Loading...
HomeMy WebLinkAboutP-201 - 1ST FLOOR WATER _ GAS SUPPLY PLAN- - - - - PIPE DOWN 1.----� IME1TINGI I STAI R42 181 IW-o I I gilkLo PIPES IN CEIU 0 I I ICOR PIPE DOWN 11 PIPES IN CEIL NG 100' D I - GA NE j1'1 1 TO IllOFFICE 6 RS HW-15 D fi'FIRE LINE 1d9 OME1 ED nE LINE 8'COMBINED FIRE WATER IPE U B UNE CONNECT FR MI I I E THE MAIN.(VERIFY OCATION (2 NOEF ATSITE.SEE CIVIL LAN FOR CONTINUATION) Al �2- IRRIGATION WATER REG TR7 SERVICE LINE 2 TR"-G'AS CONNEiTON FROM GAS F SSUPP.LY-MAIN-(VERIFY METER LOCATION AT SITE.ISEE CIVIL IR III A PLAN FOR CONTINUATION) ETER IRRI�I1 ATION ATER SUPRYLIN OUT FROMMMMMM BUILD NG I I I I I I I I I I I I I I I 1 2 3 3.1 4 3/4 FROM RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and local Codes )UMPSTER AREA WATER SUPPLY PLAN City Bf Camel 1/81, = 1'-0" AM�G,;Ubwl - iea �i` Juf OFF( E 147 PIP S 0 7 EMEREGENCV FIR SHUTOFF PIT VALVE WITH KEY sm a) 9 10 11 12 13 14 15 i6 17 PE BELOW GRADE GAS VALVE, IGNITION I (SWITCH AND REGULATdI MUST BE LOCATED BEH NO A LOCKED DOOR PANEL -PIPE DOWN VESTIBULE 139 -PIPES IN CEILING - -371 JUICE I -1ACFfN�O - T - - PREPI ORAGE AR A I - - - - GR PBX PIPA DOWN _ I I D - T!S V-02 I I I iRV I�SE ERY ,�I1,i�'I ChY.poll n 1 1 wpm rCOFFEEir IWBREWER OLVEST -1 iI HW I �I.[ti PE IN I nai p J d�wuler_i;mF.w.. li�wwwwwlwwwww�7I�l�w_wwwwww�wwwww�I�I�iiI��I��nwwwwww�w� o oJ L I - II� 31FLOOR V 1LOBBYIll 18 dl _awooloo- ® I�I�I •' 11MII will .. �I� Lrfl = ;F" _PIPE IN CEIqING - PIPE DOWN �-oa-GWI --- iii R I IINDOOR POOL I I � I Ir�HWW I14OF PIPES INPIPES IN HWR 140' G. 1 LINEN STORAGE 171 PIPE DOWI 1" CW PIPE FOR POOL FILLING PIPES IN - CEILING 18 100 19 20 21 I I I I AEG K -REG L -PIPE BELOW GRADE HB IPE OWN LAV-02 UNISEX _ _ G IT I 159 WCL-03 F I I PIPE DOWN POOL PIPE HBfO9 STO�GE/�OOL DOWN QUIP (((( HB- - Icy`.' EW H TIER PO160 EI H 161 HW-OB CVV-08I P DOWN 3/4' QW LINE TO DOWN DUMPSTER PIPE DOWN iw�YAR HYDRANT PIPE DOWN E p IPF4 1III z� I' GUEST Hw-o9 Hw-1 II LAUNDRY ENGINEERING PIPES IN CEIL 157 ROOM IL 158 COOLER FITNESS I ROOM- r - - --- ELECT I RO IPE IN CEILING I 1. 1 I I I I I I I I I I 5 6 7 91011 12 13 14 15 i6 T DATE: 07/22/19 1ST FLOOR WATER & GAS SUPPLY PLAN 1/811 = 1'-011 WATER SUPPLY KEY NOTES Tag Text 4) CONTRACTOR SHALL PROVIDE AN APPROVED WATER -TEMPERATURE LIMITING DEVICE TO PROVIDE TEPID WATER FOR EYEWASH STATION. DEVICE MUST MEET MINIMUM FLOW RATES AND DURATION REQUIREMENTS OFF TOP OF LINE PER MANUFACTURER INSTRUCTIONS. n i� A JI �L1�1 !iIIIP��Iaw I I -' • III �I��h11� l 111111111 iw 17 18 100 19 20 21 GENERAL NOTES 1. WATER HAMMER ARRESTORS SHALL BE PROVIDED AT ALL QUICK -CLOSING VALVES SUCH AS FLUSH VALVE,WASHING MACHINES, ICE MAKERS, REFRIGERATOR, DISHWASHERS, AND DRINKING FOUNTAINS. IT SHALL CONFORM TO ASSE1010. 2. REFER TO THE UNIT PLANS FOR THE PIPING IN EACH UNIT. 3. REFER TO THE ARCHITECTURAL DRAWING FOR PANTRY, FOOD PREP EQUIPMENT CALLOUTS. 4. CONTRACTOR TO COORDINATE LOCATION OF PLUMBING RISER IN SHAFT WITH OTHER TRADES. 5. REFER TO PLUMBING ISOMETRIC DRAWINGS FOR PIPE SIZES NOT LABELED IN PLANS. 6. AS PER FLOW TEST REPORT STATIC PRESSURE IS 77 PSI BOOSTER PUMP IS REQUIRED, IF THESE PRESSURE CHANGES PLEASE CONTACT THE "EOR". 