Loading...
HomeMy WebLinkAboutP-202 - 1ST FLOOR SANITARY _ VENT PLAN1 2 3 3.1 4 5 I I I I I I r� 750 GALLON GRE BE INTERCEPTOR ((CIVIL ENGINEERITO COORDINATE K THE LOCATION OF GI) .1' - 8' I I ISAMPLE Is 1 „ 1' -3( BO PIP UP 4" RD CON E& TITO EXTERNAL u q STORM (SCIVIL PLAN FOR( CONTINUA ON) — �j I\liJ�� STAIR#2404 PIPE BEL FL OR u m u F I I I PIPE PO `----' ETIN( I'r----' ano---- - -01 a ---- - 11 L I ORR. IDV CO1=1 -4' PIPES EL - - S2 a ALES( MANAGERS 1 OFFIC OFFICE F EL 147 146 5-22 a 22 PIPE IN CEILING C ECH. FD-02 tYI ----FsK — 3 FD-02 (A�.1 ��/�� GWH-01 A 7 q WH-02 13 -302 I I I I I I I I I I I I I I I I I I 1 2 3 3.1 4 5 RELEASED FOR Subject to compliance with all regulations of State and meal Codes )UMPSTER AREA SANITARY PLAN City Bf Carved� �\n/\�'� 1/8" = 1'-01 AVTG,UB*141WML T DATE: 07/22/19 T T 10 11 12 13 14 15 16 17 3' I RD CI I QQQI L� (SEE IL ALTER STORM CIVIL PLA STORM RIIL FORT UA CONTINUATION) 6'RD CONNIECT TO I EXTERNAL S'TORM(SElm C CIVIL PLAN FOR CONTINUATION) 3 ORD — — — — LEASC-TO-- PIPE BELOW FLOOR DEEG T WITH LAMBS VESTIBULE( PBX DS-1 - TbNGUE 139 PIPE DOWN 172 0t -F� � -�- - =P/STORA E p- `if AREA DR PIPE DOWN 1 RY n mii n " MI BREAKFAST���� BELOWPIPE FLOORLnJ■I� _ �� I • •III �I ,RENCH OMENS PE DOWN �i'a I a 1 ( ❑1 1 I' 1 l ,l,�,I�I�IIIIII ^ �I��II S71=CEILING Phi III CE111iY I YI�I i_ J I - •FLOOR S IN C_EILIN -I I- S2 PIPES IN CEILING 17 -21 19 16 PIPES DOWN 5-21 20 a 18 a REGISTRATION DESLOBBY ELEV1 LOBBY ---WORK_ — 1 0 '~ STATIONS I 148 MECH.I 135 — EWS 2 HOME2 11 AH -3 MARKET CART STRG. WFFFESTIBULE 137 133— 134 z w H-os-os — — n_r•aln� 15:�;w��l-r�:ramr�Trrm .—` CORR. -. !�I PIPE . FLOOR ®�Q �'J1I . 1 Li 49 II I IN • •' GWH-04 DOWN __7__)—� 3•RD 3' RD CONNECT TO EXTRNAL I STORM (SEE CIVIL PLANI FOR I I 6 7 CQNTINUATION) I I I I I 10 11 12 13 O1ST FLOOR SANITARY & VENT PLAN 1 /811 = 11-01' 10a 10 DECK pRAI PIPE — BELOW FLOOR TRENCH CONNECTTO DRAIN NEAREST PO( PIPE IN CEILING 7PIPE DOWN .SANITARY PIPE BELOW FLOOR ve' / r-o• — p PIPE DOWN PIPES IN CEILING 18 100 19 20 21 I I I I UNISEX � 159 EESANITARVLINE CO F� TOTA J P LIARN FOR CONTINUATII td. INVERT EE CIVIL E ELATION=-0'-0"FRO IFFL— A SLIMED FFL=0'0". -III I+ 11 LAV I POOU �� ��'' �� STOE 0 G J F ' EQt U WCL- 