NOTE II SEE NOTES #3 & #4 OUTSIDE CHECK CHECK VALVE 0 DRAIN `J `RELIEF VALVE LJ MIN.3" DRAIN PIPE CONNECTION ELEVATION VIEW NOT TO SCALE CHECK VALVE SHUT-OFF VALVE #1— 3 (TEST CO/CK#1 NNNN­DRAIN za �N oa PLAN VIEW NW NOT TO SCALE LOWEST POINT OR RELIEF VALVE OUTLET SHUT-OFF VALVE #1 RESILIENT: GATE VALVE WITH HANDWHEEL OPERATOR SEE NOTES #3 & #4 COPPER OR CPVC MIN. OF 5' ON EACH END OF ASSEMBLY. SEE NOTE #7 NOTE #8 FLOW SHUT-OFF VALVE #2 NOTES: 1. INDOOR INSTALLATION SHALL ONLY BE PERMITTED IN CASES WHERE ADEQUATE SPACE FOR THE BACKFLOW PREVENTION ASSEMBLY IS NOT AVAILABLE OUTSIDE.OWNER WILL REVIEW ON A CASE BY CASE BASIS. 2. BACK FLOW PRESSURE ASSEMBLIES (BFPA). 3. APPROVED BFP INCLUDES SHUT-OFF VALVE. 4. TEST COCK #1 SHALL BE UPSTREAM OF SHUT-OFF VALVE #1 AND IS PART OF THE APPROVED ASSEMBLY. 5. ASSEMBLIES SHALL BE INSTALLED UPRIGHTAND IN THE HORIZONTAL POSITION UNLESS OTHERWISE APPROVED. 6. PIPE MATERIALAND FITTINGS SHALL BE A9 SPECIFIED STANDARDS & SPECIFICATIONS. 7. SUPPORT FOR ASSEMBLY SHALL BE DESIGNED BY GENERAL CONTRACTOR. IT IS RECOMMENDED B"-10" RP BE SUPPORTED AT CENTER. THE SUPPORT SHALL NOT BLOCK RELIEF VALVE OR DRAIN PORT. B. AN AIR GAP DRAIN IS RECOMMENDED TO REDUCE SPLASHING OF MINOR DISCHARGES FROM THE RELIEF VALVE DRAIN PORT. 9. ALL LOCATIONS FOR BFPA'S REQUIRE OWNERAPPROVAL. 10. NO TAPS,BRANCHES,FH'S OR OTHER ACCESSORIES AR PERMITTED ON THE PIPING BETWEEN THE BFPA&METER. ABACK FLOW PREVENTER DETAIL I � NOT TO SCALE RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City d Camel ((�� �vm�tlBnrkleAaL x DATE: 07/22/19 CW LINE TO SERVE BUILDING SEE PLAN REDUCED PRESSURE O BACKFLOW PREVENTER (BFP-1) PIPE DRAIN TO OVER FLOOR DRAIN AS REQUIRED QRG. MAIN SERVICE SHUT-OFF SEE PLAN -PLUMBING CONTRACTOR TO VERIFY WITH CITY METER SIZE PLAN INCOMING WATER SERVICE PIPING DIAGRAM G ",,.. .. 0."C STEEL PIPE SHIELD INSULATION L IPE UNISTRUT CHANNEL WATER PIPING HANGER DETAIL WATER HEATERS INSTALLATION DETAIL � NOT TO SCALE SHUT OFF VALVE SLEEVE 2" TRAP PRIMER SUPPLY DOMESTIC WATER LINE (SEE PLAN FOR SIZE) TRAP PRIMER VALVE DISTRIBUTION UNIT (AS REQUIRED) El E! �1/2"TRAP PRIMERLINE DRAIN FLOOR DRAIN �ELASTOMERIC TM MATERIAL ALTERNATE FLOOR DRAIN WITH NO TRAP PRIMER. USE TRAP GUARD PROSET (W W W.TRAPGUARD.COM) ,]TRAP PRIMER &TRAP GUARD DRAIN INSERT DETAIL J I ",,.. .. e.-., C PIPE CIA. "D" MAXIMUM "A" 1"TO 5" 6" 67015" 8" 18" TO 21" 10" 24" TO 30" 12" 33" TO 42" 15" 48" & LARGER 18" APPROVED BACKFILL COMPACTED IN MAXIMUM 6" THICK LAYERS EXCEPTAS OTHERWISE SPECIFIED BOTTOM QUADRANT OF PIPE SHALL BE BEDDED FOR FULL LENGTH OF BARREL (EXCEPT PRESSURE PIPE) PIPE TRENCH DETAIL )I_ MA.TRENCH WIDTH ATOP _I I` T PIPE 'll NOTE: 1. REFER TO MECHANICAL DRAWINGS FOR ROUTING OF GAS FIRED WATER HEATERS INTAKE & EXHAUST FLUES. 2. VALVE BOTH SYSTEMS TOGETHER SUCH THAT EACH SYSTEM CAN BACK UP THE OTHER IN EMERGENCIES. 3. USE AO SMITH CYCLONE OR EQUIVALENT HEATERS WITH MANIFOLD SYSTEM AS PER MANUFACTURER'S REQUIREMENTS. 4. CONTRACTOR SHALL PROVIDE NON -PLASTIC DRAIN PAN FOR GAS FUELED WATER HEATERS. DRAIN PAN SHALL CONNECT TO CLOSEST FLOOR DRAIN PROVIDED. 5. REFER TO PLUMBING SHEET NO.P-401 FORWATER HEATER SPECIFICATIONS. 6. CONTRACTOR SHALL ENSURE TEMPARATURE GUAGES IS NINSTALLEO AT ALL DISCHARGE WATER LINE FOR EACH WATER HEATER. TAT CP-2) �P-1) BAS E4 BASE4 2901 CLINT MOORE ROAD, #114 BOCA RATON, FLORIDA 33496 888.901.8008 www.base-4.00m RICARDO J. MUNIZ-GUILLET, AIA 5453 NW 106TH DR CORAL SPRINGS, FL 33076 MEP ENGINEER GARRY VERMAAS PhD, PE 2183 S BERRYS CHAPEL ROAD FRANKLIN, TN 37069 Seal: H W VF QP��'\si EHh� e' %p m N 1 12 o ATE 90 . 01I PNP:'2b �gBrONAL E�` DATE: 2D1e.D3.Da GARRY WnMAAS. Phi HE Owner: THE WITNESS GROUP 600 ENTERPRISES DRIVE LEWIS CENTER,OH 513-623-9430 HOME©SUITES BY HILTON CARMEL, INDIANA PROTOTYPE VERSION-V2.22016 REVISION: MAY 2016 ISSUE NO.1 DELTA I ISSUED DATE I DESCRIPTION 1 PO 2019.03.04 ISSUED FOR PERMIT CURRENT ISSUE ISSUED FOR PERMIT CURRENT ISSUE DATE 2019.03.04 D6 WN BY SPB CHECKED BY GWV PROJECT NO, 64-134-1705 SHEET NAME DETAILS-1 DRAWINGS NO. P-101