7. PROVIDE INSULATION FORALL ICE MACHINE DRAIN TRAPS. 8. ALL SHOWER AND SHOWER/TUBS SHALL HAVE PRESSURE BALANCING VALVES. 9. BFP-2 TO BE PROVIDED FOR ALL ICE MACHINES NEAR COLD WATER SUPPLY. 10. VIBRATION ISOLATOR TO BE GIVEN FOR BOOSTER PUMP B RECIRCULATION PUMPS. 11. CONTRACTOR TO SELECT ALLVALVES AND SUBMIT SPECS TO BASE4 FOR REVIEW. 12. POOL CONTRACTOR TO SUBMIT POOL HEATER SPEC. TO BASE4 FOR REVIEW 8 GAS HEATING LOADS. 13. POOL CONTRACTOR TO CONNECT POOL HEATING PIPES TO DHU BEFORE POOL HEATER". 14. GC TO TEST THE BACKFLOW PREVENTER AT MAIN WATER LINE BEFORE PUT INTO SERVICE AND SHALL SUBMIT THE TEST REPORTS TO THE AHJ FOR APPROVAL. 15. CONTRACTOR TO USE COPPER PIPE FOR BELOW GRADE GAS PIPING. SEE MANUFACTURER'S SPECIFICATIONS FOR DETAILS. 16. CONTRACTOR SHALL INSTALL SLEEVE FOR GAS PIPES WHEREVER THE PIPE PASS UNDER SLAB AND PENETRATING THE BUILDING FOUNDATION AND PIPES ROUTED BELOW GRADE SHALL BE COPPER. 17. CONTRACTOR SHALL ENSURE TO PROVIDE THE TEMPERATURE MIXING VALVE FOR PUBLIC HAND - WASHING FACILITIES. 18. CONTRACTOR SHALL ENSURE TO PROVIDE THE BACKFLOW PREVENTER CONFORMING TO ASSE 1022 OR BY AN AIR GAP TO PREVENT THE BACKFLOW FOR THE WATER SUPPLY CONNECTION TO COFFEE MACHINES AND NONCARBONATED BEVERAGE DISPENSERS. 19. CONTRACTOR TO ENSURE THAT WET TRAP SEAL MEETS THE ASSE 1018 STANDARD. ASA PREVENTION METHOD, BACK-SIPHONAGE SHALL BE INCORPORATED AS PART OF THE DEVICE. 20. PROVIDE 1" ARMAFLEX INSULATION TO HOT WATER SUPPLY. 21. ALL WATER,SOIL OR WASTE PIPE SHALL BE INSTALLED OUTSIDE THE BUILDING SHALL BE PROTECTED FROM FREEZING CONTRACT SHALL ENSURE THAT THE PIPE IS PROTECTED WITH THE INSULATION MATERIAL. 22. CONTRACTOR TO ENSURE THE GAS PIPE LINE AT OUTDOOR GRILLS REQUIRED CORROSION PROTECTION AND THE MINIMUM BURIAL DEPTH OF GAS PIPE SHALL BE 12" BELOW FINISH GRADE. 23. ALL SHOWER AND SHOWER/TUBS SHALL HAVE PRESSURE BALANCING VALVES. 24. CONTRACTOR SHALL ENSURE TO PROVIDE THE VALVES TO BE LOCATED IN THE CORRIDORS WHERE ACT CEILINGS ARE SHOWN. 25. CONTRACTOR SHALL PROVIDE OSHA -COMPLIANT EYEWASH STATION IN EQUIPMENT ROOM, POOL EQUIPMENT ROOM, LAUNDRY ROOM, MECHANICAL ROOM AND FOOD PREP AS PER STD N 3 .1- 0 2. ON RA T R S U ENSU E HE EM R EN V SHU O F S IT H CLEA LV MA KE A D ACCESSIBLE TO GUESTS. ♦�1 BASE, BASE4 2901 CLINT MOORE ROAD, #114 BOCA RATON, FLORIDA 33496 +888.901.8008 www.base-4.com RICARDO J. MUNIZ-GUILLET, All 5453 NW 106TH DR CORAL SPRINGS, FL 33076 MEP ENGINEER GARRY VERMAAS PhD, PE 2183 S BERRYS CHAPEL ROAD FRANKLIN, TN 37069 Seal: y VJ . VFq QP: p \ ST Eq"a2, a` Eo•-. (? IN N 1 12 9 ATE V FSS/OVAL i� DATE :2019.05.01 GARRY VERMAAS, PhD, PE 2183 S BERRYS CHAPEL ROAD FRANKLM,TN3]069 THE WITNESS GROUP 600 ENTERPRISES DRIVE LEWIS CENTER,OH 513-623-9430 HOME©SUITES BY HILTBN CARMEL, INDIANA PROTOTYPE VERSION-V2.2 2016 REVISION: MAY 2016 ISSUE NO. DELTA ISSUED DATE DESCRIPTION 1 PO 2019.03.0a SSUEDFORPERMIT 2 P1 20180a.08 10p%FRPNCHISE COMMENTS 3 P2 201804.16 POSTDESION CLARIFICATION 4 P3 1 201805.01 CITY COMMENTS CURRENT ISSUE ISSUED FOR PERMIT CURRENT ISSUE DATE 2019.03.04 DRAWN BY SPB CHECKED BY GWV PROJECTNO. B4-134-1705 SHEET NAME 1 ST FLOOR WATER & GAS SUPPLY PLAN DRAWINGS NO. P=201