3 161 F Ai BACK _ 3•RD WASH 3"OR PIT " PI E IN CEILING 2'x2'x2' ° 3"IORD RELEASE A (I TODAYUGHT TH LAMBS 11 T NGLE -11 Ppit E O L ME6H DIE AN ® 160 I SA IT JVPIPE BELO OOR " RD CONNECTTJy EXTERNAL b STORM (SEE CIVIL PLAN FO� ION) _ E PIPE INQ LIN -13 DP IN .RE 13 B 2 — / D pI IN CEILING 12a P1PFC h(1WN J--- . U-y- FCUA I� I 1 — � LAUNDRY 157 FITNESS I ROOM— —AHI ENGINEERING' ROOM 158 IGUEST ���� ___J y -�� B —ECECTFiICA STAIR 18 #1 1=111111111mill 11 �7 556 ROOM O163 - 2 TROUGOUG H � i7"x1'4'x1' DRVE 3 WASHERS — — — 3"DS A 1 DRYERS — A 170 11 3• D 0NNE -302 TO NEAREST STORM LINE I I I I I I I I I I I I I I I I 14 15 16 17 18 100 19 20 21 SANITARY & VENT KEYNOTES (FIRST FLOOR) Tag Text 1Q ALL PTACS B CEILING MOUNTED AHU/DS UNITS CONDENSATE LINE SHALL RELEASE TO ABOVE GRADE. CONTRACTOR TO COORDINATE WITH THE CONNECTIONS & ENSURE SLOPE OF 1/8' PER FT IS MAINTAINED. Q2 ALL FLOOR MOUNTED AHU SHALL INDIRECTLY CONNECT TO NEAREST FLOOR DRAIN & NEED TO CONNECT TO NEAREST STORM LINE, CONTRACTOR TO COORDINATE WITH THE CONNECTIONS & ENSURE SLOPE OF 1/8'PER FT IS MAINTAINED. 3 WHERE FLOOR DRAIN ARE REQUIRED PROVIDE TRAP GUARD BY PROSET SYSTEM TO ELIMINATE METHANE GAS FROM ENTERING BATHROOM AND GUESTROOMS ® SUMP PIT OF 24" DIAMETER & 24" DEPTH.REFER TO STRUCTURAL DRAWINGS FOR SUMP PIT DESIGN. GENERALNOTES 1. REFER TO THE UNIT PLANS FOR THE PIPE ROUTING IN EACH UNIT. 2. REFER TO THE ARCHITECTURAL DRAWING FOR PANTRY, FOOD PREP EQUIPMENT CALLOUTS. 3. CONTRACTOR TO COORDINATE LOCATION OF PLUMBING RISER IN SHAFT WITH OTHER TRADES. 4. REFER TO PLUMBING ISOMETRIC DRAWINGS FOR PIPE SIZES NOT LABELED IN PLANS. 5. ALL STORM TO BE INSULATED VERTICALLY AND HORIZONTALLY. 6. ALL SANITARY TO BE INSULATED ON ALL HORIZONTAL RUNS IN SLEEPING, PUBLIC AREAS, AND BACK -OFFICE AREAS. 7. CONTRACTOR TO ENSURE THAT ALL PIPE FITTINGS AND CLEANOUTS SHALL BE RATED FOR THE MAXIMUM SYSTEM OPERATING PRESSURE AND TEMPERATURE FOR ALL UNDERGROUND SANITARY PIPES. 8. GC TO PROVIDE CLEANOUTS AT INTERVALS OF NOT MORE THAN 10OFTAND AT CHANGE IN HORIZONTAL DIRECTION GREATER THAN 45DEG. CLEANOUT'S SHALL BE THE SAME SIZE AS THE PIPE SERVING THE CLEANOUT. 