HomeMy WebLinkAboutP-102 - DETAILS-2I
TY�FI.
PROVIDE ROUND SECURED NICKEL BRONZE ADJUSTABLE
WASHER
TOP WITH "CO" CAST IN COVER. PROVIDE CLEANOUT TOP
CLEANOUT
WITH VARIATIONS SUITABLE FOR FLOOR COVERING (CARPET
FINISHED GRADE
02 WASHERS SANITARY OUTLET
( ) WIDTH=16"
MARKER, RECESSED FOR TILE, SCORIATED FOR UNFINISHED
FLOORS). PROVIDE BRONZE PLUG IN CAST IRON BODY.
RAIN TROUGH
FLOOR SLAB ON GRADE
-CONCRETE PAD
—_ FLOOR LEVEL
SAME SIZE AS SEWER
UP TO 6" MAXIMUM
r
16"X16"X6"
CONCRETE PAD
AS REQUIRED FOR DEPTH OFONG SWEEP ELBOW AT
LINT FILTER
OR TURN OF RUN.
DETAIL
SEWER HUB AND SPIGOT CASTNO
IRON PIPE BELOW FLOOR.
COMBINATION WYE AND
SANITARY OR STORM EIGHTH BEND IN RUN.
1/8 BEND IF C.O.00CURS
SEWER LINE ENTER TOP OF PIPE.
AT END OF LINE
DRAIN
-goo
TROUGH
DIRECTION
OF FLOW
n
REMOVABLE LINT FILTER
s
(LOCATION -TYPICAL)
LOCATE AT BUILDING EXIT, AT ENDS OF RUNS, AT TURNS
a LENGTH=88"
OF PIPE GREATER THAN 45 DE EINTERVALS
o
OTTOM DRAIN
ON STRAIGHT RUNS ,AND WHERE SHOWNN ON PLANS.
PROVIDE BACKFILL PER AR N
18" CLECFICATIU
LOCATE CLEANOUTS WHERE THERE IS 18" CLEAR AROUND. .
E THERE
'III —III —III —III —III —III —III —III
—III —III —III —III —III —III'
CONSULT LOCAL CODES FOR OTHER FCO REIUIREMENTS.
FLOOR CLEANOUT DETAIL
CLEANOUT TO GRADE
WASHER AND DRAIN TROUGH DETAIL
7
o
V
(�
9
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
CONT. TO OTHER FLOORS CONT. TO OTHER FLOORS
PTAC PTAC T4" PTAC
CLEAN -OUT CLEAN -OUT CLEAN -OUT
-FINISHED
3/4" TIPP 3/4"
WALL
SLOPE SLOPE
FINISHED FINISHED FINISHED
SLOPE
FLOOR FLOOR FLOOR
LEAD FLASHING IT OUT AND
TURNED UNDER FLANGE
REMOVABLE ROOF DOME
3K PTAC 3/4 PTAC
RAVEL STOP AS REQUIRED
PTAC
3/4" 3OR
PLATES
3/4"
���
LCLEAN-OUT
SLOPE SLOPE
SLOPE
EEE ZEE
3/4"
3/4"
CONNECT TO THE CONNECT TO THE
ADJUSTABLE COLLAR
NEAREST STORM LINE. NEAREST STORM LINE.
NOTES:
1. CONDENSATE PIPING FOR ALL UNITS ABOVE FIRST FLOOR ARE INSIDE WALL.
_ +
2. CONDENSATE DRAIN PIPING TO BE AS SPECIFIED PER PLUMBING PLANS, IF NOT SPECIFIED, TO BE
ROOF DRAIN
OVERFLOW ROOF DRAIN
T
TYPE "L" COPPER OR PVC WHERE ALLOWED BY CODE WITH 1/2" ARMAFLEX INSULATION.
3. PROVIDE APPROVED WATER LEVEL DETECTOR OR FLOAT SWITCH TO AUTOMATICALLY SHUT DOWN
NOTE:
THE AIR CONDITIONING UNIT, AS A SECONDARY DRAIN SYSTEM TO COMPLY WITH MECHANICAL
1. CONTRACTOR SHALL VERIFY THAT INSTALLATION IS IN COMPLIANCE
STATE BUILDING CODE.
WITH ROOFING MANUFACTURERS RECOMMENDATIONS.
END OF THE LINE TWO-WAY COMBINATION WYE AND EIGHT BEND WALL CLEANOUT
4. ALLOW SUFFICIENT SPACE BELOW DRAIN PAN FOR TRAP.
2. REFER TO ARCHITECTURAL
AND STRUCTURAL DRAWINGS FOR ROOF
5. PITCH DRAIN FOR PROPER RUNOFF.
CONSTRUCTION.
6. MANUALLY PRIME FILL TRAP BEFORE START-UP TO FORM INITIAL DRAIN SEAL.
3. REFER TO SHEET
P-401 FOR RD/ORD SPECIFICATION.
7. SUPPORT LENGTHY DRAIN LINES TO PREVENT SAG AND CONDENSATE OVERFLOW.
8. CONDENSATE DRAIN PIPING SHALL MAINTAIN MINIMUM HORIZONTAL SLOPE IN THE DIRECTION OF
DISCHARGE NOT LESS THAN 118 UNIT VERTICAL IN 12 UNITS HORIZONTAL.
