Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P-211 - ROOF FLOOR PLUMBING PLAN
1 2 3 3.1 4 T II —— —� I I I I I I I I I I G �\ — —7!0 1/4"H 2' SLOPE114-/17 01'F I SLOPG1/4712"IET SLOPE -01 a Ef�V-1 il4"I 1'0" AREST RO F IN o1/oz LOPE 1/4 /12' 914"0 G GAS LINE FROM 1STFL00 S PE 1P I I I I I -21 a -22 21 SLOPE I I I I 1 ZONE-07 00 SF — — fSL PE 1/4^/12 1/4"/112" 3'OIR 'RD B — — — LOPEE�" I I I I I � 7 I I I I I I I I I I I I I I I I I I I 1 2 3 3.1 4 5 RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City NCamel ((�� �vm�tlenrklDAaL x DATE: 07/22/19 6 7 (e) Tz1o,NESoFq 7 SLOPE 1/4"/12" OVERFLOW SCUPPER Q SLOPE 1/4712" ZOO a Q 3951yL — 6" GUTTER I I I I I I I I Ala ZONE-02 ZONE-03 1 IZONE-04 I 20NE-05 I 2115 SF 2104 IF -07 a 2115 SI� �120 SF -03 a -05 a -06 a -09 a 4 a C -03 04 -05 I -0 -0 I -OB -09 10 S OPEOPE v41/ 2" OPE 11411 OPE 114 � oil 2' rSL E 1/4"/12" SLO E 1/4712'SLOPE 1/4"/12" SLOPE 1/4"/12" SLOPE 1/4712" SLOPE 1/4712"SLOPE 1 '/12' SLOPE Ii "ORD •RD 4"ORD -RD 4' •RD 4-RD "ORD _ _ _ _ _ _ _ _ _ /4 t S OPE 1/4'/12 LOPE 1/4'112' 23 PE 1/4'/1 ' NENIE A ST ROOF J -2 -19 - -17 78 a -14/1 a /15 -20 a 18 a I I I I I I O I L P 14 12� L P 1 12 — — — OVERFLOW SCUPPER 1 6" GUTTERIL 1 WO WO Z 64 SF8 I I I I I I I I I I ROOF FLOOR PLUMBING PLAN 1/811 = 1'-01' 17 18 100 19 20 21 I K ----- T _1 I I I I OPE 1/4'/1 11 ONE- 1 Z 84 F 120 SF 1PE va•nz• OR 1 OPE 1/4"/12 SOP 1141" E 12'� 4"ORD "RD AS LINE F M 1ST S OPE 1 "/1 �J (LAIN I 3/4"B G -12 �1/4"/11'0" -13 SLOPE ERV-2 -12 aqJ ROOF • • R HYDRANT SLO E I I I SLOPE 1/4"/12" B ! VERFLO mot• gDac SCUPPER 'b. ZONE-12 SLOP 110 $ — vav r • DS A.1 A I I I I I I I I I I I I I 17 18 100 19 20 21 ROOF DRAIN SCHEDULE LOCATION: PRIMARY RAINFALL RATE: SLOPE OF DRAIN PIPING: CARMEL, IN 3.5 IN / HIP 1/8" PER FOOT ZONE NO. ROOF AREA SOFT. PRIMARYDRAIN SIZE SECONDARY ROOF DRAIN 1 1315 4" 4" 2 2115 4" 4" 3 2114 4" 4" 4 2115 4" 4" 5 2120 4" 4" 6 2120 4" 4" 7 800 3" 3" 8 564 3" 3" 9 154 3" 3" 10 395 11 395 - 12 395 ROOF DRAINAGE SYSTEMS WERE SIZED PER THE INTERNATIONAL PLUMBING CODE. MAXIMUM ALLOWABLE USING THE ABOVE STATED SOFT. INCLUSIVE OF PARAPET HEIGHTS, PARAMETERS.LISTED AS FOLLOWS ROOF RAIN PIPE SIZE PRIMARY ROOF ISO FT OVERFLOW ROOF AREA ISO FT) 3" 4" 6" 8" 959 2153 6242 13415 959 2153 6242 13415 BAS E4 BASE4 2901 CLINT MOORE ROAD, #114 BOCA RATON, FLORIDA 33496 888.901.8008 www.base-4.00m RICARDO J. MUNIZ-GUILLET, AIA 5453 NW 106TH DR CORAL SPRINGS, FL 33076 MEP ENGINEER GARRY VERMAAS PhD, PE 2183 S BERRYS CHAPEL ROAD FRANKLIN, TN 37069 Seal: Owner: i� 'Ly Morm THE WITNESS GROUP 600 ENTERPRISES DRIVE LEWIS CENTER,OH 513-fi23-9430 HOME©SUITES BY HILTON CARMEL, INDIANA PROTOTYPE VERSION-V2.2 2016 REVISION: MAY 2016 ISSUE NO.1 DELTA I ISSUED DATE I DESCRIPTION 1 PO 2019.03.04 ISSUED FOR PERMIT CURRENTISSUE ISSUED FOR PERMIT CURRENTISSUE DATE 2019.03.04 DRAWN BY SPB CHECKED BY GWV PROJECT NO, B4-134-1705 SHEET NAME ROOF FLOOR PLUMBING PLAN DRAWINGS NO. P=211