9. CONTRACTOR SHALL ENSURE TO PROVIDE CLEAN OUTAT EVERY BASE OF STACK AS PER LATEST PLUMBING CODE. 10. CONTRACTOR TO ENSURE AIR GAP BETWEEN THE FLOOR SINK AND THE DRAIN LINE FROM 3-COMPARTMENT SINK. 11. ALL FLOOR MOUNTED AHU CONDENSATE SHALL CONNECT TO NEAREST FLOOR DRAIN. 12. CONTRACTOR TO INSTALLALL THE SANITARY AND STORM PIPES OUTSIDE THE BUILDING BASED ON FROST DEPTH AND AS PER SITE ELEVATIONS. 13. CONTRACTOR SHALL PROVIDE AIR GAP FOR ALL DISHWASHERS AT KITCHENETTE SINKS AND SHALL PROVIDE STAND PIPE CONNECTION FOR ADA DISHWASHER. SEE DETAILS ON SHEET P-103, DETAIL 22(23. 14. ELEVATOR PIT/ SHAFT DIMENSIONS AND CAPACITY/ SPEED ARE BASIS OF DESIGN SPECIFICATION ONLY. GC SHALL CO-ORDINATE WITH OWNER AND SUBMIT ELEVATOR SHOP DRAWINGS / SPECIFICATIONS TO BASE4, AS SOON AS POSSIBLE BUT NO LATER THAN PRIOR TO INITIAL MUNICIPAL FILING COMMENTS RESUBMITTAL. 15. CONTRACTOR SHALL ENSURE AIR GAP BETWEEN THE DRAIN LINE OF ELEVATOR SUMP PUMP AND THE HUB DRAIN. 16. CONTRACTOR SHALL ENSURE WASTE WATER WHERE DISCHARGED INTO THE BUILDING DRAINAGE SYSTEM SHALL BE AT A TEMPERATURE OF NOT GREATER THAN 140°F. 17. CONTRACTOR TO PROVIDE INSULATION FOR WASTE AND WATER PIPING SERVING THE DUMPSTER AREA. 18. ROLL IN SHOWER FLOORS SHOULD BE MUD SET TILE AND ALLOW PROPER DRAINAGE TO THE FLOOR DRAIN. 19. CONTRACTOR TO REFER TO MANUFACTURER SHEET FOR CONDENSATE DRAIN CONNECTION FOR WATER HEATERS. BASE4 BASE4 2901 CLINT MOORE ROAD, #114 BOCA RATON, FLORIDA 33496 +888.901.8008 www.base-4.com RICARDO J. MUNIZ-GUILLET, All 5453 NW 106TH DR CORAL SPRINGS, FL 33076 MEP ENGINEER GARRY VERMAAS PhD, PE 2183 S BERRYS CHAPEL ROAD FRANKLIN, TN 37069 Seal: y W . VF T Eq•: 1 12 3 ATE V Q"� '-�:D I AN4K., � �S19/0NAL E DATE :2019.06.05 GARRY VERMAAS, PhD, PE 2193 S BERRY$ CBAPEL ROAD FRANxLM, TN 37069 THE WITNESS GROUP 600 ENTERPRISES DRIVE LEWIS CENTER,OH 513-623-9430 HOME y SUITES BY HILTBN CARMEL, INDIANA PROTOTYPE VERSION-V2.2 2016 REVISION: MAY 2016 ISSU NO. E DELTA ISSUED DATE DESCRIPTION 1 PO 2019.03.04 ISSUEDFORPERMIT 2 Pt 20180,1M 100"h FRANCHISE COMMENTS 3 P2 2019.04.1: POST DESIGN CLARIFICATION 5 P4 2019.05.2 CITY COMMENTS e PS 20t905.05 CITY COMMENTS CURRENT ISSUE ISSUED FOR PERMIT CURRENT ISSUE DATE 2019.03.04 DRAWN BY SPB CHECKED BY GWV PROJECTNO. B4-134-1705 SHEET NAME 1ST FLOOR SANITARY & VENT PLAN DRAWINGS NO. P=202