FLOOR & WALL CLEANOUTS
PTAC CONDENSATE DETAIL
ROOF DRAIN DETAIL
013
L
GA E�11
NOT TO SCALE
NOT TO SCALE
NOTE:
METALSTUD
ETAL STUD
1. BASE MATERIAL: POLY CARBONATE
STRAP SECURED
CPVC
6" AND 12"
2. SIZE: THE DECK BASE IS 6" SQUARE, THE STACKING PLATFORM IS 2" HIGH,
TO STUD
R2432 GRADE RINGS
THE TOP OF THE "U" CRADLE IS 3" HIGH, AND THE MAXIMUM INSIDE WIDTH
(TYPICAL)
SECURE BRASS ELBOW TO
24" CAST IRON FRAMES AND COVERS S REQUIRED
, EXTRA COST
OF THE CRADLE IS 1.95".
6'-11'A.F. F.
I�
WOOD BLOCKING WITH SCREW
WITH GASKET (GASTIGHT) STANDARD
3. MAX PIPE SIZE 1-1/2" INSIDE DIAMETER AND I-9(10"OUTSIDE DIAMETER.
INFOW TEE 6
4. MAX PIPE CLEARANCE: PIPES SUPPORTED ON PIPE STAND WILL HAVE A
SHOWER HEAD
STANDPIPE OUTFLOW TEE
+ + 5. CLEARANCE OF 2"OVER THE ROOF. MAX LOAD WEIGHT: MAXIMUM LOAD
&STANDPIPE
WEIGHT MAY NOT EXCEED PER PIPE STAND.
6. SPACING: MANUFACTURERS RECOMMENDED RECOMMENDED SPACING IS NOT TO
F. F.
INVERT 4a "
INVERT
EXCEED 10 FEET CENTERS DEPENDING UPON THE LOAD.
7. USE 4-3/8" KWIK BOLT WITH 2" EMBEDMENT.
—�6'-6"A.
NLET. - UTLET
18'0"
BLOCKING
(FIRE TREATED
COPPER
C
WOOD)
TRANSITION FROM REX A TO
D " PIPE AND FITTINGS E
WOODBLOCKING
(FIRE TREATED
COPPER
STANDARDS
+ +
WOOD)
SHOWER MIXING
�2'.8"AF.F.
VALVE
SIDE SECTION VIEW
COPPER
810
COPPER STRAPS
NOTES:
SECURED TO WOOD
SECURE BRASS ELBOW TO
BLOCKING
WOOD BLOCKING WITH SCREW
1. REFER TO PLUMBING DRAWINGS FOR PIPE SIZES.
(TYPICAL)
2. GREASE INTERCEPTOR DETAIL NEEDS TO BE VERFIED ON FIELD.
3. GREASE INTERCEPTOR LOCATION OUTSIDE THE BUILDING REFER TO FIRST
FLOOR PLAN FOR GREASE INTERCEPTOR LOCATION.
kk
1'-8" A.F.F.
TUB FILLER
4. REFER TO SCHEDULE FOR GREASE INTERCEPTOR SCHEDULE SIZES.
WOOD
BLOCKING
(FIRE TREATED
WOOD)
GREASE INTERCEPTOR DETAIL
ROOF GAS PIPESUPPORT DETAIL
TYPICAL TUB & SHOWER
DETAIL
G
13
4
5
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
a
RELEASED FOR CONSTRUCTION
egL.
A�Ip
SadfeCl to CBl11PIdnCC WIIII all r49ad11Bn5
of Stale and Local Codes
City d Camel
hnl0 Y
DATE: 07/22/19
BAS E4
BASE4
2901 CLINT MOORE ROAD, #114
BOCA RATON, FLORIDA 33496
+888.901.8008 www.base-4.corn
RICARDO J. MUNIZ-GUILLET, AIA
5453 NW 106TH DR
CORAL SPRINGS, FL 33076
MEP ENGINEER
GARRY VERMAAS PhD, PE
2183 S BERRYS CHAPEL ROAD
FRANKLIN, TN 37069
Seal:
Owner
' N
1 12 .
9 ATE
OF _vv
\Fo -•.D I A.- ,rani
DATE : 2019.05.21
GARRY VERMAAS, PhD, PE
2193 S BERRYS CHAPEL ROAD
FRANKLM. TN 37069
THE WITNESS GROUP
600 ENTERPRISES
DRIVE
LEWIS CENTER,OH
513-623-9430
HOMEN'.
SUITES BY HILTON
CARMEL, INDIANA
PROTOTYPE VERSION-V2.22016
REVISION: MAY 2016
ISSUE
NO.
DELTA
ISSUED DATE
DESCRIPTION
1
Po
201903.04
ISSUMFORPORMIT
5
P4
W1905.21
lP.1TVrnwAMMTq
CURRENTISSUE
ISSUED FOR PERMIT
CURRENT ISSUE DATE
2019.03.04
DRAWN BY
SPB
CHECKED BY
GWV
PROJECT NO.
134-134-1705
SHEET NAME
DETAILS-2
DRAWINGS NO.
P-102